Loading...
HomeMy WebLinkAboutNCC230800_Site Plan or Location Map_20230417 RALEIGH WATER CITY OF RALEIGH , NORTH CAROLINA SOUTH STATE' STREET SEWER REPLACEMENT APRIL 2021 PUBLIC IMPROVEMENT QUANTITY TABLE PHASE NUMBER(S) PHASE 1 Number of Lot(s) 0 Lot Number(s) by Phase 0 0 Number of Units 0 Livable Buildings 0 0 Open Space? 0 Number of Open Space Lots 0 0 Public Water (LF) 0 Public Sewer (LF) 3,706 0 Public Street (LF) - Full 0 Public Street (LF) - Partial 0 CONCURRENT REVIEWAPPROVAL Public Sidewalk (LF) p 0 CITY OF RALEIGH-PLANS AUTHORIZED FOR CONSTRUCTION Street Signs (LF) 0 Plans for the proposed use have been reviewed for general compliance with applicable codes. This limited review,and authorization for construction is not to be considered to represent total compliance with all Water Service Stubs 0 TM legal requirements for development and construction. The property owner,design consultants,and contractors are each responsible for Sewer Service Stubs 0 compliance with all applicable City, State and Federal Laws. This specific authorization below is not a permit,nor shall it be construed to permit any violation of City, State or Federal Law. All Construction must be in accordance with all Local,State,and Federal rules and regulations. lei h Electronic Approval: This approval is being issued electronically. This approval is valid only upon the signature of a City of Raleigh Review 9 TRAFFIC CONTROL AND PEDESTRIAN PLAN (TCPED) NOTES: Officer below. The city will a y of the approved plans. Any work authorized b this approval mustst proceed in accordance with the plans kept on file with the City. This electronic approval may not be edited once issued. Any modifications to this approval once issued will • PRIOR TO ANY WORK THAT IMPACTS THE RIGHT-OF-WAY, CLOSING OR DETOURING OF ANY STREET, LANE,OR invalidate this approval. SIDEWALK, THE CONTRACTOR MUST APPLY FOR A PERMIT WITH RIGHT-OF-WAY SERVICES. PLEASE DIRECT ANY City of Raleigh QUESTIONS TO RIGHTOFWAYSERVICES@RALEIGHNC.GOV. Development Approval: City of Raleigh Review Officer • THE CITY OF RALEIGH REQUIRES AN APPROVED RIGHT-OF-WAY PERMIT FOR WORK ON ANY PUBLIC STREET OR SIDEWALK AND NCDOT ROAD WITHIN RALEIGH'S JURISDICTION. Public • A PERMIT REQUEST WITH A TCPED PLAN SHALL BE SUBMITTED TO RIGHT-OF-WAY SERVICES THROUGHTHE CITY BLACK & VEATCH Sewer Collection / Extension System OF RALEIGH PERMIT AND DEVELOPMENT PORTAL. The City of Raleigh consents to the connection and extension of the ® City's public sewer system as shown on this plan.The material and Black & Veatch International Corporation Construction methods used for this project shall conform to the • PRIOR TO THE START OF WORK, THE CLIENT SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE Business License No. F-0794 standards and specifications of the City's Public Utilities Handbook. ENGINEERING INSPECTIONS COORDINATOR TO REVIEW THE SPECIFIC COMPONENTS OF THE APPROVED PLAN, 175 Regency Woods Place, Suite 200 City of Raleigh AND ENSURE ALL PERMITS ARE ISSUED. Cary, North Carolina 27518 Public Utilities Department Permit# S-4704 Authorization to Construct See Digital Signature • ALL TCPED PLANS SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS AND STANDARDS, INCLUDING BUT NOT LIMITED TO: O MANUAL ON UNIFORM TRAFFIC CONTROL (MUTCD); ATTENTION CONTRACTORS O PUBLIC RIGHTS-OF-WAY ACCESSIBILITY GUIDELINES (PROWAG); �"aueeeeep4 O AMERICAN DISABILITY ACT (ADA) REQUIREMENTS; ,.�`���,......,,!%'., The Construction Contractor responsible for the extension of water, N CARo O RALEIGH STREET DESIGN MANUAL (RSDM). .``��•O�F,$$/�jy,y9 '% sewer,and/or reuse,as approved in these plans,is responsible for 9•; contacting the Public Works Department at(919)996-2409,and SEAL the Public Utilities Department at(919)996-4540 at least twenty • ALL PUBLIC SIDEWALKS MUST BE ACCESSIBLE TO PEDESTRIANS WHO ARE VISUALLY IMPAIRED AND/OR PEOPLE = 039150 four hours prior to beginning any of their construction. WITH MOBILITY CONCERNS. EXISTING AND ALTERNATIVE PEDESTRIAN ROUTES DURING CONSTRUCTION SHALL BE REQUIRED TO BE COMPLIANT WITH THE PUBLIC RIGHTS OF WAY ACCESSIBILITY GUIDELINES (PROWAG), THE ADA '•,/�• • . �'•• Failure to notify both City Departments in advance of beginning STANDARDS FOR ACCESSIBLE DESIGN AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). ` construction, ofanyll sulterors wee aeofmonetaryfines,andreqult � reinstallation of airy water or sewer facilities not inspected as a result of this notification failure. • ALL PERMITS MUST BE AVAILABLE AND VISIBLE ON SITE DURING THE OPERATION. 2021.04.20 15:10:26-04'00' Failure to call for Inspection,Install a Downstream Plug,have Permitted Plans on the Johsite,or any other Violation of City of Raleigh Standards will result in a Fine and Possible Exclusion from ONSTRUCTION future work in the City of Raleigh. RE38 �, C❑ _CT ❑C-04 oO ��� MH-20 !Q = ° f' r U C0 0 � 1-3ARTIN L )HER KING BLVD. U w ( R 4364 ❑ [� Q M _-1 I E2 ] C0 z n Ncn) M H-1 8 150' 75' 0' 150' 300' o \ I— ❑ I - Lu ] o HORIZONTAL SCALE 1"-150' 0 0 � I Sht No. SHEET TITLE =O (D ❑ GENERAL SHEETS ❑ a • Q Nor- (� \ E U)LU EDCOVER COVER SHEET ui ] - C-03 Q G-01 SHEET INDEX SHEET LIST AND VICINITY MAP o 9 D \ G-02 GENERAL NOTES _ n _ _ n � _ ,,sseennn�b�,� Q = G-03 GENERAL NOTES SEEDING NOTES/TABLES AND PARCEL TABLE �N 5R01 ��H-17 - Al. o. .... ..•• --- EXISTING ASPHALT GREENWAY L_ i 0 0 . 1 -04 ENERAL N TE LE END AND ABBREVIATI N ?.• �E.SS%o ?9 G G O S G O S MH-16 o ° o U) SANDERS Q - ,4�0 ��•• - ] ❑ w'4 D 13 CIVIL SHEETS SEAL _ 039150 N ` ° ] co D C-01 24" SANITARY SEWER STA 10+00 TO STA 20+00 - • .;L�� �� • D L} .. • L WAYSIDE APARTMENTS M H 15 Z 0 C-02 24" SANITARY SEWER STA 20+00 TO STA 30+00 / �' j \ / MH-1%41 C-03 24" SANITARY SEWER STA 30+00 TO STA 41+00 021.04.20 15:10:27 04'00' ED d M H-1 ° ❑ 0- C-04 24" SANITARY SEWER STA 41+00 TO STA 45+80.78 0 n c _ ❑ J� ❑ C3 ou DETAIL SHEETS V Q oH 21 �,J _ BRAGG ST. SS 0,0 D 01 DETAILS o � ❑ ❑ ❑ BRAGG ST. D-02 DETAILS 7 ❑ r D-03 DETAILS 14 � o o `° �� ❑ 0 LL a z f0 C ❑ MH-1 u -10 MH-g C-02 D-04 DETAILS *' a o E - \ -SS °SS D-05 DETAILS Q � to p �� I - I I I SS J D-06 DETAILS J t ;, r z PROPOSED 24 GRAVITY SS \ 0 m tw 5 ❑ SANITARY SEWER I _ - � � D-07 DETAILS - AERIAL SEWER DETAILS ; m ^ u M H-7 0 D-08 DETAILS - AERIAL SEWER DETAILS H- � ❑ ,� H-12 DETAILS - EROSION CONTROL GROUND STABILIZATION AND \ I n D-09 MATERIALS HANDLING REQUIREMENT m \ U DETAILS - EROSION CONTROL SELF-INSPECTION, \ N M H-6 D-10 RECORDKEEPING AND REPORTING REQUIREMENTS D-11 DETAIL - TRAFFIC CONTROL z i M R C3 � J Q LJ o O= O CONCURRENT REVIEWAPPROVAL O U 1>1 CITY OF RALEIGH-PLANS AUTHORIZED FOR CONSTRUCTION ❑ MCMAKI N ST. L � Plans for the proposed use have been reviewed for general compliance13 — — with applicable codes. This limited review,and authorization for U� construction is not to be considered to represent total compliance with all U z t❑ ❑ ❑ ❑ ] Q,C� r u legal requirements for development and construction. The property U ❑ `` owner,design consultants,and contractors are each responsible for w z W Z \ compliance with all applicable City, State and Federal Laws. This UJ ^ I specific authorization below is not a permit,nor shall it be construed to permit any violation City, State or Federal Law. All Construction must ry 0 I be in accordance withth all Local,State,and Federal rules and regulations. '^ z p The approval of this electronic document is only valid if the document v) U Q O EXISTING ASPHALT GREEN WAY has not been modified and the digital signature below is valid. O LIJ Q W City of Raleigh Z J W Z I I H- Development Approval: J \ J a J co i� 4 a LLI /U C� _ W ! u � ^ - � �: Public � w I H3 = _ J �` Q L -LU Sewer Collection / Extension System W & The City of Raleigh consents to the connection and extension of the p �� z a Q I Q City's public sewer system as shown on this plan.The material and a HI U ❑ Construction methods used for this project shall conform to the O LI J tbith - } U) standards and specifications of the City's Public Utilities Handbook. '^ UJ 0 00 d� a - _ V) �/! 7 Ln Z rn \Qa �� s < j City of Raleigh o � a� y�Dr 1 ` � ` ,+ - O Public Utilities Department Permit# S-4704 111 rn o O w � a3 _ S� 3 � � Cn Authorization to Construct See Digital Signature H-2 Anag �• � i 2 E \ N a CARNAGE MIDDLE SCHOOL > cn v Qa• > e r dith �` M H-1 ATTENTION CONTRACTORS — c4 o,t o Grascock 5. �deor The Construction Contractor responsible for the extension of water, 11 a _ n sn s r Raleigh PROPOSED 24 GRAVITY NN sewer,and/or reuse,as approved in these plans,is responsible for DESIGNED: WPS I o \ contacting the Public Works Department at(919)996-2409,and DETAILED: FLL Q n € L - SANITARY SEWER the Public Utilities Department at(919)996-4540 at least twenty CHECKED: WPS U 9✓ "Carolina ortna m4l,, four hours prior to beginning any of their construction. APPROVED: DLC 'State Universit% `o C-0 DATE: APRIL 2021 LL r Failure to notify both City Departments in advance of beginning ` M H-1 2 0 4 construction,will result in the issuance of monetary fines,and require 0 1/2 1 O ° �� reinstallation of any water or sewer facilities not inspected as a result t f - ea of this notification failure. N IF THIS BAR DOES NOT yonH't \0'�D y " `�c Rork El ] MEASURE 1"THEN DRAWING �r R,sh Sr o ��a�,y Failure to call for Inspection,Install a Downstream Plug,have IS NOT TO FULL SCALE 0 0J�.�t " �a Permitted Plans on the Johsite,or any other Violation of City of PROJECT NO. N Raleigh Standards will result in a Fine and Possible Exclusion from 404750 o PETERS�N ST future work in the City of Raleigh. 0 o AL Y.it:- r41111 s ; 3 LU m -01 000 `� ISSUED FOR CONSTRUCTION SHEET 0 VICINITY MAP