HomeMy WebLinkAbout20140090 Ver 2_Site 6 and Mr. Tabor's Pond_20150427Wanucha, Dave
From: Euliss, Amy
Sent: Monday, Apri) 27, 2015 9:37 AM
To: Wanucha, Dave; Suggs, Phillip H
Cr. Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F
Subject: RE: Mr Tabor complaint
Thanks Dav�. I°m glad you ran into J�r�my and Scott on th� sit�. It alvvays h�lps our DOT proj�ct p�rsonn�l to hav�
op�n communication vvith th� ag�ncy r�pr�s�ntativ�s.
W�°v� corr�ct�d th� issu� with th� hyrdos��d�r. W�°v� also r�mind�d proj�ct p�rsonn�l that hydros��d�rs ar� not to
b� us�d in or adjac�nt to surfac� wat�rs. W� will continu� to b� dilig�nt with �nvironm�ntal complianc� for Mr. Tabor°s
pond, along with all of th� oth�r jurisdictional str�ams and w�tlands on th� proj�ct. If you hav� any furth�r conc�rns,
pl�as� I�t m� know. Also, pl�as� provid� m� with som� dat�s, if you want to do anoth�r joint insp�ction of th� proj�ct,
or any oth�r proj�ct in Division 9.
"i�l'I�l
From: Wanucha, Dave
Sent: Friday, April 24, 2015 3:00 PM
To: Suggs, Phillip H; Euliss, Amy
Cc: Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F
Subject: RE: Mr Tabor complaint
Amy and Phillip,
Thanks for the information. I followed-up with Mr. Tabor this morning at his property. While out there, I inspected the
clean-up of Site 6 where you reported a minor sediment loss and reviewed the areas draining to Mr. Tabor's pond. I also
met with Scott and Jeremy to discuss my observations and further plans of action regarding this area of the project.
Scott said that DOT intends to deploy a second turbidity curtain to help keep siltation in check. Mr. Tabor was aware of
that fact. The erosion measures looked to be in good working order with no excessive sediment in the channel
upstream or downstream of Site 6 or in sediment basins. A segment of a clean water diversion had been oversprayed
with fertilizer/mulch cover material (see photo). Scott said he would have the material swept out of the diversion since
it discharges to an upstream portion Mr. Tabor's pond. Scott was not sure if the material contained fertilizer, but would
sweep it out regardless to avoid a potential dirty discharge.
In general, the area looks to be in good shape and DOT is in compliance with permit conditions. However, in my opinion,
Mr. Tabor remains cautiously optimistic with DOT's efforts at controlling/managing sedimentation.
Dave W
Dave Wanucha
NC DENR Winston Salem Region Office
NC Division of Water Resources
Transportation Permitting Unit
450 W. Hanes Mill Rd, Suite 300
Winston�Salem, NC 27105
Cell (336) 403�5655
Office (336) 776�9703
Dave. Wanucha(r�ncdenr.gov
E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct
to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s.
From: Suggs, Phillip H
Sent: Thursday, April 23, 2015 5:00 PM
To: Euliss, Amy; Wanucha, Dave
Cc: Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F
Subject: RE: Mr Tabor complaint
I r�vi�w�d th� EC d�vic�s in that ar�a today with Scott, th� I�ad proj�ct insp�ctor. Th�y ar� making r�pairs on th� on�
skimm�r basin wh�r� th� s�dim�nt loss occurr�d and w�r� working to r�stabiliz� th� surrounding ar�a as w�ll. Th�y
hav� incr�as�d th�ir �fforts to compact th� skimm�r basin b�rms and spillways to h�lp pr�v�nt failur�s in thos� spots.
My r�comm�ndations for that ar�a w�r� to stabiliz� any �rodibl� ar�as r�maining b�tw��n th� outl�t of th� basins and
th� vv�tland/pond ar�a and to maintain/r�install any t�mporary div�rsions across th� grad� damag�d by construction
traffic. Th�s� normally n��d constant maint�nanc�.
Th�r� ar� a coupl� of spots vvh�r� th� contractor is dir�ct�d to do additional s��ding and mulching and som� additional
silt f�nc� to b� utiliz�d whil� fill mat�rial is b�ing plac�d.
W� took som� turbidity sampl�s today on th� insid� (NCDOT) of th� curtain and on th� outsid� (Mr. Tabor°s) of th�
turbidity curtain.
Th� I�v�ls w�r� 54-55 IVTU's on th� IVCDOT sid� wh�r� th� rock lift is b�ing install�d (it has still�d out and cl�ar�d som�
around this rock at this tim�). Th� I�v�l for Mr. Tabor°s sid� vvas 26 NTU°s and th� pond app�ar�d to b� consist�nt
across it in r�lation th� spot w� sampl�d.
Visually, th� pond do�s not app�ar to hav� b��n adv�rs�ly impact�d by th� vvork ar�as aft�r th� r�c�nt rain �v�nts.
If you n��d any additional info, pl�as� contact m�.
From: Euliss, Amy
Sent: Thursday, April 23, 2015 1:36 PM
To: Wanucha, Dave
Cc: Chapman, Amy; Suggs, Phillip H; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F
Subject: RE: Mr Tabor complaint
.
� �. � � � . . , ���� �. � �. �
. � .� � � . . �
Pl�as� f��l fr�� to contact m� if you want som�on� with DOT pr�s�nt if and wh�n you visit Mr. Tabor's pond. I'm out
tomorrow, but will b� back on Monday.
'��j
From: Wanucha, Dave
Sent: Thursday, April 23, 2015 1:10 PM
To: Euliss, Amy
Subject: Mr Tabor complaint
Hi Amy,
FYI, Amy C asked that I call Mr. Tabor about sediment concerns in his pond. He has contacted his legislature rep. Mr.
Tabor wants some additional measures out there ASAP to protect his pond. Let me know what you and Phil are planning
to do. Thanks.
Dave W
Dave Wanucha
NC DENR Winston Salem Region Office
NC Division of Water Resources
Transportation Permitting Unit
450 W. Hanes Mill Rd, Suite 300
Winston-Salem, NC 27105
Cell (336) 403-5655
Office (336) 776-9703
Dave. Wanucha(a�ncdenr.gov
E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct
to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s.
I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U°ii� �e,i�dcr i� �ul�j��;� �u �C�h°ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h°ih�rl I�artie,�,