Loading...
HomeMy WebLinkAbout20140090 Ver 2_Site 6 and Mr. Tabor's Pond_20150427Wanucha, Dave From: Euliss, Amy Sent: Monday, Apri) 27, 2015 9:37 AM To: Wanucha, Dave; Suggs, Phillip H Cr. Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F Subject: RE: Mr Tabor complaint Thanks Dav�. I°m glad you ran into J�r�my and Scott on th� sit�. It alvvays h�lps our DOT proj�ct p�rsonn�l to hav� op�n communication vvith th� ag�ncy r�pr�s�ntativ�s. W�°v� corr�ct�d th� issu� with th� hyrdos��d�r. W�°v� also r�mind�d proj�ct p�rsonn�l that hydros��d�rs ar� not to b� us�d in or adjac�nt to surfac� wat�rs. W� will continu� to b� dilig�nt with �nvironm�ntal complianc� for Mr. Tabor°s pond, along with all of th� oth�r jurisdictional str�ams and w�tlands on th� proj�ct. If you hav� any furth�r conc�rns, pl�as� I�t m� know. Also, pl�as� provid� m� with som� dat�s, if you want to do anoth�r joint insp�ction of th� proj�ct, or any oth�r proj�ct in Division 9. "i�l'I�l From: Wanucha, Dave Sent: Friday, April 24, 2015 3:00 PM To: Suggs, Phillip H; Euliss, Amy Cc: Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F Subject: RE: Mr Tabor complaint Amy and Phillip, Thanks for the information. I followed-up with Mr. Tabor this morning at his property. While out there, I inspected the clean-up of Site 6 where you reported a minor sediment loss and reviewed the areas draining to Mr. Tabor's pond. I also met with Scott and Jeremy to discuss my observations and further plans of action regarding this area of the project. Scott said that DOT intends to deploy a second turbidity curtain to help keep siltation in check. Mr. Tabor was aware of that fact. The erosion measures looked to be in good working order with no excessive sediment in the channel upstream or downstream of Site 6 or in sediment basins. A segment of a clean water diversion had been oversprayed with fertilizer/mulch cover material (see photo). Scott said he would have the material swept out of the diversion since it discharges to an upstream portion Mr. Tabor's pond. Scott was not sure if the material contained fertilizer, but would sweep it out regardless to avoid a potential dirty discharge. In general, the area looks to be in good shape and DOT is in compliance with permit conditions. However, in my opinion, Mr. Tabor remains cautiously optimistic with DOT's efforts at controlling/managing sedimentation. Dave W Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston�Salem, NC 27105 Cell (336) 403�5655 Office (336) 776�9703 Dave. Wanucha(r�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s. From: Suggs, Phillip H Sent: Thursday, April 23, 2015 5:00 PM To: Euliss, Amy; Wanucha, Dave Cc: Chapman, Amy; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F Subject: RE: Mr Tabor complaint I r�vi�w�d th� EC d�vic�s in that ar�a today with Scott, th� I�ad proj�ct insp�ctor. Th�y ar� making r�pairs on th� on� skimm�r basin wh�r� th� s�dim�nt loss occurr�d and w�r� working to r�stabiliz� th� surrounding ar�a as w�ll. Th�y hav� incr�as�d th�ir �fforts to compact th� skimm�r basin b�rms and spillways to h�lp pr�v�nt failur�s in thos� spots. My r�comm�ndations for that ar�a w�r� to stabiliz� any �rodibl� ar�as r�maining b�tw��n th� outl�t of th� basins and th� vv�tland/pond ar�a and to maintain/r�install any t�mporary div�rsions across th� grad� damag�d by construction traffic. Th�s� normally n��d constant maint�nanc�. Th�r� ar� a coupl� of spots vvh�r� th� contractor is dir�ct�d to do additional s��ding and mulching and som� additional silt f�nc� to b� utiliz�d whil� fill mat�rial is b�ing plac�d. W� took som� turbidity sampl�s today on th� insid� (NCDOT) of th� curtain and on th� outsid� (Mr. Tabor°s) of th� turbidity curtain. Th� I�v�ls w�r� 54-55 IVTU's on th� IVCDOT sid� wh�r� th� rock lift is b�ing install�d (it has still�d out and cl�ar�d som� around this rock at this tim�). Th� I�v�l for Mr. Tabor°s sid� vvas 26 NTU°s and th� pond app�ar�d to b� consist�nt across it in r�lation th� spot w� sampl�d. Visually, th� pond do�s not app�ar to hav� b��n adv�rs�ly impact�d by th� vvork ar�as aft�r th� r�c�nt rain �v�nts. If you n��d any additional info, pl�as� contact m�. From: Euliss, Amy Sent: Thursday, April 23, 2015 1:36 PM To: Wanucha, Dave Cc: Chapman, Amy; Suggs, Phillip H; Wyrick, Scott D; Guy, Jeremy M; Panek, Lindsey F Subject: RE: Mr Tabor complaint . � �. � � � . . , ���� �. � �. � . � .� � � . . � Pl�as� f��l fr�� to contact m� if you want som�on� with DOT pr�s�nt if and wh�n you visit Mr. Tabor's pond. I'm out tomorrow, but will b� back on Monday. '��j From: Wanucha, Dave Sent: Thursday, April 23, 2015 1:10 PM To: Euliss, Amy Subject: Mr Tabor complaint Hi Amy, FYI, Amy C asked that I call Mr. Tabor about sediment concerns in his pond. He has contacted his legislature rep. Mr. Tabor wants some additional measures out there ASAP to protect his pond. Let me know what you and Phil are planning to do. Thanks. Dave W Dave Wanucha NC DENR Winston Salem Region Office NC Division of Water Resources Transportation Permitting Unit 450 W. Hanes Mill Rd, Suite 300 Winston-Salem, NC 27105 Cell (336) 403-5655 Office (336) 776-9703 Dave. Wanucha(a�ncdenr.gov E-mail corr�spond�nc� to and from this addr�ss may b� subj�ct to th� North Carolina Public R�cords Lavv and may b� disclos�d to third parti�s. I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U°ii� �e,i�dcr i� �ul�j��;� �u �C�h°ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h°ih�rl I�artie,�,