HomeMy WebLinkAboutNCC231028_Site Plan or Location Map_20230414 ■.rr. e_ 't-'--" e •.I �1 '�+�.'. ♦• 'j tg, EEO i.p ii,aVi\ ``7-, CONSTRUCTION SCHEDULE WATTLE COrvBTHUCnOry EROSION CONTROL CONSTRUCTION SEQUENCE(REVISE AS NECESSARY TO ADDRESS SITE SPECIFIC ISSUES) SEEDING SCHEDULE i a mat.Of Siee\ �j / �� (!J 1`,•��„�� SODDING 1. Obtain all necessary permits and plan approvals 1. Use a hand tool eeaea aepmusoli from excavating the trenches ground. placed on the Uphill,or flow Side, 1, INSTALL TEMPORARY CONSTRUCTION ENTRANCE. I �� �I� �� 2. Install gravel construction entrances first,and then reinforced silt fence out lets. ^f thatre^^hbbe uaee during instelleb^n.For son,loamy oils dig into trench For hem, 2, INSTALL TEMPORARY EROSION CONTROL MEASURES AT LOCATIONS SHOWN ON PLAN. TEMPORARY SEED MIX SHALL BE USED FOR ALL AREAS EXPOSED GREATER THAN ONE WEEK AND SUBJECT TO FURTHER DISTURBANCE. `` L•\\�' rocky soils dig a 2J Teo trend,. ADEQUACY ON JULY 15. .r 1 4 A. 1� �` .III - wattles antl sift fences. areas z 3. CALL FOR ON-SITE INSPECTION BY TOWN OF SOUTHERN PINES CONSTRUCTION INSPECTOR. AN PERMANENT SEED MIX SHALL BE E SO D FOR 1 • Iikt. 3. Finish Bearing and grubbing any necessary ar on the lots as they are started. . Lay the first straw wattle anuggly in thetrenm.No daylightaheule be seen under Mew... 4. INITIATE GRUBBING AND TOPSOIL STRIPPING OF TIE SITE. DEQUATE COVER HAVE 5O SPRIGS OF BERMUDA OR SERICEA LESPEDEZA PER ONE SQUARE FOOT. / l� 1i \�1// �' - 4. Begin lot grading and excavation activities 5. AS CONSTRUCTION PROGRESSES, REMOVE SILT AND SEDIMENT BUILDUPS AT ALL MEASURES TO MAINTAIN \ Ir I .rr///�/ wattle tlgMy against Me first. NOTaoverlepnfteentla lengths ADEQUATE EROSION CONTROL. TEMPORARY SEEDING RECOMMENDAn05 for SUMMER(TO BE FOLLOWEDBY PERMANENT FALL SEED MIX) �. 1� B. Begin continue With house construction activities' 6. GROUND]CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING AND ON SLOPES GREATER THAN 3:1 \ O� i1 iir,.& ''HIV-' �i :1X..a•..,o.«a. 6. Finish all rough grading and house construction. sake Me rnawwaLuas ateacM1 end and murm^t^n defier. Q- \j COVER SHALL BE PROVIDED ON EXPOSED SLOPES AND PERMANENT GROUND COVER SHALL BE PRONGED SPECIES RATE(LB/aMILL �P�� �1. :",/��f1�11rt1�� 7. Install driveways,walks and patios. 3 FOR ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR APR. 5-AUG.15 GERMAN MILBT40 4 ■ \� i-4Y�I wA 8. Begin foe grading of lolareas DEVELOPMENT. SOIL AMENDMENTS �• It will beanacesserylto mexeahoieonan° 7 CONTINUE WITH FINE GRADING OF SITE. P I F-Q 11\Y I r/ ,,.....ora•�,,.. 9. Final grassing,mulching and stabilizing of lot.In most cases this will involve theAPPLY 2OW LB ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB ACRE 10-10-10 FERTILIZER OR FOLLOW RECOMMENDATIONS �►/ \✓� \ 9 9 9 Me gcnrind of your met.In cloven q the stake through Me stray.Man straw / / .` 'ell ? rit \� w it* s installation of sod on the lot.The sill fence will remain in place until the lots are re ,when installing B INSPECTION RYHEN UTOWN OF SOUTHERNCTION ACTIVITIES APINES CONSTRUCTION INSPECTORE COMPLETE AND ALL R.AREAS STABILIZED, CALL FOR ON-SITE OF SOL•TESTS. i �� sodded or grassing Is stabilized and takes hold. sanis,on Rapes,arwe me stakesperpendicular to me cape 9. IF SITE IS APPROVED,REMOVE TEMPORARY EROSION CONTROL MEASURES AS DIRECTED, SEED,FERTILIZE AND MULCH W 10.Inspection and final acceptance letters MULCH RESULTING DISTURBED AREAS.CLEAR ALL DEBRIS AND SEDIMENT ACCUMULATION.ESTABLISH PERMANENT APPLY 4.000 LB/ACRE GRAM STRAW OR EQUIVALENT COVER. ,/�10� 1 `� 4to heip abut them tightly ke into eWelrreNd the first wattle nha door STABILIZING VEGETATION DURING THE APPROPRIATE TIME OF YEAR ANCHOR STRAW BY ROVING.NETTING OR BY TACKING W TIT ASPHALT EMULSION AT A RAZE OF 40R CAL/ACRE , eiii.��� ,�4. U rocky sages ap of barsmsymnmaea roab 10.UPINJ ESTABLISHED AND STABILIZED VEGETATION, CALL FOR FINAL INSPECTION BY TOWN OF SOUTHERN PINESMAINTENANCE �11 lit\ CINJSTRUCTION INSPECTOR.3 ' • STRAW WA E CRO55 SECT ON DAMACETILIZE IF GROW H IS NOT LLY ADEQUA E RE EED.RE ERTILIZE ND MULCH IMMEDIA ELY FO 0W NC EROSION OR O ER WOOD STAKE `- - ��' C-Ir ( ����� �•'GIU:J� A"SELF NSPECT ON REPORT FOR LAND DSTURB NG ACTVtt AS REOU RED BT NCGS 113A 54.1"IS aw'W'q�Ej, LL(TO BE FOLLOWED BY PERMANENT FALL SEED MIX) y- ' +�4 ., 1 .;,,,,,� ,, !NI AAVAtABtE FOR USE T CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. ENCH ITTP.) TEMPORARY SEEDING RECOMMENDATION Lar FAN PLTERNATNE S TO MANE NOTAT ONS ON THE COPT OF THE APPROVED ERGS ON AND■. EP Rr ♦ ,1+��•� _ 41. m.. :o. ,wo ,r.:oo: Fe „owEa SED MENTAT ON CONTROL PLAN THAT S KEPT ON THE PROJECT STE RULE 15A NCAC 04B 0131 MM I' p� AUG.55-DEG 15 WINTER RYE(GRAIN). _ 1 (+�� -I STATES THAT W DON A COTON SHALL BE OVED ERSHED BT VITAL E AND DA ON OL MEASURE ORI ���•.� •�`' u:oam PRACT CE SHOWN ON A COPT OF THE APPROVED ERGS ON PND SED MENTAT ON CONTROL PUN OR BT 1. SEED BED PREPARATIONSOIL AMENDMENTS I. \t �\� `�'_ .� _ APPEARANCE OF G000 SOD Ep COMPLETING,DATING BeD SIGNING Be INSPECTION REPORT TH.LISTS EACH MEASURE,PRACTICE OR 4 APPLY 2,000 B/ACRE GROUND AGRICULTURAL LIMESTONE one 1,000 LB/ACRE 10-10-10 FERTILZER OR FOLLOW RECOMMENDED SOIL '�/ DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PUN: IIP l� +�Al 2. RIP THE ENTIRE AREA i0 6 INCH DEPTH. TESTS. STRAW WATTLE SHOWN IN 2-DEEP TRENCH 'fA�� ■ �/ r III,I „I. - 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND A r�� GI I ��II un . v„ UNIFORM. MULCH ■ ' 4' 4' 4' 4' APPLY 4,OW LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. ■ � - / 4. APPLY AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE IN ACCORDANCE WITH"SEEDING SCHEDULE"AND O ■� , , IIII G t IIIII `III J III - OD STAKE MIX WITH SOIL. NCHOR STRAW BY ROVING.NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RAZE OF 400 GAL/ACRE y\ oe .Po.... 5. CONTINUE TILLAGE UNTIL AWELL-PULVERIZED, FIRM, REASONABLY UNIFORM SEED BED IS PREPARED 4 TO 6MAINTENANCE m�ccw«s.µo / rs x�..,o.00az.ouoo� II *fa AM, INCHES DEEP. REPAIR AND RE FERTILIZE DAMAGED AREAS IMMEDIATELY TOPDRESS WITH 50 LB/R ACRE OF NITROGEN IN MARCH.IF IT IS NECESSARY f. ,I�fa A1�,111 6 AFTER SEEDING.SEED ON A ESHLY SEED ACCORDED STOEDSEEDING AND SCHEDUCOVER E SEED LIGHTLY WITH SEEDING EQUIPMENT OR CUL TIPACK TEMPORARY COVER BEYOND TUNE 15,OVERSEE,WITH 50 Le/ACRE e J -. �`' onamlewm.----_ _ \\\\ \\ '24 AIM ]. MULCH IN ACCORDANCE WITH"SEEDING SCHEDULE"IMMEDIATELY AFTER SEEDING. TEMPORARY SEEDING RECOMMENDATION(or LATE WINTER one EARLY SPRING(TO BE FOLLOWED BPY PERMANENT ALL BSEED RMIX) EARLY - - \ \ tX... 9 INSPECT ALL SEEDING FOR COMPLIANCE WITH THE REQUIREMENTS OF THE"SEEDING SCHEDULE".MAKE NECESSARY TO EXTEND 3 REPAIRS AND RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. OR HE DAMAGED AREA SHALL BE SPECIES RATE(LB/ACRE) _ \4 \ REESTABLISHED FOLLOWNG THE ORIGINAL LIME,FERTILIZER AND SEEDING REQUIREMENTS. DEC1-APR.15 TER RYE(GRAIN)120 1 ANNUAL KOBE LESPEDEZA 50 VICINITY MAP \ 2 \/ I OMIT LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE. \ 1 I SOIL AMENDMENTS (N.T.S.) \ \ 1 I OF APPLSOI 2,�S00 TESTS. /ACRE GROUND AGRICULTURAL LIMESTONE and 750 LB/ACRE 10-10-10 FERTILIZE OR FOLLOW RECOMMENDATIONS 6 1 \\ \ -\ \ / I ( \ MULCH APPLY 4.000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER. \ \ \ / I I \ ANCHOR STRAW BY ROVING,NETTING OR BY TACKING WITH ASPHALT EMULSION AT A RAZE OF 400 GAL/ACRE \ \ \ \ I l 1 MAINTENANCE -..,\ \ \ \ \ l / I I DAMAGE. IF GROWTH IS NOT FULLY ADEOUaiE RESEED,RE-FERILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER \\ \ \ ` \ I / /// / 7 ( ' PERMANENT SPRING SEED MIX General Erosion Control Notes \ \ wl\I i / / i M oMBM�N"`RRM DA 30 1.Only the areas shown shall be disturbed. / logo /// i / I SERICEA LESPE,Eza 3, E 2.All disturbed areas shall be grassed and mulched as soon as / r i-�j'IVO I // / I P SEED IX possible and maintained until permanent cover is established. I r\ / SEPT.svE-lENOV.1 CTE OMMON BERMUDA 30 \ / II") n / / / - PT SERICEA LESPEDEZA(UNSCARIFIED)30 _�' / I I`] I / KOBE LESPEDEZA ID / I I I CAROPINE(/VENTURES,LLC WATER 32 , 1 1 D.B.4198,PG.260`\ NIMUM OF 1 INCH OF RAINFALL A WEEK OF NOT SUPPLIED NATURALLY,CONTRACTOR SHALL SUPPLY THE REMAINING AMOUNT UNTIL \\ '5�, / t�s \�lS GROUNDM LOVER HAS BEEN ESTABLISHED. 3j� , 31 / \A 0 NOT TO SCALE NOTTOSOALa 5'Max \\ l ( \\ \\ TOWN OF SOUTHERN PINES EROSION CONTROL SEQUENCE& [ q TOWN OF SOUTHERN PINES EROSION CONTROL �- CO = " CTION Lot Plan \LS' \\ SEEDING NOTES E-1 SEEDING NOTES E 17 LI, S L / DATE. JANUARY.. DATE JANUARY.. j0051r2i/2GA. INTERMEDIATE \ \\\ / � •\\ \y \ / / l97/ ' 1, MM.10 GA. WnREs 4 1346 ` \ 37 � J/))JJ LINE WIRES / ff) \ \ � `�_ \\ \ - -_ / / GRADE / / `dr), \\ \ 16 / of ' - 29 , � 9 \ CAROPINE VENTURES,LLC'--____ / / / II& 15 ) V D.B.4198,PG.260 ' a 3g6 FRONT VIEW Q \�� / _- � / 28 I �O \ /+jN /// /-� STEEL POST NOTE `'r, 6� ' /// �''' I \ \\ -- USE SILT FENCE ONLY WHEN ¢s�" / \ Ty,(A,G ` \ WOVEN WARE FABRIC DRAINAGE AREA DOES NOT V / O 51� _'" \ \ IIIII EXCEED I/4 ACRE AND / �' 0 J14,, 27 \ Provisions ground cover on exposed slopes must be SILT FENCE FABRIC NEVER IN AREAS OF CONCENTRATED FLOW. • -� - ___-- 11\ 1 -- / accomplished within 21 calendar days following completion of any -to II / .Y 354-_ \\ // / phase of grading. FILL SLOPE // \13�- /35a / _--- l' I I / / GRADE __ y 1 \ ___-""� / Provisions for permanent ground cover sufficient to restrain i� t {g' fl / 1`2 1 \ r erosion must be accomplished for all disturbed areas within 15 • FOR REPAIR OF SILT To I 8"MIN.COVER \\�� _-/ ,/ I I / / working days or 90 calendar days following completion of FENCE FAILURES,USE <III OVER SKIRT• ------- 26 _ S2f / \ / construction or development,whichever is shorter. No.57 WASHED STONE. -DI /'' J, , I FOR ANCHOR WHEN SILT I ANCHOR SKIRT AS \ 35U-- '.l J , \ \ /// FENCE IS PROTECTING t DIRECTED BY ENGINEER• /6/ --- V _ / \ \ CA TCH BASIN. � 27 l ,�5 25 ,u - ' / 13 \\ For HOW ZONES,ground cover shall be provided within 15 MIN, .- ) ) 7 working days or 60 calendar days following completion of Y. / ,/ ; �/ construction or development,whichever is shorter. SIDE VIEW \\\ i- --- __---___-- - -----' --_---- /"// 14 1 \ 1 / �a _ I \ SITE GROUND TAS ABIL ZATION NOTES&MAINTENANCE: / / --•-"'_ _ � -� I \ / EXCEPTIONS 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS / --- ---__ �' 24 _-_--- I 1 DESCRIPTION TIME FRAME IMMEDIATELY. �28 / / i _- - 1 / PERIMETER DIKES, J DAYS NONE 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE,TEAR,DECOMPOSE OR BECOME INEFFECTIVE,REPLACE IT \ / / ----- 1 / ROOLES,DITCHES PROMPTLY / / ---- 1 / &SLOPES 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND \ / _' / 1 / HIGH QUALITY T DAYS NONE REDUCE PRESSURE ON THE FENCE TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. / / - _ _-__338 T' --- _ I I l / WATER ZONES 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND N / i ` _ --- _ (HGW) STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. I / "' __ --- SLOPES STEEPER ]DAYS IF SLOPES ARE 5. REMOVE SEDIMENT DEEPER THAN I2 ( I 23 f lI I THAN 3:1 10.OR LESS IN fi t a�ei DRAIN_ ✓If l I I LENGTH AND ARE xor,os°ALE \�9 / zz __ 334, tG11ff Y _330 _--- EASEMENT- �� I I THAN zEPE4 TEMPORARY SILT FENCE \ 11 / s+.!' Ra \33��� \ __ / OAYS ARE ALLOWED TOWN OF SOUTHERN PINES 40\ l 0 1_- E-6 I 1 I (� - 326_ _- -- I \ SLOPES FLTTER OR DA SLOPES GREATER DATE. JANMARrgopa 7 DAYS FOR DETAIL \) \I 1 I ,iq ---- I I THAN 50'IN / ro / \ LENGTH / ---- / I I ALL OTHER AREAS 14 DAYS NONE(EXCEPT ) 1 / 22 / / \ / I WITH SLOPES FOR PERIMETERS 1 / 322 I FATTER THAN 4:1 AND How ZONES) \ �49 1421 23 �/ � \\ • PAGE 1 of 2 I / 22 3 8 • TOTAL DISTURBED ACREAGE: 0.28 ACRES \ // I I 43 / /' PHASE-1 -� / ��/ LOT EROSION CONTROL PLAN 48 J / FORLOT31 I I l 44 / / I CAROPINES PHASE 12 MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION A7 A. ( FLOW TO THE REAR ) B. ( FLOW TO THE FRONT ) C.( FLOW TO THE LEFT) D. ( FLOW TO THE RIGHT) E. ( FLOW TO THE FRONT& REAR ) / Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing PROPERTY NE PROPERPROPER,UNE RAPPROPERTYPE NE LINE FOR with 2-Inch stone.After each rainfall,Inspect any structure used to trap sediment and clean It out as necessary. Immediately remove all objectionable materials spilled,washed, r x sMriNCE rFx SILT FENCE siu rtrv�t� x NLT r Nce or tracked onto public roadways. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric . LOT f LOT « LOT LOT LOT Ft DREAM FINDERS HOMES, LLC should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment does not FLOW wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during deanout operations. MOORE COUNTY,N.C. McNEILL TOWNSHIP Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate C w x a a a a moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth and stabilization of the root bed.The B>C B B4 k B B B1 MARCH 2023 SCALE: 11L=60' sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible. HOUSE OOLNE OOLNE 00060 HDUSE Grassing and Mulching-The area to receive grassing and mulching should be propedy fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has _ _ _ _ been placed,the area should Na maintained as needed to insure that all areas are germinating propedy.Any bare areas should be repaired,and reseeded as soon as possible.If the - - a E. 'w^s• - GRAPHIC SCALE time of year does not permit the establishment of A permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. ENTRANCE ENTRANCE, CONSTRUCTION c CEmRANCCE ENTRANCE ENTRANCE 60 0 30 60 120 240 General-All measures will be Inspected and°affections mate after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction m f N u m y w a activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be relocated on the lot to insure that the W n �j• ♦ tit:. j s!, +W- � �(y potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested In the erosion control manual. R !,4; R R L x /p_A : a R/w x O EV.^' nor R L 5E= -J R a w x-2L'k`L--1 VS": R Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. •..•• ... 000. •••-. N FEET Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the l inch = 60 fit. filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the STREET STREET STREET STREET STREET project in such a way that the sediment is not subject to erosion by wind or water. MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.28305 Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during°leanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials and unstable R/w R R anI Res to FAX(910)484-0388 LICENSE#:F-0106 sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has beenes properly stabilized. EROSION CONTROL DETAIL FOR SINGLE FAMILY LOTS -( N.T.S.) ) LAST SAVED:3/28/2023 ESS AM LAST PLOTTED 3/28/2023 6:SA AM PLOTTED BY.Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\I6-136T-01 C0ROPINES-EC\PLANS\CAROPINES PH-I2 LOT 31.DWG