Loading...
HomeMy WebLinkAboutNCC231019_Site Plan or Location Map_20230414 VICINITY MAP GROUND STABILIZATION SODDING (NOT TO SCALE) lar SITE AREA STABILIZATION General Erosion Control Notes Pursuant to G.S.113A(3),provisions for permanent ground cover DESCRIPTION TIME FRAME EXCEPTIONS v. _._,. IT '�'��� PERIMETER DIKES, 7 DAYS NONE TIGHT,AGAINST EACH OTHER ■��, 1.Only the areas shown shall be disturbed. sufficient to restrain erosion must be accomplished for all SWALES, DITCHES M aNnaANprRIMMINn macaw 2.All disturbed areas shall be grassed and mulched as soon as disturbed areas within 14 working days or 90 calendar days et SLOPES�4..;74, (whichever is shorter)following completion of construction. possible and maintained until permanent cover is established. HIGH QUALITY 7 DAYS NONE 421 WATER ZONES a• (HOW) ifir41 i76 N. / / / / / / / SLOPESSTEEPER 7 DAYSIFSLPEREorMMATCHEDCORREC., ���� DI IAIA1 / THAN3110'OLSINiiik Ad. Hi VI VI V / �' LENGTHANDAREn ""��� \ NOT STEEPER �-- THAN 2:1, 14DAYS ARE • L ALLOWED( AD 17. ` SLOPES 3:1 OR 14 DAYS 7 DAYS FOR III;, 1 AN SRH 7 5 —_ f FLATTER SLOHAN 50EANER n(OLL SOO MMapu nLL ✓I Ina=anHaN QaOGN �. / lLENGTH • SITE OPO CONSTRUCTION iIIII7 / 1 // / i/ ALL WITHHSLOPESAS 14 DAYS NONE(EXCEPT w�Xe� lANCEOF"`son eH a euowea LIMITS \� JFOR PERIMETERS APPEARANCE OF GOOD SOD ,S, dr .. / FLATTER THAN 4:1 AND HQW ZONES) ��� Do .4 �°,,e 35 ,c.:n1 - - - - - �1��90 VV�e�a�l�od�l� xoHaaar �„ps..oam m H Lot Plan / / / ,emrn m OMERS Lq` xE„ \ / / A OGRM \ `�'l \ /\ \ K.f (CONSTRUCTION SCHEDULESR� ^ \ / necessary Permits av pan approvals. I. Obtain all vaceesa d I I Erosion and Sediment Control ^\ ' \-... (E&SC)permitand a Cenilicete of Coverage(COC)must be obtained before any land disturbing 3Y 2 T ' \ \ activities occur.A copy of the E&SC permit,the COC and a bard copy of the plan must be kept on Lot Plan W James Allen Lane I \ \>B / site,preferably in^permits box,and accessible during inspection. ` q" m / 2. Install gravel construction entrances first,then silt fences,reinforced silt fence outlets and wattles. CONSTRUCTION \ 3. Finish clearing and grubbing any necessary areas on the lots as they are started. LIMITS 1 \ 4. Begin lot grading and excavation activities ,81 10 -\ \ 5. Begin or continue with houseconstruceon activities. \ \ \ 6. Finish all rough grading and house consimction. o3 ^1 7. Install driveways,walks and patios. _ _ 180 �� 2�ti I \B / 8. Hegin fuse gading of lot areas \-/— 16 Lot Plan ' / 9. Final grassing,mulching and stabilizing of lot.In most cases this will involve the insmllation of DATE PAGE: aD" sod on the lot.The silt fence will remain in place until the lot o sodded or grassing o stabilized and Wir-F-n- Filter Fabric Lot Plan I \ takes hold. I0. The contractor shall conduct self-inspections of the erosion and sedimencOon control measures and s Prat P. CONSTRUCTIO \ ____./ '/mil complete the following combined selfinspection form found on the DEMLR webstte S'Max.Standard S.ngth Boo.trench 7 LIMITS - - - - - - - - I Mips//fileee.2Op/ncdeq/Energy%20Mmeral%20ne%n20Land%20Resources/Stomrwater/NPDES ems strength tab&with wire re tents Wire Fence Wfe , ' and Compact F� L 29111. %n20Genem1%x20Pemms/DEMLRCSWMonitonng Forms-RevAugufoe inspection Twelve thoroughly ty 26 I fen.nJ t Steel Post / 17 I AN/ / months of complete inspection forms shall be kept on site and available for inspection at all times. Lot Plan y It is recommended a copy be kept m e pertntts box(OS!13A 54 1(e),ISA NCAC 04B 0131, 111 ,01• Lot Plan ��.�yy 1A (\ NCO01 Pert III Sections A and B) /� I » // 11 Self tuspe.ions for erosion and d rcol measures are to be perforated at least once g R 1e z4 f ,• 1 C In\ - - - �_ s \ / / e calendar days and with 24 n f f than I inch An Plpst'c or ryMn Upelope \ / CA2 - - - - ^\ very seven ca Y every greater y W're t es e•rain. , / \ / needed repairs shall be made immediately d fined All ESC measures 11 / I f/ \ ��l/// \ / shall be maintained as specified thedetails thisplan.A rain gauge shall be g r I \ insmlletd at the project site form g. / 25 30 CA1I_ _ _ r� 12 Inspection and final acceptance letters when the project is complete,the perminees shall contact `e'down a4 forward along / 18 Lot Plan I ) // --_./ / DE0MLR to close out the E&SC P1ay.After DEMLR informs the permittee of the project close out, Lot Plan Q (. /✓ .( yg% / inspection report,the pennittee shall visit"deq.ne.govMCG01"resubmit an electronic Notice Filter Fabric eRoss sECTroN VIEW C I of tenumanon(e-NO'I),A$100 annual general permit fee will be charged until the a-NOT has ry ^/\/\ been filled out M. b la nlnN.wl.mt„m=nre xe<=w=n,wv relvw=mom= a,=.m r,n=nxrsw=w, \ t I 7 L� ..'A SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY 'a NCGS 113A-54.1.1S AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR srene. .an=rw==�,m Wne.ol.w a. 24 31 �� COMPLETED AS AN EXCEL SPREADSHEET. nmmven.u.nesrc a wi wa..ilem.mm.w.uF.i.xarou.w m .....h. awlww.,m.r,a.mmin.=,=rmmm= 1J CONSTRUCTION J J .r rim an..wlm nr = n... Te \ Lot Plan LIMITS )) /r- AN EROSION ANDAPVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED m..au<.e,.p.rap..u.m.xlmunmex.r.p.namxm.rv.xH.ew..m,.lvmm ih.amx.e. r - / / r..uT=.===rewr=�e "D" W SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A m=.m..s.wor m.m.5.rmn.d.wlvmp=. \ NCAC 1STATESTHAT"...DOCUMENTATION ACCOMPLISHED Iwnnn,m=mnmwms emxxe=rim=re.ce=n / C C 048.0 31 SHALL BE BY Inrom=pman=mnn=mm= and xa= =wmtlme.m=,. a.hlo-.e CD IMPALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY NiO,THE pmp.m / 0 5 I \ - /If APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETIG rmen=.mmn.^mow own amnmuve.dmlhnnhmlm=mmm performance \ ,8 / tp.o=nn.no<nmm,wen=w=.�.mem==e. a a w p ,� I DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, \ \ 29— — Lot Plan Lot Plan I • - - // 1 PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION \ f/� Y� ��Lot Plan C — I - • •1 . ' \ l CONTROL PLAN.'CONSTRUCTION _:, :.\NC-EnvironmentOl.yeg \ 'S't . 178 2:3': ' CONSTRUCTION till II. ENTRANCE — I / 11SILT FENCE ,1B C< CONSTRUCT= .'. ENTRA[')_CE_ SILTJ::`SILTWATTLE I _ _ _ _ %// 1 The.r„.. oa v ---ENTRANCE ••-T WATTLE 22 (TYP) Fes) �� REINFO-- rci 5 / / / / // WATTLE FENCE• REINFORCED WATTLE WM:FEE S'ojj NC' / 1 /' 21 (TYP.) I �rr I / / }� ( / / // rJ 4 REINFOR D WATTLE 176 9i SILT E ITV. \ N o� / apt S. /-///� ,1• °`S- E "� Ann Street APACMENR DETAILS // \ \\ OUTLO - / / • ,..._ J „:„..„,, ..,,„,.. ,... . ".. p„.....,„ ^d / I till d Ta _ Slit honk/Wa«e t Sad/Wette NDTe y / - x. W� Areafob D rears DL rmMd.apmmanpaPaW.nLtiG N70, m I RH, undorm ywim compact 'I 2 I 12" t ire 1'n*M gedomteeFto: / / / AS, ,. bewfo�peraMlo / )) tl smkea ea ht e„ SECTION SECTION b.yanameweafa ��. e«,�edb,�, CAI / Pat areas should be .ofMewitgentWa IL land disturbance.The Ro a.Me*' aq eMav sockiwadleII \ V ����• III W silt nHI itl 4 Oak or other »e / 7 n I n�l���: �n� a-a2• 7 socldwatde stakes should I Woof M r Cum at Tgro ne"4"Mln of Sleet P Me silt sackMattl.mhcadY plumb.lmough the center of the.1 maximum interval of 4 feel ee maximpaced ina4inMi 1 w...=u.......=.o-x...d.ew..v....N., urn To /2 height l09 Ern 6 In the event staking is not possible�'uwhen erve / lir, / / 1 ' \ \ I ISOMETRIC VIEW HED INSTALLATION the slit u. wvxmau.e=.mm m wa.w a .rsoolorwatde to hore ld l p eeed g rung e §$ � �, P� m maxi FLOW RA� illli' / /� us HFl Socks �,,,..I aTae n=u m... �m� (.tioo�m)(.unhurt)Ise gym) ,�s�an 3 ante mwt be replaced ndaooe,w / / / / L _ -- =�� \ D \wo,k Areawltteack,u�myin(¢xj (eaFm)t(iiaFmj (1osm) (�es�) ftxo`m 5 shah If ponding becomes �neeced to allow for adequateTNwima / . \ —� \ \ ' j ed oreiNt / / Hydraulic Room t5 zz as beinsp..untillama • — ,miff „R gm=R " m.aeam e � aaw.ra.ee m / __ , alxea.Ww.w 1,mmj 1,m,mj /m/m) I/,raj 1,m,mj alsaroenu�s rxrmymNltrea. / / �\ \ ) ILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION / //// /� ` //// / / \ DATE PAGE: DATE: PAGE DATE: PAGE: rr MIN. _ FENCE PAGE 1 of 2 �� - --, r- - - 1 I ;� .I e % ' I / ale ar + I' MI MI I IIIIIIII IIIIIIII )' TOTAL DISTURBED ACREAGE: 7.56 ACRES t 4 ll ll T i ' o I G a I S S A A l l % % as EROSION CONTROL PLAN FOR LOTS w� t it I11 ®% w. j �.°� r7r aMMwta 16 27 & 32 35 I L �I Q�n �,wTrvEWAs D • IN v. .J L. `. Y L. L� 4J L_€_1 _, ,gl1� itc it Ye� r rrrrrrT�- -HUA N Y -Ho AY HU 1a AY -HU AY -HU WAY -RO AY Y Y Y I-.aaea<caae � . PA.- � ��.- FRONT VIEW SC HAB E RT CROSSING 'c 'c� Y Y Y Y Y Y it Y Y Notes: ,.- Y r r 1.11.r r r•41 HARDWARE FOR CURB INLET 1 If needed,Tree Protector fencing should be installed along the buffer zone wetland ,+r.. Rr-TJ-M r+1.y Mr�r 1���'t N�- boundaryand/or around protected trees providing a radius of at least125 feet for each / '�1 fif--: ,f ,� FILTER FABRIC, AND HARDWARE LEGEND inch of trunk tlameter. s M" 1/ 'vr r r r r r',YY` CLOTH NTREN H 2InatallSilt Fence on the low elevation sides of each lot.Install Silt Fence outlets shown on �� �--- �r 01.0 .. Y�' wAaHEDaTG T�sDt- = DREAM FINDERS HOMES, LLC FLOW achemafGd'a d field adjusted.f necessary,for p �'.+�r�r r ryy. DIRECTION gram an jusle ry pacemen[at low If lots are / Y,Y 2 F 3,FILTER FABRIC GROUND contiguous and have different land owners or builders ea.lot ehouNh individual Silt "'ea vtlsyX lea OFn � ON GROUND �MNMa1gN° DUKE TOWNSHIP HARNETT COUNTY,N.C. SILT FENCE Fences. ® 3.InstallrequiredSiltFencewithin10feetofpropertylinetoensurethereisnoconflictwith •-\ a gravel "nlwelevaaootere;s°ofmItfenceand SCALE: 1"=100' MARCH 2023 CONSTRUCTION ENTRANCE septic system.It is the responsibility of the builder to ensure the installation of sediment eem Pain a, bane.Constructpon Maintenance GRAPHIC SCALE CURB INLET = control measures does not impact the septic system and repair areal^). al vegetation,roots arse ourobjectenable wee and after each 1 into greater rainfall m 4.At least one Construction Entrance/Exit is to be installed per lot. etely inspect outlet et lest once eweek and after eecntlncn 100 0 50 100 200 400 5.Waste bins and other areas dedicated for managing building material waste shall be at to p grade arse dimensions shown on plans.and a BURY WIRE FENCE AND HAREM CLOTH E oss_F ncnec. y least 50 feat awe from storm drain inlets or drainage ditches unless it can be shown that c tapdre sing w sediment Owl. FlLTER FABRIC IN TRENll o other altemat ve exists.If this separation cannote achieved,these areas must be rap or other setae outlet. removeodechonabe mat spilled,.washed or tracked onto pub4 Remove lic ENGINEERS no other behind Silt Fence. 9 stab Ill,of the foundation n locations ay S.Repare stone half of stone outlet is haute dax-atenrov ered subject;:poor^ghwaternela° PLANNERS111/ER ( IN FEET) 6,Inlets downstream of disturbances should be protected;streets should be swept when SECTION VIEW sediment from the construction activity is present. ..\NC-Environment l.jpeg SURVEYORS 1. inch= 10o fit. \NC-En vironm en tot.jpeg 7.Details for Silt Fence S.Fence Outlets,Construction Entrances and other measures are ..\NC-En v4 c-Imentol.jpeg SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC, 115 BROADFOOT AVE. FAYETTEVILLE,N.C. —_ provided on additional sheets.Erosion and sediment control details are not drawn to scale. CONSTRUCTION ENTRANCE/EXIT .....„re'•'� MOORMAN, KIZER & REITZEL, INC. PHONE(910)484-5191 FAX(910)484-038B LICENSE gF-0106 ----------- TYPICAL LOT LAYOUT WITH CURB AND GUTTER LAST SAVED:3/1/2023 1:18 PM LAST PLOTTED:3/t/2023 2:53 PM PLOTTED BY:Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\22-1367-06 SunoaerT CROSSING-EC\PLANS\SCHABERT XING-LOTS 16-27 do 32-35.DWG