Loading...
HomeMy WebLinkAbout20150100 Ver 1_Construction Plans_20150427Strickland, Bev From: Montalvo, Sheri A Sent: Monday, April 27, 2015 3:20 PM To: Strickland, Bev Subject: FW: ELI User has invited you to collaborate on Box From: ELI User [mailto:noreply@box.com] Sent: Monday, April 27, 2015 3:14 PM To: Montalvo, Sheri A Subject: ELI User has invited you to collaborate on Box ELI User has invited you to collaborate on a folder: "I ieIHo, II waint to shaire my foMeir, SAC oin :�3 ox . Sheirll ... 11r Ns lis the Re for the 2015 Il... iine 1 Il iroje(;ft that you ire quested et inie Id inow lit you �have any quesdoins. Suzainine 11 ierroin 615 ...03'U0...6300 Suzanne. herron(a)eli-llc.com" Useir Environinental (DENR.— 1jrS AC) Colhabonation II 'older Get our app to view this ori iniol0lille 1 CONSTRUCTION PLANS FOR PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA JI CABARRUS / ' , , � � � '� ,� HARNETT 1 " / STANLY ± MONTGOMERY ' MOORE \ I - % % % J# ' � I 1 / ,` ^♦ SITE 7 CUMBERLAND RICHMOND /' �. HOKE • � UNION SITE 6 ANSON ' ' ' 1 SCOTLAND Rim 0 0 m 0 m � a a a� SITE5� ♦♦ SITE 4 � SITE 3 i SITE 2 ' ` / 411r, � ♦ SITE 1 O U ♦ N ♦�" ,� BLADEN ROBESON C ♦ 0 � ` I R ♦s � j ♦ COLUMBUS LOCATION MAP NOT TO SCALE ISSUE FOR CONSTRUCTION �1 r Piedmont Natural Gas OWNER: PIEDMONT NATURAL GAS 4720 PIEDMONT ROW DRIVE CHARLOTTE, NC 28210 PH:(704)731 -4375 or (615)872 -2350 ISSUE DATE: 4/13/2015 SHEET INDEX SHEET NO. SHEET TITLE GENERAL 3007 -00 -000 COVER SHEET 3007 -00 -001 NOTES & LEGEND 3007 -00 -002 DETAILS 3007 -00 -003 EROSION CONTROL DETAILS SITE 1 - RED HILLS ROAD 3007 -01 -004 OVERALL SITE LAYOUT 3007 -01 -005 STA. 5595 +57 TO STA. 5609 +89 3007 -01 -006 EROSION CONTROL PLAN SITE 2 - LUMBER RIVER 3007 -02 -007 OVERALL SITE LAYOUT 3007 -02 -008 HDD BORE PLAN & PROFILE 3007 -02 -009 EROSION CONTROL PLAN SITE 3 - SKYWAY CHURCH ROAD 3007 -03 -010 OVERALL SITE LAYOUT 3007 -03 -011 STA. 5409 +90 TO STA. 5423 +70 3007 -03 -012 STA. 5423 +70 TO STA. 5431+23 3007 -03 -013 EROSION CONTROL PLAN SITE 4 - McGIRTS BRIDGE ROAD 3007 -04 -014 OVERALL SITE LAYOUT 3007 -04 -015 STA. 5225 +35 TO STA. 5238 +86 3007 -04 -016 STA. 5238 +86 TO STA. 5247 +17 3007 -04 -017 EROSION CONTROL PLAN SITE 5 - WAGRAM ROAD 3007 -05 -018 OVERALL SITE LAYOUT 3007 -05 -019 STA. 5153 +15 TO STA. 5166 +04 3007 -05 -020 EROSION CONTROL PLAN SITE 6 - STATE ROAD 1744 3007 -06 -021 OVERALL SITE LAYOUT 3007 -06 -022 STA. 3514 +96 TO STA. 3552 +24 3007 -06 -023 EROSION CONTROL PLAN SITE 7 - CEDAR GROVE ROAD 3007 -07 -024 OVERALL SITE LAYOUT 3007 -07 -025 PLAN & PROFILE 3007 -07 -026 GRADING PLAN 3007 -07 -027 EROSION CONTROL PLAN DESIGN CONSULTANTS: CIVIL ENGINEER: THOMAS L. SAUNDERS, P.E. ENERGY LAND & INFRASTRUCTURE, LLC 1420 DONELSON PIKE, SUITE Al2 NASHVILLE, TN 37217 PHONE: 615- 383 -6300 FAX: 615- 360 -8476 SURVEYOR: MICHAEL J. MOORE, R.L.S. ENERGY LAND & INFRASTRUCTURE, LLC 1420 DONELSON PIKE, SUITE Al2 NASHVILLE, TN 37217 PHONE: 615- 383 -6300 FAX: 615- 360 -8476 ELI PROJECT #: 14 -21 -3007 PNG IR #: 2239872 (SITES 1 - 5) 2239873 (SITES 6 & 7) cENERGY LAND & INFRASTRUCTURE, PL L C 1420 DONELSON PIKE, SUITE Al2 • NASHVILLE, TN 37217 OFFICE 615- 383 -6300 • WWW.ELI- LLC.COM ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL 91 2014 ENERGY LAND G INFRASTRUCTURE. LLC_ ALL RIGHTS RESERVED 0 M a 0 0 z GENERAL NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE CURRENT SPECIFICATIONS AND STANDARDS OF PIEDMONT NATURAL GAS. 2. ALL WORK SHALL BE IN COMPLIANCE WITH OSHA TITLE 29 OF THE CODE OF FEDERAL REGULATIONS AND ALL OTHER FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. 3. THE LOCATION AND /OR ELEVATION OF THE EXISTING UTILITIES SHOWN ON ALL PLANS ARE BASED ON UTILITY COMPANY RECORDS, AND WHERE POSSIBLE, FIELD MEASUREMENTS. THE CONTRACTOR SHALL NOT RELY UPON THIS INFORMATION AS BEING EXACT OR COMPLETE. DETAILED VERIFICATION OF EXISTENCE, SIZE, LOCATION AND DEPTH SHOULD BE MADE BY THE CONTRACTOR PRIOR TO ANY DECISION RELATIVE THERETO IS MADE. DIAL 811 FOR ONE CALL. 4. PRIOR TO CONSTRUCTION OR EXCAVATION, THE CONTRACTOR SHALL ASSUME THE RESPONSIBILITY OF LOCATING ANY UNDERGROUND UTILITIES (PUBLIC AND /OR PRIVATE) THAT MAY EXIST IN THE AREA OR CONSTRUCTION. UTILITY OWNERS SHALL BE NOTIFIED IN ACCORDANCE WITH ONE CALL TIME REQUIREMENTS IN ADVANCE OF ANY EXCAVATION IN THE PROXIMITY OF UTILITIES THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL BE RESPONSIBLE FOR THE REPAIR OF EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. THE CONTRACTOR SHALL CONTACT THE ONE CALL CENTER BY CALLING 811 IN ADVANCE OF ANY CONSTRUCTION. 5. CONTRACTOR SHALL CLEARLY LOCATE ALL EXISTING UTILITY SERVICE CONNECTIONS AND AVOID DAMAGING THESE DURING CONSTRUCTION. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES AND /OR PENALTIES RESULTING FROM ALL NON - COMPLIANCE WITH FEDERAL, STATE, AND LOCAL PERMITS AND ENCROACHMENT AGREEMENTS. 7. ALL PAVEMENT DAMAGED DURING CONSTRUCTION SHALL BE RESTORED TO PRE - CONSTRUCTION CONDITIONS BY THE CONTRACTOR ACCORDING TO THE REQUIREMENTS OF THE REGIONAL OFFICE OF THE DEPARTMENT OF TRANSPORTATION HAVING JURISDICTION. 8. THE GAS MAIN SHALL BE INSTALLED SO AS TO PROVIDE A MINIMUM OF TWENTY FOUR (24) INCHES OF CLEARANCE TO ALL OTHER UNDERGROUND UTILITIES AND STRUCTURES. WHERE THIS IS NOT POSSIBLE, APPROPRIATE PROTECTION SHALL BE INSTALLED. 9. ALL DRAINAGE PIPES AND STRUCTURES SHALL BE CLEANED OF DEBRIS AND ERODED MATERIALS RESULTING FROM CONSTRUCTION. THESE PIPES AND STRUCTURES SHALL BE MAINTAINED CLEAN DURING THE PERIOD OF CONSTRUCTION. 10. ALL DISTURBED SLOPES SHALL BE RESTORED TO EXISTING GRADES AND STABILIZED WITH SEED AND STRAW AND /OR TACK IF APPROPRIATE. 11. CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL MEASURES AS DESCRIBED ON THE PROJECT PLANS AND DETAILS DURING CONSTRUCTION AND SURFACE RESTORATION UNTIL SUCH MEASURES ARE NOT NECESSARY. WHERE ADDITIONAL MEASURES ARE NECESSARY, THE CONTRACTOR SHALL INSTALL AND MAINTAIN THE APPROPRIATE MEASURES ACCORDING TO THE REGIONAL OFFICE OF THE DIVISION OF WATER QUALITY HAVING JURISDICTION. 12. SEED ALL DISTURBED AREAS AND MULCH AS REQUIRED. 13. NOTHING IN THE GENERAL NOTES OR SPECIAL PROVISIONS SHALL RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITIES TOWARD THE SAFETY AND CONVENIENCE OF THE GENERAL PUBLIC AND THE RESIDENTS ALONG THE PROPOSED CONSTRUCTION AREA. 14. THE CONTRACTOR SHALL CHECK ALL EXISTING CONDITIONS, (IE. INVERTS, UTILITY ROUTINGS, UTILITY CROSSINGS, AND DIMENSIONS) IN THE FIELD PRIOR TO COMMENCEMENT OF UTILITY WORK. REPORT ANY DISCREPANCIES TO THE OWNER'S REPRESENTATIVE. 15. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION AND EXISTENCE OF ALL EXISTING UTILITIES. TAKE CARE TO PROTECT UTILITIES THAT ARE TO REMAIN. REPAIR ANY DAMAGE ACCORDING TO LOCAL STANDARDS AND AT THE CONTRACTORS EXPENSE. COORDINATE ALL CONSTRUCTION WITH THE APPROPRIATE UTILITY COMPANY. 16. CONTRACTOR SHALL CONFORM TO ALL APPLICABLE CODES AND OBTAIN APPROVAL AS NECESSARY BEFORE BEGINNING CONSTRUCTION. 17. THE CONTRACTOR SHALL PROVIDE A SMOOTH TRANSITION BETWEEN EXISTING PAVEMENT AND NEW PAVEMENT. SLIGHT FIELD ADJUSTMENT OF FINAL GRADES MAY BE NECESSARY. 18. ALL DEBRIS FROM CHIPPING MACHINES DURING CLEARING OPERATIONS SHALL BE REMOVED FROM THE PROJECT SITE AND DISPOSED OF BY CONTRACTOR. 19. ALL UTILITIES AFFECTED BY CONSTRUCTION ACTIVITIES SHALL BE LOCATED HORIZONTALLY AND VERTICALLY BY THE CONTRACTOR PRIOR TO CONSTRUCTION ACTIVITIES COMMENCING AND ANY POTENTIAL CONFLICTS WITH THE CONSTRUCTION OF THE PROPOSED GAS LINE, BORES, OR OTHER CONSTRUCTION SHALL BE REPORTED TO THE ENGINEER FOR ANY REDESIGN REQUIRED. 20. LAND FARMING OF DRILLING MUD ON THE PIPELINE EASEMENTS WILL BE THE CONTRACTOR'S RESPONSIBILITY TO NEGOTIATE WITH THE INDIVIDUAL PROPERTY OWNERS IN ADVANCE OF SUCH ACTIVITY. c+rrr ��Trc+ 1. CONTRACTOR SHALL REPAIR ALL DAMAGE TO EXISTING FEATURES (PAVEMENT, CURBS, WALKS, DRIVEWAYS, YARDS, LANDSCAPING, ETC.) TO A LIKE NEW CONDITION AT NO ADDITIONAL COST TO THE OWNER. 2. ALL TRENCHES CUT IN EXISTING ROADS OR DRIVES SHALL UTILIZE A CLEAN SAW CUT AND SHALL BE BACKFILLED (100 %) TO FINAL SUBGRADE ACCORDING TO THE REGIONAL OFFICE OF THE DEPARTMENT OF TRANSPORTATION, HAVING JURISDICTION, REQUIREMENTS. 3. CONCRETE FOR CURBS AND SIDEWALKS SHALL BE 3500 PSI CONCRETE. 4. ANY WORK UNACCEPTABLE TO THE OWNER'S REPRESENTATIVE, TO LOCAL REPRESENTATIVE, OR TO UTILITY REPRESENTATIVE SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. 5. ALL PAVEMENT MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE REGIONAL OFFICE OF THE DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS AND SPECIFICATIONS. 6. ALL PAVEMENT STRIPING SHALL BE THERMOPLASTIC OR APPROVED ALTERNATIVE. GRADING NOTES 1. PROPER TEMPORARY AND PERMANENT MEASURES SHALL BE USED TO CONTROL EROSION AND SEDIMENTATION IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL EROSION AND POLLUTION CONTROL DEVICES AND MEASURES SHALL BE CONSTRUCTED, INSTALLED, MAINTAINED, AND REMOVED BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, ORDINANCES, AND POLICIES. 2. MULCH AND SEED ALL DISTURBED AREAS WITHIN THE TIMEFRAME DESIGNATED ON THE GROUND STABILIZATION CHART AFTER FINAL GRADING IS COMPLETED, UNLESS OTHERWISE INDICATED. CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO ESTABLISH PERMANENT SOIL STABILIZATION. 3. PROVIDE TEMPORARY CONSTRUCTION ACCESS(ES) AT THE POINT(S) WHERE CONSTRUCTION VEHICLES EXIT THE CONSTRUCTION AREA. MAINTAIN PUBLIC ROADWAYS FREE OF TRACKED MUD AND DIRT. 4. THE CONTRACTOR SHALL CHECK ALL EXISTING GRADES AND DIMENSIONS IN THE FIELD PRIOR TO BEGINNING WORK AND REPORT ANY DISCREPANCIES TO THE ENGINEER. 5. THE CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE MANUAL OF ACCIDENT PREVENTION AND CONSTRUCTION ISSUED BY AGC OF AMERICA, INC. AND THE SAFETY AND HEALTH REGULATIONS OF CONSTRUCTION ISSUED BY THE U.S. DEPARTMENT OF LABOR. 6. NO VEGETATION OR TREES OUTSIDE OF THE PERMANENT EASEMENT AND TEMPORARY WORKSPACES SHALL BE DISTURBED OR REMOVED. 7. STRIP TOPSOIL FROM ALL CUT AND FILL AREAS AND STOCKPILE UPON COMPLETION OF GENERAL GRADING DISTRIBUTE TOP SOIL OVER ALL DISTURBED AREAS, TO A MINIMUM DEPTH OF 6 ", CONTRACTOR SHALL SUPPLY ADDITIONAL TOP SOIL IF INSUFFICIENT QUANTITIES EXIST ON SITE. 8. POSITIVE DRAINAGE SHALL BE ESTABLISHED AS THE FIRST ORDER OF WORK AND SHALL BE MAINTAINED AT ALL TIMES DURING AND AFTER CONSTRUCTION. SOIL SOFTENED BY PERCHED WATER IN FOUNDATION AND PAVEMENT AREAS MUST BE UNDERCUT AND REPLACED WITH SUITABLE FILL MATERIALS APPROVED BY A GEOTECHNICAL ENGINEER. GROUNDWATER INFILTRATION INTO EXCAVATIONS SHOULD BE EXPECTED, AND THE WATER SHALL BE REMOVED USING GRAVITY DRAINAGE OR PUMPING. 9. THE LOCATION OF ALL DIVERSION SWALES AND DITCHES SHALL BE FIELD ADJUSTED TO AVOID TREES AS MUCH AS POSSIBLE. THE CONTRACTOR SHALL WALK THE ALIGNMENT OF THESE SWALES AND DITCHES IN THE FIELD TO VERIFY AVOIDANCE OF TREES. 10. STOCKPILED TOPSOIL OR FILL MATERIAL IS TO BE CONTAINED SO SEDIMENT RUN -OFF WILL NOT CONTAMINATE SURROUNDING AREAS OR ENTER NEARBY STREAMS. 11. ANY SITE USED FOR DISPOSAL AND /OR STOCKPILE OF ANY MATERIAL SHALL BE PROPERLY PERMITTED FOR SUCH ACTIVITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SEE THAT ALL REQUIRED PERMITS ARE SECURED FOR EACH PROPERTY UTILIZED. A COPY OF THE APPROVED PERMIT MUST BE PROVIDED TO THE INSPECTOR PRIOR TO COMMENCEMENT OF WORK ON ANY PROPERTY. FAILURE TO DO SO MAY RESULT IN THE CONTRACTOR REMOVING ANY ILLEGALLY PLACED MATERIAL AT HIS OWN EXPENSE. 12. AFTER STRIPPING TOPSOIL AT STATION SITES, PROOF ROLL EXPOSED SUBGRADE WITH A LOADED TRUCK TO IDENTIFY UNSTABLE SOILS. STABILIZE UNSTABLE AREAS BY UNDERCUTTING AND REPLACING UNSTABLE MATERIALS WITH COMPACTED SELECT MATERIAL. 13. ALL FILL SHALL BE FREE OF ALL ORGANIC MATTER, TRASH AND OTHER DELETERIOUS MATERIALS, CONTAINING NO ROCK FRAGMENTS GREATER THAN 6 INCHES IN ANY ONE DIRECTION. 14. STRUCTURAL SOIL FILL SHALL HAVE A STANDARD PROCTOR MAXIMUM DRY DENSITY OF 90 POUNDS PER CUBIC FOOT (PCF) OR GREATER AND A PLASTICITY INDEX (PI) OF 30 PERCENT OR LESS. ALL MATERIAL BEING USED AS SOIL FILL SHOULD BE TESTED AND APPROVED BY THE GEOTECHNICAL ENGINEER BEFORE BEING PLACED. 15. PLACE AND COMPACT FILL IN ACCORDANCE WITH SPECIFICATIONS. 16. PROPOSED CONTOURS AND SPOT ELEVATIONS SHOWN ARE FINISH GRADE. PROPER ADJUSTMENT SHOULD BE MADE BY CONTRACTOR FOR SUBGRADE. 17. EXISTING ELEVATIONS, CONTOURS, AND BENCHMARKS SHOWN ON PLANS ARE BASED ON NAD88. 18. SHAPE ALL DITCHES ACCORDING TO TYPICAL SECTION OR SPECIAL DITCH DETAIL. 19. ONLY MATERIAL MEETING CONTRACTOR'S GEOTECHNICAL ENGINEER'S REQUIREMENTS FOR EMBANKMENT MAY BE USED. 20. ALL EXCAVATION IS UNCLASSIFIED WITHOUT REGARD TO MATERIALS ENCOUNTERED. CONTRACTOR SHALL VISIT SITE AND DRAW HIS OWN CONCLUSIONS TO CONDITIONS ENCOUNTERED. LINE AND GRADES SHOWN SHALL BE ACHIEVED WITHOUT ADDITIONAL COMPENSATION. 21. ASPHALT PAVEMENT, MINERAL AGGREGATE BASE AND CONCRETE MATERIALS AND CONSTRUCTION SHALL MEET REQUIREMENTS OF THE REGIONAL OFFICE OF THE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. 22. PROPOSED CONTOURS SHOWN AT 2 FOOT INTERVAL. 23. ANY AREA THAT IS DISTURBED OUTSIDE LIMITS OF CONSTRUCTION DURING THE LIFE OF THIS PROJECT SHALL BE REPAIRED BY CONTRACTOR AT HIS EXPENSE. 24. THE CONTRACTOR SHALL NOT DISPOSE OF ANY MATERIAL EITHER ON OR OFF PROJECT SITE IN A REGULATORY FLOOD WAY AS DEFINED BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY WITHOUT APPROVAL BY SAME. ALL MATERIAL SHALL BE DISPOSED OF IN UPLAND (NON - WETLAND) AREAS AND ABOVE ORDINARY HIGH WATER OF ANY ADJACENT WATERCOURSE. THIS DOES NOT ELIMINATE THE NEED TO OBTAIN ANY OTHER LICENSES OR PERMITS THAT MAY BE REQUIRED BY ANY OTHER FEDERAL, STATE OR LOCAL AGENCY FOR THE CONSTRUCTION OF THIS PROJECT. VARIATIONS IN PLAN OR PROFILE 1. THE CONTRACTOR SHALL MAINTAIN THE HORIZONTAL ALIGNMENT (PLAN VIEW) AS INDICATED ON THE PROJECT PLANS WITH A ±2 FOOT VARIANCE. 2. CONTROL POINT ELEVATIONS SHOWN INDICATE THE MINIMUM COVER AND SHALL NOT BE REDUCED. THE CONTRACTOR MAY DRILL DEEPER WITH THE APPROVAL OF THE ENGINEER. 3. THE CONTRACTOR MAY REQUEST CHANGES TO THE PROPOSED VERTICAL AND HORIZONTAL ALIGNMENT OF THE INSTALLATION AND THE LOCATION OF THE ENTRY AND EXIT POINTS FOR HDD BORES. PROPOSED CHANGES SHALL BE SUBMITTED TO THE OWNER AND RECEIVE APPROVAL OF THE OWNER PRIOR TO STARTING THE EFFECTED ACTIVITY. BORE PILOT HOLE REQUIREMENTS 1. THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN INSTRUMENTATION WHICH WILL ACCURATELY LOCATE THE PILOT HOLE, MEASURE DRILL STRING AXIAL AND TORSION LOADS, AND MEASURE DRILLING FLUID DISCHARGE RATE AND PRESSURE. 2. THE OWNER WILL HAVE ACCESS TO THESE INSTRUMENTS AND THEIR READINGS AT ALL TIMES. 3. THE CONTRACTOR, WHEN REQUESTED BY THE OWNER, WILL PROVIDE INSPECTION HOLES AT NO ADDITIONAL COST TO VISUALLY VERIFY THE LOCATION AND CONDITION OF THE DRILLED PIPELINE. 4. THE CONTRACTOR SHALL PLOT THE ACTUAL HORIZONTAL AND VERTICAL ALIGNMENT OF THE PILOT HOLES AT INTERVALS NOT EXCEEDING 20 FEET, AND CORRESPONDING WITH THE PROJECT STATIONING AND DATUM. 5. THE CONTRACTOR SHALL MAINTAIN AND UPDATE AN "AS- BUILT" PLAN AND PROFILE AS THE PILOT BORE IS ADVANCED. 6. THE CONTRACTOR SHALL GRANT THE OWNER ACCESS TO ALL DATA READOUT PERTAINING TO THE POSITION AND INCLINATION OF THE BORE HEAD. WHEN REQUESTED, THE CONTRACTOR SHALL PROVIDE EXPLANATIONS OF HIS POSITION MONITORING AND STEERING EQUIPMENT. 7. THE ACTUAL PILOT HOLE EXIT POINT SHALL BE LOCATED WITHIN TWO (2) FEET LATERALLY OF THE EXIT POINT SHOWN ON THE DRAWINGS. LONGITUDINALLY, THE ACTUAL EXIT POINT SHALL BE NO MORE THAN FIVE (5) FEET SHORT OR FIVE (5) FEET PAST THE EXIT POINT SHOWN ON THE DRAWINGS. 8. THE PILOT HOLE SHALL BE DRILLED ALONG THE PATH SHOWN ON THE PLAN AND PROFILE DRAWING MAINTAINING THE SPECIFIED TOLERANCES. 9. THE OWNER SHALL APPROVE THE ALIGNMENT OF PILOT BORE BEFORE THE REAMING PHASE OR PIPE PULLING MAY COMMENCE. 10. IF THE PILOT BORE FAILS TO CONFORM TO THE ABOVE TOLERANCES, OWNER MAY, AT HIS OPTION REQUIRE A NEW PILOT BORE TO BE MADE. 11. IN ALL CASES, RIGHT OF WAY RESTRICTIONS SHALL TAKE PRECEDENCE OVER THE LISTED TOLERANCES. 12. NO PILOT HOLE WILL BE ACCEPTED IF IT WILL RESULT IN ANY OF THE PIPELINE BEING INSTALLED IN VIOLATION OF RIGHT OF WAY RESTRICTIONS. 13. CONCERN FOR ADJACENT UTILITIES AND /OR STRUCTURES SHALL TAKE PRECEDENCE OVER THE LISTED TOLERANCES. LISTING OF TOLERANCES DOES NOT RELIEVE CONTRACTOR FROM RESPONSIBILITY FOR SAFE OPERATION OR DAMAGE TO ADJACENT UTILITIES AND STRUCTURES. 14. ALL BEND RADII SHALL BE EQUAL TO OR GREATER THAN THOSE LISTED IN THE PROJECT PLANS. BORE INSTALLATION 1. ALL HDD DRILLS TO BE INSTALLED BY THE WIRE LINE PROCESS 2. THE CONTRACTOR, SUBJECT TO THE REQUIREMENTS OF THESE PLANS, WILL DETERMINE THE EXACT METHOD AND TECHNIQUES FOR COMPLETING THE HDD CROSSINGS. EXCAVATED MUD PITS CONSTRUCTED IN THE ENTRY AND EXIT AREAS WILL BE LIMITED TO THE PIPE BORE HOLE AREA ONLY. 3. AFTER COMPLETION OF THE DIRECTIONAL DRILLING WORK, THE ENTRY AND EXIT PIT LOCATIONS SHALL BE RESTORED TO THEIR ORIGINAL CONDITIONS. 4. THE GEOTECHNICAL REPORT IS AVAILABLE FOR THE CONTRACTOR'S USE. THE BORING LOGS SHOWN ON THE PLANS ARE FOR THE CONTRACTOR'S CONVENIENCE AND ARE A REPRODUCTION FROM THE GEOTECHNICAL REPORT. THIS SUBSURFACE INFORMATION IS PRESENTED IN GOOD FAITH AND IS NOT INTENDED AS A SUBSTITUTE FOR PERSONAL INVESTIGATION, INDEPENDENT INTERPRETATIONS OR JUDGEMENT OF THE CONTRACTOR. BORE PRE - REAMING REQUIREMENTS 1. AFTER THE PILOT HOLE IS ACCEPTED, THE CONTRACTOR SHALL PERFORM A REAMING AND PRODUCT PIPE PULL. 2. THE MAXIMUM PRE - REAMING SHALL DETERMINED BY COMPANY SPECIFICATIONS AND CONSTRUCTION SUPERVISOR'S APPROVAL UNLESS APPROVED BY THE ENGINEER. 3. BUOYANCY MODIFICATIONS SHALL BE USED AT THE DISCRETION OF THE CONTRACTOR. ANY BUOYANCY MODIFICATION PROCEDURE PROPOSED FOR USE SHALL BE SUBMITTED TO THE OWNER FOR APPROVAL. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO THE PULL SECTION RESULTING FROM BUOYANCY MODIFICATIONS. 9. DRILLING FLUID RETURNS AT LOCATIONS OTHER THAN THE ENTRY AND EXIT PITS SHALL BE MINIMIZED. 10. IN THE EVENT THAT ANNULAR CIRCULATION IS LOST, CONTRACTOR SHALL TAKE ACTION TO RESTORE CIRCULATION. 11. IF INADVERTENT SURFACE RETURNS OF DRILLING FLUIDS OCCUR, CONTRACTOR SHALL IMMEDIATELY CLEAN AND COLLECT. BORE CROSSING WITHOUT CASINGS 1. THE CONSTRUCTION OF ALL CROSSINGS DESIGNED BY THE COMPANY, INCLUDING ALL DETAILS INCIDENT TO THE INSTALLATION OF SUCH CROSSINGS, SHALL BE IN ACCORDANCE WITH THE DRAWINGS AND SHALL COMPLY WITH SUCH SPECIFICATIONS AS MAY BE REQUIRED BY THE OTHER AUTHORITY HAVING JURISDICTION, AND SUCH SPECIFICATIONS HEREIN AS MAY BE APPLICABLE. 2. THE CARRIER PIPE SHALL BE COATED IN ACCORDANCE WITH SPECIFICATIONS. NECESSARY DUMMY PIPE SHALL BE PLACED AT THE LEADING AND OF THE BORING OPERATION. THE FACE END OF THIS DUMMY PIPE CAN BE BUILT UP TO BE APPROXIMATELY ONE -HALF INCH TO THREE - FOURTHS INCH SIMULTANEOUSLY WITH THE REMOVAL OF THE DUMMY PIPE. 3. THE BORED CROSSING WITHOUT CASING SHOULD BE INSTALLED BEFORE THE DITCHING AND BENDING OPERATIONS ARRIVE AT THE CROSSING. WHEN BORING, THE CUTTING HEAD SHALL NOT EXTEND BEYOND THE LEADING END OF THE CARRIER PIPE MORE THAN SIX INCHES. GROUTING OF BORED AND CASED CROSSINGS 1. WHERE REQUIRED, BORED AND CASED CROSSING SHALL BE PRESSURED GROUTED BY THE CONTRACTOR TO COMPLETELY FILL THE ANNULAR SPACE BETWEEN THE CARRIER OR CASING PIPE AND THE EARTH. THE GROUT SHALL CONSIST OF A SAND - CEMENT SLURRY OF AT LEAST TWO SACKS OF CEMENT /YD3, OR AS REQUIRED BY JURISDICTIONAL AUTHORITY. 2. ITS PNG POLICY NOT TO LEAVE STOPPLES IN LINE UNATTENDED. CONTRACTOR SHOULD PLAN AND SCHEDULE TIE -INS AT EACH SITE FOR 1 DAY DURATION. THE PERSON TO CONTACT SHOULD ANY EROSION AND SEDIMENT CONTROL ISSUES ARISE DURING LAND - DISTURBING ACTIVITY: MIKE GOLOMBOWSKI PH: (704) 618 -1286 EMAIL: michael .golombowski @piedmontng.com GROUND STABILIZATION • , ® � Know what's below. Call before you dig. Piedmont Natural Gas STABILIZATION TIME FRAME SITE AREA DESCRIPTION STABILIZATION TIME FRAME DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA GENERAL NOTES & LEGEND REV EXCEPTION PERIMETER DIKES, SWALES, DITCHES, AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ 7 DAYS NONE ZONES MK NO QTY CAT # DESCRIPTION IF SLOPES ARE 10' OR LESS IN QTY CAT # LENGTH AND ARE NOT SLOPES STEEPER THAN 3:1 7 DAYS STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES SLOPES 3:1 OR FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION NONE (EXCEPT FOR ALL OTHER AREAS WITH 14 DAYS PERIMETERS AND HOW SLOPES FLATTER THAN 4:1 ZONES) INSPECTION SAME WEEKLY INSPECTION REQUIREMENTS SAME RAIN GAUGE & INSPECTIONS AFTER 0.5" RAIN EVENT INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS ". INSPECTIONS REPORTS MUST BE AVAILABLE ON -SITE DURING BUSINESS HOURS UNLESS A SITE - SPECIFIC EXEMPTION IS APPROVED. RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. ELECTRONICALLY - AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. LEGEND EXISTING GAS PROPOSED GAS OVER HEAD UTILITIES EXISTING EASEMENT PROPOSED PERMANENT EASEMENT PROPOSED TEMPORARY WORK SPACE EASEMENT ABANDONED GAS LINE PROPERTY LINE UNDER GROUND TELEPHONE WATER LINE BORE PULLBACK REQUIREMENTS 1. CONTRACTOR SHALL PULL EXTRA LENGTH OF PROJECT PIPE SO ONE JOINT CAN BE EXAMINED. SANITARY SEWER LINE 2. CONTRACTOR SHALL SUPPORT THE PRODUCT PIPE PULL SECTION AS IT PROCEEDS DURING PULLBACK SO THAT IT MOVES FREELY AND IS FORCE MAIN SEWER LINE NOT OVER STRESSED. TREE LINE BORE DRILLING FLUIDS FENCE LINE 1. CONTRACTOR SHALL SUBMIT THE COMPOSITION OF ALL DRILLING FLUIDS TO ENGINEER FOR APPROVAL. WETLANDS 2. CONTRACTOR SHALL NOT USE ANY DRILLING FLUID THAT DOES NOT COMPLY WITH PERMIT REQUIREMENTS AND ENVIRONMENTAL REGULATIONS. EXISTING DITCH LINE 3. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING, TRANSPORTING, AND STORING ANY WATER REQUIRED FOR DRILLING FLUIDS. 4. CONTRACTOR SHALL MAXIMIZE RECIRCULATION OF DRILLING FLUID SURFACE RETURNS. 5. CONTRACTOR SHALL PROVIDE SOLIDS CONTROL AND FLUID CLEANING EQUIPMENT OF A CONFIGURATION AND CAPACITY THAT CAN PROCESS SURFACE RETURNS AND PRODUCE DRILLING FLUID SUITABLE FOR REUSE. 6. DISPOSAL OF EXCESS DRILLING FLUID IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE CONDUCTED IN COMPLIANCE WITH ALL ENVIRONMENTAL REGULATIONS, RIGHT -OF -WAY AND WORKSPACE AGREEMENTS, AND PERMIT REQUIREMENTS. 7. CONTRACTOR SHALL SUBMIT DRILLING FLUID DISPOSAL PROCEDURES TO OWNER FOR APPROVAL. 8. CONTRACTOR SHALL EMPLOY BEST EFFORTS TO MAINTAIN FULL ANNULAR CIRCULATION OF DRILLING FLUID. - GAS GAS GAS GAS GAS GAS GAS OH OH XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX- W W W W W FM FM FM FM FM FM FM FM X X X X X -WET WET WET WEi WEl -WET-1 ­WET CIVIL ENGINEER THOMAS L. SAUNDERS, P.E. ENERGY LAND & INFRASTRUCTURE, LLC 1420 DONELSON PIKE, SUITE Al2 NASHVILLE, TN 37217 PHONE: 615 - 383 -6300 FAX: 615- 360 -8476 REVISION • , ® � Know what's below. Call before you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ \ � � - - _ _ _ - �� �� I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA GENERAL NOTES & LEGEND REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007-00-001 0 0 s A T -O -R #1 T -O -R #2 WIDTH OF PAY LIMITS FOR PAVEMENT REMOVAL AND REPAIR 1" VALVE 2" MIN. 2" MIN. (TYP.) (TYP.) CONCRETE MATCH EXISTING SECTION TACK EDGES SEE NOTE #4. ° d d FLOWABLE FILL (CONCRETE) OR AS APPROVED BY NCDOT. (TRAFFIC BEARING ROAD PLATE OR H -20 LOAD RATED STEEL PLATE CAN BE USED FOR 24 HOURS DURING CURING OF CONCRETE) EMBEDMENT (SEE SPECIFICATIONS FOR TYPE, COMPACTION, AND BLOCKING IF NEEDED) e L 36" MINIMUM - (FULL DEPTH VARIES) VA SURFACE COURSE 1.5" SF 9.5 (B- SECONDARY) INTERMEDIATE COURSE 4.0" 1 19.0 (B- SECONDARY) OR (C- PRIMARY) BASE COURSE 5.5" B 25.0 (B- SECONDARY) OR (C- PRIMARY) EMBEDMENT DEPTH VARIES (SEE SPECIFICATIONS) NOTES: 1. NEW PAVEMENT SHALL HAVE SECTION THICKNESS DESIGNED TO NCDOT SUPERPAVE STANDARDS AS PROVIDED BY ENGINEER OR MATCH EXISTING CONSTRUCTION, WHICH EVER IS GREATER OR AS SPECIFIED BY THE CONTRACT DOCUMENTS. 2. REFER TO EARTHWORK SPECIFICATIONS FOR EMBEDMENT AND FILL REQUIREMENTS. 3. THIS DETAIL SHOWS ASPHALT PAVEMENT REPLACEMENT. THE WIDTH OF PAY LIMITS SHALL APPLY TO STONE AND CONCRETE PAVEMENT AS WELL. 4. PAVEMENT TO BE SAW CUT PERPENDICULAR TO SURFACE. FACE TO BE NEAT, CLEAN & STRAIGHT. TACK PRIOR TO PATCH. TYPICAL UTILITY CUT REPLACEMENT DETAIL (NOT TO SCALE) NEW 16" PIPE )UCER O 3ALL VALVE 11 (�)TYPICAL FARM TAP/ LATERAL CONNECTION (NOT TO SCALE) (TYPICAL OF SITES 1, 3, & 6) T -O -r NEW 16" STOPPLE FOR T -O -R LOCATION SEE DETAIL 2, THIS SHEET EXISTING 16" GAS LINE -, SECTION A 45° T -O -R #1 �_ Z DIM. TDW STOPPLE LW DIM. DIMENSION TABLE PIPE DIAM. Z DIMENSION LW DIMENSION (MIN.) 4" 6" 17.75" 6" 8.5" 23" 8" 10.6" 26.75" 10" 13.4" 33.5" 12" 15.3" 36.5" 16" 21 " 48.75" 20" 26" 58" 24" 33.5" 68" 30" 38" 79" 4" - 6" PIPE: USE 1" THREAD -O -RING PLUG AND 2" DIA. DRILL 8" - 30" PIPE: USE 2" THREAD -O -RING PLUG AND 1"- 1.437" DIA. DRILL 4 THREAD -O -RING LOCATION DETAIL (NOT TO SCALE) 20' NEW 16" GAS LINE L+:j L4� FIELD DETERMINE r9 r9 16" TEMPORARY � H BY -PASS �_ H - - - -- —� 40' 0_O / I��rn��►.artir � i N TYPICAL STOPPLE PLACEMENT DETAIL (NOT TO SCALE) GRANULAR PAD /DRIVE /­ (SEE INSET B) SIDE VIEW MATERIALS TO BE WASHED AND CLEAN AND FREE OF FINES AND MATERIALS TO PROVIDE A MINIMUM 40% VOID SPACE. WEAR SURFACE - MIN 2 INCHES NO. 57 STONE OR EQUAL 10" GRANULAR SUBBASE a d d (1 -1/2" - 2 -1/2" STONE) ° d GEOTEXTILE FABRIC SUBGRADE GRAVEL PAVEMENT DETAIL (NOT TO SCALE) SAND BAGS FLOW DIVERSION CULVERT STREAM BED PIPELINE FLUME SHOULD BE SIZED TO HANDLE FLOW AND SUFFICIENT IN LENGTH TO ACCOMMODATE WIDENING TRENCH TO PREVENT FAILURE. SECTION A -A PUMP PIPELINE r--TRENCH SILT FENCE — F SF IF SF — IF — IF FLOW DIVERSION PIPE SAND BAGS SF —= SF SF �- IF IF SF A B IF — IF = IF — SF IF IF — IF — SF — s D BA S t IF SF IF B 50' A PUMP r � iF71� FILTER NOTES: BAG 1. PUMP SHOULD HAVE TWICE THE PUMPING CAPACITY OF ANTICIPATED FLOW. 2. ALL INTAKE HOSES WILL BE SCREENED. 3. DISMANTLE DOWNSTREAM DAM, THEN UPSTREAM DAM, KEEP PUMP RUNNING TO MAINTAIN STREAM FLOW. 5 STREAM CROSSING (PIPE /PUMP DIVERSION WIDTH OF PAY LIMITS FOR PAVEMENT REMOVAL AND REPAIR 2" MIN. 2" MIN (TYP.) (TYP.) TACK COAT e PRIME COAT CRUSHED STONE #67 COMPACTED IN 6" LAYERS - 4 ° d 4 12" ROCK DUST I 6" MIN. — 6" MIN. I 6" ROCK DUST 1-1 IT NOTES: 1. THIS DETAIL SHOWS ASPHALT PAVEMENT REPLACEMENT. THE WIDTH OF PAY LIMITS SHALL APPLY TO STONE AND CONCRETE PAVEMENT AS WELL. 2. PAVEMENT TO BE SAW CUT PERPENDICULAR TO SURFACE. FACE TO BE NEAT, CLEAN & STRAIGHT. TACK PRIOR TO PATCH. (i) TYPICAL PAVEMENT REPLACEMENT DETAIL (NOT TO SCALE) 1.5" ASPHALT SURFACE LAYER GRADING "E" 2" BITUMINOUS BINDER GRADING "B" 6" MINERAL AGGREGATE BASE TYPE "A ", GRADING "D" REVISION • , ® Know. whatls below. Call before you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ \ � � - - _ _ _ - j I I \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA GENERAL DETAILS REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # 4 ° QTY CAT # DESCRIPTION � CHECKED BY: SWH 1 0 TBD 16".375 WT X -65 CFB DRL PIPE 8 0 15368 16" WXW ANSI 600 GEAR BALL VALVE 2 0 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 0 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 ° 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90° WELD ELL FS 3R Y -52 dd d 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENTPROJECTNO: 2239872 8 ° DRAWING NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 I 0 15317 16 "X16 "X6" WELD RED. TEE STD WT Y -52 CRUSHED STONE #67 COMPACTED IN 6" LAYERS - 4 ° d 4 12" ROCK DUST I 6" MIN. — 6" MIN. I 6" ROCK DUST 1-1 IT NOTES: 1. THIS DETAIL SHOWS ASPHALT PAVEMENT REPLACEMENT. THE WIDTH OF PAY LIMITS SHALL APPLY TO STONE AND CONCRETE PAVEMENT AS WELL. 2. PAVEMENT TO BE SAW CUT PERPENDICULAR TO SURFACE. FACE TO BE NEAT, CLEAN & STRAIGHT. TACK PRIOR TO PATCH. (i) TYPICAL PAVEMENT REPLACEMENT DETAIL (NOT TO SCALE) 1.5" ASPHALT SURFACE LAYER GRADING "E" 2" BITUMINOUS BINDER GRADING "B" 6" MINERAL AGGREGATE BASE TYPE "A ", GRADING "D" REVISION • , ® Know. whatls below. Call before you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ \ � � - - _ _ _ - j I I \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA GENERAL DETAILS REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 0 TBD 16".375 WT X -65 CFB DRL PIPE 8 0 15368 16" WXW ANSI 600 GEAR BALL VALVE 2 0 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 0 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENTPROJECTNO: 2239872 REVISION: REVISION: DRAWING NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 I 0 15317 16 "X16 "X6" WELD RED. TEE STD WT Y -52 N 0 a 0 FILTER FABRIC SUPPLY WATER TO WASH WHEELS IF NECESSARY 50' MIN. PLAN VIEW 2' -3" WASHED STONE 2:1 OR FLATTER 6" MIN. ORIGINAL GRADE SECTION A PIPE /CULVERT IF NECESSARY CONSTRUCTION SPECIFICATIONS: 1. STONE SIZE - USE 2' -3" WASHED STONE OR LARGER AS SPECIFIED IN N.C. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2. WIDTH - 12' MIN. 3. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O.W. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WITH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS. 4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC R.O.W. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND /OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC R.O.W. MUST BE REMOVED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT (NOT TO SCALE) SEWN IN COI`IAIC('_F1nK1 CI C=\/C En[D PUMP DISCHA WITH WI GEOTEXTILE FABRIC ( UNDER AND COVERINC WOOD SILT -SAVER SEDIMENT FILTER BAG WOOD CHIPS GEOTEXTILE FABRIC (TYPE III) OR EXISTING VEGETATION TOP OF BANK 50' MIN. DISTANCE FROM STREAM STREAM PLAN VIEW NOTES: 1. SILT FENCE WITH WIRE BACKING IS USED TO INTERCEPT SMALL AMOUNTS OF SEDIMENT AND REDUCE VELOCITY FROM SHEET FLOW ONLY. USE SILT FENCE WITH WIRE BACKING UP- GRADIENT TO, AND ALONG THE PERIMETER OF STREAMS, WETLANDS, PONDS, SPRINGS, OR OTHER NATURAL WATER RESOURCES LOCATED WITHIN OR ADJACENT TO THE PROJECT RIGHT OF WAY. 2. THE MAXIMUM DRAINAGE AREA SIZE FOR CONTINUOUS SILT FENCE WITH BACKING SHALL BE 1 ACRE PER 150 LINEAR FEEL OF FENCE LENGTH. MAXIMUM SLOPE LENGTH BEHIND FENCE ON UPSLOPE SIDE SHALL BE 290 FEET (AS MEASURED ALONG GROUND SURFACE) 3. MAINTENANCE SHALL BE PERFORMED AS NEEDED; CAPTURED SOIL MATERIAL SHALL BE REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE AND /OR WHEN EVIDENCE OF FILTER CLOGGING IS OBSERVED. 4. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTENING WIRE TO THEM.WOVEN WIRE FENCE BACKING TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES.THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST SIX PER POST. 5. FABRIC SHALL BE FASTENED SECURELY TO WOVEN WIRE FENCE BACKING WITH THE TIES SPACED EVERY 24 INCHES ALONG TOP AND MIDSECTION. 6. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WITH WIRE BACKING WHEN IT HAS ACCUMULATED TO ONE -HALF THE ORIGINAL HEIGHT OF THE STRUCTURE AND PAID FOR UNDER ITEM NUMBER 209 -05, SEDIMENT REMOVAL PER CUBIC YARD. 7. STOP SILT FENCE AT PAVED CROSSINGS, USE ALTERNATIVE MEASURE IF NECESSARY. 8. COORDINATE SILT FENCE PLACEMENT IN WATER QUALITY BUFFERS TO MINIMIZE IMPACT. 9. REINFORCE TOE OF THE FENCE WITH 12 INCHES OF NC DOT #5 OR #57 WASHED STONE WHEN FLOW WILL RUN PARALLEL TO THE TOE OF THE FENCE. b a o 0 0 o SILT FENCE FILTER CLOTH 00 0o ALONG ENTIRE INSIDE 8' MAX STANDARD FABRIC oo FACE OF STRAW BALES PLASTIC OR WIRE TIES. WITH WIRE FENCE 4 U MAX EXTRA STRENGHT o ° o ° WITHOUT WIRE FENCE o WOVEN WIRE FENCE BACKING 4'MAX ON PONDING AREAS ° a 6.5' DIA. TOTAL WIDTH 32' MIN. —1 2" MIN. STRAW BALES p (MIN.) DISCHARGE FROM WITH STAKES a DEWATERING PUMP 0 0 o ° B SILT FENCE WIITH WIRE BACKING NO MORE THAN 24" °o - ° RIP -RAP OF SUFFICIENT FABRIC TOTAL WIDTH 36" OF FABRIC °o o° SIZE AND DEPTH TO ALLOWED ABOVE °o a° q RESIST MOVEMENT FROM GROUND LEVEL - PUMP DISCHARGE BOTTOM OF WOVEN WIRE FENCE EXISTING BACKING SHALL BE POSITIONED AT GROUND RIP -RAP TO RETAIN THE BOTTOM OF THE TRENCH CLASS 1 AGGREGATE REQUIRED VOLUME (cf) = PUMP DISCHARGE (gpm) X 16 BOTTOM OF STEEL POST (TYP.) 24" MIN. 6" SPILLWAY STRAW BALE 8" MIN. TRENCH DEPTH STEEL POST (STD. "T" OR "U" SECTION) ANCHOR POSITION POST /FABRIC PLATES ASSEMBLY AT VERTICAL TO A MAX 5' FROM I –_ THE VERTICAL (ANGLED TOWARD FLOW) OPERATION NOTES: 2" MIN 1. THE EXCAVATED AREA SHOULD BE A MINIMUM OF 3 FEET SILT FENCE WITH WIRE BACKING FABRIC I RIP RAP CLASS BELOW THE BASE OF THE STRAW BALES AND SILT FENCE. AND WOVEN WIRE FENCE BACKING TIEBACK BETWEEN FENCE A SIZE (MIN.) 2. ONCE WATER LEVEL NEARS THE CREST OF STONE WEIR, 26" FABRIC POST AND ANCHOR STAKE EXCAVATED AREA SHUT OFF PUMP WHILE THE STRUCTURE DRAINS DOWN ABOVE GROUND TO BE NO. 8 (0.25 ") HOLLOW SECTION A -A (3 - MIN. WET TO THE TOP OF THE WET STORAGE PIT. EXISTING GROUND BRAIDED POLYPROPYLENE SECURE TO POST STORAGE DEPTH) 3. THE WET STORAGE PIT MAY BE DEWATERED ONLY AFTER F \W ROPE WITH MINIMUM BY WRAPPING A MINIMUM OF 6 HOURS OF SEDIMENT SETTLING TIME. TENSILE STRENGTH OF 1,200 6" FACE PUMP EFFLUENT ACROSS A WELL VEGETATED AREA OR BACKFILL WITH COMPACTED SOIL POUNDS CLASS 1 AGGREGATE BASE THROUGH SILT FENCE PRIOR TO DISCHARGE. 8„ III 4. ONCE WET STORAGE AREA BECOMES FILLED TO ONE SILT FENCE WITH 2:1 (H: V) HALF THE EXCAVATED DEPTH, THE SEDIMENT SHALL BE ICI MIN. 24" POST FLOW WIRE BACKING 2:1 (H: V) PROPERLY REMOVED AND DISPOSED. ANCHOR SILT FENCE WITH WIRE 4" I� BELOW GROUND FLOW o �r BACKING FABRIC 8" DEEP WITH 4" RUN -OUT LENGTH. COMPACT BACKFILL. ANCHOR STAKE MIN. 18" EXISTING GROUND RIP RAP, CLASS LONG TO BE PLACED 12" CLASS A SIZE (MIN.) SECTION B -B SECTIONAL VIEW INTO GROUND SILT FENCE TIEBACK EXCAVATED AREA OPTIONAL LIFTING NOTES: STRAPS 1. SEDIMENT FILER BAGS SHOULD NOT BE PLACED WITHIN A JURISDICTIONAL WETLAND OR WITHIN 50 FEET OF A STABILIZED OUTLET, STREAM, OR OTHER NATURAL WATERS RESOURCE. 2. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 3. SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN SEDIMENT HAS ACCUMULATED TO %2 OF THE BAGS CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. ;IES WITH GROUND LINE SLOPE ?' -0" MIN. 2' -0" MIN. SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE III) 6" MIN. OR EXISTING VEGETATION SILT -SAVER DEWATER FILTER BAG 6" X 15" SWALE OR OTHER SEDIMENT PUMP 13" X 15" CONTROL DEVICE PUMP 13" X 25" 0' -6" PUMP NOTE: A CONSTRUCT SEDIMENT BARRIER ISSUE DATE: MARCH 13, 2015 AND CHANNELIZE RUNOFF TO LL SEDIMENT TRAPPING DEVICE MK NO QTY z20' R MIN. DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 0 Q O L w o o o o C7 12' MIN. QK WIDTH a- z �< w REVISION: - - -- PIPE /CULVERT IF NECESSARY FILTER FABRIC SUPPLY WATER TO WASH WHEELS IF NECESSARY 50' MIN. PLAN VIEW 2' -3" WASHED STONE 2:1 OR FLATTER 6" MIN. ORIGINAL GRADE SECTION A PIPE /CULVERT IF NECESSARY CONSTRUCTION SPECIFICATIONS: 1. STONE SIZE - USE 2' -3" WASHED STONE OR LARGER AS SPECIFIED IN N.C. DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. 2. WIDTH - 12' MIN. 3. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC R.O.W. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WITH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE THROUGH USE OF SAND BAGS, GRAVEL, BOARDS, OR OTHER APPROVED METHODS. 4. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC R.O.W. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND /OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC R.O.W. MUST BE REMOVED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT (NOT TO SCALE) SEWN IN COI`IAIC('_F1nK1 CI C=\/C En[D PUMP DISCHA WITH WI GEOTEXTILE FABRIC ( UNDER AND COVERINC WOOD SILT -SAVER SEDIMENT FILTER BAG WOOD CHIPS GEOTEXTILE FABRIC (TYPE III) OR EXISTING VEGETATION TOP OF BANK 50' MIN. DISTANCE FROM STREAM STREAM PLAN VIEW NOTES: 1. SILT FENCE WITH WIRE BACKING IS USED TO INTERCEPT SMALL AMOUNTS OF SEDIMENT AND REDUCE VELOCITY FROM SHEET FLOW ONLY. USE SILT FENCE WITH WIRE BACKING UP- GRADIENT TO, AND ALONG THE PERIMETER OF STREAMS, WETLANDS, PONDS, SPRINGS, OR OTHER NATURAL WATER RESOURCES LOCATED WITHIN OR ADJACENT TO THE PROJECT RIGHT OF WAY. 2. THE MAXIMUM DRAINAGE AREA SIZE FOR CONTINUOUS SILT FENCE WITH BACKING SHALL BE 1 ACRE PER 150 LINEAR FEEL OF FENCE LENGTH. MAXIMUM SLOPE LENGTH BEHIND FENCE ON UPSLOPE SIDE SHALL BE 290 FEET (AS MEASURED ALONG GROUND SURFACE) 3. MAINTENANCE SHALL BE PERFORMED AS NEEDED; CAPTURED SOIL MATERIAL SHALL BE REMOVED WHEN "BULGES" DEVELOP IN THE SILT FENCE AND /OR WHEN EVIDENCE OF FILTER CLOGGING IS OBSERVED. 4. STEEL POSTS SHALL HAVE A PROJECTION FOR FASTENING WIRE TO THEM.WOVEN WIRE FENCE BACKING TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES.THE WIRE FASTENERS SHOULD BE EVENLY SPACED WITH AT LEAST SIX PER POST. 5. FABRIC SHALL BE FASTENED SECURELY TO WOVEN WIRE FENCE BACKING WITH THE TIES SPACED EVERY 24 INCHES ALONG TOP AND MIDSECTION. 6. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WITH WIRE BACKING WHEN IT HAS ACCUMULATED TO ONE -HALF THE ORIGINAL HEIGHT OF THE STRUCTURE AND PAID FOR UNDER ITEM NUMBER 209 -05, SEDIMENT REMOVAL PER CUBIC YARD. 7. STOP SILT FENCE AT PAVED CROSSINGS, USE ALTERNATIVE MEASURE IF NECESSARY. 8. COORDINATE SILT FENCE PLACEMENT IN WATER QUALITY BUFFERS TO MINIMIZE IMPACT. 9. REINFORCE TOE OF THE FENCE WITH 12 INCHES OF NC DOT #5 OR #57 WASHED STONE WHEN FLOW WILL RUN PARALLEL TO THE TOE OF THE FENCE. b a o 0 0 o SILT FENCE FILTER CLOTH 00 0o ALONG ENTIRE INSIDE 8' MAX STANDARD FABRIC oo FACE OF STRAW BALES PLASTIC OR WIRE TIES. WITH WIRE FENCE 4 U MAX EXTRA STRENGHT o ° o ° WITHOUT WIRE FENCE o WOVEN WIRE FENCE BACKING 4'MAX ON PONDING AREAS ° a 6.5' DIA. TOTAL WIDTH 32' MIN. —1 2" MIN. STRAW BALES p (MIN.) DISCHARGE FROM WITH STAKES a DEWATERING PUMP 0 0 o ° B SILT FENCE WIITH WIRE BACKING NO MORE THAN 24" °o - ° RIP -RAP OF SUFFICIENT FABRIC TOTAL WIDTH 36" OF FABRIC °o o° SIZE AND DEPTH TO ALLOWED ABOVE °o a° q RESIST MOVEMENT FROM GROUND LEVEL - PUMP DISCHARGE BOTTOM OF WOVEN WIRE FENCE EXISTING BACKING SHALL BE POSITIONED AT GROUND RIP -RAP TO RETAIN THE BOTTOM OF THE TRENCH CLASS 1 AGGREGATE REQUIRED VOLUME (cf) = PUMP DISCHARGE (gpm) X 16 BOTTOM OF STEEL POST (TYP.) 24" MIN. 6" SPILLWAY STRAW BALE 8" MIN. TRENCH DEPTH STEEL POST (STD. "T" OR "U" SECTION) ANCHOR POSITION POST /FABRIC PLATES ASSEMBLY AT VERTICAL TO A MAX 5' FROM I –_ THE VERTICAL (ANGLED TOWARD FLOW) OPERATION NOTES: 2" MIN 1. THE EXCAVATED AREA SHOULD BE A MINIMUM OF 3 FEET SILT FENCE WITH WIRE BACKING FABRIC I RIP RAP CLASS BELOW THE BASE OF THE STRAW BALES AND SILT FENCE. AND WOVEN WIRE FENCE BACKING TIEBACK BETWEEN FENCE A SIZE (MIN.) 2. ONCE WATER LEVEL NEARS THE CREST OF STONE WEIR, 26" FABRIC POST AND ANCHOR STAKE EXCAVATED AREA SHUT OFF PUMP WHILE THE STRUCTURE DRAINS DOWN ABOVE GROUND TO BE NO. 8 (0.25 ") HOLLOW SECTION A -A (3 - MIN. WET TO THE TOP OF THE WET STORAGE PIT. EXISTING GROUND BRAIDED POLYPROPYLENE SECURE TO POST STORAGE DEPTH) 3. THE WET STORAGE PIT MAY BE DEWATERED ONLY AFTER F \W ROPE WITH MINIMUM BY WRAPPING A MINIMUM OF 6 HOURS OF SEDIMENT SETTLING TIME. TENSILE STRENGTH OF 1,200 6" FACE PUMP EFFLUENT ACROSS A WELL VEGETATED AREA OR BACKFILL WITH COMPACTED SOIL POUNDS CLASS 1 AGGREGATE BASE THROUGH SILT FENCE PRIOR TO DISCHARGE. 8„ III 4. ONCE WET STORAGE AREA BECOMES FILLED TO ONE SILT FENCE WITH 2:1 (H: V) HALF THE EXCAVATED DEPTH, THE SEDIMENT SHALL BE ICI MIN. 24" POST FLOW WIRE BACKING 2:1 (H: V) PROPERLY REMOVED AND DISPOSED. ANCHOR SILT FENCE WITH WIRE 4" I� BELOW GROUND FLOW o �r BACKING FABRIC 8" DEEP WITH 4" RUN -OUT LENGTH. COMPACT BACKFILL. ANCHOR STAKE MIN. 18" EXISTING GROUND RIP RAP, CLASS LONG TO BE PLACED 12" CLASS A SIZE (MIN.) SECTION B -B SECTIONAL VIEW INTO GROUND SILT FENCE TIEBACK EXCAVATED AREA OPTIONAL LIFTING NOTES: STRAPS 1. SEDIMENT FILER BAGS SHOULD NOT BE PLACED WITHIN A JURISDICTIONAL WETLAND OR WITHIN 50 FEET OF A STABILIZED OUTLET, STREAM, OR OTHER NATURAL WATERS RESOURCE. 2. CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 3. SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN SEDIMENT HAS ACCUMULATED TO %2 OF THE BAGS CAPACITY OR IN ACCORDANCE WITH THE MANUFACTURE'S RECOMMENDATIONS. ;IES WITH GROUND LINE SLOPE ?' -0" MIN. 2' -0" MIN. SILT FENCE WITH WIRE BACKING GEOTEXTILE FABRIC (TYPE III) 6" MIN. OR EXISTING VEGETATION SILT -SAVER DEWATER FILTER BAG 6" X 15" 2" - 3" PUMP 13" X 15" 0' -4" PUMP 13" X 25" 0' -6" PUMP – SEDIMENT FILTER BAG 0' -6" MIN. VARIES 4 TYPICAL SEDIMENT FILTER BAG (NOT TO SCALE) USE WOOD CHIPS PAD TO LEVEL BAG FROM NATURAL GROUNDLINE 10' -0" 50' MINIMUM MINIMUM EXISTING VEGETATIVE BUFFER GEOTEXTILE FABRIC (TYPE III) SECTION A SILT FENCE DETAIL (NOT TO SCALE) SILT FENCE r WITH WIRE BACKING 2' MIN. TOP OF BANK EXISTING GROUNDLINE GEOTEXTILE FABRIC (TYPE III) STREAM OR EXISTING VEGETATION 0 DEWATERING STRUCTURE DETAIL (NOT TO SCALE) SHLD. EDGE OF PAVEMENT i SEE INSET A t; EXCELSIOR �, O�� & WATTLE MATTING BACK SLOPE \ y ISOMETRIC VIEW 2' (MAX.) I ♦ MATTING 2'UPSLOPE STAKE 2' DOWNSLOPE STAKE CROSS SECTION VEE DITCH 2'UPSLOPE l 2" F STAKE, MATTING `� 2' DOWNSLOPE STAKE CROSS SECTION TRAPEZOIDAL DITCH NATURAL GROUND NATURAL GROUND WATTLE DETAIL (NOT TO SCALE) NOTES: 1. USE MINIMUM 12" DIAMETER EXCELSIOR WATTLE. 2. USE 2' WOODEN STAKES WITH A 2" X 2" NOMINAL CROSS SECTION. 3. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. 4. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. 5. PROVIDE STAPLES MADE OF 0.125" DIAMETER STEEL WIRE FORMED INTO A'U' SHAPE NOT LESS THAN 12" IN LENGTH. 6. INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. 7. INSTALL MATTING IN ACCORDANCE WITH THE NCDOT STANDARD SPECIFICATIONS. ST, INSET A STA INSET B TOP VIEW REVISION • , ® Know what's below. Call before you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ \ � � - - _ _ _ - I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT VARIOUS COUNTIES, NORTH CAROLINA GENERAL EROSION CONTROL DETAILS REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -00 -003 a N O 0 N a ' 1 I I \ I r owe, \ A\ I I / / GCESS - I ■�, IR ') CARL GLENN ` - - HARRIS \ D.B. 1271, PG. 446 \ TRACT 1 - PIN# 930665356100 \ O I 1 NATHAN R. BRYANT & I ` i 11 GOLDIE R. LOCKLEAR ` D.B. 452, PG. 251 PROPOSED 2 \ EXISTING 1,6_GAS LINE PIN# 930655945800 PERMANENT EAS ENT i (TO REMAIN) PROPOSED 10' OF - - ��7/ — / TEMPORARY WORKSPACE �'o —GAS, GAS � rr-rnrr nn GAS —GsS- s_ I o 0 I__- _rn STA. 0 +00 I STA. 5595 +57 EXISTING 50' GAS EASEMENT EXISTING 16" GAS LINE - - - - (TO BE ABANDONED) GRAPHIC SCALE (IN FEET) 50 0 25 50 100 1 inch = 50 ft. OVERALL SITE LAYOUT SCALE: 1" = 50' 1 \ 1 ANNIL L. TRACT 3 LOCKLEAR oy JACKIE DEAN D.B. 601, PG. 736 HUNT PIN# 930665439300 1 D.B. 1683, PG. 389 -- -- — s TERRY A. & PIN# 930665239000 �� GRAVEL DRIVE _ BARBARA CUMMINGS D.B. 566, PG. 860 - - PIN# 930655917400 _ - 1 � 1 � 1 INSTALL CONSTRUCTION ENTRANCE, SEE DETAIL 1, SHEET 3007 -00 -003 1 SALEM MISSIONARY I BAPTIST CHURCH I D.B. 829, PG. 641 PIN# 930665516200 1 1 \ 1 1 4 i 1 \ I 1 1 1 ' I \ SALEM MISSONARY BAPTIST CHURCH ' D.B. 829, PG. 639 1 PIN# 930664492700 I � 1 ` 1 ` I 1 ` 1 ` I \ 1 ` 1 1 I , \ -1 ' 1 I _ — 1 _ - -OIL TRACT 5 ZIATTA BULLARD D.B. 579, PG. 940 PIN# 930666811300 RELOCATE EXISTING GRAVEL DRIVEWAY, MATCH EXISTING. (SEE DETAIL 4, SHEET 3007 -00 -002) � ♦ p0 px %* Q) G \ \\ F ♦ O� 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 - I -- 1 I 1 1 I 1 I 1 1 I 1 i I PROPOSED 23' PERMANENT EASEMENT _ 1 PROPOSED 10' OF TEMPORARY WORKSPACE I ♦ *% TRACT CHARD 6 I RI ! I � ♦ CHANCE v \ �x \ h�o \ 1 1 JOE G. EXISTING 16" GAS L�NE \ LOCKLEAR (TO BE ABANDONED) \D.B. 623, PG. 280 \ 1 D.B. 1340, PG. 278 1 PIN# 930675204900 1 PROPOSED 12' \ ,��x ♦ ♦ ` �� TEMPORARY ACCESS DRIVE I \ \\ ♦♦ ` 1.� (DEDICATED FOR LAND OWNER'S USE ONLY) s � END NEW 16" GAS LINE \ \\ 1 4% ♦ ♦ STA. 14 +43 = STA. 5610 +09 f- \ �**;`PROPOSED 12' j TEMPORARY WORKSPACE (TED LYNN EARL CHAVIS D.B. 671, PG. 278 PIN# 930675796800 - EXISTING 16" GAS LINE AGGE55 EASEIC/IEN I `\ ,�0 `, \ EXISTING 50' \ \\ p° `\ GAS EASEMENT \ \\ ^ ^x i ` \ / \ JOE GLENN LOCKLEAR / - • \ D.B. 507, PG. 290 \ PIN# 930664985300 \ / S ?_Q P ovo 1 / \ (TO REMAIN) INSTALL CONSTRUCTION ENTRANCE, SEE DETAIL 1, REVISION • ® � Knowwhars below. Callbefore you di Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f �' � � - _ _ _ - �� � / \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ROBESON COUNTY, NORTH CAROLINA SITE 1 - RED HILLS ROAD OVERALL SITE LAYOUT REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007-01-004 a h a a 0 M C O 11 O Q d co O d co O a M O d M O d M O d M O II 11 II II Il II Il II 11 II 11 II Z W Z W Z W Z W Z W Z W � TRACT 1 TRACT 2 TRACT 3 TRACT 4 TRACT 5 TRACT 6 TRACT 7 W z NATHAN R. BRYANT & CAROL GLENN JACKIE DEAN ANNIE L. ZIATA RICHARD LYNNE EARL GOLDIE R. LOCKLEAR HARRIS HUNT LOCKLEAR BULLARD CHANCE CHAVIS 0 D.B. 452, PG. 251 D.B. 1271, PG. 446 D.B. 1683, PG. 389 D.B. 601, PG. 736 D.B. 579, PG. 940 D.B. 1340, PG. 278 D.B. 671, PG. 278 H 16" x 0.219" WT X -42 po O 7 9 11 O O O2 O O 7 9 11 1 3 16" x 0.219" WT X -42 \ \ \ GEO -CORE B -1 \ STA. 8 +02 \ OFFSET = -7.4 \ PROPOSED EXISTING 50' r� °" O °�/ �\ 30' 05' — _ an an ■�o� ♦ / TEMPORARY WORKSPACE , / GAS EASEMENT _1 V 0 12' x 20' + ♦ \ \ � � BORE PIT o ■ so +- ` / PROPOSED / - - - -- o -- -'%o `co —�` ` -�.�RE PIT °� ♦ ♦ ♦ \ PERMANENT EASEMENT STA. 2 +59 � ° ■ + BEGIN NEW 16" GAS LINE INSTALL NEW/FARM TAPS _ � � C) L0 `�' - - - - -- J XG G ` Gp� XG _' �px `` ♦ ♦ / STA. 0 +00 = �j� ■ o+ ■ / - - _ _ 55 ° ` ♦ - / STA. 5595 +57 5 s�HE�E�C i ° co M _ ���� ��!ro' 16'_ 5555X5 - / __ - - -__ \\ °° y , o ' `�♦ ♦ ♦ \ 7 -WET i X� i O - -� � , N ( HI� CD ' Oy + -X! IO�WET x –_– \ \ 0010 L0 011111111, _ v v �/� _ _ rte°= -N % cy) �o Q0 - ° AC d� GAS o _ _ _ - - - 1.0 DO -Y\,p\ ` I OO ♦ ,.✓`' \ ` _ _ i GAS ®G�'s c+:) _____-- - - - -LO / – °" \\ / / / / / AV V / � Q-5 �� \\ v ��co. ♦ PROPOSED EXISTING 16" GAS LINE----- - - - - -- / °" \ �,� h.w �♦ ♦ v Q o (TO REMAIN) rn __--- - --- -- �' - ' °N \ , = = \ ♦ TEMPORARY WORKSPACE 041* - -\ a -� L0 L0 - -- x/ `\ -- -� \ \ �, -07 ♦ per ••. PROPOSED - - - - -- EXISTING 16" GAS LINE _ Q \ 00% O ♦ • \ PORTION TO BE ABANDONED ` x ,- x ` ♦ .• PERMANENT EASEMENT '� ( ) \ \ ..,.,.. �Oo \ - -- ••. STA. 13 +83 \ \ `\ 6 ♦ ♦ ♦ ♦ •• INSTALL NEWFF KM TAP / ° \ ,/ ` p�� ��,��' /END NEW 16" GAS LINE ` �(P\ , �coo� ,\0`X *,''C ��� STA. 14 +43 = \ ♦ ♦ �� STA.5610 +09 N *ss / \ \ O O s ,♦ • • EXISTING 50' °x • EXISTING 16" GAS LINE GAS EASEMENT PLAN (PORTION TO BE ABANDONED) ALIGNMENT PLAN \ EXISTING 30' o qs SCALE: 1" = 50' \ \ \ ` ACCESS EASEMENT '\ o G46 GRAPHIC SCALE (IN FEET) ` \ / \ \\ yVJ`� \G4S \ 50 0 25 50 100 \ \ \ \ Gqs EXISTING 16" GAS LINE 1 inch = 50 ft. \ / \ /� \ (TO REMAIN) °o \Qws ZA W J_ 11 O ry a_ 220 co 00 S I I F- d >Z N + PROFILE VERTICAL SCALE: 1" = 5' a -,- -- -` -- HORIZONTAL SCALE: 1" = 50' c/) o 210 - 200 - 190 - 180 - + z o ,\ co � 11 11 U) GEO - CORE B -1 O O Q O STA. 8 +01.7 c7 U = � U SURF. ELEV = 206.2 / \� z w p ,, -' a. � TERM ELEV = 176.2 \ Zo U) O O OFFSET 7.41- �.'��- S! \ J +o ° LLJ ���/ \` M Q -` oo� .I o - -, U) _ - \�� LOOSE �� 0 O II SAND 3 -4 -4 Q F- M 4' MIN. COVER \\ LL Q F- 2 -2 -2 N =4 \\ W –� 16" VERY LOOSE Z / SAND ` / 2 -3 -4 ` W f' / N =7 ` Lo L ) /�/ 84 L.F. - CONVENTIONAL OR cn M N / 0 I I / / 2 -5 -4 co /' N_9 07 o w �� co) 4' MIN. COVER z o 'y �\� '`� END BORE 16" w Q ,� � (D 1 ~ /•- c�\1 5-7-10 STA. = 8 +10 z Z .' m t- " N =17 INV. EL. = 196.43 ,/ Z 11 w / / w z _ Co. cn ? --------- - - - - -- - -- --------- - - - - - -- 7 -9 -8 N =17 FIRM 4 MIN COVER SAND �/�• 16, 11 -10 -6 N =16 N � N 00 00 N � 00 0) N M ( - f� 0 0 � O 0O 0 M 0 M CO t7]116 0 0 0 0 � N C N C N 0 N 0 1 N D N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I O M O OJ L0 a a) N ' 'T 00 0 00 L0 C CV � J J C�10 0 � 00 O O V V O M M� M M � Q 0 O O L O N - � 0) O O L O N 00 0 � W L I M M 11 1 O 1 � TRACT 1 TRACT 2 TRACT 3 TRACT 4 TRACT 5 TRACT 6 TRACT 7 W z NATHAN R. BRYANT & CAROL GLENN JACKIE DEAN ANNIE L. ZIATA RICHARD LYNNE EARL GOLDIE R. LOCKLEAR HARRIS HUNT LOCKLEAR BULLARD CHANCE CHAVIS 0 D.B. 452, PG. 251 D.B. 1271, PG. 446 D.B. 1683, PG. 389 D.B. 601, PG. 736 D.B. 579, PG. 940 D.B. 1340, PG. 278 D.B. 671, PG. 278 H 16" x 0.219" WT X -42 po O 7 9 11 O O O2 O O 7 9 11 1 3 16" x 0.219" WT X -42 \ \ \ GEO -CORE B -1 \ STA. 8 +02 \ OFFSET = -7.4 \ PROPOSED EXISTING 50' r� °" O °�/ �\ 30' 05' — _ an an ■�o� ♦ / TEMPORARY WORKSPACE , / GAS EASEMENT _1 V 0 12' x 20' + ♦ \ \ � � BORE PIT o ■ so +- ` / PROPOSED / - - - -- o -- -'%o `co —�` ` -�.�RE PIT °� ♦ ♦ ♦ \ PERMANENT EASEMENT STA. 2 +59 � ° ■ + BEGIN NEW 16" GAS LINE INSTALL NEW/FARM TAPS _ � � C) L0 `�' - - - - -- J XG G ` Gp� XG _' �px `` ♦ ♦ / STA. 0 +00 = �j� ■ o+ ■ / - - _ _ 55 ° ` ♦ - / STA. 5595 +57 5 s�HE�E�C i ° co M _ ���� ��!ro' 16'_ 5555X5 - / __ - - -__ \\ °° y , o ' `�♦ ♦ ♦ \ 7 -WET i X� i O - -� � , N ( HI� CD ' Oy + -X! IO�WET x –_– \ \ 0010 L0 011111111, _ v v �/� _ _ rte°= -N % cy) �o Q0 - ° AC d� GAS o _ _ _ - - - 1.0 DO -Y\,p\ ` I OO ♦ ,.✓`' \ ` _ _ i GAS ®G�'s c+:) _____-- - - - -LO / – °" \\ / / / / / AV V / � Q-5 �� \\ v ��co. ♦ PROPOSED EXISTING 16" GAS LINE----- - - - - -- / °" \ �,� h.w �♦ ♦ v Q o (TO REMAIN) rn __--- - --- -- �' - ' °N \ , = = \ ♦ TEMPORARY WORKSPACE 041* - -\ a -� L0 L0 - -- x/ `\ -- -� \ \ �, -07 ♦ per ••. PROPOSED - - - - -- EXISTING 16" GAS LINE _ Q \ 00% O ♦ • \ PORTION TO BE ABANDONED ` x ,- x ` ♦ .• PERMANENT EASEMENT '� ( ) \ \ ..,.,.. �Oo \ - -- ••. STA. 13 +83 \ \ `\ 6 ♦ ♦ ♦ ♦ •• INSTALL NEWFF KM TAP / ° \ ,/ ` p�� ��,��' /END NEW 16" GAS LINE ` �(P\ , �coo� ,\0`X *,''C ��� STA. 14 +43 = \ ♦ ♦ �� STA.5610 +09 N *ss / \ \ O O s ,♦ • • EXISTING 50' °x • EXISTING 16" GAS LINE GAS EASEMENT PLAN (PORTION TO BE ABANDONED) ALIGNMENT PLAN \ EXISTING 30' o qs SCALE: 1" = 50' \ \ \ ` ACCESS EASEMENT '\ o G46 GRAPHIC SCALE (IN FEET) ` \ / \ \\ yVJ`� \G4S \ 50 0 25 50 100 \ \ \ \ Gqs EXISTING 16" GAS LINE 1 inch = 50 ft. \ / \ /� \ (TO REMAIN) °o \Qws ZA W J_ 11 O ry a_ 220 co 00 S I I F- d >Z N + PROFILE VERTICAL SCALE: 1" = 5' a -,- -- -` -- HORIZONTAL SCALE: 1" = 50' c/) o 210 - 200 - 190 - 180 - + z o ,\ co � 11 11 U) GEO - CORE B -1 O O Q O STA. 8 +01.7 c7 U = � U SURF. ELEV = 206.2 / \� z w p ,, -' a. � TERM ELEV = 176.2 \ Zo U) O O OFFSET 7.41- �.'��- S! \ J +o ° LLJ ���/ \` M Q -` oo� .I o - -, U) _ - \�� LOOSE �� 0 O II SAND 3 -4 -4 Q F- M 4' MIN. COVER \\ LL Q F- 2 -2 -2 N =4 \\ W –� 16" VERY LOOSE Z / SAND ` / 2 -3 -4 ` W f' / N =7 ` Lo L ) /�/ 84 L.F. - CONVENTIONAL OR cn M N / 0 I I / / 2 -5 -4 co /' N_9 07 o w �� co) 4' MIN. COVER z o 'y �\� '`� END BORE 16" w Q ,� � (D 1 ~ /•- c�\1 5-7-10 STA. = 8 +10 z Z .' m t- " N =17 INV. EL. = 196.43 ,/ Z 11 w / / w z _ Co. cn ? --------- - - - - -- - -- --------- - - - - - -- 7 -9 -8 N =17 FIRM 4 MIN COVER SAND �/�• 16, 11 -10 -6 N =16 N � N 00 00 N � 00 0) N M ( - f� 0 0 � O 0O 0 M 0 M CO t7]116 0 0 0 0 � N C N C N 0 N 0 1 N D N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I H 16" x 0.219" WT X -42 po O 7 9 11 O O O2 O O 7 9 11 1 3 16" x 0.219" WT X -42 \ \ \ GEO -CORE B -1 \ STA. 8 +02 \ OFFSET = -7.4 \ PROPOSED EXISTING 50' r� °" O °�/ �\ 30' 05' — _ an an ■�o� ♦ / TEMPORARY WORKSPACE , / GAS EASEMENT _1 V 0 12' x 20' + ♦ \ \ � � BORE PIT o ■ so +- ` / PROPOSED / - - - -- o -- -'%o `co —�` ` -�.�RE PIT °� ♦ ♦ ♦ \ PERMANENT EASEMENT STA. 2 +59 � ° ■ + BEGIN NEW 16" GAS LINE INSTALL NEW/FARM TAPS _ � � C) L0 `�' - - - - -- J XG G ` Gp� XG _' �px `` ♦ ♦ / STA. 0 +00 = �j� ■ o+ ■ / - - _ _ 55 ° ` ♦ - / STA. 5595 +57 5 s�HE�E�C i ° co M _ ���� ��!ro' 16'_ 5555X5 - / __ - - -__ \\ °° y , o ' `�♦ ♦ ♦ \ 7 -WET i X� i O - -� � , N ( HI� CD ' Oy + -X! IO�WET x –_– \ \ 0010 L0 011111111, _ v v �/� _ _ rte°= -N % cy) �o Q0 - ° AC d� GAS o _ _ _ - - - 1.0 DO -Y\,p\ ` I OO ♦ ,.✓`' \ ` _ _ i GAS ®G�'s c+:) _____-- - - - -LO / – °" \\ / / / / / AV V / � Q-5 �� \\ v ��co. ♦ PROPOSED EXISTING 16" GAS LINE----- - - - - -- / °" \ �,� h.w �♦ ♦ v Q o (TO REMAIN) rn __--- - --- -- �' - ' °N \ , = = \ ♦ TEMPORARY WORKSPACE 041* - -\ a -� L0 L0 - -- x/ `\ -- -� \ \ �, -07 ♦ per ••. PROPOSED - - - - -- EXISTING 16" GAS LINE _ Q \ 00% O ♦ • \ PORTION TO BE ABANDONED ` x ,- x ` ♦ .• PERMANENT EASEMENT '� ( ) \ \ ..,.,.. �Oo \ - -- ••. STA. 13 +83 \ \ `\ 6 ♦ ♦ ♦ ♦ •• INSTALL NEWFF KM TAP / ° \ ,/ ` p�� ��,��' /END NEW 16" GAS LINE ` �(P\ , �coo� ,\0`X *,''C ��� STA. 14 +43 = \ ♦ ♦ �� STA.5610 +09 N *ss / \ \ O O s ,♦ • • EXISTING 50' °x • EXISTING 16" GAS LINE GAS EASEMENT PLAN (PORTION TO BE ABANDONED) ALIGNMENT PLAN \ EXISTING 30' o qs SCALE: 1" = 50' \ \ \ ` ACCESS EASEMENT '\ o G46 GRAPHIC SCALE (IN FEET) ` \ / \ \\ yVJ`� \G4S \ 50 0 25 50 100 \ \ \ \ Gqs EXISTING 16" GAS LINE 1 inch = 50 ft. \ / \ /� \ (TO REMAIN) °o \Qws ZA W J_ 11 O ry a_ 220 co 00 S I I F- d >Z N + PROFILE VERTICAL SCALE: 1" = 5' a -,- -- -` -- HORIZONTAL SCALE: 1" = 50' c/) o 210 - 200 - 190 - 180 - + z o ,\ co � 11 11 U) GEO - CORE B -1 O O Q O STA. 8 +01.7 c7 U = � U SURF. ELEV = 206.2 / \� z w p ,, -' a. � TERM ELEV = 176.2 \ Zo U) O O OFFSET 7.41- �.'��- S! \ J +o ° LLJ ���/ \` M Q -` oo� .I o - -, U) _ - \�� LOOSE �� 0 O II SAND 3 -4 -4 Q F- M 4' MIN. COVER \\ LL Q F- 2 -2 -2 N =4 \\ W –� 16" VERY LOOSE Z / SAND ` / 2 -3 -4 ` W f' / N =7 ` Lo L ) /�/ 84 L.F. - CONVENTIONAL OR cn M N / 0 I I / / 2 -5 -4 co /' N_9 07 o w �� co) 4' MIN. COVER z o 'y �\� '`� END BORE 16" w Q ,� � (D 1 ~ /•- c�\1 5-7-10 STA. = 8 +10 z Z .' m t- " N =17 INV. EL. = 196.43 ,/ Z 11 w / / w z _ Co. cn ? --------- - - - - -- - -- --------- - - - - - -- 7 -9 -8 N =17 FIRM 4 MIN COVER SAND �/�• 16, 11 -10 -6 N =16 N � N 00 00 N � 00 0) N M ( - f� 0 0 � O 0O 0 M 0 M CO t7]116 0 0 0 0 � N C N C N 0 N 0 1 N D N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I PROFILE VERTICAL SCALE: 1" = 5' a -,- -- -` -- HORIZONTAL SCALE: 1" = 50' c/) o 210 - 200 - 190 - 180 - + z o ,\ co � 11 11 U) GEO - CORE B -1 O O Q O STA. 8 +01.7 c7 U = � U SURF. ELEV = 206.2 / \� z w p ,, -' a. � TERM ELEV = 176.2 \ Zo U) O O OFFSET 7.41- �.'��- S! \ J +o ° LLJ ���/ \` M Q -` oo� .I o - -, U) _ - \�� LOOSE �� 0 O II SAND 3 -4 -4 Q F- M 4' MIN. COVER \\ LL Q F- 2 -2 -2 N =4 \\ W –� 16" VERY LOOSE Z / SAND ` / 2 -3 -4 ` W f' / N =7 ` Lo L ) /�/ 84 L.F. - CONVENTIONAL OR cn M N / 0 I I / / 2 -5 -4 co /' N_9 07 o w �� co) 4' MIN. COVER z o 'y �\� '`� END BORE 16" w Q ,� � (D 1 ~ /•- c�\1 5-7-10 STA. = 8 +10 z Z .' m t- " N =17 INV. EL. = 196.43 ,/ Z 11 w / / w z _ Co. cn ? --------- - - - - -- - -- --------- - - - - - -- 7 -9 -8 N =17 FIRM 4 MIN COVER SAND �/�• 16, 11 -10 -6 N =16 N � N 00 00 N � 00 0) N M ( - f� 0 0 � O 0O 0 M 0 M CO t7]116 0 0 0 0 � N C N C N 0 N 0 1 N D N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I FIRM 4 MIN COVER SAND �/�• 16, 11 -10 -6 N =16 N � N 00 00 N � 00 0) N M ( - f� 0 0 � O 0O 0 M 0 M CO t7]116 0 0 0 0 � N C N C N 0 N 0 1 N D N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I I� ct I O M co � d d O O ch M O O p CD M 0 N N N N — r r T 11 +00 12 +00 13 +00 14 +00 - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I - 220 - 210 - 200 - 190 - 180 REVISION PREPARED BY: \ I I / SCALE: DESIGNED BY: REV DATE DESCRIPTION • a f, AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE ROBESON COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: MATERIAL SUMMARY , ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ Piedmont _ SITE 1 -RED HILLS ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION __ _ ELI PROJECT NO: CHECKED BY: 1 1,359' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 _ - 14 -21 -3007 SWH STA. 5595 +57 TO STA. 5610 +09 2 84' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 2 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 2 12792 2".154 WT X -52 CFB DRL PIPE PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA i; 2239872 REVISION: DRAWING NO: - - -- 3007 -01 -005 7 2 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 I I d 0 N r7 z Q 0 Z 0 0 0 0 0 0 3 0 i 0 Q ii 0 0 AOL \ - \ Ilk AW41 S I \F 1 FLOWjam ARROW (TYP.) .' � ET -GASH I 1 I \- - - - - - - - _ mil �•1-T 5u -T 1�1 BIS-GAS \ - -- G --G INSTALL CONSTRUCTION ENTRANCE, SEE DETAIL 1, SHEET 3007 -00 -003 Ifn cas�cas cas G -G G� \ I I �_ - GAS- GAG�GAS G�� G -GG 1 1 _ i J/ / - { _ _ w,_ ���'� ° '� - =� �' "^- \`. \ \\ \•� AS GAG GAS 1_GAS ` 'I I - ,_�G -� ) / - - - - - -_ - -_ - _-1�� _� - - - - -- -_� / -GAS I - - - ` - - �° ♦ 1 RNs �AS� / c d � - - - - - - - - - - - 1 / 1 GAG h s 84 8 /86 .� � � �o G -GAS -G l ^ cV ~ o GAS / g° _ \ GPOND _ �- iGAS \ G G\ \ 1 \ \ .� / _ _ -r - / ! I °T� °�����° I /o micas oo o GASGAS- / °� --GAS GV Gas GAS -♦ r w / GAG �- __________ �_ SILT FENCE (TYP.) I 1 1\ I - - --= ' (SEE EPSC DETAILS SHEET) EXISTING CONTOURS (TYP.) I \\\ SAFETY FENCE (TYP.) \ I\ I \ 1 1 I 0 I \ 1 \ \ 1 \ I 1 \ I \ 1 \ I 1 \ 1 \ I 1 I 1 \ i W I _� �3 rr I \ 1 \ I \ I low, \ I -- N GRAPHIC SCALE (IN FEET) 60 0 30 60 120 1 inch = 60 ft. GrCUJIUIV UUN I MUL SCALE: 1" = 60' t �l p r dim p _ I Y I \l r 10 it, a THE SOILS IN THE PROJECT AREA INCLUDE: • NoA - NORFOLK LOAMY SAND, 0 TO 2 PERCENT SLOPES • Pt - PORTSMOUTH LOAM • WkB - WAKULLA SAND, 0 TO 6 PERCENT SLOPES PERMANENT EASEMENT TEMPORARY WORKSPACE 1 I 1 1 I \ I I I I 1 1 I I I I I 1 - I 1 1 I I I - � 1 I 1 ' I ' yam[ I \ ` I / F 1 ^A IL n I LIMITS OF DISTURBANCE Aft a \ 214 \ // \ ♦c 8 1 1 \ Po ,- ' \ \ r I TEMPORARY yS\ RESIDENTIAL I j IN �a, \cqs \♦ �\ ACCESS 11 I 1 v INSTALL CONSTRUCTION N 198 I \ I r' \ \ ENTRANCE, SEE DETAIL 1, V - \ SHEET 3007 -00 -003 / \ \ / , FZO \NS p c, ,0 0�9 / I_ s� I.qA PROJECT DESCRIPTION THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS APPROXIMATELY 2.96 ACRES. EXISTING SITE CONDITIONS THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REVISION , , ® K110W WI11t'S below. Call before you dig. Piedmont Natural GGaIs Owl-/ ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ I / � - _ _ - I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ROBESON COUNTY, NORTH CAROLINA SITE 1 -RED HILLS ROAD EROSION CONTROL PLAN REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 1 2,748' SILT FE CE 2 318' SAFET FENCE CLIENT PROJECT NO: 2239872 REVISION: - --- DRAWING NO: 3007 -01 -006 N a a 0 N \ \ \ \ \ \ EXISTING 100' RAILROAD EASEMENT / / / / / / / / / N GRAPHIC SCALE (IN FEET) 100 0 50 100 200 1 inch= 100 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 100' 1 / / \ O\ / \ \ G I \ \ \ qs \ \ SAS o0 \ \ 1 0 I O \ \ \ \ 4 \ ` ♦ \ \ \ Gqs\ �q �G1,q, Q, \ \ BEGIN NEW 16" GAS LINE ♦ \ y� \ \ STA. 0 +00 = ♦ \ cqs, O STA. 5548 +51 � \ Qi G Gqs \ qs \ EXISTING 110' \ �qs \ \ qs "vx \ GAS EASEMENT ♦ ♦ \ \ cqs \ \ c�`cn``� \ \ Q) \ \ ♦ ♦ \\ cqs \ s C� \ \ 1 \ PROPOSED 35' ♦ ♦ \ \ \ \ TEMPORARY WORKSPACE cqs ♦ \ s o° G \ I \ \ \ q's ♦ COQ ,yl\ \\Gqs \ 9 \ \ \ EXISTING 16" GAS LINE ♦ ox \ \ \ \GqS \ X00 I \ 1 \ (TO REMAIN) \ �� N�-O EXISTING 16" GAS LINE W4�1_ \ xo (TO BE ABANDONED) _ _ G EXISTING 70' \ ♦s \ \ �yti — — _ GAS EASEMENT TRACra i ♦ �� 't� �`'� O — — _ _ D.B. 1875, PG. 147 MABLE H. BROWN (LIFE ESTATE) ♦ ♦ �iQ \ \ _ _ _ x0 _ _ — _ _ C.A. BROWN JR. p ♦ \ — _ M — _ _ D.B. 511, PG. 272 PIN# 930616100100 i �' ♦ O° _ — _ _ _ _ �� _ _ _ — _ _ _ _ I \ PROPOSED o °� TEMPORARY WORKSPACE M PROPOSED 23' I � ♦` � \ hh oo - - -___ —___ _ PERMANENT EASEMENT ♦, \ _ — — _ — — — — OO Op — I ------------------ I `^O \ \ as% "\ \ Cb O ♦ 4* � XO O 4* I f TRACT 3 I � 5 ** ` \ \ \ \ OO I DAVID LEACH HEIRS HEIRS I O `♦ \ \ \ \ h� O C/O DAVID INGRAM O v D.B. 511, PG. 272 i Q ♦ \ \ ,� PIN# 930616934600 O IO G Q� M O EXISTING GAS LINE i o° ABANDONED IN PLACE C.A. BROWN JR. ET AL 14� I o EXISTING 16" GAS LINE PIN# 930616 00100 40 (TO BE ABANDONED) / I o � I TRACT 2 x 4 v MARSHALL P. JAMES JR. & JANE O I \\ ` MARY L. HILLARD & ET AL ^ �OXs i i \ P N# 9306 8842100 ^O ``� 4* \ 00 I ' \ O ° o i i v` �� ��O,kgs v v v,�h�O o EXISTING 16" GAS LINE Q "'`'Y� \ \ , / (TO REMAIN) I Q ,\ O / \ I JOHN H. LEACH PROPOS D 23' �°j v \ \ \ �� \ \ C/O DAVID INGRAM �O� ° ti cqs x0 \ \ I D.B. 511, 782 272 i PERMANENT EASEMENT ♦ ♦ ,N �h \ \ kqs \ \ \ h� °o ' PIN# 930617826600 , s PROPOSED ♦ \ \ \ < o h TEMPORARY WORKSPACE ^"' ^x T END NEW 16" GAS LINE \3, \ Gq9 ham'- �' r r0 / 0 I STA. 20 +95 / O O STA. 5569 +37 -7- o � -G D INSTALL CONSTRUCTION \ TRACT1 EN�ANCE, SEE DETAIL 11 EMMA L. SHEET 3007 -00 -003/ �� \ LOCKLEAR D.B. 943, PG. 374 PIN# 930636957200 I v REVISION • , ® AVOW WI1at'S bP•IOW Callbefore you dig. Piedmont FAA11 Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ - - _ _ _ - SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ROBESON COUNTY, NORTH CAROLINA SITE 2 - LUMBER RIVER OVERALL SITE LAYOUT REV I DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007-02-007 a 0 a a 0 N M C PROJECT DESCRIPTION THIS DESIGN IS FOR A HORIZONTAL DIRECTIONALLY DRILLED BORE FOR A 16" NATURAL GAS PIPELINE. EXISTING SITE CONDITIONS \ \ \ THE DESIGN CROSSES THE LUMBAR RIVER, EXISTING WETLAND / AND R.O.W. GENERAL NOTE \ r O ALL CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH O LOCAL AND STATE ENVIRONMENTAL REGULATIONS. 1 / NOTES: -7-L INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL - - —� <O BORE LENGTH: 1,832 FEET \ .' ' OQ\ / \ PIPE SPECIFICATION: 16" O.D., 0.375" W.T. X -65 HDD CALCULATED APPROX PULLBACK LOAD: 98,813 LBS EXISTING GAS LINE "CONTRACTOR TO FIELD VERIFY ALL EXISTING UTILITIES (TO REMAIN) ✓� /\ ' / i ' / EXISTING 70' BEFORE CONSTRUCTION BEGINS. EXISTING 16" GAS LINE / / / GAS EASEMENT — — — — ° (TO REMAIN) EXISTING 16 GAS LINE \ D.B. 1875, P.G. 147 + CD_ — — — _ _ _ _ _ (PORTION TO BE ABANDONED) `` +° o° —o° — — — — o — — _o_ — — o �/ \ EXISTING 50 \ STA 26 +84 / m 1 _C r+., + ° +o — o-- .-- _o°_ -- o o ��� GAS EASEMENT < HDD Point 8° / I / 3AS GAS _ CC)3AS '' L0 LO + + 'f O - _ O \ / \ GAS "t GAS d'. O O — _ `� �`S — I- + o — — ° o o G EXISTING 16" GAS LINE RIG SIDE _ L0 GAS d / O w O i' O O O O L G S -_ G, Lfn -�L /r L0 + + + o O + �j o O ° N 366146.21 Lf) / F AS — — — — — — Ui-�GAS �GA.��GAS r r-_ \�N + + + + + o (PORTION TO BE ABANDONED) \ / — — — — — — _ GAS Lfi — J QAS GNS -- GAS GA6 GA — — — — — — — — • M O dd ,�' ` GAS �.�{S' GAS GP` ' LLO /� • - - \ �. ./ i L[1 L0 00 O O / Y GASI GAS I— GAS +— GAS -7-- GAS ---H- GAS / — m LO Ln L0 \ `� Ifi O \ _ O + O �V� j I \� � � Lp L0 �' �. � L0 � + O O O O / p \\ 00 // OO O I 1 11 11 / GAS -+- GAS --I- GAS GAS �X SAC -Fp(G — j` _ .. ;AS / _ — — _ _ _ — / _ (_ ._- — / _ - - - -- -- - - -- - - - -- ----- -t1) -- ' lf') O �Y Ll� Cfl ti / 00 + + O SON I 1 I + ---------- - - - - -- XX�cfX ic�ciaXXXii %,i�cSX % 4X*X Pic c-i(GXSuv -., �¢ ( O O / \ / *� �5 �` X �Ci Y�iGA§ IDk . �(4K _ - - - - �H�C - - cas —� s - - -GAS - -GAS - -GAS - -Gras — Gn / CD L0 / - - - - - \ - - M / - o / ° �/� / / 1 M M \\A y �7� y i f� k Lr) LO O _ _ + — O O O . \ \ \ - - - \ F -_ _- — __ __ \ \ \ \ \ \\ 1\ III I I \\ - `- - - - - i�7C -X MR>A \ J —�— G GAS — G�AS� GAS - G �_,g - GAS - GA - ! —/ — L:�.`- O� /-4 � rsrT %�itX X XAX _X(X XX X X i XGXs%�c�c 9X%X+X X XG- cAS - \ + O O — 1 I I _ -_ _ — - - - \i< DC X�Cw v v XgXI GAS - - GAS - � r- GAS - s — / / N M + O O. \ \\ / ` �...� 1 \ - k; // (,i III I \ \ — — _ — — _. — — — — — — _ — ._ — 7c7[T , — - - - V ��u GAS 8AS 9 GAS GAS PROPOSED 35' o \ + °\ o ° loM M M . TEMPORARY WORKSPACE \\ o N M + °` i C> \r\ o+ - — oo lO� o O�y / ` ` \ j -- psi X � �j CD �� ; ; + + O O '�, O \\ X00 pi 10� .O■ .� L► �' — — / / -- \ \ N CV M + + + O O O O I I O N I I I / I I I I / / PLAN ALIGNMENT PLAN SCALE: 1" = 100' GRAPHIC SCALE (IN FEET) 100 0 50 100 200 1 inch= 100 ft. PROFILE VERTICAL SCALE: 1" = 10' HORIZONTAL SCALE: 1" = 100' n4 f% STA 8 +48 CP #4 HDD Point 8° STA 9 +90 PIPE SIDE N 366869.64 N 366934.96 E 1901745.67 E 1901619.48 PT \ \ \ \ \ \ CP #3 STA 12 +15 N 366773.11 E 1901948.96 PC GAS LINE N N N N / N ` 'N — — — �N ._.� rn o+, N M M M CP #2 CID #1 \ PROPOSED / GEO -CORE I STA 23 +16 STA 25 +41 TEMPORARY WORKSPACE , STA. 29 +61 1 - - � N 366302.83 N 366207.95 \ / OFFSET=-19.0 I E 1902944.38 E 1903148.55 PROPOSED 35' I PT PC PERMANENT EASEMENT / II 7 +00 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 25 +00 26 +00 27 +00 28 +00 29 +00 30 +00 210 200 190 180 170 160 150 140 130 120 118 / / / / / I / I / 1 I/ REVISION • , ® Knowat's below. Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ \ \ I I I / / f � - - _ _ _ - ` ` / / / \ \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ROBESON COUNTY, NORTH CAROLINA SITE 2 - LUMBER RIVER HDD BORE PLAN & PROFILE REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 255' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 1,840' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -02 -008 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 1 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -70 0 N z 0 z 0 z 0 0 0 0 0 I r O 0 O 0 0 N Q 0 0 I / / I / I / \ I / \ I/ � I THE SOILS IN THE PROJECT AREA INCLUDE: • BB - BIBB SOILS • KaA - KALMIA LOAMY SAND, 0 TO 2 PERCENT SLOPES • LaB - LAKELAND SAND, 0 TO 6 PERCENT SLOPES • Lu - LUMBEE SANDY LOAM • Pm - PLUMMER AND OSIER SOILS • W - WATER - I I LUMBER \ RIVER p \ \ \\ IN \ \ \\ \ c CS �6 I v X00. EXISTING CONTOURS (TYP.) \\ qS C \ \ oo> \\ chi Ac Ncb S \ \y \gyp s ' "T / SS� \ \i \N \'� I - ' HEAVY EQUIPMENT / SILT FENCE (TYP.) (SEE EPSC DETAIL SHEET) NO v cb / MATTING 's WETLAND LIMIT \ (TYP.) - .k i / / INSTALL CONSTRUCTION ENTRANCE, SEE DETAIL 1, / SHEET 3007 -00 -003 PROJECT DESCRIPTION THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS APPROXIMATELY 0.11 ACRES. EXISTING SITE CONDITIONS THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. RrNFni ii F CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REVISION , , ® Knowwhars below. 0111 before you dig. Piedmont Natural GGaIs ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ I I / - _ \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ROBESON COUNTY, NORTH CAROLINA SITE 2_ LUMBER RIVER EROSION CONTROL PLAN REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 1 983' SILT FE CE 2 0 SAFETY FENCE CLIENT PROJECT NO: 2239872 (� REVISION: - °- DRAWING NO: 3007 -02 -009 4- 1 1 g a N 0 N a / STA. 5 +17 PROPOSED 10' EXISTING 70' INSTALL LATERAL CONNECTION. �• , PERMANENT EASEMENT GAS EASEMENT SEE DETAIL 5, SHEET 3007 -00- 02 EXISTING 70' / �f ,�. — — — D.B. 1334, PG. 302 GAS EASEMENT / � • - - - - - -- o��� =M�Mmm�M� L D.B. 1348, PG. 13 / — — — — — — — — — m m � m m m � O O O O �+ —p- — — — — — — —p— — — — -p— — — — — — — -- p— — — — — — — — p — — — — — — — — O+ — — — — — — — —/ O `♦ + + + + , }GAS GAS GAS GAS G A@—GAS GAS F GAS GAS GAS GAS GAS M GAS I GAS GAS G 3 I I \ \ \ / — — — -Ix "V GAS GAS GAS I II0� - GIS GAS GAS —�S GAG5 GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS_ V X # V >\ , F I 3 / GAS , q-.p I _ WV / , "YQ711 I wy ' I C \`GAS \ ,, w - w � � � �� - w —T -w w w w w w w--� -w w W_ w w w w� O - — - , j _ PROPOSE 20' _ w_ _ W O+ ' , �r �\ NU SCOTLAND 2 ° / - - - I PERMANENT EASEMENT \ - - - - -= — -- -- — ---------- - - - - -- - - - - - -- - - - \ \� L. P. _ I II �j \ \ \ ♦ D.B. 443, PG. 003 y o — — — — — — — — — — — — — — — — — — — — — — — — — — — — �O� PIN# 01- 262 -01 -003 I III I �/ �/ �/ �/ �/ �/ �[�� �/ �/ �/ �[ \/ �/ �/ �(y y �/ �/ �/ �[ �/ �/ �/ �( v �/ �/ �/ �( �,\/�� �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �( �/ �/ �/ �( �/ �/ �/ �/ �(, �/ �/ �( �/ y �/ �/ y �/ �/ �/ �/ �/ �/ �j �/ �/ �/ �/ �/ �/ �/ �/y (] 3AS- IS GAS GA GAS ��, C#1S i1HR GA (3x- '1'xx- x °�7CT�lG° K-X-XO'X*X-\GX .X*)(- XGX*X-XX*)(TX*X- X XA-xxx4x_x y+- �'7r7/^W 7�T1V�A AX-*X-XAX- CYOX X -)17 )('-X-X-AX-XX -XA K` i' C7C- 1�Ja(` �' C7r/' �)^ C" 9T7r/�JnC7YC7C7i- YC9T/C7rY'CSXX XSn �7CYC5 u$y �/�f�//.y( W\ \\ O \ I I Y'C //r7C7C'' `SiC7CH^1 \ \ S10 A O O O \ O O O O O I O \w O O /* x o o O o o 0 0 / / CO °\� + + + + —oH off off oH- + -oH off off off + off Ic`� Lw—O O O O �S - O r + O r N co CI _ off _ _ _ _ _ + _ -T O - - - - -- - -- - x - --� -- - -- - - - -- -_ - -- - _ -- - - - -- - / O \ r r - r - - - r - - r = - ° Lf') — °" °" off oH- + -oH + + s LO L!� N m Ln Lf> I � ,. � x -x z X - -� DO \ V \ NT BE Kl PROJECT EXISTING EXISTING 50' x °s `f' "' ��N STA. 0 +00 \= \ ACCESS EASEMENT GAS EASEMENT NEW 2" LATERAL STA. 5409+ \ \ D.B. 1365, PG. 90 D.B. 3B, PG. 415 EXISTING 16" GAS LINE °s H� 9s �` 9 \\ \ (TO BE ABANDONED) ° \, \ 9S - OH + A O \ \ \\ \ \X O \ \D \ s OH —OH— <0 \ � ° /A * \ AlIx ° \ e % V 011� \ \ TRACT 3 \ \ O ' v MERITOR HEAVY ` + \ \� Nix \ \ VEHICLE SYSTEMS \ \ \ \ 9s \ , \ D.B, 1070 P.G. 99 \ \ PIN# 01- 252 -01 -014 O `x0 \ \ �� °ti \ °9s \ ,, PROP�SED 10' \ \ 1 \ \� \ \ \ \ \ \ PERMANE7 EASEMENT \ °9s GASIEAS EASEMENT % � -B. 1348, PG. 13 OAXQ / \ °9s , \\ \ 1 1 r ��`LFj\\ \ \ \ xo0 \ 1 - \ 4 \ . � \ � STA. 19 +59 \► t \ \ \ \ INSTALL LATERAL CONNECTION. \+ \ \ °y ° SEE DETAIL 5, SHEET 3007 -00 -002 \ 9s \ EXISTING 16" GAS LINE \ \ '� (TO BE ABANDONED) \ \ \ \ NEW 2" GAS LATERAL TO \ � 1 ° EXISTING POST REGULATOR \ \ \ °9s \ PROPOSED 20' \ ! t \ \ ERMANENT EASEMENT ► �.\ • \\ # GAS IEASEMENT \\ ° \ ,000000 ° \\ '• i D.B. 3B, PG. 415 \ \ \ \ �.�� \ yN \ O \ oy \ \ \ , (� LL • �V" X — GAS�GAS- \ '..7 \ \ ,� , \ Gp�\\ \ \ \ \ ON 0 fO'SH H OH�U/ / ` \ ' , \]/h O ti �� \ \° \ // I lop, \ \ � • /� / / JOG 3 CM(0)i \ N 2 x 00 O • d( � \ N ° N t , ' 4z I I \ s \ \ \ / \ `v \ \ LAURINBURG MAXTON AIRPORT COMMISSION \ / D.B. 2E, PG. 749 GRAPHIC SCALE (IN FEET) PIN# 01- 262 -01 -003 A \ \ \ 60 30 60 120 / \ \ � / / / \ 1 inch = 60 ft. \ .' - END NEW 16" GAS LINE '� \ 0 r L X STA. 54310+23 PLAN \\ OVERALL SITE LAYOUT SCALE. 1 = 60 REVISION • ® KIIOW WI1at's below Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY, NORTH CAROLINA \ f - - _ _ _ - //� ��� I I \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 3 - SKYWAY CHURCH ROAD OVERALL SITE LAYOUT REV DATE DESCRIPTION 1 1 -19 -15 ADDED 20' PERMANENT EASEMENT FOR LATERAL PIPING. ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: 1 DRAWING NO: 3007 -03 -010 0 r� a 3 O r M N d N Q F O F m m 0 Q I� I 16" x 0.219" WT X -42 � 3) 1O O5 1O 4O 1O I R / EXISTING 70' _rte GAS EASEMENT - PLAN i '_�-^^ D.B. 1334, PG. 302 v��� PROPOSED 10' ALIGNMENT PLAN PERMANENT EASEMENT MIN GRAPHIC SCALE (IN FEET) ' r go — — — O — 50 0 25 50 100 I _ _ — — — — O _ - - - -! °O \� M N I I 3 I / I I � ' �� _ O � ��� / a♦ go I _ - - -0 I _ + \ \ ,woo 0 on so STA. 5 +17 EXISTING 70' - - - ° p� INSTALL LATERAL CONNECTION. GAS EASEMENT I - - - - - - - °o °' / ,`ti \ ♦♦ D.B. 1348, PG. 13 - - - + \ SEE DETAIL 5, SHEET 3007 -00 -002 _ _ _ _ - o - CID / \ — � O GPSGAS�GAG GAS \ I 1 San 0 GAS + GAS GAS— pqs ­11-1 \ an =ago — \ wo \ GqS ♦ _ Room + _ _ - Q (0 ° 0\h GAS GAS GAS GAS s W��_,- W _W— \ \ ;,�"� ♦ PROPOSED 10 % ♦ PERMANENT EASEMENT Al GAS \ \ \ 1 Inch = 50 ft. � � ,! I � cA �cns —GAS 3 � �w —W '�--�" — — — — � `� \ cS I —GAS — W — —' y 9 PROPOSED 20 -� _� -- - - - - w — — GA - PERMANENT EASEMENT Z / / 1 I _X X I �GAS�GAS — - �_ _ ^`i — — — — — — —G GAS GAS�G_�S I ` - - W —W —,•: O L \ \. \� \ \ G9y OO ♦♦ �/ GAS �— f - 11 w 411 4 ,9 V`X \ \ ♦ / \(Y GAS 111 G x— — I — GAS —GAS ` I W _ •Xoo. / jW "fI� ♦ l / - / 40P 40P G' GAS IN °o /° - ---�- i o (T N + -� - - - - M O E GH- - -- b 1 _� EXISTING BEGIN NEW 16" GAS LINE ACCESS EASEMENT STA. 0 +00 = D.B. 1365, PG. 90 STA. 5409 +90 220 210 I J_ LL 0 a I 200 190 01- - EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) O - -\ N \ \ \ ♦ �\ °o �x� \ ON \ s \ X�X \ \� GN /pN \� \ Y \ \ \G9S �/ \ , ♦♦ \� LID 0 8i =yam ON \ (� S� p\ \ \C S� O ♦ w + XO \ O• O Ln �oH °H� 5 pN v 1 ° o n�N \o\ \ \ \ Gqs \ ♦ O�i py /ON/ NEW 2 LATERAL EXISTING 50' - GAS EASEMENT D.B. 3B, PG. 415 EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) II �+ \� X 9 \ \ GH s \ \G9S \ G9S\ \ \ \ �O R \ \ ♦ a nX o ♦ ' CO M t4 O Cy) " O "t r­ N O M n co 00 O O r J O JM0� r-- C O Or co r*-: O�� O 0 N� 0 0 NO N � NN � M00 M r'^ �Q � W N 11 N I I N N O I N _ I N N O N O M aM 0_M dM aM Cl) O aM p O II II II II II II II II II II II II II II �,.5 Z W Z W Z W Z W Z W Z W Z W I� I 16" x 0.219" WT X -42 � 3) 1O O5 1O 4O 1O I R / EXISTING 70' _rte GAS EASEMENT - PLAN i '_�-^^ D.B. 1334, PG. 302 v��� PROPOSED 10' ALIGNMENT PLAN PERMANENT EASEMENT MIN GRAPHIC SCALE (IN FEET) ' r go — — — O — 50 0 25 50 100 I _ _ — — — — O _ - - - -! °O \� M N I I 3 I / I I � ' �� _ O � ��� / a♦ go I _ - - -0 I _ + \ \ ,woo 0 on so STA. 5 +17 EXISTING 70' - - - ° p� INSTALL LATERAL CONNECTION. GAS EASEMENT I - - - - - - - °o °' / ,`ti \ ♦♦ D.B. 1348, PG. 13 - - - + \ SEE DETAIL 5, SHEET 3007 -00 -002 _ _ _ _ - o - CID / \ — � O GPSGAS�GAG GAS \ I 1 San 0 GAS + GAS GAS— pqs ­11-1 \ an =ago — \ wo \ GqS ♦ _ Room + _ _ - Q (0 ° 0\h GAS GAS GAS GAS s W��_,- W _W— \ \ ;,�"� ♦ PROPOSED 10 % ♦ PERMANENT EASEMENT Al GAS \ \ \ 1 Inch = 50 ft. � � ,! I � cA �cns —GAS 3 � �w —W '�--�" — — — — � `� \ cS I —GAS — W — —' y 9 PROPOSED 20 -� _� -- - - - - w — — GA - PERMANENT EASEMENT Z / / 1 I _X X I �GAS�GAS — - �_ _ ^`i — — — — — — —G GAS GAS�G_�S I ` - - W —W —,•: O L \ \. \� \ \ G9y OO ♦♦ �/ GAS �— f - 11 w 411 4 ,9 V`X \ \ ♦ / \(Y GAS 111 G x— — I — GAS —GAS ` I W _ •Xoo. / jW "fI� ♦ l / - / 40P 40P G' GAS IN °o /° - ---�- i o (T N + -� - - - - M O E GH- - -- b 1 _� EXISTING BEGIN NEW 16" GAS LINE ACCESS EASEMENT STA. 0 +00 = D.B. 1365, PG. 90 STA. 5409 +90 220 210 I J_ LL 0 a I 200 190 01- - EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) O - -\ N \ \ \ ♦ �\ °o �x� \ ON \ s \ X�X \ \� GN /pN \� \ Y \ \ \G9S �/ \ , ♦♦ \� LID 0 8i =yam ON \ (� S� p\ \ \C S� O ♦ w + XO \ O• O Ln �oH °H� 5 pN v 1 ° o n�N \o\ \ \ \ Gqs \ ♦ O�i py /ON/ NEW 2 LATERAL EXISTING 50' - GAS EASEMENT D.B. 3B, PG. 415 EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) II �+ \� X 9 \ \ GH s \ \G9S \ G9S\ \ \ \ �O R \ \ ♦ a nX o ♦ ' TRACT 3 O O� CO TRACT 2 W L!) (n N N d' O I O z MERITOR HEAVY 0 I` NU SCOTLAND � VEHICLE SYSTEMS M N (` L.P. 0 D.B. 1070, PG. 99 00 M D.B. 443, PG. 003 I� I 16" x 0.219" WT X -42 � 3) 1O O5 1O 4O 1O I R / EXISTING 70' _rte GAS EASEMENT - PLAN i '_�-^^ D.B. 1334, PG. 302 v��� PROPOSED 10' ALIGNMENT PLAN PERMANENT EASEMENT MIN GRAPHIC SCALE (IN FEET) ' r go — — — O — 50 0 25 50 100 I _ _ — — — — O _ - - - -! °O \� M N I I 3 I / I I � ' �� _ O � ��� / a♦ go I _ - - -0 I _ + \ \ ,woo 0 on so STA. 5 +17 EXISTING 70' - - - ° p� INSTALL LATERAL CONNECTION. GAS EASEMENT I - - - - - - - °o °' / ,`ti \ ♦♦ D.B. 1348, PG. 13 - - - + \ SEE DETAIL 5, SHEET 3007 -00 -002 _ _ _ _ - o - CID / \ — � O GPSGAS�GAG GAS \ I 1 San 0 GAS + GAS GAS— pqs ­11-1 \ an =ago — \ wo \ GqS ♦ _ Room + _ _ - Q (0 ° 0\h GAS GAS GAS GAS s W��_,- W _W— \ \ ;,�"� ♦ PROPOSED 10 % ♦ PERMANENT EASEMENT Al GAS \ \ \ 1 Inch = 50 ft. � � ,! I � cA �cns —GAS 3 � �w —W '�--�" — — — — � `� \ cS I —GAS — W — —' y 9 PROPOSED 20 -� _� -- - - - - w — — GA - PERMANENT EASEMENT Z / / 1 I _X X I �GAS�GAS — - �_ _ ^`i — — — — — — —G GAS GAS�G_�S I ` - - W —W —,•: O L \ \. \� \ \ G9y OO ♦♦ �/ GAS �— f - 11 w 411 4 ,9 V`X \ \ ♦ / \(Y GAS 111 G x— — I — GAS —GAS ` I W _ •Xoo. / jW "fI� ♦ l / - / 40P 40P G' GAS IN °o /° - ---�- i o (T N + -� - - - - M O E GH- - -- b 1 _� EXISTING BEGIN NEW 16" GAS LINE ACCESS EASEMENT STA. 0 +00 = D.B. 1365, PG. 90 STA. 5409 +90 220 210 I J_ LL 0 a I 200 190 01- - EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) O - -\ N \ \ \ ♦ �\ °o �x� \ ON \ s \ X�X \ \� GN /pN \� \ Y \ \ \G9S �/ \ , ♦♦ \� LID 0 8i =yam ON \ (� S� p\ \ \C S� O ♦ w + XO \ O• O Ln �oH °H� 5 pN v 1 ° o n�N \o\ \ \ \ Gqs \ ♦ O�i py /ON/ NEW 2 LATERAL EXISTING 50' - GAS EASEMENT D.B. 3B, PG. 415 EXISTING 16" GAS LINE (PORTION TO BE ABANDONED) II �+ \� X 9 \ \ GH s \ \G9S \ G9S\ \ \ \ �O R \ \ ♦ a nX o ♦ ' EX. 16" O 00 I1_ LO O O� CO N� O N M L!) (n N N d' O I O O co M r M 0 I` O O � t r M N (` N O M O M 00 M + I N O O In � O 00 N N M M d Q 00 O O — 7 — N N O I I C) O LO co O Ci 00 O 00 O .- 6 O — 6 O p O C O O � 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. N N M H �,.5 co C,.5 N O N N + O N N Z 04 N N Cj N� N LO N N N M I Z_ (n U) N N N N N N N N N Cq N N Q U 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 u 16763 � O U CLIENT PROJECT NO: 2239872 ♦- DRAWING NO: 3007 -03 -011 6 V J 16 "X16 "X16" WELD BARRED TEE Y -70 Z rn + U7 1 Z (n 16 "X16 "X6" .375X.280 WT WELD BBT Y -70 _j M 00 Q � o Z 0 0 II (n ^--------------------- -- - - - - - - - - -_ W W -_ II U Z '-- -- -- - - ---- Z J __ - - - - -- __ LL � U - - - - -� -- ---------------------------------------------- ---------- - --- -- - - -'- '____ ---- - - - - --- - - - - - -- - - - - - - - - - 4- MIN. COVER ' 16" C O \J 4' MIN. COVER - -- ��, , 4 N11N• 16 16„ EX. 16" O 00 I1_ LO O O� CO N� O N M L!) (n N LO O O I O O co M r M 0 I` O O M O O M 1` 00 M N (` N O M O M 00 M M 67 N N O O In � O 00 N N M M d 00 � 00 O O — 7 — N N O O C) O LO co O Ci 00 O 00 O .- 6 O — 6 O p O 6 O O O � 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. N N M �,.5 M �,.5 co C,.5 N O N N O N N O N N 04 N N 04 N N Cj N� N N N N N N N N N N N N N N N N N N N N N N N Cq N N N N 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 14 +00 15 +00 PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' 220 210 200 190 REVISION • , ® Knowat� below. Callbefore you dig. Piedmont - Natu ��I Gas PREPARED BY: � ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ � � _ __ _ _ — i SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 3 - SKYWAY CHURCH ROAD STA. 5409 +90 TO STA. 5423 +70 REV DATE DESCRIPTION 1 1 -19 -15 ADDED 20' PERMANENT EASEMENT FOR LATERAL PIPING. ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 1,550' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 0 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 1 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 1 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 149' 12792 2".154 WT X -52 CFB DRL PIPE 4 1 16762 16" 90° WELD ELL FS 3R Y -52 11 1 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 1 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: 1 DRAWING NO: 3007 -03 -011 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 7 1 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -70 a d a 0 a TRACT 2 W SKYWAY CHURCH TRACT 1 z NU SCOTLAND ROAD LAURINBURG MAXTON L.P. RIGHT -OF -WAY AIRPORT COMMISSION O D.B. 443, PG. 003 D.B. 2E, PG. 749 Z Q d PLAN to a co ALIGNMENT PLAN 1 SCALE: 1" = 50' / GRAPHIC SCALE (IN FEET) 50 0 25 50 100 GPS. /GPS 1 inch = 50 ft. / / PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' W J_ LL O ry a_ / GPS / / GAS -GPS / \Wy\ STA. 19 +59 y INSTALL LATERAL CONNECTION. ) \ SS w SEE DETAIL 5, SHEET 3007 -00 -002 \1 \ wy \w - \ PROPOSED 10 1___1 • f, \ PERMANENT EASEMENT wy 00 ` \ 00 00 / �4 EXISTING 70 go / I Q / PI O PROPOSED 20' I Z TEMPO\ /R ARY WORKSPACE I U I � 12'x 60 ; 2 BORE PIT _ Q U ' __ an `/- + CV + Y GAS EASEMENT ` 00----- - - - - -- r r -- \ D.B. 1348, PG. 13� �/ op / y\ I's a 37' go w I z ''/ / / / S , AS \ GAS GAS 1 O , YVy GAS GAS GAS C � I ' G S--GA ` w/ H ♦ / / GPs \ X �I ('I II I I --,a CO '' '00� psi _r 00 O Ar 00 00 V7 � 00 / 'y2A 11 • � GPS /GA / / ll GPs / / / 220 210 200 190 _ LL , Wy\ s /GAS GPS /GAS/ / / PROPOSED 20' / / / PERMANENT EASEMENT / O t JA 'SP IN ■ S N/ ' ' O O O I \\ I �\r ON/ P /SP i'N - ON i 'PF _ c o SP 0 w\ �AF' � �-\�� In /G 0" i 'PF IF L O) tiX ti ,12'x20' BORE PIT — PF ter\ O \ _ - - -- / / / o sQ / / X�<9 ------G—GAS GAS \ 04 / � GAS GAS— END NEW 16" GAS LINE ♦ bs; STA. 24 +03 = ♦ �O STA. 5431 +23 ♦ ♦ nJX \ / ♦♦ ♦♦ N �PF' /PF ♦ PF CIA PF / k / /pF /PF \NO v EXISTING 16" GAS LINE bS \� (PORTION TO BE ABANDONED) t \ bg y0 s \bS \NO 0 N - CO r N Piedmont _. ,, Natural Gas Ln � � -_ - __ _ _ - i N (O OO v? C) 0') O N 0 M o L Q z L N W C O D7 Lp O Lr) (V (O M M W II O) C) II I0 II I� 0 co co C2 MC co W DESCRIPTION II II II II II II d II II II II CHECKED BY: SWH Z W Z W Z W Z W Z W TRACT 2 W SKYWAY CHURCH TRACT 1 z NU SCOTLAND ROAD LAURINBURG MAXTON L.P. RIGHT -OF -WAY AIRPORT COMMISSION O D.B. 443, PG. 003 D.B. 2E, PG. 749 Z Q d PLAN to a co ALIGNMENT PLAN 1 SCALE: 1" = 50' / GRAPHIC SCALE (IN FEET) 50 0 25 50 100 GPS. /GPS 1 inch = 50 ft. / / PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' W J_ LL O ry a_ / GPS / / GAS -GPS / \Wy\ STA. 19 +59 y INSTALL LATERAL CONNECTION. ) \ SS w SEE DETAIL 5, SHEET 3007 -00 -002 \1 \ wy \w - \ PROPOSED 10 1___1 • f, \ PERMANENT EASEMENT wy 00 ` \ 00 00 / �4 EXISTING 70 go / I Q / PI O PROPOSED 20' I Z TEMPO\ /R ARY WORKSPACE I U I � 12'x 60 ; 2 BORE PIT _ Q U ' __ an `/- + CV + Y GAS EASEMENT ` 00----- - - - - -- r r -- \ D.B. 1348, PG. 13� �/ op / y\ I's a 37' go w I z ''/ / / / S , AS \ GAS GAS 1 O , YVy GAS GAS GAS C � I ' G S--GA ` w/ H ♦ / / GPs \ X �I ('I II I I --,a CO '' '00� psi _r 00 O Ar 00 00 V7 � 00 / 'y2A 11 • � GPS /GA / / ll GPs / / / 220 210 200 190 _ LL , Wy\ s /GAS GPS /GAS/ / / PROPOSED 20' / / / PERMANENT EASEMENT / O t JA 'SP IN ■ S N/ ' ' O O O I \\ I �\r ON/ P /SP i'N - ON i 'PF _ c o SP 0 w\ �AF' � �-\�� In /G 0" i 'PF IF L O) tiX ti ,12'x20' BORE PIT — PF ter\ O \ _ - - -- / / / o sQ / / X�<9 ------G—GAS GAS \ 04 / � GAS GAS— END NEW 16" GAS LINE ♦ bs; STA. 24 +03 = ♦ �O STA. 5431 +23 ♦ ♦ nJX \ / ♦♦ ♦♦ N �PF' /PF ♦ PF CIA PF / k / /pF /PF \NO v EXISTING 16" GAS LINE bS \� (PORTION TO BE ABANDONED) t \ bg y0 s \bS \NO 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 220 210 200 190 0 N REVISION , ® Knowat� below. Callbefore you dig. Piedmont _. ,, Natural Gas PREPARED BY: `ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.EII- IIC.COM LICENSE # P -1289 • ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA � � -_ - __ _ _ - i SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 3 - SKYWAY CHURCH ROAD STA. 5423 +70 TO STA. 5431 +23 REV DATE t 1 1 -19 -15 ADDED 20' PERMANENT EASEMENT FOR LATERAL PIPING ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ II MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION W co QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 n TBD 16".375 WT X -65 CFB DRL PIPE 8 Z N J t TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. fn O 16771 16" .375 WT X -65 CFB /PC DRL PIPE + + 1 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 V Q ISSUE FOR CONSTRUCTION 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE � 234' 12792 N NN 4 1 16762 16" 90° WELD ELL FS 3R Y -52 11 1 ZII 2" WXW ANSI 600 KEY COATED BALL VALVE 5 1 II + 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 (n I 6 0 Q Q N 16 "X16 "X16" WELD BARRED TEE Y -70 Cl) 7 pC? 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -70 II co W W U 0 (n N O u C (J Z Z � II N F- MO --- (nZ — _— __________ - - - - -- -- _- F5 (n _ < C? N N N LLJ N - - -_- O (Z' O(n + II Q - U W 00 O N Cl) - Z F_ Of Z O U to II F_ _ vi 0 cn ZCl) O — ____ —___J \Cl) (n W W Z J U) Q 88 L.F. CONVENTIONAL BORE N N M M W ,_ O Zo O N N O O X 00 N O N II W II W Z CO W �ZHz 1¢—� Z 00 (n —Z W (n M �j CO f� N CO O O M LO CD f� LO d- O M LO 60 't O O O d 67 67 0) 6) O O O O(0 — � � 00 00 N N N N N N N N N N N N N N N N 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 24 +00 220 210 200 190 REVISION , ® Knowat� below. Callbefore you dig. Piedmont _. ,, Natural Gas PREPARED BY: `ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.EII- IIC.COM LICENSE # P -1289 • ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA � � -_ - __ _ _ - i SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 3 - SKYWAY CHURCH ROAD STA. 5423 +70 TO STA. 5431 +23 REV DATE DESCRIPTION 1 1 -19 -15 ADDED 20' PERMANENT EASEMENT FOR LATERAL PIPING ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 765' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 88' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 1 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 234' 12792 2".154 WT X -52 CFB DRL PIPE 4 1 16762 16" 90° WELD ELL FS 3R Y -52 11 1 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 1 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: DRAWING NO: 3007 -03 -012 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 7 1 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -70 0 o N Q 0 0 0 0 0 0 0 o 0 0 0 0 0 0 Q ii 0 0 THE SOILS IN THE PROJECT AREA INCLUDE: �i • BIC - BLANTON SAND, 8 TO 15 PERCENT SLOPES GoA - GOLDSBORO IOAMY SAND, 0 TO 2 PERCENT SLOPES 71W / I i i \I \ r -/ / LIMITS OF DISTURBANCE --------------------------- - - - - -- - FLOW ARROW (TYP.) (1� 1 � \- _�--- - - - °J- -- J - - -- _ -_ - - -�° / \ �\ SILT FENCE (TYP.) /� v - �l� (SEE EPSC DETAILS SHEET) - \ / \ -. _ I6 / GAS -J IS '° , I s � � \ \ / � � � ) \III \ ` I I' I � � J I III � � � / /;;% �,� - � \ ° \\ \ \�-- �. C �� \� . ♦ �. Av I A AAA V A \\ v V A p 0 (III INSTALL CONSTRUCTION M " ENTRANCE, SEE DETAIL 1, f"' +�. s \ \ \ \ \ \` -� \ \ hxh p IIN SHEET 3007 -00 -003 a� \ \ \ \ \ \ _ \ \\ O - - \ \ \ \ \ pN Nk ♦ ` r •.: �- r, - '�� 11 � A V A . � A �'V V \ X \\ \ \ \ \ / // / \ \\ \ \ I \ \ �\ �• LL EXISTING .41k / ° V A ( \ AVM / / V� CONTOURS O� ` INSTALL CONSTRUCTION \ � ENTRANCE, SEE DETAIL 1, \ _ • f SHEET 3007 -00 -003 \ \r ON I / / J lot 1z SOP' N, * OA N GRAPHIC SCALE (IN FEET) 80 0 40 80 160 1 inch = 80 ft. � ' PLAN EROSION CONTROL PLAN \ ' SCALE: 1" = 80' AIL W" PROJECT DESCRIPTION THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS APPROXIMATELY 4.81 ACRES. EXISTING SITE CONDITIONS THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. CrW1=nIII F CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REVISION , , ® K110W WI11t'S below. Call before you dig. Piedmont Natural Gas owl-/ ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ I / � - _ _ _ ° I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 3 - SKYWAY CHURCH ROAD EROSION CONTROL PLAN REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 1 4,888' SILT FE CE 2 112' SAFET FENCE CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -03 -013 N a 0 N N GRAPHIC SCALE (IN FEET) 100 0 50 100 200 1 inch = 100 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 100' \ - — — — — — — — — EXISTING 70' �' -�� _ - - - -- GAS EASEMENT , -� - -- ,F D.B. 1334, PG. 276 \'�A BEGIN NEW 16" GAS LINE ST'. 25 +15 PROPOSED F TE Z?RARY WORKSPACE EXISTING 50' IbT.fi VARIES) GAS EASEMENT ell EXISTING 16" GAS LINE Xp0 (0 (TO REMAIN) �`0 x0 o�/ 0 0 ,\x ��0 s J 0\1 PROPOSED PROPOSED 40' / TEMPORARY WORKSPACE _X // \ PROPOSED 50' ' JGq j /O� °F xpp PERMANENT EASEMENT WALKER FARMS, INC. / x0 \\ \\ xp \ D.B. 14E, PG. 154 / �,�� \ \ \\� \ �� \9s \\ PIN# 01025901001 O�� \ \ � \\ �� \ \\ °9fOXOp EXISTING 16" GAS LINE / °� x , \ \'' \�� , \\ (TO BE ABANDONED) / / / / ♦ �� \ \ \ \` \ ° \NXOO EXISTING GAS LINE / / ' / / �`♦ ♦ \ \ \ \ \ , 0., (TO REMAIN) INSTALL CONSTRUCTION \ \ s \ ENTRANCE, SEE DETAIL 1, ♦,, TRACT 1 O SHEET 3007 -00 -003 O \ �, / �x , \ \ \ \\ ° ��j \ WALKER � t' FARMS, INC. PIN# 0025 01001 ilk ♦ \ ` \ \ \ \ °9S \ \\ O w XO x ♦ \ \// _ \ Cl ^ ♦O ♦ O \ \ \ \ \\ \ Xp PROPOSED 20' �x ♦ \ \ \ \ \'�`�s � \`\ TEMPORARY WORKSPACE ♦�� \ \ \ \ 'f�,\�9s \ \\ ��p0 �v vv�p0 ((�� \, ( X OO \ X xR) ♦ v'X\ WALKER ��♦ ♦� 0���\ =� `\ °qS��L \\ FARMS, INC. D.B. 14E, PG. 154 \ ` \` `:qs `, O PIN# 01025901001 PROPOSED 50' PERMANENT EASEMENT �\ \ ` XOO PROPOSED 40' TEMPORARY WORKSPACE \ \ \ \ \ ` ,♦ ` \`\ \ \ °qS \\` Xpp INSTALL CONSTRUCTION ,' \ \ \ ♦ p, �`\ �,�� \`\ ENTRANCE, SEE DETAIL 1, / ` k \ \ �� ♦ \\ \`\ `\ SHEET 3007 -00 -003 \ \ \ \ ♦ ,� \\ , \` \ °qs \` O ♦ `\ x 41. XR3 / \ \ \ \ \ ``� ♦ ,� \\ `�S� EXISTING 16" GAS LINE sFr , \ \ \ \ ♦ �, \\ '* \ \� °qS �` p�' (TO BE ABANDONED) XZ EXISTING GAS LINE X - � = - _ � - - \\ \ \ ` ♦gyp \\\ \\\ °���` .�\ (TO REMAIN) \ x�♦ h \GqS o °�, PROPOSED \ \ \ \ �� ♦ ♦ �\ * PERMANENT EASEMENT , \ y \\ \ , ` \wry\ ,\ o � o \ \ \ \ / ♦ ` �,\ �'` EXISTING \ moo,S °qs. N o GAS EASEMENT 0 `�♦ ` ,4� °qs D.B. 1334, PG. 276 ry `per `\ \ °q, yN p \ \ •cV ` p� °�S\ �° s Y. EXISTING 16" GAS LINE (TO REMAIN) \ \ \\ PROPOSED ♦ �G4S\\• ry�p. \ \ TEMPORARY WORKSPACE =qs h qs \ \ \ \ END NEW 16" GAS INE CO \ \ \ STA. 23 +58 = G4 \° ^ � \ qs� Nh h \ \ STA. 5247 +37 REVISION • , ® Knowwhars below. � � Callbefore you dig■ Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -12139 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL N A S H V I E l E , TENNESSEE CARY , NORTH CAROLINA \ \ � � - - _ _ _ - �� �� I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 4 - MCGIRTS BRIDGE ROAD OVERALL SITE LAYOUT REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -04 -014 a a o N 3 N d 0 0 m ro N Q 0 a 0 i 0 0 M O� 3 O O 2 a 0 a E 0 0 0 z a 0 0 N i WTRACTI J LC M W M M 0 0 O '6 J M J �Oj of M O J� LQ O N I'- W I­ O tt N V V) 11 N 00 M 11 W 11 O C0 O M 11 O f` M O I\ Q W d II II ap d f1 II II ap II II d m W II II N co z W z W z W z W WTRACTI J LC McGIRTS TRACTI McARN z WALKER BRIDGE WALKER ROAD O FAMRS, INC. ROAD FAMRS, INC. RIGHT -OF -WAY O D.B. 14E, PG. 154 RIGHT -OF -WAY D.B. 14E, PG. 154 rn W 16" x 0.219" WT X -42 POO O O O z Q In W J_ LL O IY a_ FA j / 101 / GAS \GA ____GAS \ \ \ I o= / GEO CORE B -0 \GAs I Station =3 +15 \GASH /- - - - - -- -------- - - - - -- - - - -- Offset=- 106.3L GAS I EXISTING 70' GAS EASEMENT D.B. 1334, --------------- - - - - -- — 276 / o GAS O / \ GAS —GAS O I O O O O / 0 —GASH O , O + + / O \ \ \ O + GAS + -A/ GAS GAS GAS -- N GAS GAS —GAS M GAS GAS GAS GAS M —GAS GAS GAS- -GAS— M ,S GAS GAS GAS— / 00 O OM cM M N N N N -N N - N N - -�- - - - - - - - - - L- - - - - - - - - - -L0 - - - - - - - /� In — — — — — — — — — — l!0 \ �- — — — — — — — - Lo - — — — -- — — — - � — — — — — — — — — — � - -�/ —�/ —�/ --/ —v —�/ �( �/ �/ �( �{ �/ �/ �( �/ �/ �/ �( �/ yam` [,�( �/ �/ �/ �( �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ X�J9YCSXT7CYCSX'7C7 -A.*7�7C`A rx N(- C`T57 *X T(sx rX 7C7�/C`i'k'/C7C7CWF x4-X X-7V4X`AX- -X7 .)4x- rXG )47r/ -XG )47 -GAS GAS GAS GAS — GAS GAS WYt' - - - - - - - - p - e EXISTING 16" GAS LINE C) (TO REMAIN) ++ _ ♦, Xo° - i ° - -- — — — 8 — — — — — — — — — — — — — moo - - - - - - - s ♦ O PROPOSED TEMPORARY WORKSPACE ♦ r"' T PROPOSED XD ♦ / PERMANENT EASEMENT ♦ Q 0 / ° PLAN C9 ALIGNMENT PLAN SCALE: 1" = 50' / /0 GRAPHIC SCALE (IN FEET) 50 0 25 50 100 ° 1 inch= 50 ft. / or ILL Lr z� J LC LC PROFILE �a VERTICAL SCALE: 1" = 5' Ct HORIZONTAL SCALE: 1" 50' w u O Oil O F_ C BEGIN PROJECT EXISTING 16" GAS LINE I I STA. 0 +00 = (TO BE ABANDONED) N � STA. 5225 +15 rn / O O O 1 O Q0 N Cq N N r i N co N l CAT# O O O j / 101 / GAS \GA ____GAS \ \ \ I o= / GEO CORE B -0 \GAs I Station =3 +15 \GASH /- - - - - -- -------- - - - - -- - - - -- Offset=- 106.3L GAS I EXISTING 70' GAS EASEMENT D.B. 1334, --------------- - - - - -- — 276 / o GAS O / \ GAS —GAS O I O O O O / 0 —GASH O , O + + / O \ \ \ O + GAS + -A/ GAS GAS GAS -- N GAS GAS —GAS M GAS GAS GAS GAS M —GAS GAS GAS- -GAS— M ,S GAS GAS GAS— / 00 O OM cM M N N N N -N N - N N - -�- - - - - - - - - - L- - - - - - - - - - -L0 - - - - - - - /� In — — — — — — — — — — l!0 \ �- — — — — — — — - Lo - — — — -- — — — - � — — — — — — — — — — � - -�/ —�/ —�/ --/ —v —�/ �( �/ �/ �( �{ �/ �/ �( �/ �/ �/ �( �/ yam` [,�( �/ �/ �/ �( �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ �/ X�J9YCSXT7CYCSX'7C7 -A.*7�7C`A rx N(- C`T57 *X T(sx rX 7C7�/C`i'k'/C7C7CWF x4-X X-7V4X`AX- -X7 .)4x- rXG )47r/ -XG )47 -GAS GAS GAS GAS — GAS GAS WYt' - - - - - - - - p - e EXISTING 16" GAS LINE C) (TO REMAIN) ++ _ ♦, Xo° - i ° - -- — — — 8 — — — — — — — — — — — — — moo - - - - - - - s ♦ O PROPOSED TEMPORARY WORKSPACE ♦ r"' T PROPOSED XD ♦ / PERMANENT EASEMENT ♦ Q 0 / ° PLAN C9 ALIGNMENT PLAN SCALE: 1" = 50' / /0 GRAPHIC SCALE (IN FEET) 50 0 25 50 100 ° 1 inch= 50 ft. / or ILL Lr z� J LC LC PROFILE �a VERTICAL SCALE: 1" = 5' Ct HORIZONTAL SCALE: 1" 50' w u O Oil O F_ C O z4 I I + 230 N � 220 210 200 195 e 002 22 L.F. OPEN CUT 1¢— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ —0 — 0+ I WARN ROAD -� -�_ � � 1 't Q0 - — 1 _ 4 - 13 +00 _ — — o _O - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - --- - - - - - -_ - - - - -- - - - - - -- _ co _ - -_ -_ LU / 0 O O O — _ _ _ __ _ / O O O O O O O O _ C) -- / or M 00 SA O O Q =MMM mom M v- Na 1 ft ft _N lift - 36 L.F. OPEN CUT 6 PROPOSED 1 1 ; 002 TEMPORARY WORKSPACE , 1 PROPOSED L 1 I PERMANENT EASEMENT aft 1 PROPOSED J I PERMANENT EASEMENT I i PROPOSED ' TEMPORARY WORKSPACE I i i EXISTING 16" GAS LINE S9 D � I I M (TO BE ABANDONED) O N � O O O O O O I O + I I + + N � o rn o C) - N -GAS GAS GAS GAS GA: N —GAS GAS GAS GAS— N �S GAS GAS GAS N —GAS—GAS- I o - - - - - L0 - - - Ln - - LO- - - - . - - - - - - - - - - N co N e 002 22 L.F. OPEN CUT 1¢— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — _ —0 — 0+ I WARN ROAD -� -�_ � � 1 't Q0 - — 1 _ 4 - 13 +00 _ — — o _O - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - --- - - - - - -_ - - - - -- - - - - - -- _ co _ - -_ -_ LU / 0 O O O — _ _ _ __ _ / O O O O O O O O _ C) -- / or M 00 SA O O Q =MMM mom M v- Na 1 ft ft _N lift - 36 L.F. OPEN CUT 6 PROPOSED 1 1 ; 002 TEMPORARY WORKSPACE , 1 PROPOSED L 1 I PERMANENT EASEMENT aft 1 PROPOSED J I PERMANENT EASEMENT I i PROPOSED ' TEMPORARY WORKSPACE I i i 36 L.F. OPEN CUT 230 220 VERY \ 4' MIN. COVER FIRM 9 -13 -18 SAi D N =31 \ 16 210 I M 11 -3 -14 22 L.F. OPEN CUT VERY N -17 STIFF LEAN 7 -12 -13 N =25 LN 0 d LD S9 D � - a0 M PREPARED BY: ` ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA O N � O A O O l+ L0 O LC O 't d O O O I I d LO O � N N � O O t C O d O 11� ° ' CO d 1� M � N C7 N N co N CAT# O O O Q Q z O 6F) GEO CORE B -04 - - o C/) cn ti Station =3 +15 O o v a 0 � d SURF ELEV = 221' + + N N N a a O 10 TERM ELEV = 191' N N - N N N N - N N O N N - N N N N N N ___ N 0 +00 1 +00 2 +00 3100 16763 16 "45 °WELD ELL FS 3R Y-52 Sn Sn - -- __ -_ CLIENT PROJECT NO: 2239872 REVISION: 1 DRAWING NO: 3007 -04 -015 a O a O 1 16650 16 "X16 "X16" WELD BARRED TEE Y -70 3 -3 -3 ILL LU — 4'MIN, 16652 1 6"X1 6"X6".375X.280 WT WELD BBT Y -70 N =6 __j COVE R `------ -9ANDE - -ZZZ ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- — 16 - - - - -- - - -- N=4 -��i� \ \\ IN. COVER '- ------------ - - - - -- \- - - ----- ---- -- --- -- 16" 4' MIN. COVER - - - - za 16" 36 L.F. OPEN CUT 230 220 VERY \ 4' MIN. COVER FIRM 9 -13 -18 SAi D N =31 \ 16 210 I M 11 -3 -14 22 L.F. OPEN CUT VERY N -17 STIFF LEAN 7 -12 -13 N =25 LN 0 d LD S9 D � - a0 M PREPARED BY: ` ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA O N � O A O O O L0 O LC O 't d O O O O O 0`- ) d LO O � O L0 N � O O t C O d O 11� CO d 1� M � N N '0 CD M N CAT# O O O N N O N O 6F) VERY - - 8 -12 -12 ti ti ti S9 O O O O O O (0 O � � d d N N N N N N N FIRM N SAND) - 10 N =24 N N N - N N N N - N N - N N N N - N N N N N N N N N 0 +00 1 +00 2 +00 3100 16763 16 "45 °WELD ELL FS 3R Y-52 4 +00 5 +00 6 +00 7 +00 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 14 +00 6 -15 -12 N =27 200 195 REVISION , ® Know. what's below. Call before you dig. Piedmont Natural Gas PREPARED BY: ` ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ I / \ � � _� = _ _ i I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 4 - MCGIRTS BRIDGE ROAD STA. 5225 +35 TO STA. 5238 +86 REV DATE DESCRIPTION 1 03/15/15 REMOVED CONVENTIONAL BORES ISSUE DATE: MARCH 13 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT# DESCRIPTION MK NO QTY CAT# DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 1,375' TBD 16".375 WT X -65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 125' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 1 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE 4 2 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 2 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: 1 DRAWING NO: 3007 -04 -015 6 0 1 16650 16 "X16 "X16" WELD BARRED TEE Y -70 7 0 16652 1 6"X1 6"X6".375X.280 WT WELD BBT Y -70 a a a 0 N M C ry W Z O TRACT 1 WALKER FAMRS, INC. D.B. 14E, PG. 154 H O 3 16" x 0.219" WT X -42 Z J CL PLAN ALIGNMENT PLAN SCALE: 1" = 50' GRAPHIC SCALE (IN FEET) 50 0 25 50 100 1 inch = 50 ft. PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' W J_ 11 O ry d M O —'Al O — —GASH co _ M s _ N �GAS_ cas L—GAS— _ GAS —GAS �6AS It EXISTING 16" GAS LINE (TO BE ABANDONED) O LMV O � + 4S EXISTING 70' GAS EASEMENT ).B. 1334, PG. 276 — _ EXISTING 16" GAS LINE k— — — — — — — — (TO BE ABANDONED) o AS�GAS- y� CF —G GAS— + _ _O (�� 1�%C TS �N,� AS— GAS —GA O I � GAS GAS _ O ' !_- �• �` S G GAS— 1 \ O \ \ \ \ \ \ \ —GASH O'GAS- d' —Cf) GAS —GAS I O \ \ \\ \ �GAS�GAS—GAS L _ ��_ - _ _7�(�(s1c " — _ \G^ + �cAs \ g\—c \ c O _GAS cns cns —GAS � STA. 23 +18 = _ _ — STA. 5247 +37_ O O GAS�G GAS�GAS- G� N Ift I — _ M GAS GA.. _ �3+ aft — — _ _ N \ \ \ \ \\ — o + _ — — LO EXISTING 16" GAS LINE Op oC) jWq( 'any \ \ _ - - - - -- 7�"�� (TO REMAIN) __ -- CIA Mft \ M W \ ^ " �yrJ(Ga(.]/G7C n 7CG7F n JC /` ' " "(� /�G aft C) 100 » w \ — now co o _o_ o i + C) woo ftft aft PROPOSED — — — \ \` ` �1"\' \ \ _ N Now ♦ TEMPORARY WORKSPACE — — r \ woo all- 230 220 210 200 190 PROPOSED PERMANENT EASEMENT 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 230 220 210 200 190 �o �L � o L0� \ f � _ __ _ _ - ` i ; I I SCALE: AS SHOWN DESIGNED BY: SWH J� V o r`7 �� M Q N M � W ISSUE DATE: MARCH 13, 2015 II M a) 00 GJ rl- d Cl) W d co W d M W d co c2 DESCRIPTION MK NO II II II II II II II II CHECKED BY: SWH 1 Z W Z W Z W Z W ry W Z O TRACT 1 WALKER FAMRS, INC. D.B. 14E, PG. 154 H O 3 16" x 0.219" WT X -42 Z J CL PLAN ALIGNMENT PLAN SCALE: 1" = 50' GRAPHIC SCALE (IN FEET) 50 0 25 50 100 1 inch = 50 ft. PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' W J_ 11 O ry d M O —'Al O — —GASH co _ M s _ N �GAS_ cas L—GAS— _ GAS —GAS �6AS It EXISTING 16" GAS LINE (TO BE ABANDONED) O LMV O � + 4S EXISTING 70' GAS EASEMENT ).B. 1334, PG. 276 — _ EXISTING 16" GAS LINE k— — — — — — — — (TO BE ABANDONED) o AS�GAS- y� CF —G GAS— + _ _O (�� 1�%C TS �N,� AS— GAS —GA O I � GAS GAS _ O ' !_- �• �` S G GAS— 1 \ O \ \ \ \ \ \ \ —GASH O'GAS- d' —Cf) GAS —GAS I O \ \ \\ \ �GAS�GAS—GAS L _ ��_ - _ _7�(�(s1c " — _ \G^ + �cAs \ g\—c \ c O _GAS cns cns —GAS � STA. 23 +18 = _ _ — STA. 5247 +37_ O O GAS�G GAS�GAS- G� N Ift I — _ M GAS GA.. _ �3+ aft — — _ _ N \ \ \ \ \\ — o + _ — — LO EXISTING 16" GAS LINE Op oC) jWq( 'any \ \ _ - - - - -- 7�"�� (TO REMAIN) __ -- CIA Mft \ M W \ ^ " �yrJ(Ga(.]/G7C n 7CG7F n JC /` ' " "(� /�G aft C) 100 » w \ — now co o _o_ o i + C) woo ftft aft PROPOSED — — — \ \` ` �1"\' \ \ _ N Now ♦ TEMPORARY WORKSPACE — — r \ woo all- 230 220 210 200 190 PROPOSED PERMANENT EASEMENT 16 +00 17 +00 18 +00 19 +00 20 +00 21 +00 22 +00 23 +00 230 220 210 200 190 REVISION • , ® Knowat's below. Callbefore you dig. Piedmont Natural Gas PREPARED BY: ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f � _ __ _ _ - ` i ; I I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 4 - MCGIRTS BRIDGE ROAD STA.52 38 +86 TO STA. 5247 +37 REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 818' TBD 16".375 WT X-65 CFB DRL PIPE 8 0 15368 16" WXW ANSI 600 GEAR BALL VALVE 2 0 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 1 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -04 -016 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 7 0 15317 16 "X16 "X6" WELD RED. TEE STD WT Y -52 d Z Q d 0 z 0 z 0 0 0 0 0 3 0 0 0 Q 0 0 ♦ � � Gqs ° °�> \ ♦ \ Gq /♦ ♦ 9 ♦ \ s /\ \ ♦ ` \ � G9S � ° `\> \ \ F♦ N. l \ \ \♦ \ °q \ t� \ vI �NO- G t \ ♦ � qs \ j / SAFETY v v FENCE (TYP.) �\ Al \L/ i INSTALL CONSTRUCTION ENTRANCE, SEE DETAIL 1, SHEET 3007 -00 -003 i Ali -/ N .r\ EXISTING CONTOURS (TYP.) x ° \ °o \ \ \ \ \ \\ \ \\ \ \`r ♦ ` \ \G9S ` _/ / / / G \ �V A V HS ♦ V GqS / ` � • _ \ \ hhh °° ` \ \ `� \ 4 \ \ \ \ \ \ \ s \ ♦ i Gqs / ♦ ♦9S /� I \ \ ° °'� \< \ \ \ Jas ♦ ♦ I� \ FLOW ARROW (TYP.) V ♦� G�� \ < ° °AVA\ `v \\ I �GgsGgs I ♦ \ \ �G'` \\ \\ \ G9S ` GqS ♦ \ \ \ � -� / G\ \ °OS \\ \ \ `� \\ G"� ♦ G9S ♦ ro, � G � \ \ \ \ �\ \GqS ♦ ♦ x s% Po�♦ Gqs ♦� ♦ LIMITS OF DISTURBANCE \G \ \ \ \� \\ \° / ` \ \ GqS ♦ ♦qS �<o \ \ � \ \ \ \\ `` \ \G9S ♦ \(`'qS � \ �G \ \ \� \ °. �G�� ♦ No �r �� �\ ` � �� V G9S ♦ \ GRAPHIC SCALE (IN FEET) 80 0 40 80 180 1 inch = 80 ft. PLAN EROSION CONTROL PLAN SCALE: 1" = 80' REVISION G � � `\ \ \\ ♦ � G9S GS ♦��`Oo 9 S � 9 9f ♦ `� ♦ GqS ♦\ vo � vv`"ww 9 ♦ s ♦ °° \ G SF � ° \ \ , \ \ ♦GqS \ °'�p� � °\ \ � � V�A \ \ � � � ♦ ♦ � \� GqS ♦� SS ♦ � � \ \ \ _p / \ \\\ \ \ \ � ,, ♦ ♦�\ \Gqs ♦ \ ♦ ♦\ ` °° INSTALL CONSTRUCTION \ \�\ \ \\ �7�I \\ \Gqs ♦�°S ♦\ ENTRANCE, SEE DETAIL 1, \ \�A \\ ♦ �G ♦�G9s ♦ ° ♦ \� °° SHEET 3007 -00 -003 V `� A\ �\ �� ♦�� qs ♦ ♦� ♦A <° / \ \ ` \� ♦ GqS ♦9S ♦ //� G w � ♦ v� � ♦�Gys �% ' II I I I ♦ \ ,: Gqs �� v v �� ♦ v ♦ 1, f 11 iii /I � � *'•jre �� +�_..� � � `� A \ ���� ♦� � �Gq� ♦ ♦Gqs /� I � ti% //� l REV DATE DESCRIPTION MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION 1 4,580' SILT FE NICE 2 137' SAFET FENCE Know what's below. Call before you dig r6111 Piedmont Natural Ga.&S- N/ TEMPORARY STREAM CROSSING. SEE DETAIL 7, SHEET 3007 -00 -002 �C /1 14,// \ \ \ \ THE SOILS IN THE PROJECT AREA INCLUDE: • CoA - COXVILLE LOAM, 0 TO 2 PERCENT SLOPES • LyA - LYNCHBURG SANDY LOAM, 0 TO 2 PERCENT SLOPES • NcA - NOBOCO LOAMY SAND, 0 TO 2 PERCENT SLOPES • NcB - NOBOCO LOAMY SAND, 2 TO 6 PERCENT SLOPES • NoB - NORFOLK LOAMY SAND, 2 TO 6 PERCENT SLOPES \ ♦ \ \ GIs � \ 9S G 4". GqS Po\ GqS °p \ S \`\GqS � Qq �� V ♦ GqS ` GAS\ \ ♦ ` ` GIs ` GqS ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL NASHVILLE, T E N N E S S E E C A R Y , N O R T H C A R O L I N A PROJECT DESCRIPTION THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS APPROXIMATELY 6.4 ACRES. EXISTING SITE CONDITIONS THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. SCALE: DESIGNED BY: AS SHOWN SWH ISSUE DATE: DRAWN BY: MARCH 13, 2015 CAJ ELI PROJECT NO: CHECKED BY: 14 -21 -3007 SWH CLIENT PIEDMONT NATURAL GAS CLIENT PROJECT NO: 2239872 PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 4 - MCGIRTS BRIDGE ROAD EROSION CONTROL PLAN ISSUE FOR CONSTRUCTION REVISION: - - -- DRAWING NO: 3007-04-017 -017 g a r a a 0 N a o (TO REMAIN) / h ^ I I f `GAS\ h I I / GIs Q'qs ____ - -- GgS�Ggs� \\ 1 BEGIN NEW 16" GAS LINE STA. 0 +00 STA. 5153 +01 / \G9S�GgS O PROPOSED XTEMPORARY WORKSPACE 5 ' G `3J EXISTING 16" GAS LIN Gp5 /GP qS ' (PORTION TO BE ABAN ONE i1' /GPS t' _ \ \ EXISTING 50' ISS \ GAS EASEMENT q \� \ o jGPS /� 'Is \ / \ PROPOSED / \ I� ```` ` O MPORARY WORKSPACE I PS ja /S \GASH <' - \ �° oo \\ , PROPOSED GPS /GS GqS \ M \P NENT EASENA NT GPS/ o J s- \,h PROPO / TEMPORAR R PACE s s h / GIs -10 � EXISTING 70' `\ / GAS EASEMENT ° PROPOSED y TEMPORARY WORKSPACE X/ 1 / / / 4/ i l _4 Ile I , 5. a GRAPHIC SCALE (IN FEET) 60 0 30 60 120 1 inch = 60 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 60' f / 1 V •� 1^ O � oJ� GgS\GgS P\� • / • / -CO �o GqS 'c / • \O /NX / \� O�j / �� \GqS\ / \ Q / °N N / \ \ TRACT 1 ` \ WALLACE \ TRUCKIN( D.B. 14K, PG. ` \ PIN# 020305 0 Go (p ` �O '�1( \G / WALLACE \ `�`\ TRUCKING \ D.B. 14K, PG. 283 PIN# 020305 01045 z O \ ` 0 / \ 9 \ PROPOSED ♦ \` 9 TEMPORARY WORKSPACE �c� �A \� \\ O I � C / ` ,, ♦\ -Pv \G9s \ \♦ / 4 a Ll OO • • 01 PORTION BAN N ON O c ,.� \\` \ \� 9s \G \ \ \\ N \ ONE \ ` 0't EN N 16" GAS L NX STA. 13 +O6't- \ \ 9S\ STA. 5166 +04` NZ\ LL PROPOSED PERMANENT EASEMENT ♦ _ _ PROPOSED 4 / / TEMPORARY WORKSPACE / / \ -,,,LAURINBURG REGULATOR / STATION / / I 1 I r° I •' I I I I I I I I I I I 1 I 1 / 1 / / / / I I / / C I / / lI I I J J J j j ° I / I 1 I I I I I I I I / / / I / I / / � I O / r� TRACT 18 WALLACE TRUCKING D.B. 6R, PG. 472 PIN# 020305 01047 REVISION • ® Knowwhat's below Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI— LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f �' � � - - _ _ _ — �� I I \ \ \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 5 — WAGRAM ROAD OVERALL SITE LAYOUT REV I DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY ACCESS DRIVE DESCRIPTION / QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH PROPOSED TEMPORARY WORKSPACE woo / � 0 wo woo ISSUE FOR CONSTRUCTION WALLACE I �— TRUCKING _— 1 D.B. 1003 PG. 125 PIN# 020305 01060 _ �— I I I CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -05'0 I I 1 TRACT 4 1 SCOTLAND COUNTY ECONOMIC 1 CITY OF I DEVELOPMENT CORPORATION D.B. 1319, PG. 189 ' I LAURENBURG I PIN# 020305 0103801 D.B. 1407, PG. 145 EXISTING 16" GAS LINES S PIN# 020305 0106001 o (TO REMAIN) / h ^ I I f `GAS\ h I I / GIs Q'qs ____ - -- GgS�Ggs� \\ 1 BEGIN NEW 16" GAS LINE STA. 0 +00 STA. 5153 +01 / \G9S�GgS O PROPOSED XTEMPORARY WORKSPACE 5 ' G `3J EXISTING 16" GAS LIN Gp5 /GP qS ' (PORTION TO BE ABAN ONE i1' /GPS t' _ \ \ EXISTING 50' ISS \ GAS EASEMENT q \� \ o jGPS /� 'Is \ / \ PROPOSED / \ I� ```` ` O MPORARY WORKSPACE I PS ja /S \GASH <' - \ �° oo \\ , PROPOSED GPS /GS GqS \ M \P NENT EASENA NT GPS/ o J s- \,h PROPO / TEMPORAR R PACE s s h / GIs -10 � EXISTING 70' `\ / GAS EASEMENT ° PROPOSED y TEMPORARY WORKSPACE X/ 1 / / / 4/ i l _4 Ile I , 5. a GRAPHIC SCALE (IN FEET) 60 0 30 60 120 1 inch = 60 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 60' f / 1 V •� 1^ O � oJ� GgS\GgS P\� • / • / -CO �o GqS 'c / • \O /NX / \� O�j / �� \GqS\ / \ Q / °N N / \ \ TRACT 1 ` \ WALLACE \ TRUCKIN( D.B. 14K, PG. ` \ PIN# 020305 0 Go (p ` �O '�1( \G / WALLACE \ `�`\ TRUCKING \ D.B. 14K, PG. 283 PIN# 020305 01045 z O \ ` 0 / \ 9 \ PROPOSED ♦ \` 9 TEMPORARY WORKSPACE �c� �A \� \\ O I � C / ` ,, ♦\ -Pv \G9s \ \♦ / 4 a Ll OO • • 01 PORTION BAN N ON O c ,.� \\` \ \� 9s \G \ \ \\ N \ ONE \ ` 0't EN N 16" GAS L NX STA. 13 +O6't- \ \ 9S\ STA. 5166 +04` NZ\ LL PROPOSED PERMANENT EASEMENT ♦ _ _ PROPOSED 4 / / TEMPORARY WORKSPACE / / \ -,,,LAURINBURG REGULATOR / STATION / / I 1 I r° I •' I I I I I I I I I I I 1 I 1 / 1 / / / / I I / / C I / / lI I I J J J j j ° I / I 1 I I I I I I I I / / / I / I / / � I O / r� TRACT 18 WALLACE TRUCKING D.B. 6R, PG. 472 PIN# 020305 01047 REVISION • ® Knowwhat's below Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI— LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f �' � � - - _ _ _ — �� I I \ \ \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 5 — WAGRAM ROAD OVERALL SITE LAYOUT REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007 -05'0 a 0 v 0 N M C Of TRACT 5 TRACT 4 TRACT 3 TRACT 2 TRACT 1 w HWY 401 z WALLACE CITY OF SCOTLAND COUNTY ECONOMIC RIGHT -OF -WAY WALLACE WALLACE TRUCKING LAURENBURG DEVELOPMENT CORPORATION TRUCKING TRUCKING O D.B. 10J, PG. 125 D.B. 1407, PG. 145 D.B. 1319, PG. 189 D.B. 14K, PG. 283 D.B. 14K, PG. 283 16" x 0.219" WT X -42 3 0 2O 0 3 z a n w J_ LL O ry 1I v `, � / -/ yP / Z + + \+ . ,/ \yp \\ +/ \\ /x / 4- \ C +\GEO CORE X06 + / Z % ' SURF. ELEV: 2 + / \ TERM ELEV: 191' \+ / TER / \+ EXISTING 16" GAS LINE \ Offs- -14!4 (PORTION TO BE ABANDONED) � + 3 / BEGIN NEW 16 GAS LINE + , \ 0 + 12'x 60' �.28- S TA. 0 +00 = ' o �� � BORE PITS STA.5153 +01 � ,' �, ' _� ��� EXISTING 16" GAS LINE +� °o / __ - -' - -- G G� (TO REMAIN) +\o d // __-- 's'_ - -- - ��G }G►- - -- J -- Ln e s -- - - -. -- 0 LO 0 M s N _- -_�•__ -5 + __ s =� O _ _ - d' - ------ - -� - -- \ __ __ ___ �- ♦tiO / -GA� -GAS GAS��GAS AS G - - _ _ _ - _ _ CO OH OH _ _ -GAS \ O O _ _ _ _ - - N as so GAS \ O C) _ _ - - --- - -- L // a m /3 PLAN PROPOSED ALIGNMENT PLAN TEMPORARY WORKSPACE SCALE: 1" = 50' PROPOSED PERMANENT EASEMENT GRAPHIC SCALE (IN FEET) / so o zs so 100 f inch =50 ft. PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' 230 220 210 200 O + M Ln In X W 11 M 0 (n 0 w t W - �m w Z II co II d Q I¢- X W 0U)LU0 LOTSE EX. 16" CLAYEY M 4 AN COVE SAND " R 16 0 0 0 LO L0 �--, o 0 L0 / 1 \ / GEO CORE B -05 SURF. ELEV: 222' \ / TERM ELEV: 192' / Station =7 +11 \ \ Offset = -50.7 \ \ \ \ O 1 \ m o /� c°o 12'x 20' I 1 - o x �, BORE PIT ° EXISTING PNG STATION co 0) Q I 1 '� - -_- I \ 1 SEE SHEET 3007-05-018 FOR /x A s� ° \ EXISTING 50 CONNECTION DETAIL \ r- -� _ 1 �HF�ED�e jr S ��'�__ +° GAS EASEMENT \ _OHA END NEW 16" GAS LINE 0 No s Mft� o \ - -- ss v' -- �`( 1 STA. 13+05 �-iiiii•— - + - — — ,� a STA. 5166 +04 _ CIO 011 0 / Q -OH OH OH I I � \ _ _ \ GAS 7 00 7 dew wo I . x x x x� I 1 -an 00 i1 � ' �- ' \ ---- - - - - -- 1 J � \ PROPOSED TEMPORARY WORKSPACE \ PROPOSED x` PERMANENT EASEMENT \� I I / I I I I I 0) N rn (0 + + N + M II + II II Q M Ln II Cn C0 v7 + Q O Z <n H - = o_ = p O o O U) 0 o LU w O U) rn GEO CORE B -06 0 � 2 2 w Station =2 +43 = `SURF ELEV = 221' O TERM ELEV= 191' - ---- 3 -3 -3 N6 \ / - - - - - - - - - - 2.4.4 \ / J v GEO CORE B -05 Station =7 +24 SURF ELEV = 223' TERM ELEV= 193' wo Z J (+O M cD co W W p u F- co z° IM F- I -; 230 �JL3 CLAYEY � N =5 SAND - - - /'� -- -- 220 112 VERY ------------------- N=3 LOOSE SAND --------------- - s 4' MIN. COVER J 16" N =13 N =10 STIFF 4' MIN. COVER STIFF SAND SANDY CLAY 16" CLAY 4 -8 -8 N =16 300 L.F. CONVENTIONAL BORE 2-1-3 N =6 LOOSE 487 0 o CLAYEY N =15 � OO N W OO N SAND FIRM 0 ++ II 0� II CLAYEY Z II W m II W SAND ED U) W (nZ - -- SAN Y CLAY 3-5-7 N =12 4 -8 -9 Ln M CO O� 00 It O �' O M Lx) (0 CO M M ti LI O 00 r- �+•� M O 00 N =17 FI M O 6t N Q0 O 6� O O co M 1 O Ln O Ln It r- M SAND � ti N 1 O cF r O L0 O LS? d' . f1- M (` � N L0 O N M N N N 6 -1 -12 N N N co N M O N O CA - Cn - op N N N N N N VERY N =24 N N N N N N N N N I N N N r N N N N N N N FIRM N N N N N N N N N N 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I ,- (0 . .- 00 M M M M M O O) NO � �'Lo Q O N JrCO Q ( r.�O L L6 c), L Lo Lo N I (0 L O N N N II N0 N II M L~Q IJ - 00 ( (0 M M 0 -II ( N ( a l l I I 1 0N NM z zw z zw z zw z z Of TRACT 5 TRACT 4 TRACT 3 TRACT 2 TRACT 1 w HWY 401 z WALLACE CITY OF SCOTLAND COUNTY ECONOMIC RIGHT -OF -WAY WALLACE WALLACE TRUCKING LAURENBURG DEVELOPMENT CORPORATION TRUCKING TRUCKING O D.B. 10J, PG. 125 D.B. 1407, PG. 145 D.B. 1319, PG. 189 D.B. 14K, PG. 283 D.B. 14K, PG. 283 16" x 0.219" WT X -42 3 0 2O 0 3 z a n w J_ LL O ry 1I v `, � / -/ yP / Z + + \+ . ,/ \yp \\ +/ \\ /x / 4- \ C +\GEO CORE X06 + / Z % ' SURF. ELEV: 2 + / \ TERM ELEV: 191' \+ / TER / \+ EXISTING 16" GAS LINE \ Offs- -14!4 (PORTION TO BE ABANDONED) � + 3 / BEGIN NEW 16 GAS LINE + , \ 0 + 12'x 60' �.28- S TA. 0 +00 = ' o �� � BORE PITS STA.5153 +01 � ,' �, ' _� ��� EXISTING 16" GAS LINE +� °o / __ - -' - -- G G� (TO REMAIN) +\o d // __-- 's'_ - -- - ��G }G►- - -- J -- Ln e s -- - - -. -- 0 LO 0 M s N _- -_�•__ -5 + __ s =� O _ _ - d' - ------ - -� - -- \ __ __ ___ �- ♦tiO / -GA� -GAS GAS��GAS AS G - - _ _ _ - _ _ CO OH OH _ _ -GAS \ O O _ _ _ _ - - N as so GAS \ O C) _ _ - - --- - -- L // a m /3 PLAN PROPOSED ALIGNMENT PLAN TEMPORARY WORKSPACE SCALE: 1" = 50' PROPOSED PERMANENT EASEMENT GRAPHIC SCALE (IN FEET) / so o zs so 100 f inch =50 ft. PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' 230 220 210 200 O + M Ln In X W 11 M 0 (n 0 w t W - �m w Z II co II d Q I¢- X W 0U)LU0 LOTSE EX. 16" CLAYEY M 4 AN COVE SAND " R 16 0 0 0 LO L0 �--, o 0 L0 / 1 \ / GEO CORE B -05 SURF. ELEV: 222' \ / TERM ELEV: 192' / Station =7 +11 \ \ Offset = -50.7 \ \ \ \ O 1 \ m o /� c°o 12'x 20' I 1 - o x �, BORE PIT ° EXISTING PNG STATION co 0) Q I 1 '� - -_- I \ 1 SEE SHEET 3007-05-018 FOR /x A s� ° \ EXISTING 50 CONNECTION DETAIL \ r- -� _ 1 �HF�ED�e jr S ��'�__ +° GAS EASEMENT \ _OHA END NEW 16" GAS LINE 0 No s Mft� o \ - -- ss v' -- �`( 1 STA. 13+05 �-iiiii•— - + - — — ,� a STA. 5166 +04 _ CIO 011 0 / Q -OH OH OH I I � \ _ _ \ GAS 7 00 7 dew wo I . x x x x� I 1 -an 00 i1 � ' �- ' \ ---- - - - - -- 1 J � \ PROPOSED TEMPORARY WORKSPACE \ PROPOSED x` PERMANENT EASEMENT \� I I / I I I I I 0) N rn (0 + + N + M II + II II Q M Ln II Cn C0 v7 + Q O Z <n H - = o_ = p O o O U) 0 o LU w O U) rn GEO CORE B -06 0 � 2 2 w Station =2 +43 = `SURF ELEV = 221' O TERM ELEV= 191' - ---- 3 -3 -3 N6 \ / - - - - - - - - - - 2.4.4 \ / J v GEO CORE B -05 Station =7 +24 SURF ELEV = 223' TERM ELEV= 193' wo Z J (+O M cD co W W p u F- co z° IM F- I -; 230 �JL3 CLAYEY � N =5 SAND - - - /'� -- -- 220 112 VERY ------------------- N=3 LOOSE SAND --------------- - s 4' MIN. COVER J 16" N =13 N =10 STIFF 4' MIN. COVER STIFF SAND SANDY CLAY 16" CLAY 4 -8 -8 N =16 300 L.F. CONVENTIONAL BORE 2-1-3 N =6 LOOSE 487 0 o CLAYEY N =15 � OO N W OO N SAND FIRM 0 ++ II 0� II CLAYEY Z II W m II W SAND ED U) W (nZ - -- SAN Y CLAY 3-5-7 N =12 4 -8 -9 Ln M CO O� 00 It O �' O M Lx) (0 CO M M ti LI O 00 r- �+•� M O 00 N =17 FI M O 6t N Q0 O 6� O O co M 1 O Ln O Ln It r- M SAND � ti N 1 O cF r O L0 O LS? d' . f1- M (` � N L0 O N M N N N 6 -1 -12 N N N co N M O N O CA - Cn - op N N N N N N VERY N =24 N N N N N N N N N I N N N r N N N N N N N FIRM N N N N N N N N N N 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I z a n w J_ LL O ry 1I v `, � / -/ yP / Z + + \+ . ,/ \yp \\ +/ \\ /x / 4- \ C +\GEO CORE X06 + / Z % ' SURF. ELEV: 2 + / \ TERM ELEV: 191' \+ / TER / \+ EXISTING 16" GAS LINE \ Offs- -14!4 (PORTION TO BE ABANDONED) � + 3 / BEGIN NEW 16 GAS LINE + , \ 0 + 12'x 60' �.28- S TA. 0 +00 = ' o �� � BORE PITS STA.5153 +01 � ,' �, ' _� ��� EXISTING 16" GAS LINE +� °o / __ - -' - -- G G� (TO REMAIN) +\o d // __-- 's'_ - -- - ��G }G►- - -- J -- Ln e s -- - - -. -- 0 LO 0 M s N _- -_�•__ -5 + __ s =� O _ _ - d' - ------ - -� - -- \ __ __ ___ �- ♦tiO / -GA� -GAS GAS��GAS AS G - - _ _ _ - _ _ CO OH OH _ _ -GAS \ O O _ _ _ _ - - N as so GAS \ O C) _ _ - - --- - -- L // a m /3 PLAN PROPOSED ALIGNMENT PLAN TEMPORARY WORKSPACE SCALE: 1" = 50' PROPOSED PERMANENT EASEMENT GRAPHIC SCALE (IN FEET) / so o zs so 100 f inch =50 ft. PROFILE VERTICAL SCALE: 1" = 5' HORIZONTAL SCALE: 1" = 50' 230 220 210 200 O + M Ln In X W 11 M 0 (n 0 w t W - �m w Z II co II d Q I¢- X W 0U)LU0 LOTSE EX. 16" CLAYEY M 4 AN COVE SAND " R 16 0 0 0 LO L0 �--, o 0 L0 / 1 \ / GEO CORE B -05 SURF. ELEV: 222' \ / TERM ELEV: 192' / Station =7 +11 \ \ Offset = -50.7 \ \ \ \ O 1 \ m o /� c°o 12'x 20' I 1 - o x �, BORE PIT ° EXISTING PNG STATION co 0) Q I 1 '� - -_- I \ 1 SEE SHEET 3007-05-018 FOR /x A s� ° \ EXISTING 50 CONNECTION DETAIL \ r- -� _ 1 �HF�ED�e jr S ��'�__ +° GAS EASEMENT \ _OHA END NEW 16" GAS LINE 0 No s Mft� o \ - -- ss v' -- �`( 1 STA. 13+05 �-iiiii•— - + - — — ,� a STA. 5166 +04 _ CIO 011 0 / Q -OH OH OH I I � \ _ _ \ GAS 7 00 7 dew wo I . x x x x� I 1 -an 00 i1 � ' �- ' \ ---- - - - - -- 1 J � \ PROPOSED TEMPORARY WORKSPACE \ PROPOSED x` PERMANENT EASEMENT \� I I / I I I I I 0) N rn (0 + + N + M II + II II Q M Ln II Cn C0 v7 + Q O Z <n H - = o_ = p O o O U) 0 o LU w O U) rn GEO CORE B -06 0 � 2 2 w Station =2 +43 = `SURF ELEV = 221' O TERM ELEV= 191' - ---- 3 -3 -3 N6 \ / - - - - - - - - - - 2.4.4 \ / J v GEO CORE B -05 Station =7 +24 SURF ELEV = 223' TERM ELEV= 193' wo Z J (+O M cD co W W p u F- co z° IM F- I -; 230 �JL3 CLAYEY � N =5 SAND - - - /'� -- -- 220 112 VERY ------------------- N=3 LOOSE SAND --------------- - s 4' MIN. COVER J 16" N =13 N =10 STIFF 4' MIN. COVER STIFF SAND SANDY CLAY 16" CLAY 4 -8 -8 N =16 300 L.F. CONVENTIONAL BORE 2-1-3 N =6 LOOSE 487 0 o CLAYEY N =15 � OO N W OO N SAND FIRM 0 ++ II 0� II CLAYEY Z II W m II W SAND ED U) W (nZ - -- SAN Y CLAY 3-5-7 N =12 4 -8 -9 Ln M CO O� 00 It O �' O M Lx) (0 CO M M ti LI O 00 r- �+•� M O 00 N =17 FI M O 6t N Q0 O 6� O O co M 1 O Ln O Ln It r- M SAND � ti N 1 O cF r O L0 O LS? d' . f1- M (` � N L0 O N M N N N 6 -1 -12 N N N co N M O N O CA - Cn - op N N N N N N VERY N =24 N N N N N N N N N I N N N r N N N N N N N FIRM N N N N N N N N N N 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I 0 0 0 LO L0 �--, o 0 L0 / 1 \ / GEO CORE B -05 SURF. ELEV: 222' \ / TERM ELEV: 192' / Station =7 +11 \ \ Offset = -50.7 \ \ \ \ O 1 \ m o /� c°o 12'x 20' I 1 - o x �, BORE PIT ° EXISTING PNG STATION co 0) Q I 1 '� - -_- I \ 1 SEE SHEET 3007-05-018 FOR /x A s� ° \ EXISTING 50 CONNECTION DETAIL \ r- -� _ 1 �HF�ED�e jr S ��'�__ +° GAS EASEMENT \ _OHA END NEW 16" GAS LINE 0 No s Mft� o \ - -- ss v' -- �`( 1 STA. 13+05 �-iiiii•— - + - — — ,� a STA. 5166 +04 _ CIO 011 0 / Q -OH OH OH I I � \ _ _ \ GAS 7 00 7 dew wo I . x x x x� I 1 -an 00 i1 � ' �- ' \ ---- - - - - -- 1 J � \ PROPOSED TEMPORARY WORKSPACE \ PROPOSED x` PERMANENT EASEMENT \� I I / I I I I I 0) N rn (0 + + N + M II + II II Q M Ln II Cn C0 v7 + Q O Z <n H - = o_ = p O o O U) 0 o LU w O U) rn GEO CORE B -06 0 � 2 2 w Station =2 +43 = `SURF ELEV = 221' O TERM ELEV= 191' - ---- 3 -3 -3 N6 \ / - - - - - - - - - - 2.4.4 \ / J v GEO CORE B -05 Station =7 +24 SURF ELEV = 223' TERM ELEV= 193' wo Z J (+O M cD co W W p u F- co z° IM F- I -; 230 �JL3 CLAYEY � N =5 SAND - - - /'� -- -- 220 112 VERY ------------------- N=3 LOOSE SAND --------------- - s 4' MIN. COVER J 16" N =13 N =10 STIFF 4' MIN. COVER STIFF SAND SANDY CLAY 16" CLAY 4 -8 -8 N =16 300 L.F. CONVENTIONAL BORE 2-1-3 N =6 LOOSE 487 0 o CLAYEY N =15 � OO N W OO N SAND FIRM 0 ++ II 0� II CLAYEY Z II W m II W SAND ED U) W (nZ - -- SAN Y CLAY 3-5-7 N =12 4 -8 -9 Ln M CO O� 00 It O �' O M Lx) (0 CO M M ti LI O 00 r- �+•� M O 00 N =17 FI M O 6t N Q0 O 6� O O co M 1 O Ln O Ln It r- M SAND � ti N 1 O cF r O L0 O LS? d' . f1- M (` � N L0 O N M N N N 6 -1 -12 N N N co N M O N O CA - Cn - op N N N N N N VERY N =24 N N N N N N N N N I N N N r N N N N N N N FIRM N N N N N N N N N N 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I GEO CORE B -05 Station =7 +24 SURF ELEV = 223' TERM ELEV= 193' wo Z J (+O M cD co W W p u F- co z° IM F- I -; 230 �JL3 CLAYEY � N =5 SAND - - - /'� -- -- 220 112 VERY ------------------- N=3 LOOSE SAND --------------- - s 4' MIN. COVER J 16" N =13 N =10 STIFF 4' MIN. COVER STIFF SAND SANDY CLAY 16" CLAY 4 -8 -8 N =16 300 L.F. CONVENTIONAL BORE 2-1-3 N =6 LOOSE 487 0 o CLAYEY N =15 � OO N W OO N SAND FIRM 0 ++ II 0� II CLAYEY Z II W m II W SAND ED U) W (nZ - -- SAN Y CLAY 3-5-7 N =12 4 -8 -9 Ln M CO O� 00 It O �' O M Lx) (0 CO M M ti LI O 00 r- �+•� M O 00 N =17 FI M O 6t N Q0 O 6� O O co M 1 O Ln O Ln It r- M SAND � ti N 1 O cF r O L0 O LS? d' . f1- M (` � N L0 O N M N N N 6 -1 -12 N N N co N M O N O CA - Cn - op N N N N N N VERY N =24 N N N N N N N N N I N N N r N N N N N N N FIRM N N N N N N N N N N 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I 0 +00 1 +00 2 +00 7 -1 3 +00 4 +00 5 +00 6 +00 7 +00 1 1 5-3715 1 8 +00 9 +00 10 +00 11 +00 12 +00 13 +00 210 200 REVISION PREPARED BY: \ SCALE: DESIGNED BY: REV DATE DESCRIPTION • f AS SHOWN SWH PNG 2014 CLASS LOCATION REPLACEMENT ENERGY LAND & INFRASTRUCTURE SCOTLAND COUNTY, NORTH CAROLINA � ISSUE DATE: DRAWN BY: ® 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 MARCH 13, 2015 CAJ MATERIAL SUMMARY Piedmont __ _ SITE 5 - WAGRAM ROAD MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION _ ELI PROJECT NO: CHECKED BY: 1 990' TBD 16".375 WT X -65 CFB DRL PIPE s 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 919- 234 -1974 WWW.ELI- LLC.COM • LICENSE # P -1289 -- — 14 -21 -3007 SWH STA. 5153 +15 TO STA. 5166 +04 2 300' 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 Natural Gas CLIENT: 3 2 16"X3'.375 WT .219 WT X-65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE ` PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE Knowat� below. 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL CLIENT PROJECT NO: 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 Callbefore you dig. NASHVILLE, TENNESSEE CARY , NORTH CAROLINA i ; 2239872 REVISION: DRAWING NO: - - -- 3007 -05 -019 7 0 16652 16 "X16 "X6" .375X.280 WT WELD BBT Y -79 I I g a n N 0 n a \ I \ \ -p ` O \ \ ` O ` O ` N \ O \ \ O F(p \ \ \ \ \ \ \ \ \ \ \ \ c \ o � PROPOSED 15' AANENT EASEMENT\ \ N N GRAPHIC SCALE (IN FEET) 10 0 5 10 20 1 inch = 10 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 10' EXISTING 50' GAS EASEMENT APPROX. TIE -IN FOR NEW 16" GAS LINE TEMPORARY WORKSPA EXISTING MAIN LINE VALVE TEMPORARY 6" BYPASS EXISTING STATION OUTLET TEMPORARY 6" BYPASS INSTALL NEW 4" BLIND FLANGE INSTALL NEW 4" STOPPLE DETAIL 1 \ ENLARGED STATION DETAIL - WALLACE \\ TRUCKING SCALE: 1" = 5' \ D.B. PIN# 02020 305 5 010404 4 \ \ \ \ o \ ` i `\ o \ \ + °y\ ' EXISTING MAIN Mp�R LINE VALVE Y.pA E�ISI� 0U 11% / �/ SS TIO g PIEDMONT D.B. T3D, PG 217 PIN# 020305 01044 PROPOSED 20' / TEMPORARY WORKSPACE ISOMETRIC TEMPORARY 6" BYPASS TIE -IN NOT TO SCALE REVISION • , ® Knowwhat's below � Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f � - - _ _ _ i ` � ! SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 5 - WAGRAM ROAD ENLARGED PLAN & TIE -IN DETAIL REV DATE DESCRIPTION / k ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH N N GRAPHIC SCALE (IN FEET) 10 0 5 10 20 1 inch = 10 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 10' EXISTING 50' GAS EASEMENT APPROX. TIE -IN FOR NEW 16" GAS LINE TEMPORARY WORKSPA EXISTING MAIN LINE VALVE TEMPORARY 6" BYPASS EXISTING STATION OUTLET TEMPORARY 6" BYPASS INSTALL NEW 4" BLIND FLANGE INSTALL NEW 4" STOPPLE DETAIL 1 \ ENLARGED STATION DETAIL - WALLACE \\ TRUCKING SCALE: 1" = 5' \ D.B. PIN# 02020 305 5 010404 4 \ \ \ \ o \ ` i `\ o \ \ + °y\ ' EXISTING MAIN Mp�R LINE VALVE Y.pA E�ISI� 0U 11% / �/ SS TIO g PIEDMONT D.B. T3D, PG 217 PIN# 020305 01044 PROPOSED 20' / TEMPORARY WORKSPACE ISOMETRIC TEMPORARY 6" BYPASS TIE -IN NOT TO SCALE REVISION • , ® Knowwhat's below � Callbefore you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ f � - - _ _ _ i ` � ! SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 5 - WAGRAM ROAD ENLARGED PLAN & TIE -IN DETAIL REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239872 REVISION: - - -- DRAWING NO: 3007- 05 -019A 0 N z Q 0 z 0 z 0 0 0 w 0 N 0 0 0 0 3 0 0 0 Q 0 0 THE SOILS IN THE PROJECT AREA INCLUDE: s T C10 N\ ' Lu / EXIST. EASEMENT FLOW ARROW (TYP.) (TYP.) / - - - - \ _c 9s _ --� - / _ -_ -_ /_ cn-s _ --c- .cs - - - - --- - - - - - - - - - - - GAS GAS - - - - - - - i AS GAS_G GAS GAS GAS GAS GAS \ / - - - - - - - - - - ----- ----- ----- --------- -- --- - - -- \ \ \1V -- -- '' � LIMITS OF DISTURBANCE / \ s c9 `\ � \ (TYP) \ I c\ I \ mss\ \ \ 9S \ �t N n GRAPHIC SCALE (IN FEET) 80 0 40 80 160 1 inch = 80 ft. t„ PLAN EROSION CONTROL PLAN SCALE: 1" = 80' JmA - JOHNSTON SOILS, 0 TO 2 PERCENT SLOPES, FREQUENTLY FLOODED NcA - NOBOCO LOAMY SAND, 0 TO 2 PERCENT SLOPES c P SILT FENCE (TYP.) \ Ns (SEE EPSC DETAILS SHEET) _ _T�t ANENT, - L1) �- - - -- �f9N \� �� ,/� \ EASEMENT (TYP.) J/% / TEMPORARY / WORKSPACE (TYP.) N\�I`( �� �X c � i i /c9s W_ da >W 4. , p CATCH BASIN TC= 221.4 \9N It` \� \ ,,► �Y /xI N 1\ \c\ \ r \ N\ \\ \ \ c N \ \ \ \ 1N \ 746k EXISTING CONTOURS (TYP.) , / / / \ I / \ / / / , / VA -W \ N \ / t / \ \ c \ \ \ AVA \ N x � / /'\ \ N \ \ \\ \ N \ �O, \ �s ♦ CONSTRUCTION TRAFFIC TO \ l A USE EXISTING DRIVEWAY \ �} \ s �' PROJECT DESCRIPTION THE PROPOSED PROJECT WILL INSTALL A NEW GAS LINE CROSSING MILTON RD FOR PIEDMONT NATURAL GAS. THE DISTURBED AREA IS APPROXIMATELY 1.97 ACRES. EXISTING SITE CONDITIONS THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. cr1W=nln G CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN AUGUST 2014 AND BE COMPLETE BY NOVEMBER 2014. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REVISION DATE DESCRIPTION , , ® K110W WI11t'S below. Call before you dig. Piedmont Natural Gas ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ I / � - _ - SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT SCOTLAND COUNTY, NORTH CAROLINA SITE 5 - WAGRAM ROAD EROSION CONTROL PLAN REV ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 1 2,244' SILT FE CE 2 0 SAFET FENCE CLIENT PROJECT NO: 2239872 REVISION: - --- DRAWING NO: 3007 -05 -020 0 0 Q 0 a E z 0 0 o EXISTING 50' GAS EASEMENT I I I I I I I I I I I I I ♦ I ./ \n. ` l CONC MON (OLD) i / \ TRACT 2 � HENDRICK B V GRAVEL / & SAND CO. \ D.B. 201, P.G. 299 ' PIN# 742500205500 / CONC MON (OLD) I I I I I I I I I I I I I I I I I I \ I I �I I I I I \ I I I REVISION , , ® �/.. �cnowwhanbelow. Call before you dig. Piedmont Natural GG,.--P ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ \ I I I / / � � - - _ - _/ _ � / / I I I \ \ \ SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 6 -STATE ROAD 1744 OVERALL SITE LAYOUT REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239873 REVISION: --- - DRAWING NO: 3007-06-021 a ro a 0 r� a 0� W M oO_O 00 � z r- J J W co Of OM & SAND CO. Ornp JM Q Ll M ODD O N ') _j O O 04 O N II O II O� GD II O "t r r CO II r � (R r.- 04 u 11 04 a 11 a4� a 11 N a�� II II 04 aIZT� II II DESCRIPTION zW zW zW zW zW 0� W TRACT 3 TRACT 2 TRACT 1 z HENDRICK B V GRAVEL HENDRICK B V GRAVEL HENDRICK B V GRAVEL II & SAND CO. & SAND CO. & SAND CO. O Book 162, Page 422 Book 201, Page 299 Book 162, Page 422 I LLI I 16" x 0.219" WT X -42 3) 1O 7 9 11 1O I O2 I 1O 6 8 O (3 ,i 16" x 0.219" WT X -42 I Z a n W J II O ry d PROPOSED 13' \PERMANENTEASEMENT PROPOSED 20' TEMPORARY WORKSPACE now \ o= \ J / _ 0- CD O I --------- - - - - -_ _ °s� l Now f s ^` Ow.. ° RIG SIDE BORE PIT / C/ V MA O1 , O , G7 L............. � L- - - off - - -- .� PROPOSED 20' \ EXISTING PNG STATION TEMPORARY WORKSPACE \ D.B. 566, PG. 27 PROPOSED 13' PERMANENT EASEMENT PIPE SIDE BORE PIT �} \� `/ _ C) / O CD 00 + * / OO _ v _ O ----- - - - - -- `����J ' - - - - -- A -N/ GAS a°C�A A O i N G iEG )iG *x GA��HE iCG 31HHF iG9�` i( X�9 �E iE ^iC�E iti��C iHcP�AX i�iCi� �C iC f�j O -GF,S — GA 11 ( O I -4 {. / - ��GAS �. -GAS \AS i� ,r 0 =45 GAS O 1 L0 aE /o \ \ .`y1\1�I�cns GAS cAS- -F–cAS O s { � -f JAF�--Af` AF c- 1 3 / + G J- GAS GAS O Q O O GAS- + -G 11 M / AF - A -- AF.���AF AF s GAS- =GASH + AS O O GAS __GAS� BEGIN NEW 16 GAS LINE - . a, �t - - - AF / 11 - DO - �� —GAS - GAS rGAS GPS \Y _ _ / M / 'X AF I a^ - __ - -_ - - - - - _• - - - -� - - M AF AF --AF GAS GAS AS GAS G GAS -EGA GAS F + ° �\ (<i _ STA. 0 00 -_ \ -- - --- - - -3 -- - - - -F -- a? �F A� AS GAS S N _A_ AF M -A t \ I Off' �_-- - - - -.- _ � AF _ STA. 3514 +96 r _ EXISTING 16" GAS LINE / /o - �AF- _ - - - -- —�� —AF AF AF AF AF —At -- - - - - -- �v /\ \ ��' \ (PORTION TO BE ABANDONED) / 3 0 / \ & \ \ v \ \ \ 3 �Gq / -_ - - - -- \ \ \ 3 G C)° STA. 7 +28 =- - - - GAS GAG- -GAS -- � GAS _GAS STA. 3522 +22 -1S N - - - - -• "C` \ —AF —AF - AF � - - - - - AFT �_ ^---- •----- - - - - -- EXISTING 16" GAS LINE I I I I \\ \ \ \ / (PORTION TO BE ABANDONED) o ---------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PLAN OH ` OH �O ° " ° °" °" \ °" OH OH O H ALIGNMENT PLAN / - / OA O OH SCALE: 1" = 40' °" °" °" °" ° "- GRAPHIC SCALE (IN FEET) OZ \ / , 40 0 20 40 80 I \ 1 inch = 40 ft. ---------------- - - - - -\ \ - oy – / - - - - -t O r M + + N N C) N ii II PROFILE VERTICAL SCALE: 1" = 4' HORIZONTAL SCALE: 1" = 40' 470 460 450 445 CD O O + ni + WC) I- WCDV \�� HGo / O+ Z II Of + 11 �\ zm N m N + W W W r W H 0 H i �\ H Q / OOfnZ W fnZ J ._ /v _ N, � O I� + II Q < II M d M � 00 O II II ~ U) CO ~ H M � O f� Q p N i 0 (0 Z (n ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ C/) N (V Z U5 Z Z U7 11 QU O O W Z_ W CAT # DESCRIPTION MK NO QTY Z Q �O DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 O aU U U ry W O ry 8 1 TBD of J U O a O W = cn O v 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 1 V O WO LLj 0 Q 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 w J (� 10 23' 12792 O 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 4 16763 16 "45 °WELD ELL FS 3R Y-52 12 1 TBD 16 "90 °WELD ELL LRY -65 CLIENT PROJECT NO: 2239873 REVISION: - - -- DRAWING NO: 3007 -06 -022 -- --------- WELD BB Y-7 13 2 ------------- - - - - -- 1 166502 16 "X16 "X66 .375 280 Y -70 (n / / Z / f/ 0 C/) W (.0 Z + WL CROSSING - STA. = 2 +33 UGT CROSSING - STA. = 2 +48 , <M W / \\��� o 80 L.F. CONVENTIONAL BORE CN Z w ,'� + w N QM \\�� LU ow ,'� 2' MIN. 0 Q �(n ZO ul o / co X W W I- Q / W o 0 0 O II WC) I- WCDV \�� HGo / O+ Z II Of + 11 �\ zm N m N + W W W r W H 0 H i �\ H Q / OOfnZ W fnZ J ._ /v _ N, � O I� 00 00 O M d M � 00 O - ti 17 M— M � O f� W O 00 ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 7 +00 470 460 450 445 REVISION , ® blowat� below. Callbefom you dig. Piedmont _. ,, Natu ral Gas PREPARED BY: ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.EII- IIC.COM LICENSE # P -1289 • ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL N A S H V I L L E , T E N N E S S E E CARY , NORTH CAROLINA � __ _ _ - SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 6 -STATE ROAD 1744 STA. 3514 +96 TO STA. 3552 +24 REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 658' 1 16".375 WT X -65 CFB DRL PIPE 8 1 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 80' 16771 16" .375 WT X -65 CFB /PC DRL PIPE 9 1 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 2 16 "X3' .375X.219 WT X -65 TRANS. PIPE 10 23' 12792 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90° WELD ELL FS 3R Y -52 11 2 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 4 16763 16 "45 °WELD ELL FS 3R Y-52 12 1 TBD 16 "90 °WELD ELL LRY -65 CLIENT PROJECT NO: 2239873 REVISION: - - -- DRAWING NO: 3007 -06 -022 7 WELD BB Y-7 13 2 TBD 16" 45° WELD ELL LR Y -65 1 166502 16 "X16 "X66 .375 280 Y -70 / f 1 I I I I I 1 I / I (OO / I I J I II SILT FENCE (TYP.) (SEE EPSC DETAILS SHEET) <00 � 00 \ 4O0 / / / CONSTRUCTION TRAFFIC TO USE EXISTING ACCESS DRIVE / / uh I � \ oiy o° \ / u f / / / / THE SOILS IN THE PROJECT AREA INCLUDE: • LgB - Lillington gravelly sandy loam, 2 to 8 percent slopes • LgC - Lillington gravelly sandy loam, 8 to 15 percent slopes 'I CONC MON (OLD) N Go\ 00 400, 6. coo \ \ yS�0 LIMITS OF DISTRUBANCE c°o \ \ >� TOTAL AREA = 0.71 ACRES coo \ sF \ \osF SILT FENCE (TYP.) (SEE EPSC DETAILS SHEET) too �F 'coo <00 \ I CO \ 4y c„ 0> 1 °H \ L.1 11 I I I I I I I I I I I I Cb 4q, \ coo \ \ q coo .I off , 1 • ' Kww. whars below, IL r/�'� {/fill bef re you dig. Piedmont Natural Gas ' ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY. NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL NASHVILLE. TENNESSEE CARY , NORTH CAROLINA \ I I / i i - _ _ - - �� �� / / I I OH. DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 6 -STATE ROAD 1744 EROSION CONTROL PLAN REV DATE DESCRIPTION Oh. ISSUE DATE: MARCH 13, 2015 DRAWN BY CAJ PROJECT DESCRIPTION THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS APPROXIMATELY 0.71 ACRES. THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY EASEMENTS; AND EXISTING ROAD R.O.W. SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. EROSION AND SEDIMENT CONTROL NARRATIVE THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT INVOLVE THE STRATEGIC PLACEMENT OF VARIETY OF DEVICES INCLUDING: • SILT FENCE • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. CONSTRUCTION SEQUENCE 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. B. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS CEASED. 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING REPRESENTATIVE. 11. PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. 3. SILT FENCE SHALL BE INSTALLED DOWN - GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL STABILIZATION ON STEEP SLOPES. MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. GENERAL NOTES 1. THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. STANDARDS ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. REVISION , 1 • ' Kww. whars below, IL r/�'� {/fill bef re you dig. Piedmont Natural Gas ' ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY. NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE • ENVIRONMENTAL NASHVILLE. TENNESSEE CARY , NORTH CAROLINA \ I I / i i - _ _ - - �� �� / / I I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 6 -STATE ROAD 1744 EROSION CONTROL PLAN REV DATE DESCRIPTION ISSUE DATE: MARCH 13, 2015 DRAWN BY CAJ MATERIAL SUMMARY MK NO CITY DESCRIPTION M K NO QTY CAT# DESCRIPTION ELI PROJECT NO: 14-21 -3007 CHECKED BY: WH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 7 1,694' CE 2 O HCAT FENCE CLIENT PROJECT NO: 2239873 G ��]] REVISION: ---- DRAWING NO: 3OOTO6 -O2J a a 0 N N GRAPHIC SCALE (IN FEET) 20 0 10 20 40 1 inch = 20 ft. PLAN OVERALL SITE LAYOUT SCALE: 1" = 20' \ \ //////// O \ \ \ \ \ \ EXISTING 16" GAS LINE (TO REMAIN) ` I EXISTING 50' \\ ` \GAS EPcrnnrnn- \. , EXISTING GAS LINE (TO REMAIN) TRACT 2 RAEFORD DEAN LINGERFELT AND LAURA C. LINGERFELT D.B. 959, P.G. 211 PIN# 644900214874 i / / / / 7/ / / / TRACT 1 ROBERT E. SIKES D.B. 933, P.G. 100 PIN# 644900241038 �\ \ PACE \ \ REVISION • , ® � Knowwhars below. Callbefore you di Piedmont Natural Gas ENERGY LAND V INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ \ / - - _ _ _ _ �� �� SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 - CEDAR GROVE ROAD OVERALL SITE LAYOUT REV I DATE DESCRIPTION 1 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. 1 0 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH \ \ REVISION • , ® � Knowwhars below. Callbefore you di Piedmont Natural Gas ENERGY LAND V INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE • CARY , NORTH CAROLINA \ \ / - - _ _ _ _ �� �� SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 - CEDAR GROVE ROAD OVERALL SITE LAYOUT REV I DATE DESCRIPTION 1 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. ISSUE DATE: MARCH 13, 2015 DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239873 REVISION: DRAWING NO: 3007- 07 -024 J w w TRACT 2 TRAC T 1 W SCALE: 1" = 50' I /C \ EXISTING 24" RCP / v — — z RAEFORD DEAN LINGERFELT AND ROBERT E. / / LAURA C. LINGERFELT SIKES O BOOK 959, PAGE 211 BOOK 933, PAGE 100 O O O M Cl) O J L O Lr) V II CD N N � a�CD Zw I W I 16" x 0.219 WT X -42 I O3 O O I 16" x 0.219 WT X -42 I z Q w w J U- 0 ry a_ 7 now ftft i � _ d Now -oft PROPOSED 20' `� \ \`\'� \ \ -- -_ - - -- r/ aft TEMPORARY WORKSPACE \ \ — \ \ \ \ — — — _ — — — — ®_ ' ftft aft \ \ \ \ \ \ \ \ \\ \ \ \n \ @\ \ \ \ \ \ \ / / / — — / / am --� _ i / - - - - - -- --------------- - - - - -� - - - - - ---------------------- — - - -- ------ - - - - -- -- ------------------------------------------- - - - - -- \ \ — - -- - - -- / PROPOSED 20' \ \ 1 � \ \ -------------- -------- -� - - -- j = - - -�- �`�' — — -- TEMPORARY EASEMENT \ \ \ EXISTING 16" GAS LINE ° O (TO REMAIN) C v o —GAS GAS GAS GAS GAS GAS GAS -4—GAS GAS GAS GAS \ / — — — \ CO \\ \� / _ — / _ - - -- \ � \\ N i i \\ \ p ,IE302.0 — — — — — — _ _ — _ — — J — — ��� / / /// N------------ �,�----- - --'— / — — — f� -- / / Ov BEGIN 16" NEW GAS LINE _ _ \ _ _ 1 STA. 0 +00 =1 _ - - — INSTALL NEW DRAINAGE PIPING. SEE _ _ — — N _ —� _ _ O _ 301— — - - - - + GRADING PLAN, SHEET 3007 -07 -026 STA. 2606 +18 I O _ G . sas \ h __- -- - -- _ - - -__ GAS_ GAS' -GAS 1 1 GI�„gV �\ / / `3p —__ -- — /" _�� — -_��\ -END 16" NEW GAS LINE — --GAS PLAN 1 e - - -- - - - -- ' - -' _ - -- STA. 2 +23= -- - - - - -- -GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS \GAS GAS - -G� / GAS 1 GAS GAS GAS GAS GAS-t— 9.-- ��{PAS GAS GAS GAS GASp�G` GA Gq5 GAS GAS GAS GAS GAS GAS / / - ALIGNMENT PLAN 1 / 1 — — — — — — / — GAG�GAS GAS GAS — — ✓ GAS GAS GAS GAS ` - _ A. 2608 +41 'T GAS GAS -GAS—CAS SCALE: 1" = 50' I /C \ EXISTING 24" RCP / v — — _ / _ — _ _— — -- GAS- -GAG GAG \ (TO BE REMOVED) / / / - -- — GAS -- - -' - - - - - - -- — — 307 — / / ' GRAPHIC SCALE (IN FEET) \ I/ / / / —® C ° - — 3oa — GAG_ —GAG — — — — — — — — — — — — — — / ' / —GASH \ 50 0 25 50 100 / / \` IAF / O / \ — — — 309 — — — — — — - —GAS- __GAS ' GAG �AF_ -AF —Al AF AF AF -- AF AF AF O / / % O H ��GAS_ / — — — —310— — — — — — — — — — — — — — — — — — \ I / GAS AF / AF 1 inch= 50 ft. / AF / � AF — / - / — — — — — —311— \ GqS —GASH \ / / ' ' - - - - - - - - - - - - _ AF AF AF AFB / AF AF AF AF AF AF - -AF AF AF AF —CAF AF AF / / / / — 312 — AS —\ \ G GAS— / \ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ------ - - - - - - -�--------- //../ /� - -� - - - / ---- --- - - - - -- ------------ All --- / Q II AF AF _r \ PROFILE CO REVISION VERTICAL SCALE: 1" = 10' Piedmont Natural Gas CD HORIZONTAL SCALE: 1" = 10' w co � PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 -CEDAR GROVE ROAD PLAN & PROFILE Z + DATE DESCRIPTION J (p U) O 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. N d0' O 0 DRAWN BY: CAJ O H M O r (n O MK NO X X 1-1.1 co W W Z + O Q II J CO CHECKED BY: SWH co 223' M Z O — t O Q N Ur Q 0 LL1 - 2 H O U) 16".375 WT X -65 CFB /PC DRL PIPE 9 X X 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 W W ISSUE FOR CONSTRUCTION 3 oil 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 320 12792 Z + 320 16762 16" 90" WELD ELL FS 3R Y -52 - W_ N 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 H Q � 16 "45 °WELD ELL FS 3R Y-52 U) CLIENT PROJECT NO: 2239872 310 - - -' -- -_ 0 310 16 "X16 "X16" WELD BARRED TEE Y -70 _ ______ _______ __ __ - EXISTING GRADE ------------------ �----------------- 7 4' MIN. COVE - - - - -- _ R- - - - ------------------------------- 16"X1 6"X6".375X.280 WT WELD BBT Y -70 16" - - -- -- - - -_,_ ----------- - - - - -- 300----- __ 4' MIN. COVER ' ---------- - - - - -- 300 290 290 285 1 1 1 1 i 285 0 +00 1 +00 2 +00 CO REVISION O Piedmont Natural Gas CD \ I / � � _ _– _ — _ - i I SCALE: AS SHOWN � PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 -CEDAR GROVE ROAD PLAN & PROFILE REV DATE DESCRIPTION 1 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. Lq d0' O ISSUE DATE: MARCH 13 2015 � DRAWN BY: CAJ M M O O MK NO O CAT # co O QTY O DESCRIPTION O CHECKED BY: SWH co 223' M 16".375 WT X-65 CFB DRL PIPE M 0 +00 1 +00 2 +00 REVISION , ® Know. what's below. Call before you dig. Piedmont Natural Gas PREPARED BY: ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, TENNESSEE CARY , NORTH CAROLINA \ I / � � _ _– _ — _ - i I SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 -CEDAR GROVE ROAD PLAN & PROFILE REV DATE DESCRIPTION 1 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. ISSUE DATE: MARCH 13 2015 � DRAWN BY: CAJ MATERIAL SUMMARY MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION ELI PROJECT NO: 14 -21 -3007 CHECKED BY: SWH 1 223' 1 16".375 WT X-65 CFB DRL PIPE 8 0 TBD 16" WXW ANSI 600 GEAR BALL VALVE W /10' EXT. 2 0 16771 16".375 WT X -65 CFB /PC DRL PIPE 9 0 16488 6 "X2" WELD RED. COUPLING STD WT Y -52 CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 3 2 16"X3'.375 WT .219 WT X -65 TRANS. PIPE 10 0 12792 2".154 WT X -52 CFB DRL PIPE 4 0 16762 16" 90" WELD ELL FS 3R Y -52 11 0 15180 2" WXW ANSI 600 KEY COATED BALL VALVE 5 0 16763 16 "45 °WELD ELL FS 3R Y-52 CLIENT PROJECT NO: 2239872 REVISION: 1 DRAWING NO: 3007 -07 -025 6 0 16650 16 "X16 "X16" WELD BARRED TEE Y -70 7 0 16652 16"X1 6"X6".375X.280 WT WELD BBT Y -70 cy \ s \ cgs cys \ \ y cys \ ♦ l \ cgs 9s s ` I I 91.0 / i �♦ \ s \cgs / \ \ �\ ♦ \ \ cqs I \ `\ \ 31' OF 53"X 43" \ \ HERCP @3.23% `\ \ I\ 0� IE(UP)= 303.00 \ HEADWALL WITH \ \ E (OUT) = 302.00 ♦ \ GRATE ♦ c ♦ CLASS "B" RIP -RAP (5 " -15" IN - �'D \ � �� ;. -- __ - _ __ ♦\ \ SIZE, 2' THICK) OVER FILTER - -- FABRIC / / \/ / STANDARD \ '` \ ` \ HEADWALL `\ \ L / EXISTING CULVERT (TO BE REMOVED) ♦\ \ /`, \ �, \ / O^ ♦♦ \ \ \ \ EXISTING STREAM \ \ CENTERLINE \\ \ \ 310 `\ \ _ - \ \ / --- ♦...... - - -- _ -_- \ N — - - - -- \\ ♦♦ \ cgs \ \ \\ \ \ \ \ C GRAPHIC SCALE (IN FEET) - — — - -- \ � \ \ \ 9s \\ \ \ 1 inch =loft. PLAN GRADING PLAN SCALE: 1"= 10' \ \ \ \ REVISION , ® KIIOW WII�°S below. ��h/� IL {/all bef re you dig. Piedmont Natural Gas / / ENERGY LAND & INFRASTRUCTURE 1015 PASSPORT WAY • CARY. NORTH CAROLINA 27513 919- 234 -1974 • WWW.ELI- LLC.COM • LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL N A S H V I L L E . TENNESSEE • CARY , NORTH CAROLINA \ \ I I / / i /i _ _ = _ �/ / / I I \ \ SCALE:: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA SITE 7 -CEDAR GROVE ROAD GRADING PLAN REV DATE DESCRIPTION t 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. 2 3/25115 ADDED LIVE STAKING AREAS ISSUE DATE: MARCH 13, 2015 DRAWN BY CAJ MATERIAL SUMMARY MKNO QTY CAT #. DESCRIPTION MK NO QTY CAT# DESCRIPTION ELI PROJECT NO: 14-21 -3007 CHECKED BY: SWH CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION CLIENT PROJECT NO: 2239873 jj� n C REVISION: 2 DRAWING NO: 3OOTOTO26 PROJECT DESCRIPTION ♦ \\ ♦♦ THE SOILS IN THE PROJECT AREA INCLUDE: ♦♦ \ ♦ • Goldston channery silt loam, 25 to 45 percent slopes THE PROPOSED PROJECT WILL REPLACE 7 PORTIONS OF NATURAL GAS ♦ ♦ / PIPELINE ALONG PIEDMONT NATURAL GAS' LINE 1. THE DISTURBED AREA IS ♦ ♦♦ / \ APPROXIMATELY 0.30 ACRES. ♦ ♦ ♦ EXISTING SITE CONDITIONS ♦ ♦♦ THE SITE IS COMPRISED OF GRASSED RESIDENTIAL; EXISTING UTILITY ♦ EASEMENTS; AND EXISTING ROAD R.O.W. ♦♦ ♦ / ♦ ♦ N ♦ ♦♦ \ / SCHEDULE CONSTRUCTION OF THE PIPELINE IS SCHEDULED TO BEGIN APRIL 2015 AND BE COMPLETE BY DECEMBER 2015. ♦ ♦ ♦ EROSION AND SEDIMENT CONTROL NARRATIVE ♦ I ♦♦ THE EROSION AND SEDIMENT CONTROL MEASURES FOR THIS PROJECT ♦ INVOLVE THE STRATEGIC PLACEMENT OF A VARIETY OF DEVICES INCLUDING: ♦ ♦♦ • SILT FENCE I / • TEMPORARY GRAVEL CONSTRUCTION ENTRANCE /EXIT ♦ ♦ ♦ MOST OF THESE DEVICES ARE TO BE INSTALLED PRIOR TO CLEARING AND ♦ ♦ GRADING. ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE ♦ ♦ ♦ GRAPHIC SCALE (IN FEET) PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL �o� 20 40 / ♦♦ ♦� CONSTRUCTION ACTIVITIES HAVE CEASED AND ALL DISTURBED AREA HAVE / !° M \ % BEEN STABILIZED. ADDITIONAL EROSION AND SEDIMENT CONTROL DEVICES ♦ ♦ / 1 inch - 20 ft. ♦ �\ MAY BE REQUIRED DURING CONSTRUCTION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE ♦ ♦ ♦ ♦ SITE IS STABILIZED. DUST CONTROL ON SITE SHALL BE KEPT WITHIN ACCEPTABLE LIMITS BY SPRINKLING WITH WATER OR OTHER ACCEPTABLE \ METHODS. THE CONTRACTOR IS RESPONSIBLE FOR THE CONTROL OF ♦ c ♦ ♦ qs °o ♦ - LIMITS OF DISTURBANCE SAFETY FENCE (TYP.) ♦ / �° i TOTAL AREA = 0.30 ACRES ♦ SEDIMENT ON SITE. IF THE APPROVED EROSION AND SEDIMENTATION CONTROL MEASURES PROVE INSUFFICIENT, THE CONTRACTOR MUST TAKE THOSE �� ADDITIONAL STEPS NECESSARY TO STOP SEDIMENT FROM LEAVING THE SITE. ♦ cq ♦ ♦ s x o ♦ \ \ THE PIEDMONT SITE REPRESENTATIVE MAY ADJUST EPSC PLANS BASED ON SITE CONDITIONS IN ACCORDANCE WITH BEST MANAGEMENT PRACTICES. ♦ \ ��// �, s 0 CONSTRUCTION SEQUENCE ♦ ♦ ♦, °� / '�♦ \� / FLOW C \ - PROPOSED CONTOUR ARROW "s / ♦ e \ 1. OBTAIN PLAN APPROVAL AND PERMITS. 2. HOLD PRE - CONSTRUCTION CONFERENCE. 3. FLAG CONSTRUCTION LIMITS. 4. INSTALL EROSION CONTROL MEASURES. (TYP.) ♦ LINES (TYP.) ♦ \ ° ♦ cqs ♦♦ l °� 5. BEGIN CLEARING. 6. REPLACE OR INSTALL REMAINING EROSION CONTROL MEASURES. 7. BEGIN INSTALLING PIPE. ♦\ ♦ �� \ ♦ ' ♦ \ \♦ ♦ c ♦♦ q \ ♦♦ 8. COMPLETED AREA SHOULD BE SEEDED WITHIN 7 DAYS AFTER PIPE HAS BEEN INSTALLED AND FINAL GRADING OR AS SOON AS PRACTICAL. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 14 DAYS AFTER WORK HAS qc CEASED. �� ♦, �♦ / \ o ° ♦ 9. ALL DISTURBED AREA SHALL BE STABILIZED WITH SEED AND STRAW, HYDROSEEDING, OR SOD. cn ♦; o0 ♦ qs / 10. REMOVE EROSION AND SEDIMENT CONTROLS FOLLOWING FINAL INSPECTION ♦ AND SIGNOFF FROM LOCAL STORMWATER OR ENGINEERING ♦ ♦ c ♦ ,- PROPOSED STREAM ♦ / �o \ \ CENTERLINE REPRESENTATIVE. 11 . PROVIDE PERMANENT VEGETATION. EROSION CONTROL DEVICE NOTES 1. ALL STREAM AND /OR WETLAND CROSSING LOCATIONS NOTED ON THE PLANS oo ♦� ` ♦ ��� s I os °\ ♦ RIP-RAP OVER -- 06 ° \ s ` ° FILTER FABRIC ♦� ARE APPROXIMATE. 2. SEDIMENT TRAPS SHALL BE LOCATED A MINIMUM OF 20 FEET OUTSIDE STREAMS AND WETLANDS. o03 J °� \ / STANDARD q � SILT FENCE (TYP.) HEADWALL WITH -' / HEADWALL \ 'ts (SEE EPSC DETAILS SHEET) 3. SILT FENCE SHALL BE INSTALLED DOWN- GRADIENT OF THE CONSTRUCTION AREA AS NOTED ON THE PLANS AND AS SHOWN IN THE DETAILS. ♦ / 0 GRATE / ` ♦♦ \� ° ' 4. ANY FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED FOR ANY REASON SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. c \\ \ v ~ `♦ q� qs \ ♦\ / \ / 5. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE p EXISTING STREAM ♦ o �\ � \ � CENTERLINE 31' OF 5HERC �� P ♦♦ cqm / ♦ \ EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE r ♦ 1A, ✓ ° DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE __ °p \ ♦ \ \ \ `� \ ♦♦ CONTRACTORS RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR / \ \ \ lam\ q \ ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION. ♦ 9 ♦ ° ♦ \ '\ 6. BUFFER DISTURBANCES AS NOTED ON THE PLANS SHALL BE SEEDED AT A RATE OF 20 GALLONS PER 100 L.F. OF BUFFER DISTURBANCE USING THE w ♦ s FOLLOWING MIX: KENTUCKY 31 FESCUE (55 %), ENGLISH RYE (20 %), KOREAN / ♦ \ °� �O y \ LESPEDEZA (15 %), GERMAN MILLET (10 %). 7. HYDROSEEDING OR CURLEX (OR APPROVED EQUAL) IS REQUIRED FOR FINAL / �\ ♦ \ �`� s STABILIZATION ON STEEP SLOPES. \ q ♦ s ♦ ♦ • ` ` 01 \ r EXISTING \ \ \ MAINTENANCE 1. ALL SEDIMENT AND EROSION CONTROL DEVICES INCLUDING PLANTED AREAS SHALL BE INSPECTED AT LEAST ONCE PER WEEK AND WITHIN 24 HOURS q� 1 ys \ AFTER ANY STORM EVENT GREATER THAN A HALF INCH(DURING A 24 HOUR \ CONTOUR LINES (TYP.) PERIOD). DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED AS NECESSARY BY THE END OF THE DAY. 2. CLEAN SILT BARRIERS WHEN THEY ARE APPROXIMATELY 50% OBSTRUCTED BY SEDIMENT OR AS DIRECTED BY THE OWNER'S REPRESENTATIVE. v� \ 007 \ - Q07 G, °� \ GENERAL NOTES THE CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES. s o0 2. ALL UNDERGROUND UTILITIES SHOULD BE LOCATED AND MARKED IN THE I` �'ys \ FIELD PRIOR TO COMMENCING CONSTRUCTION. 3. DISTURBED AREA SHALL BE STABILIZED AS SOON AS PRACTICALLY POSSIBLE \ \ FOR PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE BEEN \ \ ♦� \ \ COMPLETED. THESE AREAS SHALL BE STABILIZED NO LATER THAN 14 DAYS AFTER CONSTRUCTION HAS CEASED. \ 4. FILL, COVER, AND TEMPORARY STABILIZATION AT THE END OF EACH DAY IS RECOMMENDED WHERE PRACTICAL. IT IS IMPORTANT TO CLOSE AND / \ \ \ ♦ \ \ p� x STABILIZE OPEN TRENCHES ON STEEP SLOPES AS SOON AS POSSIBLE. 5. CONTRACTOR SHALL REGULARLY SWEEP SITE TO AVOID TRANSPORTING N \ � �;'� ` y,. O°� \ � \ G1 � \ \ SILT OR SEDIMENT FROM SITE. 6. STREAM AND WETLANDS, IF PRESENT, SHALL BE RETURNED TO ORIGINAL `\\0� \ \ l9s \ `� e GRADE UPON COMPLETION OF CONSTRUCTION. 7. SILT FENCE SHALL REMAIN OR BE INSTALLED ALONG STREAMS FOLLOWING c \ ` \ \ \ PIPELINE INSTALLATION AND FINAL GRADING UNTIL THE AREA IS STABILIZED. \��\ ♦ 1 \ `♦ \T 8. ADDITIONAL MEASURES MAY BE NECESSARY TO PROTECT AREA STREAM AND /OR WETLANDS IF PRESENT. ° ` ♦` \ cgs I \ \ 9. THESE PLANS ARE FOR EROSION AND SEDIMENT CONTROL PURPOSES ONLY AND DO NOT APPLY TO CONSTRUCTION PURPOSES. 10. IF A FRACTURE IS OBSERVED DURING THE BORING OF A STREAM CROSSING, �\ WORK MUST BE IMMEDIATELY HALTED, AND ALL LOST LUBRICANT /MUD MUST 9� GRAPHIC SCALE (IN FEET) \ y BE REMOVED FROM THE STREAM. THE FRACTURE HOLE WILL BE SEALED 100 0 50 100 200 \ ��6 \ / \ `♦ \ \\ AND THE SITE WILL BE EVALUATED BEFORE CONTINUATION OF BORING. 11. CONTRACTOR SHALL MAINTAIN A MINIMUM VERTICAL CLEARANCE OF 24" `�O�x 1 inch= 100 ft. i \ \ � BETWEEN THE PIPELINE AND ALL EXISTING AND PROPOSED UTILITIES. \ / \ \ PLAN / `� \ \ STANDARDS OVERALL SITE LAYOUT ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN ACCORDANCE WITH THE NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES AND SCALE: 1" = 1 THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND \ DESIGN MANUAL. REVISION , , c ` ENERGY LAND INFRASTRUCTURE V \ \ / SCALE: AS SHOWN DESIGNED BY: SWH PNG 2014 CLASS LOCATION REPLACEMENT ANSON COUNTY, NORTH CAROLINA REV DATE DESCRIPTION 1 2/11/15 ADJUSTED GRADING AND LENGTH OF H.E.R.C. 2 3/25/15 ADDED LIVE STAKING AREAS ISSUE DATE: DRAWN BY: ® Piedmont 1015 PASSPORT WAY • CARY, NORTH CAROLINA 27513 -_ _ MARCH 13, 2015 CAJ SITE 7 - CEDAR GROVE ROAD MATERIAL SUMMARY ELI PROJECT NO: CHECKED BY: MK NO QTY CAT # DESCRIPTION MK NO QTY CAT # DESCRIPTION �/,. nnowwhatlsbelow. Call b e f o r e y o u dig. Natural Gas -11 919- 234 -1974 WWW.ELI- LLC.COM LICENSE # P -1289 ENGINEERS • SURVEYORS INFRASTRUCTURE ENVIRONMENTAL NASHVILLE, T E N N E S S E E C A R Y , N O R T H C A R O L I N A __ __ _ � / / I I \ 14 -21 -3007 SWH EROSION CONTROL PLAN CLIENT: PIEDMONT NATURAL GAS ISSUE FOR CONSTRUCTION 1 1 635' SILT FE CE o SAFET FENCE CLIENT PROJECT NO: 2239873 REVISION: 2 DRAWING NO: 3007 -07 -027