HomeMy WebLinkAboutNCC230985_ESC Approval Submitted_20230405 ROY COOPER
Governor
ELIZABE'TH S.BISER ` }
Secretary
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
March 31, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
STAG NC Holdings, LP
ATTN: David Barker
One Federal Street, Floor 23
Boston, MA 02110
RE: Project Name: OPW Fueling Containment Systems Parking Addition
Acres Approved: 2.10
Project ID: JOHNS-2023-025
County: Johnston
City: Smithfield
Address: Citation Lane
River Basin: Neuse
Stream Classification: Other
Submitted By: Fleet Temple Engineering, PLLC; ATTN: Fleet Temple
Date Received by LQS: March 2, 2023
Plan Type: New
Dear Mr. Barker:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC)under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain
the COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCGOL Please direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
D � North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
NoR�IC i NANA ~
uw d—t m[nrimn—1 uwnq 919.791.4200
Letter of Approval
STAG NC Holdings, LP
March 31, 2023
Page 2 of 4
Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is
any change in the information included on the form. In addition,it would be helpful if you
notify this office of the proposed starting date for this project.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
+NORTH CAROLJNP.
� .tId ti 0,.1 919.791.4200
Letter of Approval
STAG NC Holdings, LP
March 31, 2023
Page 3 of 4
Your cooperation is appreciated.
Sincerely,QV 7 Q uj
Dylan Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Regional Office file
Fleet Temple Engineering, PLLC; ATTN: Fleet Temple
(fleet(cr�,ftempleen ing eerin .cgom)
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
+NORTH CAROLJNP.
Dq .tId ti 0,.1 919.791.4200
Letter of Approval
STAG NC Holdings, LP
March 31, 2023
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: OPW Fueling Containment Systems Parking Addition
Project ID: JOHNS-2023-025
County: Johnston
1. Add the following statement to the construction sequence: "Erosion and Sediment
Control (E&SC)permit and a Certificate of Coverage (COC)must be obtained before
any land disturbing activities (including timbering and demolition) occur." The COC can
be obtained by filling out the electronic Notice of Intent(e-NOI)form at
deq.nc.gov/NCGOI.
2. Add a requirement to the construction sequence to contact the DEMLR Raleigh Regional
Office at least 48 hours prior to commencing the land-disturbing activity. The contact
number is (919) 791-4200. (15A NCAC 04B .106(b))
3. Add the following statement to the construction sequence, "Per NPDES requirements, a
rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are
required to be maintained on site and accessible during inspection. It is recommended
that these items be placed in a permits box at the beginning or entrance of project."
(NCGO1 Part III Sections A and B, 15A NCAC 04B .0131)
4. Add the following statement to the construction sequence: "The contractor shall conduct
self-inspections of the erosion and sedimentation control measures and compete the
following combined self-inspection form found on the DEMLR website
https:Hdeq.nc.gov/about/divi si ons/energy-mineral-land-resources/erosion-sediment-
control/forms. Twelve months of complete inspection forms shall be kept on-site and
available for inspection at all times. It is recommended a copy be kept in a permits box."
(GS 113A-54.1 (e), 15A NCAC 0413.0131,NCGO1 Part III Sections A and B)
5. Provide a note that states: Any off-site borrow and waste required for this project must
come from a site with an approved erosion control plan, a site regulated under the Mining
Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site
must be disposed of at a facility regulated by the Division of Solid Waste Management or
per Division of Solid Waste Management or Division of Water Resources rules and
regulations. (15A NCAC 4B .0110)
6. Provide two copies of the plan set (one full-size and one half-size), showing the
modifications required for approval. To facilitate DEMLR review,bubble, highlight, or
otherwise identify the changes to your resubmittal. Provide one copy of additional
items (such as design calculations). Provide a cover letter referencing the project name,
project ID, and purpose for submittal. (G.S. 113A-57(4))
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
D North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh,North Carolina 27609
919.791.4200