HomeMy WebLinkAboutNCC230971_ESC Approval Submitted_20230405 ROY COOPER $Alt Q,
Governor
ELIZABETH S.BISER
Secretary f
BRIAN WRENN
Director NORTH CAROLINA
Environmental Quality
August 18, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
City of High Point
Attention: Robby Stone, Director of Public Services
PO Box 230
High Point,NC 27261
RE: Project Name: Kersey Valley Rd, Realignment
Project ID: GUILF-2022-033
Acres Approved: 10.4
County: Guilford
City: High Point
Address: Kersey Valley Rd.
River Basin: Cape Fear
Stream Classification: WS-IV; CA—Randleman Lake Watershed
Submitted By: Moffatt&Nichol
Date Received by LQS: August 15, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
modifications required for approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land-disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for
this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of
this project changes in the future, the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
—0k Winston-Salem Regional Office 1,450 Hanes Mill Road,Suite 300(Winston-Salem,North Carolina 27105
,9:Lq_11-ST 336-776-9800
Letter of Approval with Modifications
City of High Point
August 18, 2022
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept
on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with
the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply
to this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
7'Tdm�eraEp li , PE
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
ec: Cameron Long (clong@moffattnichol.com)
Letter of Approval with Modifications
City of High Point
August 18, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Kersey Valley Rd, Realignment
Project ID: GUILF-2022-033
County: Guilford
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Additional measures may be required - The applicant is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
MCI � r.� � � •� �
o �
4-4
O G •"� � � GAO � .�
v +� ^tj
,� •� �i
tj
� V
A z