HomeMy WebLinkAboutNCC230947_Site Plan or Location Map_20230404 \ 1 1 I I I `/ \ \\ J/ SITE AREA STABILIZATION SODDING
'gym ovPs coca J oJ2 �///'` \ 6 I I I _ / EXCEPTIONS •,., M Tonoraaa„arA°naaaa
GROUND STABILIZATION
T^ O G � '�
s N"'# TIGHT, xN000
NOERSROgD wGi'o°" ''Ngr 0w�%' tp'.�` �/ 1 / � DESCRIPTION TIME FRAME
s ao o yl, CEMETERY , /) // 64 I I �/ Z� / PERIMETER DIKES, 7 DAYS NONE
�,% FRE / e°P \ / / / I / \ / SW&ESLOPESHES M, aurrlrvn Andre EN°sAn°ralMMw°Pecas.
'° JO.p pagoR, �`nP ' / / �/ / \ / HIGH QUALITY 7 DAYS NONE M
i �a o"° o�sa �' �.� �/ / — / // \\ \ / / WATER ZONES c
a$� 'e x 400� i \ j 6 /= \ zo \ \� (HOW) Ar r. aa' E�" o �� / % \ \ L, / ------_ ` / I SLOPES STEEPER 7 DAYS IF SLOPES ARE "' CHE°coaaacn/ / / THAN3:110'OR LESS IN
_` MORO''s \ \ l / / / \ /.• \ LENGTH AND ARE
e° WNtso" s4ozoc gs� / / {{{GG /, \ / NOT STEEPER
y ALLOWED
e`su Wy ,�o �a� SITE I \—� / \` ��\� � \ /% / �� \ \ \ \ / I TDAYS ARE4
e mo �1 -- �a° \ \ / / / \ \ SLOPES 3.1 OR 14 DAYS THANYSOFON IIIO
$o oa \ \ ..1.
/ _ _ \� / - �Z�� / FLATTER SLOPES GREATER pol`aaav°a�nrncoMA�rT°I n�wadgo°�t,.:a1........ 1 1 H,11
�� / ALL OTHER AREAS 14 DAYS NONE EXCEPT wnH Hero uID. "1O1V1Yi�aa rHa spD
\ � � � % / � � \ \� Mmwaa
/ ��� � \\ \ 6� ` WITH SLOPES FOR PERIMETERS APPEARANCE OF GOOD SOD
\ �� �H \�'f� , \ .............."/Z FLATTER THAN 4:1 AND HQW ZONES)
o
OJ?OO 04• ` \ �� / • \ \\ \ \ \ �—/ / I mnnaannm. ,,,
4.
40
•
��p� b \ / \ N\ (---- - \ / ammn,a n.aa.acar:,Ar
___
, ___._
......._
SR zo,� Nc Hwr 24/2> VICINITY MAP \ / � ___ 70 \\\ \\ \♦ , pliP.A\*
� / / / / CONSTRUCTION SCHEDULE eO
°° \ 1i(t\ 7 \ �9� \ / / / 1. Obtain all necessary permid and plan approvals.Erosion and Sediment Control
(NOT TO SCALE) 3 _,n \ � \\\ \\ / \ Ad.-- 2. (E&SC)permit and a Certificate of Coverage(COC)must be obtained before any land disturbing
to \ \ ` activities occur.A copy of the E&SC permit,the COC and a hard copy of the plan must be kept on
—� \ 71 MAIL \ \\ ` ✓ / / / site,preferablyinaper..box,and accessible during inspection.
>i 2 \ \ -Ads"'
3. lnsrell gravel construction entrances first,then silt fencey reinforced silt fence outlets and wattles.
General Erosion Control Notes — _� \ KIOSK \\ — � �� \/ 4 Fi• clearin:and: bbingmynecesaa area n the lots as the are start-.
1.Only the areas shown shall be disturbed. \ QPEN SPADE \ -- \\ / / V -
2.All disturbed areas shall be grassed and mulched as soon as a z u \ ( \ \ \ \ \�\ ��\ / 58 —� \ �� / / 6. Began or continue with house cons ruction activities.
_� 370 \ \ \ 7. Finish all r0015 grading and house construction.
possible and maintained until permanent cover is established. \ `� \ \ \ 1 \�� \ / N / / g. Install driveways,walks end patios.
\ �� / 9. Hegin fine grading of lot areas
�_ \ \ 390 I 10. F i grassiag,mulching andstabdiung of la.In most cases Nis will involve Ne installation of
\ 1 \ \ \ \ sod on the lot.The silt fence will remain in place until the rat is sodded or grassing is stabilized and
Pursuant to G.S.113A(3),provisions for permanent ground cover 1\ \ \ \ C
�1e ekes Hold.
sufficient to restrain erosion must be accomplished for all ` \ o \ \ \ \!.\ \\ �i 1 J u. The contractor shall conduct self-inspections of the erosion and sedimrntado,vv!se measures and
\ -----
\ \ \ \�' \ �s4^ I complete the following combined self-inspxtion form found on Ne DE MLR website
disturbed areas within 14 working days or 90 calendar days i &\ \ \\ hops://filea.na.gnvmaae4/Energy'�zoMlneral�zoma�aofana�zoRes°races/srormwaterlNPDEs
(whichever is shorter)following Completion of Construction. "fs ` i\�US STOPS \ 3� x' (/ months
o10 l/aoPermitsrDEMLo CSw-Mmtimring-Forms-Rev-Anquscs-zol9.paf.Twelve
l \ \ \ _ I monma of aompl inspection forms shall e kept o site and evadable for inspection all erase.
61GN EA MENT \\\ M& ' ` It is recommended a copy be kept in a permits box.(GS113A-541(e),15ANCAC 0413.0131,
\ \ e 15 \- 111„ • NC001 Par ID Sections A and B)
\ // e 'E I 12. Self-inspections for erosion and sedimentation control measures are m be performed at least once
DATE: • PAGE: I \ \ NSIMITS ON/` o livery seven calendar days end within 24 Hours of every min event of NalESC to Any
Filter Fabric Y, , \BUS LIMITS ! 1t ceded repairs shall be made immediately to maintain measures as designed All ESC measures
s«IPwt Plastic or \ 1161 \\ vv''6T e'3� ROADSIDE 1 // '8 shall be maintained as specified to the construction details on this plea Amin gauge shall be
8'Max.Standard Vlor , ' B.ckfll trencM1 �� i .m , \ %1, b DITCH ,SI NI LT FENCED \ installed at the project site for monitoring.
s•Max.Ems strength Strength
aboo we.wire fence core Fence and Compact IGN� V ]•_V GROUND COVER 13 Inspection end final acccpavec letters.When the projet is complete,the parmircees shell contact
OUTLET DEMLR to close out the L&SC Plan After DEMLR informs the permutes of the project close out,
J Steel Poet thoroughly \ \3g° ]] EAS= ENT\ \\ IN DI WHERE PIPES via ins cen
y \ \ \ l}� \ \ \, HAVE BEEN STALLED / \ PEN p on report,) $100 annual)eneraleq.nc gfeeC0o1"msudmitel electronicNTNotice
1 \ 72 •(}0a 1 PICAL ALL aS) /yr LS S ACE of termination(e-NOT}ASIOOawual general permit fee will be charged until thee NOT has
updope \ , \\\ \ , 2 ATnEØf
t\4 been filled out
f
Ble \gO DITC a. L \ j �� ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
1 to-za• 4• f \ \ \ a \ITC \ \\ \ SILT FENC�
n e•Mm. \ _ \ �\ (TYP) ,aj ♦ NCGS 113A 541"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
W're ties \ / ♦ COMPLETED AS AN EXCEL SPREADSHEET.
1 1 24 \ °' $heJ� —N11 \ \ \D\\� C STRUCT / " AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
\ \ ,7 \ •AVG UND VER \\ C. ENT CE ION/ / 1 e•20�' SELT FENCED // EROSION AND
\ �- �`p WATTLE • SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE RULE 15A
z4 [sr down automata aang lie o9ncM1 \"' IN.ITCC HNST PIPES IT x\\_T DRIVEWAY /�%•, 3� /� ,� OUTLET NCAC 048.0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY
1+I HA•BEEN INSTALL• PIPE IN �' �/ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
Filter Fabric �` �� (TYPICAA\ALL COT6)OO,e," \�\\` DITCH / /61LT FEN E / �' / APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
CROSS SECTIONVEw \ / (TYP) /DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
_ PRACTCE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
nr....er"ure,.en.. rain:,4w:mwn / .\
morn, ev a.•cone 3) ' ' ao /O�Qy O / CONS'UCTION -EINFORCED
ET- / CONTROL PLAN.'
dwme \ o - \ \\ J'jJ p O 'j,\\ EN.ENCE // 4., SILT FENCE
n•w.+•v..a:,hnsm .w �o O'' ''' f WATTLE LET- / /
�/,,,,pp5a DRIVEWAY // 4 I ••
a Ex.strength mer fabric wAn a foot pest soa.p do..requhe a°Ire mesh support.. .r n.0 a.nn.,rmnce,.uvm - a �— �, \CONTRT5ttON A SIL ENCE �0`\ \\\ I TCII .//" SIL(TYPNCE ISLL �/ / The.r....ID oa
red mesa.mom.cnmennron of bad.is urnw to.re:.eew:mann.oft.trend, ':°°'m•left am. l jWA E �..�W Fi 4,-,,,.:Cis \\\`;f� ENTRANCETION CONST UCTION \ / m n^ t
«_
lo Op elixnamranrcroen•unetree. —\ �"&'• \ \ / SILT .) . LIM S 00 -
e pawn end..
/ 12 \ �� .�� ) \'j�\\ DRIVEWAY _ // d a top
___.) h< �� O\ \` PIPE IN 5 (`
/ /// \ ° / 8 \ \\ ♦�Ve\ DITCH \ \N ' - / .,
..\NC Environmentcl.lPe9 —1 \ �gEINFOR�.c0 \ \ \\\� \ � \ /
r SIL ENCE WA p \ , .: O I ,III II II' w
n :„ SILT FENCE _ / \ v ouT E 999 \, A \ nIrma tin Pn:�."::DE"
4.
\ _.p, 'TI .• \ ROADSIDE \ I�ll.r1L,,]I
_ ILS
\ 1 yaf"" •NS UCTIO\ OADSI \ , \ DITCH �,M—IOW
�� \ \ ../ LIM e& \ \\\ , \ ` ....,..
_ DI H Il�ll�f�
Silt sock/Wattle sat sod, Wattle7 R FOR \ a\ •
y, \ • I I II
a�I s•�I / , MI I \ \ _ \ SIL ENC ` O\- \\ \\/\ \ 'C \ ` \ \ IHI I II w.en.:.,a.,,,,e.a�,.
way ya a Lbe au ve am prdwan // OU T �u' `�\ \ \ �� ,"..,...b..Na.
-,. a 1L,:u - nee err be aubstenea far \ �/ / �� \ ��
,z ran il..•-' ..,_
2 z."` ,rM tl I: _n n, 'n to the desired length such°nay a�a"".":��aae�i. I • \ \\ /� \\\ �� ....,..
Stokes 9mk« r) be installed parallel S / VA 1 ��' ::
b. awem as / / N 7,..,_
ssanory SECT ory M1NBtl&aedeee�th�" / / �• .nr,eRD aq del�l�cu g turned e be OPE \ \ y3`/ W��� iILP°'"" hhta)mgI1 / ( ( I - - SPA E \ \ \ \ I�
II Iv...,. ���7 8"-12"
$ in.3 2 in.cross secbon should be driven
verticattY plumb..rough the canter of the Mt
sock/wattle Stakes should he placed et e ANI .: — 4,-'/ -----,
.mrcum interval of 4 feel or a maximum interval / '`/ a•°.
Woo,M o Com st ground 4"Min. / / \
N RENeHEDmBTI INSTALLATION Qilt sock/wattle is e, / J 1 > I \\ �\
ISOMETRICyIEW �-.nm.nere.m . e E. hold p during . / / \ l l lrr::-- 1 � ���ra lnma<FLOW PATE Remo„Bd�r J / J —\ ( \ /\� � / , � / / / � \ , /// � (ri,,\\\ \ \ \\ \ \ \� �
Area To Prd neo :2mj (.'too rim,4:..:,Ise rim) '2=, 2. anle must be p ndogge,a \''.
c /
h,tas�Fl ayMulch or Compost sl.,=oak, (a%r sa3 s) (22aFm needed.allow for adequate II. ,,,,„..--
/ // ) ) \ \ \ I�worker« '� ettlee.re ,. ,i. (�osom) (�Fs�) f'xom) s �— / \\ m 1 Oa (1 a gam,, -(2st l
EMSVn9/m) VnV.) I„raj „raj I/m/raj m«suee.. one t v subareas. / // \ / / \ \ \ `'' \ \\ \ \ , IIf 1 ` \ \
ILT SOCK I WATTLE FOR PERIMETER AND INLET PROTECTION , / / / '/ //\/ /// / \ \ \ \ \ I I I /\ 1\\ \ \\ /
DATE: PAGE: DATE: PAGE: PAGE 1 of 2
DATE: PAGE:
m r / + MIrv. FENCE TOTAL
EROSIONUCONTROLBED RPLAN FOR LOTSGE: 3.63 ACRES
� B u � � � � � �a� "� iF I I I I I I I I I I I I I I I I I I I I I I I I l t , 2 4IN8 & 9
4 G a �Q 4 e e % % as A.'t14
I JI I i
«- n° �''°'r'• WATSON RIDGE
.r. R .s< �� - J 9� L�� L��I QJ�\`GC / 1' �MM ro'mrw THEwAs D STO- li AY - � PHASE TWO
��-QQRD®D®D®)WWI "RRRDD®®®�"WWv ......�
�0 �HUA NAYame kU AV �ItU AY kU AV V HU WAV RO AV T Y Y Y Y Y Y Y Y Y HAROwREF FRONT VIEW
.�'�Y'T� YiYY4Y Y is Y:4414 -7 � ` FOR
Notes -I�' '����'� '��II I• 'N
,BURY INLET re we 1 If needed Tree Protector fencing should be installed along the buffer zone wetland
.e- - 4: YyYyYyY
boundary and/or around protected trees providing a radius of at least 1 25 feet for each r 1 c�c�c�c
LEGEND 'nchoftrunktlameter. / aMn ;; 'vr rr.. � `' WAaHEDaT° FILTER FABRIC,
ANDHRWARE DREAM FINDERS HOMES LLC
2 Install Silt Fence onthe low elevation des of each lot Install Silt Fence tits h n �' 'ew'44-ti i� Yt YY.'m� TO SAPOL 1
FLOW schematic/diagram and field adjusted.f necessary,for p ~Y Vi..17 4 ry Y' `� - FILTER FABRIC ^DIRECTION gram juste ry pacemen[at low If e / Y�Y: �F
c°rigs°us and have aferenntland owners orbuilders ea.lot should have navdnalSn �Ya v�YX" ° DF.� ON DRDUND ~MGROUND
NMe INTO
GREENWOOD TOWNSHIP LEE COUNTY,N.C.
SILT Fences.
FENCE FENCE ® 3.Install required Silt Fencewithin 10 feet of property line to ensure tereisno conflict with \ a gravel aoniwaal"aooe�.es°ofsiiiffenwla^ SCALE: FEBRUARY 2023
....WC-HON ENTRANCE septic system.It is the responsibility of the builder to ensure the installation of sediment hued on field Ihnns.Construction Maintenance GRAPHIC SCALE
CURB INLET = control measures does not impact the septic system and repair area(s). 1 Clear the entrance and eut area of all vegetation,,onto and other t made wee and after each,inch greater rainfall
4.At least one Construction Entrance/Exit is to be installed per lot. eteI00 \ MAINTENANCE.
Inspecaowet at lest onreeweek one omen«cn,Inch 100 0 50 100 200 400
5.Waste bins and other areas dedicated for managing building material waste shall be at u p grade and d:menslons shown on plans.one g BURY WIRE FENCE AND HAREM CLOTH E oa2_Fll reshen stone... inches.immediately
least Sll feet awe from storm drain inlets or drainage ditches unless it can be shown that c talaressine w:thl2 tea:stone FILTER FABRIC IN TREK
o other altemat ve exists.If this separation cannote achieved,these areas must be 3 Provide drainage.cany water to a sediment rap re other suitable outlet removentieeaonabe mat spilled,washed re tracked onto p e4 Remove ENGINEERS •
no other alto ativeeFence. 9 stability of the foundation n bca. ay a.Repave stone needed haute dextis con
subjeoto eepag fabrics
PLANNERS ( IN FEET)
6.Inlets downstream of disturbances should be protected:streets should be swept when SECTION flew
sediment from the construction activity is present. NC-Environmental. SURVEYORS L inch= 100 ft
jpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are .\NC-En v4 comentol. ..
\Nc-environmental )peg r SILT FENCE OUTLET MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETTEVILLE,N.C.
-- provided on additional sheets.Erosion and sediment control details are not drawn to scale. CONSTRUCTION ENTRANCE/EXIT
-----------
" ^ MOORMAN, KIZER & REITZEL, INC. PHONE(910)484-5191 FAX(910)484-0388 LICENSEq F-0106
TYPICAL LOT LAYOUT WITH CURB AND GUTTER
LAST SAVED 2/g/2023 5.07 PM LAST PLOTTED.2/14/2023 2:37 PM PLOTTED BY:Dennis Gilbert FILENAME:G:\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-01 WATSON RIDGE-EC\PLANS\WATSON RIDGE EC-LOTS 2-4.8&9.DWG