HomeMy WebLinkAbout980001_Compliance Evaluation Inspection_2023030214'j S U Division of Water Resources
Facility Number ®- p 1 O Division of Soil and Water Conservation
O Other Agencv
Type of Visit: .Q Com lance Inspection V Operation Review U Structure Evaluation O Technical Assistance
sit: Ro Reason for Viutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 3- l• L3 Arrival Time:1 g7;j:rj4e4 Departure Time: County: IN t 1 S0 J Region: i{D
Farm Name: 141,11s Pl r c RSFAt/ Owner Email:
Owner Name: Phone:
Mailing Address: �J /
Physical Address: 7 571 sf#*111dG75e/d A&
r l'i %Gi NI_e-
Facility Contact: �/�C�1 I ni, i C �� Title: Phone: q f
q-73$ - 3S$4f
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Swine
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
kL'
er
3zooaaovNon-Layer
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Pullets
Other
Poults
Design Current
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
Design Current
Cattle Capacity Pop.
DairyCow
DairyCalf
DairyHeifer
D Cow
.Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes No ❑ NA ❑ NE
0 Yes ❑ No NA ❑ NE
b. Did the discharge reach waters of the State? (If yes, notify DWR)
❑ Yes
❑ No �NA
❑ NE
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
❑ Yes
NA
❑ NE
2. Is there evidence of a past discharge from any part of the operation?
❑ Yes
VN ❑ NA
❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters
❑ Yes
0 NA
❑ NE
of the State other than from a discharge?
.Page I of 3 5/I212020 Continued
Facilit Number: gig - of jDate of Inspection: 3 — 2 7-3
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
No
[3 NE
a. If yes, is waste level into the structural freeboard?
❑ Yes
[3 No rN
❑ NE
Structure 1 Structure 2 Structure 3 Structure 4
Structure 5
Structure 6
Identifier: GoM6/pi6�J i 2_ Pic Siena
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): 6(�
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
FZ No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No ❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmenta hreat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes rN
❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes ONo
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes CINo
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate ManurciSludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift: ❑ Application
Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑Yes No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes <No
[] NA
[] NE
18. Is there a lack of properly operating waste application equipment?
C] YesFa-N-o
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
[3 NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes VN
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
[] Weather Code
❑ Rainfall ❑Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes El"No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ YesEl-No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facility Number: $ - Date of Inspection: 3 - 2 - 2--3
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes L'J No ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? [:]Yes N ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ff No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
3 I. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/lnspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes <0 ❑ NA ❑ NE
(:]Yes No ❑ NA ❑ NE
[:]Yes No
❑ Yes
❑ Yes
❑ Yes
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
❑ NA ❑ NE
Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
�� - ►-�.z3 z��-o �1 �Ji& /5 �o�- z Yc�R5
57
z,-
P. 3,
%
�,�f,s�fyr�Et�r1,�dErlr,�o✓
Reviewed Inspector Name: �P_i !� 1 /LC C
Reviewerllnspector Signature:
Phone: �lq- 79 - 11z3`+
Date: 3. 2. - Z 3
r
Page 3 of 3 511212020