Loading...
HomeMy WebLinkAbout20150361 Ver 1_401 Application_20150415rA City of Greensboro 6 / North Carolina April 10, 2015 Division of Water Quality, 401/Wetlands Unit, 1650 Mail Service Center, Raleigh, NC, 27699 -1650 2 0' 503 6 Re Stream Bank Protection East Woodlyn Way, Greensboro, NC Dear Sir /Madam The City of Greensboro would like to notify your office of the proposed Stream Bank Stabilization Greensboro, North Carolina The project's objective is to stabilize the existing eroded stream bank and minimize sediment from downstream lake The City of Greensboro hereby request your approval of this project at @ E Woodlyn Way by 2 Forest Lake Cir, , Greensboro, NC Attached is the general information (vicinity map, and aerial map with pipe layout) regarding the subject site for your review Site: 2 Forest Lake Circle by East Wooslyn Way Stream Stabilization, Greensboro, NC Site Condition: Eroded Stream in a Residential Neighborhood If you have any further questions, please call me at (336) 373 -2619 ( 2 Sincerely, D APR 1 4 2015 A e Idowu — Opera ions Management Supervisor DENR - WA RESOURCES Water Resources Department, Stormwater Management 401 & BUFFER PERMITTING Tel (336) 373 -2619 Email ade Idowu@ci greensboro nc us Attachment PCN Application Form & Application Fee ($240 00) Vicinity Map and Pictures Stormwater Aerial & Topography Maps Construction Drawings P 0 Box 3136 - Greensboro, NC 27402 -3136 - www greensboro -nc gov - (336) 373 -CITY (2489) - TTY # 333 -6930 o�ot 11AwrF59 pc oaw c Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps ❑X Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verged by the Corps9 ❑ Yes ❑X No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑X 401 Water Quality Certification — Regular ❑X Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑X No For the record only for Corps Permit ❑ Yes ❑X No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes X❑ No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ❑X No 2. Project Information 2a Name of project East Woodlyn Way Stream Bank Stabilization 2b County Guilford 2c Nearest municipality / town Greensboro 2d Subdivision name 2e NCDOT only, T I P or state probed no '�, 3. Owner Information A1:' 3a Name(s) on Recorded Deed Brant T Harris 2 3b Deed Book and Page No 006031 and 02255 4ot & Wqt 3c Responsible Party (for LLC if applicable) RPE R RM /TTiNES 3d Street address 2 Forest Lake Circle 3e City, state, zip Greensboro, NC 27407 3f Telephone no 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 1 4 January 2009 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify Municipality 4b Name Ade Idowu 4c Business name (if applicable) City of Greensboro 4d Street address PO Box 3136 4e City, state, zip Greensboro, NC 27402 4f Telephone no (336) 373 -2619 4g Fax no 4h Email address ade Idowu @greensboro -nc gov 5. Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification la Property identification no (tax PIN or parcel ID) 00110684BO86700083 lb Site coordinates (in decimal degrees) I Latitude 36 033382 Longitude -79 891916 1 c Property size 121 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Sedgefield Lake 2b Water Quality Classification of nearest receiving water 2c River basin Haw River Basin 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Existing stream bank is eroding and in need of stabilization 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 140 3d Explain the purpose of the proposed project To slope back stream bank, stabilize with fiber matting, install about 24 feet of boulder wall at the bend, and seed /straw as necessary 3e Describe the overall project in detail, including the type of equipment to be used Slope back stream bank 5 1, stabilize with 8" coir log/fiber matting, seed & straw Install about 24 feet of boulder wall at the bend with the use of backh O 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications been requested or obtained for this project (Including all prior phases) in the past? ❑Yes ❑X No ❑ Unknown 5b If yes, explain in detail according to "help file" Instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands 0 Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 - Choose one Choose one Yes /No W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes /No W4 - Choose one Choose one Yes /No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /No 2g Total Wetland Impacts: 2h Comments 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 P Stabilization Unknown PER DWQ 7 75 S2 Choose one S3 Choose one S4 Choose one S5 Choose one - S6 Choose one - 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 14 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indiv ually list all o en water impacts below 4a Open water impact number Permanent (P) or Temporary 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total: 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet 61 Yes /No 62 Yes/No 63 _ Yes/No 64 - Yes /No B5 - Yes /No B6 Yes /No 6h Total Buffer Impacts: 61 Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The proposed task is necessary to avoid sediment transport downstream toward Sedgefield Lake 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Sod & erosion control devices will be implemented before and during construction of proposed project Land disturbance will not take place without the start of construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the protect require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation Yes ❑X No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑X No 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? ova 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this probed DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan 2e Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this ro ect*7 City of Greensboro ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) []Session Law 2006 -246 []Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 14 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑ No use of public (federal/state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 26 0200)? 2b Is this an after -the -fact permit application? ❑Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes X❑ No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 9 of 10 PCN Form — Version 14 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑X No 5b Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑X No 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Cntical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ❑X No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? Effective special fllood hazard area, A, AE & AE, Floodway map Ade Idowu Applicant/Agent's Printed Name 4/10/2015 Date App nt/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is prowded Page 10 of 10 East Woodlyn Way - Pictures (Upstream & Downstream) Upstream picture of existing culvert Downstream picture of existing culvert L SS CONFIRM LOCATION OF EX. SANITARY / SS SEWER LITERAL E LATERAL STONE WALL \ DOES NOT ENCROACH ON TERAL� EN h •,/ S S N N SCALE: 1" = 10' H y/ Er -MOVE EXCESS RIP RAP FROM INVERT OF CHANNEL — WORK FROM END OF ENERGY DISSIPATOR TO TREEUNE NATURAL FIBER MATTING ^-2 " -6" TOPSOIL (SUFFICIENT TO SUPPORT VEGETATION GROWTH KEY IN FIBER MATTING 1' -0" AND SECURE BEHIND STONE GFtF CLASS 2 RIP RAP OR EQUIVALENT SIZED RECTANGULAR STONES \ FOOTER STONE AT OR BELOW STREAM BED INVERT TOE RIPRAP BELOW SCOUR DEPTH POROUS BACKFILL STONE TOE PROTECTION NOT TO SCALE APPROX. 24 L.F. OF PROPOSED — STONE TOE PROTECTION SEE DETAIL BELOW SS SAS S S 11 PROVIDE BENCH ON INSI OF BEND LAY BACK SLOPE AT 5:1; 1 TALL 8• WI COIR LOG AT TOE AND MAT NCH f! SEE DETAIL BELOW O 8 \ Il s s J ' KEY IN 6" DEEP BACKFILL W/ TOPSOIL AND TAMP STAPLES OR STAKES 2' X 2' SPACING ALONG BANK BENCH MARKS I REVISIONS SIDEWALK Q 0 co / �SS % 3 � / r0 r S Q r I I r 3 I b 8" COIR LOG — STAKE PER MANUFACTURERS RECOMMENDATIONS o L O O 3 F FOREST 0 a o CONTRACTOR NOTES THE CONTRACTOR SHALL INSTALL A COFFER DAM ABOVE THE WORK ZONE TO TRAP THE LOW FLOW. THE CONTRACTOR SHALL USE AN ADEQUATELY SIZED PUMP TO HANDLE THE LOW FLOW AROUND THE WORK ZONE. IF THE SITE HAS TO BE DEWATERED, THE CONTRACTOR SHALL PUMP THE WATER THROUGH AN ADEQUATELY SIZED STILLING BASIN OR THROUGH A SILT BAG. THE DEWATERING SILT BAG IS TO BE LOCATED AS SHOWN ON THE PLAN. ALL DEWATERING OF THE CONSTRUCTION AREA IS TO PASS THROUGH THE SILT BAG. SEEDING AND MULCHING OR A SUITABLE GROUND COVER SHALL BE PROVIDED ON ALL DISTURBED AREAS WITHIN 7 WORKING DAYS OR 14 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF THE STORM SEWER INSTALLATION. CONSTRUCTION SEQUENCE 1. FOLLOW SECTION CUT DETAILS FOR STREAM BANK STABILIZATION - SEE BELOW 2. INSTALL FIBER MATTING ALONG STREAM BANKS PARALLEL TO STREAM FLOW 3. SEED BENCH AND SLOPES WITH SEASONAL MIX AND RE -SEED AFTER 14 DAYS IF NO GROWTH 4. INSTALL SILT FENCE ALONG BANK PARALLEL TO FLOW IF CONSTRUCTION TAKES MULTIPLE DAYS KEY IN 6" DEEP BACKFILL W/ TOPSOIL AND TAMP NATURAL FIBER MATTING � 1 MPX P`ON G BENCH STAPLES OR STAKES 2' X 2' SPACING ALONG BANK BENCH WITH COIR LOG NOT TO SCALE CONTRACT SHEET III OF SENSITIVE INFORMATION Not to be copied or distributed without the 0 -press written permissioi 0f the City of Greensbor( ®OT NPDES General Permit Applies DISTURBED AREA = X.XX Acres GIS DISCLAIMER lb)sots on thl. map ehmm with a dotts 11 tyle w.re nat a yed, they were ptled by phatoprammetrla m.thad. am0oble the G— rophlc Iaformatlon System (CIS) eokware ..W by the City of Greensboro. 2 " -6" TOPSOIL JOB NO. P - CITY OF GREENSBORO K— DESIGNED 1/114/'15 BY JAH ENGINEERING DIVISION CONST. SURVEY eY EAST WOODLYN WAY STREAM STABILIZATION SHEET NO. CHECKED BY Al BETWEEN HILLTOP ROAD AND FOREST LAKE CIRCLE OF SCAI F- SEE ABOVE AT REAR OF 2 FOREST LAKE CLRCLF 1 0 WATER Resources City of Greensboro r This map is for representational purposes only. Stormwater Management Aerial Map East Woodlyn Way Stream Bank Stabilization �a i Stream Bank Stabilization Site SWM * Revisit_ Locations Address Points Contou r at 20 feet Contour at 2 feet Guilford County Parcels Combination Inlets Curb Inlets Grate Inlets ® Storm Manholes ¢ Pipe Jos ® Spillways F7 Yard Inlets Channels Culvert Barrels Flow Connectivity Lines i Pipes Swales Waterbodies • Clean Outs r Private Public • Sewer Fittings • Private • Public 9 Sewer Valves N Waste Water Treatment ---- --- - - - -- Private Public -------- - - - - -► Private Public Sewer Service Lines • Automatic Flushers • Backflow Preventers = Blow Offs Chlorination Stations + Hydrants ■ Meters ■ Pump Stations Water Fittings Water Tanks Water Treatment Plants r➢ Water Valves ---- --- - - - - - -- Private Public — Water Service Lines County Centerline FIRM Panel Grid uraaana.�a tG8 Red: Band-1 Green: Band –2 1:600 1 inch = 50 feet 7� W t� rQ' o r 3� 11L N WATER Resources City of Greensboro y J � - - --j-- Stormwater Management Planimetric View East Woodlyn Way Stream Bank Stabilization This map is for representational purposes only. 0, 0 Stream Bank Stabilization Site "Ji 2 C-3 --I r SWM * Revisit Locations Contour at 20 feet Contour at 2 feet Guilford County Parcels Combination Inlets Curb Inlets Grate Inlets ® Storm Manholes O Pipe IOs ® Spillways Yard Inlets Channels Culvert Barrels Flow Connectivity Lines Pipes Swales Walerbodies • Clean Outs Private Public • Sewer Fittings • Private • Public 6 Sewer Valves Waste Water Treatment Pla ----- - - - - -- Private Public -- -- - --- - + Private - - - - -- - ► Public Sewer Service Lines • Automatic Flushers • Backflow Preventers j Blow Offs ■ Chlorination Stations • Hydrants ■ Meters ■ Pump Stations Water Fittings • Water Tanks Water Treatment Plants Water Valves - - - - -- Private Public - -- - Water Service Lines • Tower Streams Building ParkRec PVArea PVOrive SwimmingPool Tank County Cenlerline N W+ S 1:600 1 inch = 50 feet