HomeMy WebLinkAbout20150356 Ver 1_More Info Received_20150416aoiro3so
CORRECTION 04/14/2015
Please use the attached site plan for the NC Lake Wyllie, LLC commercial marina expansion
The last revision date was 8/13/2014 instead if 5/09 /2014 The difference is Dock A has two PWC's
added to the new site plan, dock B has 2 PWC "S slips and 2 end ties and dock C has 6 PWC's and 2 end
ties
The letter is correct and the exhibit of proposed marina expansion is correct
Sorry for any confusion
Ann Duncan
rAPR
r s2 0 15 ,�!
Notes:
PeninsuW in Gaston County, NC and York County. SC is to
be developed into a master planned community by NW Lake
Wylie LLC (-NW ). NW has prepared this shoreline study in
order to illustrate the various components of a shoreline
application that is forthcoming.
2. NW is requesting a shoreline re-classification in one area of
the shoreline. On the West Shore, NW requests a
re- classification from Future Public Recreation to Future
Residential.
3. NW is requesting that shoreline classifications be assigned
to the shoreline along the ponds located on the south side
of the site. Refer to the plan.
4. All Environmental and Impact Minimization Zones were
flagged in the field by Duke Energy Lake Services on
August 14, 2013. These flags have been field surveyed and
are documented on these pages. Attached is a copy of the
Lawrence Survey.
5. NW is proposing to expand the existing commercial marina
located within the Commercial Manna shoreline south of the
New Hope Road Bridge.
6. Low Impact Design Practices will be implemented at the
Commercial Marina.
Total Existing Project Shoreline: 33,216'
Total Environmental Shoreline: 4,752'
Total Shoreline (Net Environmental): 28.464'
Proposed Residential Lots Along Shoreline: 164
Proposed Expansion of Commercial Marina Facilities: 1
Total Boat Storage: 300
Docks: 3
Wet Slips Shown: 28
PWC Slips Shown: 10
Lease Area 1.12 Acres
Approximate Excavation Area: 1,200 w. yd.
Shoreline Stabilization: 395'
Note: Duke Energy Project Boundary from the 569.4' contour,
surveyed by Lawrence Associates, originally dated August 1,
2013.
0 50 too 200 300 400
Future Dry Stack Boat -
} Storage Facility
(Proposed
Schematic Design)
f
a�
Elevated
Launch Pad
(30'x40')
Gated Landing
I
Limits of
Lease Area
(1 12 Agee)
Commercial Marina - detail
Future Public Recreation
to be reclassified to
Future Residential
__ � 200' Property Offset
Proposed new classification
Natural
Proposed new classificati'o
Environmental APR r 6 2
Legend
i Impact Minimization Zone
Environmental
Future Commercial Marina
Commercial Marina
Future Residential Manna
Future Residential
Residential
Future Public Recreation
Business Industrial
Proposed Future Residential
Proposed Environmental
e -�
Y. >- � �?
V Z�'
M 0 U
U
J
J
T �z
kc
Y a�CO
J
Z
�mm
CO Z
J E C
O
t
W
Natural
0 200 1111 Nix) 1211 00 �' 1pu pu
,
Limit of
Excavation
Note:
K
Conceptual design of dry stack boat storage
facility, parking and associated upland uses
C B -Dock
is preliminary and subject to change
(12.10'x24'kps
2 1hC sl s
pending finalization of planning and
2 End Tres)
engineering.
C-Dock
(10.10'x2a' slips, 6 PVJC slips, 2
End Ties)
Future Public Recreation
to be reclassified to
Future Residential
__ � 200' Property Offset
Proposed new classification
Natural
Proposed new classificati'o
Environmental APR r 6 2
Legend
i Impact Minimization Zone
Environmental
Future Commercial Marina
Commercial Marina
Future Residential Manna
Future Residential
Residential
Future Public Recreation
Business Industrial
Proposed Future Residential
Proposed Environmental
e -�
Y. >- � �?
V Z�'
M 0 U
U
J
J
T �z
kc
Y a�CO
J
Z
�mm
CO Z
J E C
O
t
W
Natural
0 200 1111 Nix) 1211 00 �' 1pu pu