Loading...
HomeMy WebLinkAbout20061617 Ver 1_Worksheets_20070808 (2)Project Name: Wendell Subdivision Project No. DWQ 06-1617 BMP 1.1 sr~r~nriTTrn nrs~r,~~ r~rnc>>RFn nrsrc~~ elevations Permanent Pool (ft) 249.83 Teml~rn~nrv Pool (ftl 251.E areas Permanent Pool SA (sq ft) 4149 Drainage Area (ac) 4.86 Impervious Area (ac) 2.28 Forebay (ft2) 624 High Marsh (ft2) 1442 Low Marsh (ft2) 1469 Micropool (ft2) 627 vohmies Temprn-arv Pool (cu ft) 8 329 o!h~°r ~~~rrrrnn~~k~r-e uriticc Diameter (in) Design Rainfall (in) 1 Linear Interpolation of Correct SA/DA Im ervious Next Lowest 1.73 Project Impervious 46.9 Next Highest 2.06 1.67 ft de~~th 4149 sq. ft. 46.9 15.039769 34.8 35.4 15.112075 100.3133 8331 cu. ft. 0.02 cfs drawdowu 4.0 day drawdown 0 ft. Permanent Pool Depth SA/DA from Table 2.06 48.61 2.4 ~« /~~.~- ~'l~'~~7 nl, check siu fac ok ok ok ok clack tem>>n ok Project Name: Wendell Subdivision Project No. DWQ 06-1617 BMP 1.2 .~(!R4IITTG'D DFSIG~' RFOC'IRl'(? DF,SIC.~'. elevations Permanent Pool (ft) 220 Tei~~porarv Pool (ft) X22.58 x.54 ft. dei~th nl: areas Permanent Pool SA (sq ft) 7243 7214 sq. ft. ok Drainage Area (ac) 9.41 Impervious Area (ac) 3.85 40.9 % - Forebay (ft2) 1082 14.938561 % ok High Marsh (ft2) 2558 35.3 % ok Low Marsh (ft2) 2513 34.7 % ok Micropool (ft2) 1089 15.035206 % ok 99.98819 vultnues Temporary Pool (cu Ft) 14246 1x286 cu. ft o% ether /~rn'rm~~'h°i~e ----, .. ~ ~i.~ ~ i. r-. r_ Orifice Diameter (in) 1.5 0.07 cfs drawdo~~~n Design Rainfall (in) 1 2.5 day drawdown ok Linear Interpolation of Correct SA/DA Im ervious Next Lowest 1.73 Project Impervious 40.9 Next Highest 2.06. 0 ft. Permanent Pool Depth SA/DA from Table 2.06. 42.43 2.4 ~/ Project Name: Wendell Subdivision Project No. DWQ 06-1617 BMP 2.1 ~1'/~~I/TTFI? DF_SIG~'. P,F'O('IRED DFSIG,1'. elevations Permanent Pool (ft) 222 Tcmnorarv Pool (ftl 22 x.72 1.72 fr. depth oh areas Permanent Pool SA (sq ft) 5468 5454 sq. ft. ok Drainage Area (ac) 6.59 Impervious Area (ac) 2.97 45.1 % - Forebay (ft2) 820 14.996342 % ok High Marsh (ft2) 1904 34.8 % ok Low Marsh (ft2) 1910 34.9 % ok Micropool (ft2) S20 14.996342 % ok 99.74396 voltnrtes Temporary Pool (cu ft) 10901 10899 cu. ft. oh !7!h P7' ~) ;'1'0!11 C'lC'7 :~' ( ~..i ~. ~~ ~ ~ ~i - i ~. ., i Orifice lliameter (in) l.~ 0.0~ cfs drawdown - Design Rainfall (in) 1 2.3 day drawdown ok Linear Interpolation of Correct SA/DA Im ervious Next Lowest 1.73 Project Impervious 45.1 Next Highest 2.06 0 ft. Permanent Pool Depth SA/DA from Table 2.06 46.71 2.4 b~ A~+~ ~'~~1~~ Project Name: Wendell Falls Parkway Project No. DWQ 06-1617 Pond No. SUBMITTED DESIGN. elevations Bottom of Basin (ft) Permanent Pool (ft) Temporary Pool (ft) areas Permanent Pool SA (sq ft) Drainage Area (ac) Impervious Area (ac) volumes Permanent Pool (cu ft) Temporary Pool (cu ft) Forebay (cu ft) other parameters SA/DA Orifice Diameter (in) Design Rainfall (in) 255 258 259 9277 17.1 5.9 9050 29765 3391 1. Q average depth 3 ft. depth 1 ft. depth ~~si~~ 11289 . ft. 1 based on avg depth 34.5 22379 cu. ft. 37.5 oV~s~ ~-~ O 1.52 ,M,J ~' ~ 1.52 0 1QJ~~C. 16.70 cfs drawdown 0.0 day drawdown REQUIRED DESIGN. Linear Interpolation of Correct SA/DA Next Lowest Project Impervious Next Highest 3 ft. Permanent Pool Depth 91~(0~ AML status ok ok check surfac check surfac ok checkforebc check drawn, Im envious SA/DA fron (Avg. Depth) 30 1.34 1.86636197 1.08 34.5 1.52 2.08 1.24 40 1.73 2.337340735 1.43 3 ft 4 y~~(oz O(o - ~ ~o I "1 -~•~ t~s ~~~ w~-e~S. art ~, ~ d~ ~ fie, ~~< <~ ~ ~ P b~ To ~ ~ ~- SV~~U~C~ . ii -M, L