Loading...
HomeMy WebLinkAboutNCC191139_NOT Closeout Documents_20230323INSPECTION REPORT Gaston County Soil Erosion & Sedimentation Control Program O� pOU1U�� m { Iti 1846/ I� GASTON COUNTY Natural Resources Gaston Natural Resources Department 1303 Dallas-Cherryville Hwy Dallas, NC 28034 Office: (704) 922-4181 www.gastongov.com/d epartments/natural re sources Gaston County Belmont Bessemer City Cherryville Cramerton Dallas Gastonia High Shoals Lowell McAdenville Mount Holly Ranlo Stanley Purpose Statement: "To serve the people of Gaston County by protecting and improving their soil, water, air, plant and wildlife resources through conservation planning, engineering, education, and regulatory programs." Project: Livent Temporary Facilities Location: HWY 161 Financially Responsible Party: Larry Spickard ❑ In Compliance Inspection Date: 1/24/23 ❑ Out of Compliance Compliance Date: Violations: 0 No approved plan, Sec. 18(k); G.S. 113A-57(4) and G.S. 113A-54(d)(4); 15A NCAC 04B .0107 0 Failure to follow approved plan, Sec. 18(k); G.S. 113A-61.1 0 Failure to submit revised plan, Sec. 18(c)(k); G.S. 113A-54.1(b); 15A NCAC 04B .0118(a) 0 Failure to provide adequate groundcover, Sec. 8(c) and Sec. 9(b)(5); G.S. 113A-57(3); 15A NCAC 04B .0107(b) and 15A NCAC 04B .0124(e) 0 Insufficient measures to retain sediment on site, Sec. 7(e); G.S. 113A-57(3) 0 Failure to take all reasonable measures, Sec. 6(c); 15A NCAC 04B .0105 0 Inadequate buffer zones, Sec. 8(a)(1)(2); G.S. 113A-57(1); 15A NCAC 04B .0125(a) 0 Graded slopes and fills too steep, Sec. 8(b) and Sec. 9(b)(4); G.S. 113A-57(2); 15A NCAC 04B .0124(d) 0 Unprotected exposed slopes, Sec. 8(b) and Sec. 9(b)(4); G.S. 113A-57(2) 0 Failure to maintain erosion control measures, Sec. 14; 15A NCAC 04B .0113 0 Failure to self -inspect, Sec. 4(b), G.S. 113A-54.1(e) and 15A NCAC 04B .0131 0 Other: Sediment Damage: ONo ❑Yes: Corrective Actions: None Comments: Project has been completed and site stabilized. Remaining temporary SE&SC measures (silt fence) should be removed. This will be the final SE&SC inspection report for this project; the plan has been archived. Report by: Jonathan Boerger