Loading...
HomeMy WebLinkAboutNCC230774_ESC Approval Submitted_20230324ff � . DERSON �S HENDERSON COUNTY GOVERNMENT SITE DEVELOPMENT DEPARTMENT SOIL ERSOSION AND SEDIMENT CONTROL DIVISION Natalie J. Berry P.E. Deb Johnston, PE Director Assistant Engineer ------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------- February 28, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Attn: Andrew C. Baker Ripple Falls, LLC 69 Clark Gap Rd Fletcher, NC 28732 Project Name: Project ID: Acres Approved: County: City: Address: River Basin: Stream Classification: Submitted By: Date Received by HC Plan Type: Dear Andrew C. Baker, Rich Mountain Subdivision Phase 3 SESC 2023-02-03 6.45 Henderson N/A Locust Grove Road (35.390441,-82439966) French Broad River Basin Harpers Creek, Class B, John Kinnaird, PE February 2, 2023 Revision Tr, Segment 6-55-11-11 This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Modifications Rich Mountain SD, Phase 3 February 28, 2023 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Assistant Engineer Soil Erosion & Sedimentation Control Office Enclosures: Certificate of Approval NCGO1 Fact Sheet ec: Zachary Wortman, Brooks Engineering Stan Aiken PE, DEQ — Asheville 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 Letter of Approval with Modifications Rich Mountain SD, Phase 3 February 28, 2023 Page 3 of 3 MODIFICATIONS • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER AND FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET C-5.11 & C-5.12 OF THE APPROVED DRAWING WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • IF EXISTING SOIL ROAD IS GOING TO BE USED DURING CONSTRUCTION, AN AUTHORIZATION FORM FROM PROPERTY OWNER IS NEEDED PRIOR TO START OF LAND DISTURBANCE. • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "RICH MOUNTAIN PHASE 3" AND DATED JANUARY 12, 2023, IS REFERENCED HERE AND INCORPORTED INTO THIS LETTER OF APPROVAL. • PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: Print Name and Title: Date: 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553