HomeMy WebLinkAboutNCC230690_NOT Closeout Documents_20230317North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Robeson Project: East Lumberton FMC River basin: Lumber
Person financially responsible: David E. Looper & Company, Inc. - Clark Rowe, Project #: ROBES-2021-002
Project Manager
Address: P.O. Box 3224, Hickory, NC 28603
1. Project Location: Linkhaw Road, Lumberton
Pictures: No
2. Weather and soil conditions: sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
None
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe: See comments.
7. Has sedimentation damage occurred since last inspection? No
8. Contact made with (name): No one
Inspection report: Sent Report Date given/sent: March 09, 2023
9. Corrective action needed: None
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO10000) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Mike Lewis
Date of inspection: February 22, 2023 Time arriving on site: 2:00 PM Time leaving site: 2:20 PM
cc: FRO DEMLR Files, Andrew P. Mericle, P.E. (via email)
Yes