Loading...
HomeMy WebLinkAbout19990774 Ver 2_401 Application_20150410AVOLIS ENGINEERING. P.A. P O Box 15564 New Bern, North Carolina 28561 Office 252.633 0068 April 1, 2015 Ms. Cindy Karoly Supervisor 401 Oversight/Express Review Permitting Unit NCDENR - Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699 -1650 RE: Boat Ramp Repairs, Eastern Carolina Yacht Club Trent Woods, Craven County, North Carolina AE Project No. 15016 Dear Cindy: Attached please find a 401 Water Quality Certification application for the referenced project consisting of the following: Permit Application (Five Copies) Project Plans Full Size ( Two Copies) 11 x17 (Three Copies) USGS Map (Five Copies) Soils Map (Five Copies) Permit Fee $240 It is requested that you review the attached permit application and if deemed appropriate issue a 401 Water Quality Certification and riparian buffer impact for the proposed impact. If you should have any questions or need any additional information to process this request, please do not hesitate to call. Sincerely, .evin Avolis, P.E. ice - President C> �r I q kq 6�_q V 2� Office Use Only Corps action ID no - DWQ project no F ID orm Version 1 4 Ja uary 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1 Processing la Type(s) of approval sought from the Corps ❑ Section 404 Permit ❑ Section 10 Permit lb Specify Nationwide Permit (NWP) number or General Permit (GP) number 1 c Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d Type(s) of approval sought from the DWQ (check all that apply) ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization 1 e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ❑ No For the record only for Corps Permit ❑ Yes ❑ No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ❑X No 1 g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑X Yes ❑ No 1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑X Yes ❑ No 2 Project Information 2a Name of project Eastern Carolina Yacht Club Boat Ramp Repairs 2b County Craven 2c Nearest municipality / town Trent Woods 2d Subdivision name Trent Woods 2e NCDOT only, T I P or state project no N/A 3 Owner Information 3a Name(s) on Recorded Deed Eastern Carolina Yacht Club, Inc 3b Deed Book and Page No Deed Book 464, Page 147 3c Responsible Party (for LLC if applicable) Hunter Williams, President -- 1/ nn 3d Street address 4005 Trent Pines Drive 3e City, state, zip Trent Woods, NC 28562 3f Telephone no DENR.yygTE 3g Fax no R►' NtGti 3h Email address Page 1 of 10 PCN Form — Version 1 4 January 2009 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address 5 Agent /Consultant Information (if applicable) 5a Name J Kevin Avolis, PE 5b Business name (if applicable) Avolis Engineering, PA 5c Street address 5405 Morton Road (P O Box 15564) 5d City, state, zip New Bern, NC 28562 (28561) 5e Telephone no 252 633 0068 5f Fax no 5g Email address avolisengineering @embargmail com Page 2 of 10 B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) 8049 -015 -A lb Site coordinates (in decimal degrees) Latitude 35 073264 Longitude -77 086702 1c Property size 341 acres 2 Surface Waters 2a Name of nearest body of water to proposed project Trent River 2b Water Quality Classification of nearest receiving water SB, Sw, NSW - Index 27- 101 -(31) 2c River basin Neuse 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Site is developed with existing boat ramp facilities to be refurbished by this protect Club house, asphalt parking area, marina docks and boathouses all exist on site 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 587 3d Explain the purpose of the proposed project Refurbish existing boat ramp 3e Describe the overall project in detail, including the type of equipment to be used See attached narrative 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases in the past? ❑ Yes ❑X No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a Have permits or certifications, been requested or obtained for this project (including all prior phases) in the past? El Yes ❑ No ❑X Unknown 5b If yes, explain in detail according to "help file" instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams —tributaries ❑X Buffers ❑X Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland 2d Forested 2e Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f Area of impact (acres) W1 Choose one Choose one Yes /No - W2 Choose one Choose one Yes /No W3 Choose one Choose one Yes /No 1/x/4 Choose one Choose one Yes /No W5 Choose one Choose one Yes /No W6 Choose one Choose one Yes /No 2g Total Wetland Impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one S2 Choose one S3 Choose one S4 Choose one S5 Choose one S6 Choose one 3h Total stream and tributary impacts 31 Comments Page 4 of 10 PCN Form — Version 14 January 2009 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivi ually list all open water impacts below 4a Open water impact number Permanent (P) or Tem ora T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 P Trent River Other Estuary 014 O2 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 014 4g Comments Reconstruct existing boat ramp 5 Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total: 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is In which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (P) or Temporary T 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 P Replace Concrete Drive Trent River No 324 0 B2 Yes /No B3 Yes /No B4 Yes /No B5 Yes /No B6 Yes /No 6h Total Buffer Impacts 61 Comments Replace existing concrete ramp above normal water level disturbed during boat ramp construction Page 5 of 10 D Impact Justification and Mitigation 1 Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The existing concrete ramp area is not proposed to be expanded in the buffer areas Disturbance is for restoration of existing facilities only 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b' Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permlttee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes X No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑ No within one of the NC Riparian Buffer Protection Rules9 1 b If yes, then is a diffuse flow plan included9 If no, explain why Existing surface runoff maintained in sheetflow action ❑ Yes ❑X No 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project'? 202% 2b Does this project require a Stormwater Management Plane ❑ Yes ❑X No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Project involves renovations of an existing boat ramp No new impervious areas are proposed 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan See attached narrative 2e Who will be responsible for the review of the Stormwater Management Plan? 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project2 Town of Trent Woods ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed X❑ Other NONE 3c Has the approved Stormwater Management Plan with proof of approval been El Yes ❑ No attached9 4 DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply) ❑Session Law 2006 -246 ❑X Other NONE 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached9 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements2 ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? 1 b If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA /SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter ) ❑ Yes ❑ No Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑Yes ❑X No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ❑X No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility No sewage generated by this project Page 9 of 10 PCN Form — Version 1 4 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ❑X No habitat'? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑X No impacts? 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat? Project proposes refurbishment of existing boatramp facilities only 6 Essential Fish Habitat (Corps Requirement) 6a WIII this project occur in or near an area designated as essential fish habitats ❑ Yes ❑X No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Project proposed refurbishment of existing boat ramp facilities only 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Project proposed refurbishment of existing boat ramp facilities only 8 Flood Zone Designation (Corps Requirement) 8a WIII this project occur in a FEMA- designated 100 -year floodplain? ❑X Yes ❑ No 8b If yes, explain how project meets FEMA requirements No flood proofing requirements exist for boat ramp facilities 8c What source(s) did you use to make the floodplain determination? NC Flood Maps Hunter Williams, Pres. 1LAW- Applicant /Agent's Printed Name Date Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10