HomeMy WebLinkAbout20230428 Ver 1_Site Plan_20230323Full Pond/
Normal Water Level
Shoreline
bye e�` Lake
A+r 110 d/h! IUV L I
�a u on orma ater eve } 20 a 'C U+
9-1
b 00-+ rare
L'o
- 7'i
� � _ re.YYl nv eC,
�o �reeS
I®` o bove X il'
(Yl + n ma.A G1 54 iv'
. a
w+de a,
C
house. 4
s
s
Please approximately sketch the following information on this plan, length of sharellne
(provide dimensions for each item, such as 10ft x 100 ft)*:
1, All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ formal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining wails, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
�redr�� �oJ h char dy-e-dqe- spo 1 I5 re-mcwaA
C�I� done.. y
caone �� I c�Y�l
FORM: SSGP 10-2013 Page 3 of 3