March 2, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
Appalachian Mountain Community Health Centers
ATTN: Ms. Shantelle Simpson
141 Asheland Ave., Suite 300
Asheville, NC 28801
RE: Project Name: PEACHTREE HEALTH CENTER
Acres Approved: 2.32
Project ID: CHERO-2023-003
County: Cherokee
City: Murphy
Address: E. US Hwy 64 Alt.
River Basin: Hiwassee
Stream Classification: Peachtree Creek - Class C
Submitted By: Brooks Engineering Assoicates - Mr. Mark Brooks, PE
Date Received by LQS: February 1, 2023
Plan Type: Commercial
Dear Ms. Simpson,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) tinder the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed, you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
Title 15A NCAC 413.0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
��- North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Q
J{l� Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
+�d� / 828.296.4500
Letter of Approval with Modifications
Appalachian Mountain Community Health Centers
ATTN: Ms. Shantelle Simpson
March 2, 2023
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through bb), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Fred Walker, PE
Engineer III
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
Modifications Required for Approval
ec: Mr. Mary Brooks, PE (mbrooks@brooksea.com)
Ms. Savannah Leduc - NCDEQ-LQS [savannah.leduc@ncdenr.gov)
cc: Regional Office file
Letter of Approval with Modifications
Appalachian Mountain Community Health Centers
ATTN: Ms. Shantelle Simpson
March 2, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: PEACHTREE HEALTH CENTER
Project ID: CHERO-2023-003
County: Cherokee
1. Submit revised notarized Financial Responsibility Form with Part B.2.a completed
with the Registered Agent's contact information on file with the N.C. Secretary of
State. {G.S.113A-54.1.(a)}
2. Provided phased sheets for the project. An initial, intermediate, and final E&SC
sheet should be included at a minimum. {15A NCAC 04B .0106(a)(3)}
3. Hatch all areas that must meet NPDES NCGO10000 7-day stabilization requirement.
{NPDES NCGO10000)
4. Provide double row silt fence or super silt fence between construction activities and
receiving streams. Provide construction detail for E&SC measure. {G.S. 113A-
57.(3)1
S. Clarify in call outs, details, and calculations if the proposed sediment trap feature is
a sediment trap or a skimmer basin. Conveyances, including slope drains, must
enter at the furthest point in the basin from the skimmer or surface discharge point
and pass through 3 baffles before discharging. Provide stabilized inlets into basins
that extend into basin floor. {G.S. 113A-57.(3))
6. A runoff coefficient of 0.6 is strongly recommended to account for coefficient factor
inputs during grading activities. 115A NCAC 04B .0108}
7. Due to proximity to sensitive receiving waters all fertilizers must be applied per soil
test recommendations, provide documentation that a soil test was not available if
generic rates are used. {G.S. 113A-57.(3)}
8. Revise the construction sequence to include the following language: obtain NPDES
NCGO10000 coverage after approval letter is received from NCDEQ-LQS, request
close-out inspection from NCDEQ-LQS inspector when project is ready for a close-
out inspection, file for NPDES NCGO10000 e-Notice of Termination once close-out
inspection report is received from NCDEQ-LQS. 115A NCAC 04B .0106(a)(3))
9. Orient southern permanent stormwater discharge away from wetlands and redirect
along contour to disperse flow into riparian buffer. {15A NCAC 04B .0106(a) (6)}
10. Provide verification for jurisdictional authority that post -construction stormwater
permitting has been approved, applied for, or is not required.
CD
y N CD r
CD
N �•
CD
IrD
.� ►�
c m
r M
eD �
�. =. ► }..� BCDCD
O Gera
�r•1
n r�
gFA P q
,® cot_
F� � Imo• O t C�'P `� J4r` y�;�'�
i
hr.
j..l..( '� ¢ rp W � O •
�Q j� A� ►�T Y C �
oCD CD � m o
\%=.
rD
CD fD
W *1
O ow
CD
C CD,... CD
CD