HomeMy WebLinkAboutNCC230765_ESC Approval Submitted_20230321ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
August 3, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
RZ Forest City, LLC
Attn: Heidi Boring
1437 Wintercress Court
Marietta, Georgia 30066
RE: Project Name: Sparks Drive Commercial Building
Acres Approved: 1.45
Project ID: RUTHE-2023-003
County: Rutherford
City: Forest City
Address: 176 Sparks Drive
River Basin: Broad
Stream Classification: C
Submitted By: Tarr Group, LLC
Date Received by LQS: July 27, 2022
Plan Type: Commercial
Dear Ms. Boring,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
R
QNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
e:!5�Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500
Letter of Approval
RZ Forest City, LLC
August 3, 2022
Page 2 of 3
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.
Your cooperation is appreciated.
;Sincer
Isaiah Reed, EI, CPSWQ, MS4CECI
Assistant Regional Engineer
Land Quality Section
Letter of Approval
RZ Forest City, LLC
August 3, 2022
Page 3 of 3
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications
ec: Kevin Pulis, kevin@tarr-group.com
cc: Regional Office file
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Sparks Drive Commercial Building
Project ID: RUTHE-2023-003
County: Rutherford
For final plan approval, please provide to this office the requested documents listed below.
1) Item 3 in the Erosion and Sediment Control Notes on sheet C0.2 shall either;
reference the stabilization schedule outlined in the Ground Stabilization and
Materials Handling section of sheet C1.5, or include sufficient language to include all
stabilization requirements outlined on sheet C1.5.
2) A drainage area map outlining all on -site and off -site drainage areas contributing to
the construction stormwater runoff/treatment shall be provided (including during
ESC Phase 1).
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A,0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities