Loading...
HomeMy WebLinkAboutNCC230765_ESC Approval Submitted_20230321ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality August 3, 2022 LETTER OF APPROVAL WITH MODIFICATIONS RZ Forest City, LLC Attn: Heidi Boring 1437 Wintercress Court Marietta, Georgia 30066 RE: Project Name: Sparks Drive Commercial Building Acres Approved: 1.45 Project ID: RUTHE-2023-003 County: Rutherford City: Forest City Address: 176 Sparks Drive River Basin: Broad Stream Classification: C Submitted By: Tarr Group, LLC Date Received by LQS: July 27, 2022 Plan Type: Commercial Dear Ms. Boring, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed R QNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources e:!5�Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 828.296.4500 Letter of Approval RZ Forest City, LLC August 3, 2022 Page 2 of 3 at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. ;Sincer Isaiah Reed, EI, CPSWQ, MS4CECI Assistant Regional Engineer Land Quality Section Letter of Approval RZ Forest City, LLC August 3, 2022 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Kevin Pulis, kevin@tarr-group.com cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sparks Drive Commercial Building Project ID: RUTHE-2023-003 County: Rutherford For final plan approval, please provide to this office the requested documents listed below. 1) Item 3 in the Erosion and Sediment Control Notes on sheet C0.2 shall either; reference the stabilization schedule outlined in the Ground Stabilization and Materials Handling section of sheet C1.5, or include sufficient language to include all stabilization requirements outlined on sheet C1.5. 2) A drainage area map outlining all on -site and off -site drainage areas contributing to the construction stormwater runoff/treatment shall be provided (including during ESC Phase 1). Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A,0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities