Loading...
HomeMy WebLinkAbout20200859 Ver 1_Certification of Completion_20230321Action ID Number: SAW-2018-01144 County: Union/Stanly Permittee: Union County Public Works, John Shutak Project Name: Yadkin Regional Water Supply Project Date Verification Issued: 10/27/2021 Project Manager: Bryan Roden -Reynolds Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Bryan Roden -Reynolds Charlotte Regulatory Office U.S Army Corps of Engineers 8430 University Executive Park Drive, Suite 615 Charlotte, North Carolina 28262 or bryan.roden-rynolds@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Xnature of Permittee Date