Loading...
HomeMy WebLinkAboutSW8960326_APPROVED PLANS_19970404 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD SEDIMENT BASIN CALCULATIONS 1) TOTAL AREA OF SITE FOR DISTURBANCE AREA #1 - 0.73 AC, 2) DETERMINE FLOW FOR 10 YEAR STORM Q-CIA C=0.9 1 -5.2 FOR 10 YEAR STORM AREA #I: Q - (.9) (5.2) (.73) Q = 3.4 CFS 3) DETERMINE STORAGE AREA FOR SEDIMENT BASINS AREA #1 Q1= 1800 x .73 = 1314 CIF L- 1314 CF 43.8' (44' ) 30 SF (CROSS-SECTIOR) I II I I I. LEGEND. E.I.S. = EXISTING IRON STAKE I I G' S.I.S. - SET IRON STAKE y T.C. = TOP OF CURB c E.P. = EDGE OF PAVEMENT F.L. - FLOW LINE M.H. = MAN HOLE A C.B. = CATCH BASIN I CA = CENTERLINE C R/W = RIGHT OF WAY 1Zn G.S. = GROUND SHOT C.O. = CLEAN OUT L.P. - LAMP POLE I P.P. = POWER POLE I 49-4 - PROPOSED GRADE I -E-= OVERHEAD ELECTRICAL LINE LINE BEARING DISTANCE 1 N 02' 57' 48" W 9.87' 2 N 85' 51' 20" E 20.00' 3 N 85' 10' 00" W 20.25' REF: PORTION OF D.B. 988, PG. 708 NORTH PER D.B. 988, PG. 7 Ge r JACKSONVILLE DOCTORS PARK, INC. D.B. 422. PG. 370 ZONED - 0 & I C.B. TOP-5273 u fl b III III I� II so a- 17- J" BOTTOM OF DITCH -,, �14,6i - G" i- 2:1 -: 7, 04 - R TBASINI CROSS SECTION SEDIMENT �Cj (LENGTH - 37') /� �(x y 2\ NOT TO SCALE (i 1 Z'Z � GRAVEL (NCDOT STAN. #57) SEDIMENT BASIN --T - R(ITTfW1 M PIT - LLA' N ail u-,-SEEP COLLAR BERM - _ :.-.. 11=11=11=II=11. , �ICIICIIICIIICIIICI� -- EXISTING ASPHALT RIP -RAP CONCRETE SEDIMENT PIT ROCK CHECK EXISTING ASPHALT SEDIMENT BASIN OUTLET CONTROL DETAIL DAMS (PERMANENT STORMWATER NOT TO SCALE (PERMANENT S70RLIWA7ER INV CONTROL DEVICE) S 04 08 40 E 199.96 CONTROL DEVICE) 47.8 SG 8? k7 8, INV. - 47.8 C.69 - 9 TOP ELEV.-48.2 - y4=5o S 04' 08' 00" E 286.28' 49 96 PROPOSED 20' DRAINAGE k STORMWATER EASEMENT 50' T.c.=5, 49 _ c. -i E.P.- 3, 5c29 32- T OUTLET CONTROL T.C.-55.93 E.P.-50. -.----___�! EXISTING VEGETATIVE SWALE 4864 . 48.46 , RISER J E.P.-50 58 - -- _--_-- - _ - - - - - -- - - - 84 - - - - - _ =�4 4'08'40'E 19 ""'�_----�'6a� -- - -------y --- 4z2---4,`n'S- tINV. E.I.S. - - -----•w------� P.-49-9 Ste dT,a -� _,a a>6, 4B72 eeB 4e40 �- 484cae a 4eB3 6 225 49 sc S 04' 08' 00" E 283.12' CLEAN DITCH TO �I' - 51.24 ' \ PROPOSED 1 STORY BLOCK/METAL BUILDING BOTTOM - 45' _ BOTTOM ELEV.- 44' A' -44.77 ' � F.F. ELEV. = 51.5 - - - - , e OUTLET S' -44.05 N _ I ' C' -44.55 �5,850 SQ. FT. - HEIGHT 16'1 4y'4 49-' 49, '�' ---- do " A' m M. IN IN Q N 0 0 --I 0 xl A Im I I I I I TO IN 25, 4y v 3 - 49 24 a, 12 - - .- ..Ja 'a4 4B F, ae 5 :46.92 ..\ .. a9y 600 4 `; 8 i I I I CANOPY n- Lm : 1 I t,'-aa 33 < >< e X I 1000 GALLON ` k X y�� Y�y� GREASE TRAP iP 49 �'� %. i Y 5r < X f,rl' E.P.-a9HE a 4g'= an <E _ .%� X �( �rX� �xr .• �I i G.S-49.42 49 .� F d T'x >> s x x w i936 l I l i CAP END 49 9� EXISTING C.B. a9 ,C} �2 B I �. C.O. 3t INV.-42.87 A 49'S TOP - 49.5 _ x / X ' "x X �• a `� x. x�. y' a8 INV. - 4d0 _ -'< �(JC� Jim J' S ! X.r ,c 'I �_43 3- FILTER �<�X < X x, h a EXISTING ASPHALT>�� x I I B7 <93B \ ;l �! I �� as aB x ,< x - 0O ; �♦ d..: 5a 49 8' _ v 48 �k4�1 a k l�x��•u i �6. 41 \ x f x x r > 1 -_ __ N i0 aE 6 4o 92 a= ba a9 23 E.P.-49 9' a9 _9 _ a ey 3' x �(x } Z I INV. G.S.=49 4 49 SE % %(X v Y x w X >� 'a5 Ea �� 4a78 - S CLIFTON JACOBS ay E3 .�`;i X ` �` �` i9 25 1// S ,/ -{x i`kXr I Ie 2B 48 631r D.B. 472, PG. 442 , , l HENRY W. GEROCK, JR. ZONED B-1 10 0. C�hx D.B. 402, PG. 441 x } ZONED - B-1 1.79 AC. �� - 4s ° a9 « iy 46 a9 56 491- X x � % 0 v ` xv l' w Z �. � - x� _ 4 4- 6` iz 29 �� WI.�48 12 1 49.90 . �X � k F uj- 50.53 f i x VI M ' x, SC3' SG 42 '� SSG 59 i n ay 4- 4980 a3 " y o N � X X J 4 ^5�41 0.'8 498� W C � X N '49 Sa C.B. .S-4v a6 ,> i� % DRAINAGE BREAK LINE x x kXk�x �X�Cx �934 4889 3 I 1 X/ yx: X � x - 'an a�. ay 49 a`. 49 80 4c BE uT I h -� E lS' i �C -51 - i °G y X . f� ^ 9.BC ff PP T._�-51 2350.0. �- /� V) x ° `-c J°` PROPOSED ASPHALT E.P.-4343 T _ =5. 2" - " 36 1483 "Al " / x G.SI�s 27 4y d3� LP 49 3' 49 3= a9 9' '! X "x"`49 a9 9., 48.88 EP=5G' EF=50n4 �< I . P� x��_x�4' i II H. a in x ?x _ 1 E.F/` ,V. A -44.27 a9 a 49.34 < 49 C; 49�ag9' X yx )l iC "A.��V.'B"-H.20 �-'2x� B x ` �X a95' V. 'C'-44J4 ♦Xk a_. = 49 , 40 �3 32 xXX �<'✓ Orx '. . Iag �4 PROPOSED ASPHALT T x . / 23 y E0.06 ' ♦ l2 1X �> n � X 51 42 °yE.' 5� I ` 1 3 1=48.99 S eFt ea 5S� a a1_ay3 t j u_ 9 a4 no441 � a� W EXISTING ASPHALT I 4. 85 •4e99 4=.ac 488: - _ 'iIGN f _ ae 46 / as 93 'I W GLENN L. HOOPER, JR., TRUSTEE O1 C'D 4e 57 48 a' 45 D.B. 492, PG. 240 T `.' '` MYERS 5-23 6 (1/4 H.P. SUBMERSIBLE PUMP 4._ S' 4e I' w EP - -' .� WITH MERCURY FLOAT SWITCH TOP-48 C.B. ZONED - B-1 A / k GATE VALVEL3.2% DISCHARGE TOP-48.1 I I U, 5' a= 04 C RATE O 9 G.P.INV.-45.27 ay e` 48 9Y - t-. =aB 84 O 49 " e9 2'ae.=_e , 5.=48 45 to 4E a9 4e =4 75 LF. OF I RCPDE 48:1 z I _-l:L�111 t.0w-wdIP Pump-- I 43'4 4=sF I s. FILTER -4` °= w PROPOSED JUNCO VE BOX EXISTING C.B. a3 EXISTING ASPHALT M1TM MANNaE �oVER TOP - 4e2 °4=` "' SUMP PUMP t CATE VALVE II INV. - 45.27 I TOP-49.7 (PROVIDE WATER -TIGHT COVER k INV. 4287 II CONSTRUCT BAFFLE /W TOP B BOTTOM 42.27 ELEV. OF 46.8T - SEE DETAIL) I Up C.B. - SC `�.Ba 50' MB.L II� W �LP � TOP-47.03 ' e� �l 48 `6 ae 54� I� aE 5C 48 _4_ y: , [= �. bp. Ev - W I1� I 2d 34 48 z. 4B . 48 _- I III STORMCEPTOR DEVICE a9 496` r 4 ;ee MEMORIAL DR. COUN�YG�j 1410011 0im,TA VICINITY MAP NOT TO SCALE SEEDING SCHEDULE SPREAD 4" TOPSOIL OVER AREAS TO BE SEEDED AND ESTABLISH UNIFORM GRADE PRIOR TO SEEDING. APPLY LIME AND FERTILIZER AND WORK INTO SEED BED, DISTRIBUTE SEED UNIFORMLY AND COVER LIGHTLY. APPLY CLEAN STRAW MULCH OVER SEEDED AREA AND ANCHOR SECURELY NTH STRAIGHT BLADE DISC IN FLAT AREAS AND WITH ASPHALT TACK WHERE SLOPES EXCEED 4X MATERIAL APPLICATION RATE LIME 2 TONS/ACRE 20% SUPERPHOSPHATE 600 POUNDS/ACRE FERTILIZER(10-10-10) 1000 POUNDS/ACRE APRIL - JULY FESCUE, KY-31 50 POUNDS/ACRE BERMUDA (HULLED) 10 POUNDS/ACRE JANUARY - MARCH FESCUE, KY-31 50 POUNDS/ACRE BERMUDA (UNHULLED) 20 POUNDS/ACRE RYE (GRAIN) 25 POUNDS/ACRE SEPTEMBER - NOVEMBER FESCUE, KY-31 50 POUNDS/ACRE MULCH 2 TONS/ACRE ASPHALT TACK 300 GALLONS/ACRE NOTE: OWNER MAY VARY SEEDING TO CONFORM TO LANDSCAPING REQUIREMENTS SEEDBED PREPARATION NOTES: 1. SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN. 2. AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3" DEEP. TOTAL SEEDBED PREPARATION DEPTH SHALL BE 4' -6" DEEP. 3. LOOSE ROCKS, ROOTS AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WILL NOT INTERFERE MATH THE ESTABLISHMENT AND MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. 4. IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TO BE ACCORDING TO SEEDING SPECIFICATIONS ABOVE. IN ADDITION, PROVIDE 15 LBS/1000 S.F. OF SUPER PHOSPHATE. 5. IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOIL TEST REPORT. 6. LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION. CONSTRUCTION SEQUENCE OF EACH SECTION 1. OBTAIN PLAN APPROVAL. 2. INITIATE CLEARING & INSTALL CONSTRUCTION ENTRANCE, GRAVEL, & RIP -RAP FILTER BASINS, & INTERCEPTOR DIKES ADJACENT TO DITCH. 3. BEGIN STRIPPING SITE & EARTHWORK. INSTALL ROCK DAMS & SEDIMENT TRENCHES IMMEDIATELY UPON OPENING OF ENTRANCE, ALSO INSTALL CONSTRUCTION ENTRANCE. 4. INSTALL CULVERT, MAINTAINING FLOW IN EXISTING CHANNEL. UPON COMPLETION, INSTALL U.S. & D.S. RIP -RAP & BEGIN PLACING FILL OVER PIPE. ELIMINATE INTERCEPTOR DIKES. 5. MAINTAIN STRUCTURES DURING CONSTRUCTION. 6. STABILIZE SLOPES & DITCHES AS THEY ARE BROUGHT TO GRADE. 7. REMOVE TEMPORARY MEASURES. NOTE: CONTRACTOR TO HAVE UNDERGROUND UTILITY COMPANY LOCATE UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION OF BASINS. THIS IS TO CERTIFY THAT THIS MAP WAS PREPARED FROM AN ACTUAL SURVEY BY ME OR UNDER MY DIRECT SUPERVISIC AND THAT THE ERROR QF CLOSURE AS CALCULATED BY LATS DEPS. IS 1: /D Mir LLBOARO MODEL STC 1800 WITS MY HAND & SEAL THIS DAY OF I Cam- cN I I INV. IN - 45.02 4B -- 4e Ego 4a 5Lx! 49 s. 19 INV. OUT - 4-4.94 W �pM iE :e ae s6 ab 4e ba 2t SIGN JL I T.C.-St. T.C.-50.5 T.C.-49.4 I I TOP = t50 T.C.-49.4 48 3 0' S0 q ✓ SUk b�. = e6. I "' 2?.a JOWL. P�E, R.L.S. L-2596 6 O t+v' 6tMARK ONE.I.S. c c 50.6 CONC- CURB 4. _} <5 ? --e9 `2 ',: 48.91 T a8 >.�� ... r �'b4r .J ./ t?>i _ _ _ _ _ _ _E P 48 9y_ _ c -48 '3 -EF_=ag.SG Er_48 36 _ a8 3 \ „04 4n,•„•Y S a' oe' co E t oo.00 _ a9 eE 62 N 04' 08' 00' W 19 .04' - - "- - - E _ , 'E. x o (3 z ' ' -' -r �-?--� ��^�4F E ,rur- ,a-aJ'. 4.. St �FH ,,(t .tN GAS _ _ _ ?Q pEs . a . w ' APPROVED .�° ST 50.00 CH N PROP. 4' CONC. W _ _ _ _ PROP. 4' CONC. WALK 49 45 INV. A' -4J.30 poi _ . 4B e' 4e 58, VI * } s - - - NORTH CAROLINASMIIININOW t ORMWATEE INV. S' -43.29 08 47 0L . - - 0z MANAGEMENT COMMilION i EXISTING C.B. TOP I 48.5 //� 9 I I {I I T/� DIVISION OF WATER OUMJ►r G� DEC ,E, J.,V E Q 90 LF. OF 15' R.C.P. -EB.gR I m - 48.5 CS\\ \ P T.C.-50.3 T.C.-50.0 O 0.4x GRADE C INV. 28 LF OF t8' R.C.P. II II , //, ! ' t TOP \\ ♦ _ b b , J> � EXISTING C.B. p yy��``JJ�/ INV. - 45,26 . ` - - - /L - -1NV:� l a .Y Dete 4 /�P2 PI_I 1 �Aj y ,� \ 1 0 0.4% GRADE a8 t a8.58 `47• T.C.-Ifl.71 CONC. NEADWALL 4!!lIIN^IMN,!!lµr,, \ '. 3'. _ _ - R - - - - �- - �CONC. CURB t GUTTER J 48.55 ` Lam.-�.- StOrMwMw PenBN No` �� 3�C% MAR 2 61997 - - - - - - - - - - - - - - - - STORMWATER PLAN nn „ =a9 9' 49.8- i. -49.'t C.B. a- % _a5 a' ' - ay 2S aB 6e VALLEY W - - - - - - - - L4/ =aB 9a ?r.-d9 B� PROJ # a=495` r.c-49.97 =4aaE =ay-3 T.c. - 49.06 a9 3 F=a9o' bee =aga9 °=a84, ioP-48.61 a=aer SITE DATA_ SEDIMENTATION & EROSION CONTROL PLAN � II F.L. - 49.08 INV. -44.79 - __ -.- �\ II EXISTING ASPHALT - - TOTAL AREA = 1.79 AC. PREPARED FOR WATER - CITY OF JACKSONVILLE ,4'u- CLIFTON JACOBS lI '-4g_ SEWER -CITY Of JACKSONVLLB►PT- bROVED _--So-'----- ZONING - B-1 t1 WESTERN BLVD. =' N.C.S.R. 1470 - 16811 R/W - _ _ ONVILLE TOWNSHIP, ONSLOW COUNTY, NC - -- - - - - - - -- - - - - - - - - - i CARflLINA ENVIR� PREPARED BY MANAGEMENTCOMMISSON �OHN L. PIERCE - SURVEYING 49.,s e9F._ 4941 49. l ae.'S 9." OWNER/DEVELOPER DIVISION OF WATER QUAQ JOHNSON BLVD. JACKSONVILLE, NC 28540 CLIFTON JACOBS U?,14V6-Z012'PHONE: 910-346-9800 DATE: MARCH 21, 1996 310 WESTERN BLVD. SCALE: 1" = 30' F.B. 272, PG. 32 11� JACKSONVILLE, NC 28546 JOB #952115 FILE NAME: CARDINAL v - - PHONE: (910)353-7700 II GB T.C. - 49.51 REVISED 04-15-96 REVISED 03-24-97 30 15 0 30 60 90 , F.L - 49.09 ce REVISED 04-24-96 INV. - 44.34 _ TOPREVISED 05--96 �15; ---------------------- 2' CONC. CURB t GUTTER , REVISED 11-0404-97 SCALE IN FEET CIS REVISED 01-08-9 REVISED 02-05-97 SHEET -!-OF 2 REVISED 03-06-97 jl)� 336 STC 1800 Precast Concrete Stormceptore (1800 US Gallon Capacity) 32 0 STORMCEPTOR COVER AND GRATE 5" GRADE ADJUSTERS TO SUIT FINISHED GRADE Ell 6" 72' ' 0 7" VARIES SEE NOTE #3 /INSPECTION PORTS 18 r 36" 0 18" L6"0 DROP PIPES J INLET TEE 0 4 8 SECTION THRU CHAMBER NOTE 1. CSR RECOMMENDS THE USE OF FLEXIBLE CONNECTIONS AT THE INLET AND OUTLET WHERE APPLICABLE. 2. COVER TO BE POSITIONED OVER INLET INSPECTION PORT. 3. RISER SECTION ABOVE THE INSERT TO BE 72"0 FOR A MINIMUM OF 5.0' FROM TOP OF INSERT OR TO GRADE (WHICHEVER IS LESS). 4. THIS IS A GENERAL ARRANGEMENT DRAWING CONSULT LOCAL REPRESENTATIVE FOR SPECIAL CONDITIONS. 18" NOR SEE NOTE #1 _VARIABLE DIA.7 4 a I AL RUBBER GASKET PER ASTM C 443 ENLARGED OUTLET CONNECTION DETAIL DESIGN SPECIFICATIONS 1. ASTM C 478 2. BASE WEIGHT = 6.35TONS EROSION CONTROL PLAN NARRATIVE 1. OBTAIN PLAN APPROVAL. 2. CONSTRUCT CONSTRUCTION ENTRANCE. 3. CONSTRUCT DRAINAGE BERM AND INSTALL SILT FENCE SEDIMENT TRAP AT EACH DRAIN TO INITIAL SITE GRADING, MAINTAIN IN GOOD CONDITION UNTILL NEW SURFACE IS ESTABLISHED. 4. STRIP TOPSOIL FROM ALL CUT OR FILL AREAS AND STOCKPILE. 5. ON ALL DISTURBED AREAS, CONTRUCT TO FINAL GRADE, SPREAD TOPSOIL, FERTILIZE, SEED AND MULCH IN ACCORDANCE NTH SEEDING SCHEDULE AT EARLIEST POSSIBLE DATE AND WITHIN 30 DAYS OF COMPLETING THE GRADING WORK. 6. WHEN GROUND IS ESTABLISHED, REMOVE SEDIMENT TRAPS, CHECK DAMS AND SILT FENCE, AND FERTILIZE, SEED AND MULCH IN ACCORDANCE WITH SEEDING SCHEDULE. STC-1800 REVISED 5/96 PIPE + 2' 4" #4 RE -BAR PIPE I.D. + 7 n (ol 12" O.C. EACH WA + 2' 4" R7BRICK Z OPENING - N 6 LLI EXPANSION MATERIA 8 a d � =G. N 81 4" CONC GROUT FILL I I a C0 ° ° d c a da ° ° a d a. a 2500# CONC. — 8" PIPE I.D.+ B" FOOTING 4" 1' 0" NOTE: COVER TO BE PROVIDED WITH TWO (2) LIFTING HANDLES PIPE I.D. + 3' 0" TYPICAL JUNCTION BOX NOT TO SCALE 0 1 (MAX.) 00 c o0° N0. 67 STONE �o°�°-°�o-O 1 0 o I 0 0 00 0 0 0 00.0 0o z 00 0( ° ° 00 ° ° ° O 0 0 0 N 000 0 0 0 °.0 O.O°O0 °O.° 0 p00 0 00°0 OOoo- i o oo°o o o NO. 1 RIP -RAP 1' MINIMUM 1 4' MINIMUM ROCK CHECK DAM NOT TO SCALE A 06 WASHED STONE :. /31/2' MESH HARDWARE CLOTH CATCH BASIN 05 WASHED STONE PLAN TH 1:1 El El El F-1 1:1 El 1:1 _ DE TH VARIES 1" FORCE MAIN -� CATCH BASIN -' L------------� DOUBLE CONCRETE SECTION A -A BLOCK — FILTER — AROUND CATCH BASIN (D-6) 4„ MEYERS S-25 (1/4" SUBMERSIBLE PUMP W/ MERCURY FLOAT SWITCH, CHECK VALVE h GATE VALVE) r 7" PIPE ID VARIES PIPE ID + 12 co ° a a 4 a 1 8" 3 0" 8" 8" T 5' 0" J BRICK 4" TYPICAL DROP INLET NOT TO SCALE PROPOSED 18" RCP STORMWATER STORAGE INV.= 45.27 DEWEY BROS. INC. 24" X 36" DROP INLET CH-814-2 - CONC. GROUT FILL _ ==:k a 2500# CONC. c 4 a FOOTING 8 2' 0" 4" 4' 0" ° A -INV.- 45.27 a G ° PROPOSED CATCH BASIN TOP - 48.1 INV.- 45.27 PROPOSED 18" RCP �NV.= EXISTING CATCH BASIN - I . 45.27 REMOVE GRATE AND PROVIDE WATERTIGHT COVER. TOP 8.2 b CONSTRUCT BAFFLE I I 5 INV.- 45.27.27 TOP ELEV.= 46.87 I I I d I la I dl I I I 1" FORCE MAIN FROM SUMP PUMP I ---INV.= 46.9 a I I° a INV.- 45.27 II L----d_ I —4 lai ICI � I. I Iml C-) IZI ILI V) IWI N o I I CATCH BASIN DETAIL (PLAN VIEW) NOT TO SCALE STORMWATER PLAN SEDIMENTATION & EROSION CONTROL PLAN PREPARED FOR CLIFTON JACOBS JACKSONVILLE TOWNSHIP, ONSLOW COUNTY, NC PREPARED BY REVISED 4-15-96 JOHN L. PIERCE — SURVEYING REVISED 4-24-96 REVISED 5-20-96 409 JOHNSON BLVD. JACKSONVILLE, NC 28540 REVISED 7-08-96 PHONE: 910-346-9800 DATE: MARCH 21, 1996 REVISED 11-04-96 SCALE: AS NOTED FILE:CARDPG3 REVISED 01-08-97 REVISED 02-05-97 REVISED 03-06-97 SHEET 2 OF 2 1. i. LEGEND - - EXISTING IRON STAKE IE.I.S. ' O' S.I.S. - SET IRON STAKE y T.C. - TOP OF CURB E.P. - EDGE OF PAVEMENT F.L. - FLOW LINE M.H. - MAN HOLE I C.B. - CATCH BASIN CA - CENTERLINE C R/W - RIGHT OF WAY TZ+1 G.S. - GROUND SHOT C.O. - CLEAN OUT I L.P. = LAMP POLE P.P. = POWER POLE I 49.4 - PROPOSED GRADE I -E-= OVERHEAD ELECTRICAL LINE LINE BEARING DISTANCE 1 N 02' 57' 48" W 9.87' 2 N 85' 51' 20" E 20.00' 3 N 85' 10' 00' W 20.25' REF: PORTION OF D.B. 988, PG. 708 Sa. TOP-5273 L RIP RAP LINED 24• PERFORATED RISER PIPE SEDIMENT BASIN NORTH wBERMPER `I I I=! I i N •18' CMP.11JACKSONVILIE DOCTORS PARK, INC. I - ICIIIil I�I'�I�III I D.B. 422, PG. 370pq�ZONED - 0 & I p� -I. y1 1 11 �1 CI-I I 1 I'R 93 XU83 U.91 �086 p U117 OUTLET CONTROL DETAIL U-77 1070 50.62NOT TO SCALE EXISTING ASPHALT RIP -RAP LINED RIP -RAP LINED p RM CHEac EXISTING ASPHALT SEDIMENT PIT 1 s0.95 SEDIMENT PIT�69,�4�- DAIS PROPOSED 20' DRANAGE t STOINWAlF3t EASE?IFNT S 04' 08' 40" E 199.98' TOP ELEV.-4e.2 4996 '50. 83 �0.81 �_ _ '�g.63 S 04' 08' 00" E 286.28' - - - - - . - T.0.-51.011 4 E.P.-1-t.. ,:.}1 ,G-29 _ _ VICINITY MAP T.C.- 50.93 EP.-•0 5P _ _ _ _ - - - - - - - - - - - - - �7 _ J8.4 _ EIDS7ING VEGETATIVE SCALE x 46 64 te. !I 1 I)1 ' OUTLET CONTROL NOT TO SCALE J- EP.-5058 __--__ ___ - ` 1c4_d71- 54/ - - - ��-__-- _ y _ ^.7a 4'08'40"E 19-'�AUF4_- 4 - --� 7..,9 u-- - 4zz2------- �-r-�� _7 46s6 __ Ix- _ ; ' 7 5 t -' 7 E.I.S. �- - �- - - - --,•i'-• - _ - �aS� SI.S EP -45 i9 4v.18 La 149.14 - 8.67 49.72 66 48.40 -- 46 40 ® 48.12 1 4� 1 11 aE.83 '<' 66 49.92 49.79 49.a2 G.S.-49 39 - A' Y.M. 1 49.50 a I S 04' 08' 00" E 283.12' TOP - 51.24 W I �, r C I I - SEEDING SCHEDULE (GRASS SWALE) INV. 'A'-u.77 \ ----- - - - , NV. ' S' -44.65 \ NV. - 47.5 i3 • _ - - - NV. • c' -44.63 \ �iJ _ , , _ SPREAD a TOPSOIL OVER AREAS TO BE SEEDED AND ESTABLISH UNIFORM _ \ x 49 z4 4917 49 12 GRADE PRIOR TO SEEDING. APPLY LIME AND FERTILIZER AND WORK INTO j • A' ■ \\ 49.29 49.24 9.12 9"` 49.04 ♦ a8.5 1 I 1 1 - SEED BED, DISTRIBUTE SEED UNIFORMLY AND COVER LIGHTLY. _ _ - 48-BZ 4b.fi0 49.31 `� 11 x46.32 APPLY CLEAN STRAW MULCH OVER SEEDED AREA AND ANCHOR SECURELY _ 1 \\\ 60.0' 48 3 1 1 l 1 J WITH STRAIGHT BLADE DISC IN FLAT AREAS AND WITH ASPHALT TACK \ t' WHERE SLOPES EXCEED 4X 1 x \` E►.-.9.e6 x b 49 7c • g,SL MATERIAL APPLICATION PATE x 50 93 50.83 \ GS_49 42 49.3+ a9 :0 19 33 49 46 ' < /9. 35 •. "_, 49.9C E%ISTNG C.0. z 9 25 k 74 444 t 1 _ LIME - 2 TONS/ArFE-- 5oa'. 'Ii0.3t \\ 49.;5 N 4&G 49 }2 4 '1.- F* '� 20% SUPERPHOSPHATE 600 -96 i 1 - %3 ^ FERT9JZER(10-10-10) low PgUt4CA/A1j-f \ FILTER - EXISTING ASPHALT\ k. - `- ((I - - - - i Y . -) /I-- APW-L - JULY LP I . ; FESCUE, KY-31 PAY-/�d5/Atft •- � \`x 1_<2 4=-- - s 1 >• E� iLfA (NlhiE :) - 10 "Av(iS/Af.*E x x W 51.01 \ - t \ - I f - e L•£ �♦ TSh� {' ) ��//Ilyf - _ f 50.53 50.53 N ? o 46 �o 13 \ \ 49.92 4V 6l 49 : • �49 93 i -y : a �� 3- \ Z y i - - (1�+} 4a�ia •� P.+'! (GPAA) Z9 Vow - - - - O \ - S-49 41 ii �f ' (.1 -\ �` • 4. r �± �5 _ ��. f• , - - _ - N SCiIE F=-`�(:+E. !L>-3t - - Sb PI.X.S/Aft HENRY W. GEROCK, JR. m D.B. 402, PG. 441 Z \ 19. a953 4946 s wk r°"t 2 TGH`s/ffRC f ZONED - B-1 1.79 AC. \\ ti m� W 1 •>'=,• ASPHALT TACK 300 GA:LCNS`/ASP( W Z U 19 / :x x I W Z 4 m u1 NOI_ OWNER MAY VARY SEEOM+G TO COi (>R11 TO tAlKiiCA!'4Nfi RE2l1PE+/EN'S j SO.SS 49.90 - �� x . �014 i 49.5 50�3 y: 43 50 42 x50.78 59 i }� 49 5' 49 4S 19 S. W \y 1 N 49 54 G.5s 49 3 ` lY i-49 46 .h t' SEE"y✓•BED PQEEPARAT" NOTES- _ DRAINAGE BREAK LINE I �,> p <. X<� 1'3` a-� ' X X 3 , 1. SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO PLAN. . Z 2" AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVALABLE k\� , t3'6�' TOPSOIL 3" DEEP. TOTAL SEEDBED PREPARATION DEPTH SHALL BE 4'-6' DEEP. 49 41 49 43 49 45 49 s6 49 s . / f 3. LOOSE ROCKS, ROOTS AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WILL NOT INTERFERE WITH THE ESTABLISHMENT AND I CLIFTON JACOBS' ` MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, m F D.B. 472, PG 442 '1� AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. -a 23.. i� n ZONED B-1 900 PP '�' 4. IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME TG BE ACCORDING TO SEEDING �. SPECIFICATIONS ABOVE IN ADDITION, PROVIDE 15 LBS/1000 S.F. OF SUPER PROPOSED ASPHALT EP.-49 43 I 1949 1 c.s'-w z7 6 '�9 -6 49.27 LP 19.31 49.3s .� 9 , - x PHOSPHATE. =5,. Lt -i 4990 + 48� - 5 IF SrXL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO SOL TEST EP 0�' E =5084 5�3 � I - - - F .M. . _ _ �7 .. a. REPORT. • - TOP-50.65 E P =�z; - - NV. A' -4a.27 - x 49.07 _ 49- 49.93 SS EXISTING ASPHALT '..4 4a 67 - 6. LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXER WITH THE SOIL NV. ' e' -44.20 51.4- % 52 7 / 1984 '19.3a � � , - - DURING SEEDBED PREPARATION- E P =555 83 27 / - 49 19 49.1 x49.19 49.32 .23 4874�'� BASIN A & BASIN B P ANT SGH 1 F• - _ _ - J PROPOSED ASPHALT I 60.0' C60 '� 1. NUPHAR LUTEUM (SPATTERDOCK) OR EQUIVALENT PLANTING IN SUFFICIENT NUMBERS E.P.-51.42 �' - ' ' •' ' .% • . t ' '' TO COVER BASIN AREAS IN SIX MONTHS. PLANTING SUBSTITUTIONS MAY BE APPROVED E P _48 99 I 49.12 r� AT TIME OF CONSTRUCTION SO LONG AS THEY COMPLY WITH DEHNR ' STORMWATER BEST i sc 15C 64 I 3 49 53 / '18 93 cs.-4e.6 1 1 49 � - / 'll1' MANAGEMENT PRACTICES'. 48 48 48 71 49.90- 1 CONSTRUCTION SEQUENCE OF EACH SECTION- 1 1. OBTAIN PLAN APPROVAL / ( _ 2. INITIATE CLEARING & INSTALL CONSTRUCTION ENTRANCE, GRAVEL, & RIP -RAP FILTER BASINS, - -, BASIN ' A' (SEE DETAIL) r SNP I x _ �A9" a DRY DETENTION - SEE PLANT VJ' 48.88 889 4e90 4882 --___- � ; k INTERCEPTOR DIKES ADJACENT TO DITCH. ( / - - - -- 1 43 46 3_ BEGIN STRIPPING SITE k EARTHWORK. 'INSTALL ROCK DAMS &SEDIMENT TRENCHES IMMEDIATELY / SCHEDULE) / 49.9 I 1883 48 63 4e 9t ' ` 1 UPON OPENING OF ENTRANCE, ALSO INSTALL CONSTRUCTION ENTRANCE GLENN L HOOPER, JR., TRUSTEE '0 ° 49 71 x 4, INSTALL CULVERT, MAINTAINING FLOW IN EXISTING CHANNEL UPON COMPLETION, INSTALL U.S" k _ 37 48.17' D.S. RIP -RAP & BEGIN PLACING FILL OVER PIPE ELIMINATE INTERCEPTOR DIKES. D.B. 49D PG. 240 5. MAINTAIN STRUCTURES DURING CONSTRUCTION. ZONED - B-1 (w 49.3 y� U s1.i31 r E.P.-ag:- 4a.6s 4e.e2 r I 6. STABILIZE SLOPES & DITCHES AS THEY ARE BROUGHT TO GRADE 0 4 5 49 n 4a.6e E30ST91c ae. G S -4.8 Mt 7. REMOVE TEMPORARY MEASURES. N a TOP - 46.2 3 4e.54000 1 ; � f �� IN - 45,27 w 48.26- J `° «� I ` NOTE- 4919 49.3 49.J 49.9 1 48.64 48.56 48.50 48.40 - t EXISTING ASPHALT Y �;39 4as5 ; 1 47.5,` 4946 CONTRACTOR TO HAVE UNDERGROUND UTILITY COMPANY LOCATE `• 72 UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION OF BASINS. 1 LP Tc.=5180 1 w.3 1 y 3 EP-_5C.80 . SO' M.B.L. I LP T TOP�47.05 ' _ ?o _5 ' 0.415 ( - a4` 9 20 T� U.56 4e.54 THIS IS TO CERTIFY THAT THIS MAP WAS PREPARED FROM 4• DIAMETER PERMANENTI POOL 48.50 48.63 .52 46.ee 48.a2 m ( AN ACTUAL SURVEY BY ME OR UNDER MY DIRECT SUPERVISION, . EARTH BERM RISER PIPE 1 a9.9 x RI S AND THAT THE ERROR OF CLOSURE AS CALCULATED BY LATS. & NV. - 46.5 r DIAMETER PERMANENT POOL ( -34 48-31 48 +8 48.07\ l 1 DEPS- IS 1: iy{ Y RISER PIPE 49.0 47.89 47 as 4- 66 E '4 G��•�{,AJ +A6y'�S� '� DAY OF N 30' GRASS SWALE ORJFICE - 47.01 x y v- 1 NV. - 46.3 I WITN MY 41Aj� ,4�1'��L,^` L Av4 . elu.BOANO I EARTH BER ORIFICE - 46.e 5101 I j ' I 49.'31 eF '• h• T.C.=5095 1 SHiI ! 30' RASS SWALE 4e.77 W 48.65Dg� 48.62 48.59 U.,� x r yp/ � , 19-//�tr Q`�G1STZ s E.P =5G6 E.P.=50.6a 6 I i� � 46.,6 W 4821 a8.131\ 47.50 GR4.�S 1 ! T` ' "^; -.. 2S LF. OF tY I , ( 49.24 JOHN L eIERCErRtLS,3tj1198 _ CMP • 1.2%, GRADE - - _ _ x E.P.-506 46.6� MARK ON T.C.=4S.57 T.C.-49. 13 T.C.=49.12 TC�8.93 `��l E 'v J."t4'a �L/ - - - NV. FROM tY -E F.- 48 E.P.=46 35 T c `" 1 £ C1p -,46,0 OONC _CURB E.P.=4839 E P =48 73 _ ���'1 s 6 ,.y + S 04'OB•00'E I0.0 49.8E N04'0 W 19 .04'a-40 LF. OF tY •1.UC^ORADi- '.��-- _- - g-}'�x�- - - - 7(0 ��{; `xe� 1 '19.37 4s4`�D' `fU�V(� � 41�{CApy L�n,n„'�\ 3 s >, FILTER -• � T.C.-50.5 T.G-50.2 .. ., .. =i 9 y Y - - \ I I' I -_ �4Wy�i �• ax�a, P c957 -. � 1 Z 1I -.��. r - TOP-50.00 (BENCH PARK) PROP. 4' CONC. W _ _ _ _ _' - _ NV. FRdI lY 45 l ✓•PROP. 1' CONIC, WALK TC.-4987 NV. A' -43.30 ti - RCMP - 4SS k`2 E.P.:48.87 r �- / `8 �( j NV.I I I t I DRAINAGE SPLIT NV. 'B'-43.29 48.t7 9' /1•l`�' 90 LF. OF /3' RC.P. J:1RIL m \\`� _ _ _ • 0.4K GRADE EXISTING C.0. BASIN ' B" (SEE DETAIL) x°j a�', I'� I r BASIN A - 29,575 S.F T p E)OSTNc 256 - TOP - . - DRY DETENTION - SEE PLANT SCHEDULE ,�� ` I ' 7/I' 1' I BASIN B - 9.869 S.F. - E C E I V E TOP - 485 \ CA Div. - 44.90 'R1V. NV. - 45.26 C\ \ 26 LF. OF IW R.C.P. \ ♦ P T.C.-50.3 T.C.-50.0 0 0.4X GRADE - 1� ` 1p 481x ( /j' - - - -• • '� �. T.C._49.71 - , . , pl >3', • !' '^a8.08 D ' , � j„ - / CGNQ HEADWALL MAY 2 41996 _ ' �X,,,,E,;;i1%' 2} .tea: mar rC�C. CURB t GUTTER \ i' 48.55 ` j�ILN - - - - _ .. rS V.-46.66 - - _ _ _ _ STORMWATER PLAN ; - - - - - - - - - - - - - - - - - - - - - r - - D \T.C.-49.9] TC.=49.87 T C-49 71 C0. T-C -49. 55 T.C.-49.41 ` '..C.-A9 22 48.68 VALLEY GUTTER r a rp y7/ - E.P--49.55 T.C._49.97 EP.-49.46 EP.=a929 T.C. - N.56 E.P._49.13 EP._a9.01 T.C.-48. 94 T.C.=488� C.B. - - - -T.0 =4876 - PRQJ R'�'-.li � 3G 1� - - - - \\ 11 F.L. - 49.E _ . 4892 E.P.-48.49 EP.-48.41 TOP-46.61 E.P.=4837 SITE DATA - ---SEDIMENTATION & EROSION CONTROL PLAN- ` NV.-44,79- \ EXISTING ASPHALT TOTAL AREA - 1.79 AC. - PREPARED FOR WATER - CITY OF JACKSONVILLE /"� /� - - - '49-_ r - SEWER - q?Y OF JACKSONVILLE CLIFTON JACOBS 1 _go------ -� ZONING - B-1 rr WESTERN BLVD-=' N.C.S.R._1470-_-16811 R/W JACKSONVILLE TOWNSHIP, ONSLOW COUNTY, NC PREPARED BY - - - - - JOHN L. PIERCE - SURVEYING �o3T Sozs So1z a 49.95 4975 4960 49.46 49z9 49.16 49.10 409 JOHNSON BLVD. JACKSONVILLE,- NC 28540 (1 PHONE: 910-346-9800 DATE: MARCH 21, 1996 llp OWNER , oP R - SCALE: 1 • - 30' F.B. 272, PG. 32 JOB #952115 FILE NAME: CARDINAL i - CLIFTON JACOBS 3 11 cB. 310 WESTERN BLVD. 30 15 O 30 60 - 90 11 T.a - 40.51 JACKSONVILIZ NC 28546 r.L - 40.09 / C.e. - '''' NV. - 44,34 �- &58 PHONE: (910)353-7700 5ice 2caNcaRe�curlEle___ REVISED 04--15-9e SCALE IN FEET . SHEET 1 OF 2 REVISED 05-20-96 y 1 A - 33.0' EXTENDED DRY DFTEN71ON BASINS TOTAL DRAINAGE AREA TO BASIN A _ 29,575 S.F. TOTAL DRAINAGE AREA TO BASIN B _ 9,869 S.F. TOTAL DRAINAGE TO BASINS _ 39,444 S.F. BASIN A DRAINAGE AREA - 29,575 S.F. VOLUME OF BASIN STORAGE REQUIRED FOR 1' RAINFALL -- VOLUME REQUIRED _ 1/12 (29,575) _ 2,465 C.F. PLUS 20% - 493 C.F. TOTAL STORAGE VOLUME REQUIRED 2,958 C.F. 12' 14' 6' 2' 2' 195 LF 33 LF BASIN A STORAGE VOLUME - 195 [/2(12)(2] + 33 [1/2(20)(2) - 2340 CF + 660 CF _ 3000 CF DETERMINE ORIFICE FOR 2-5 DAY DRAWDOWN VOL = 2,958 CF 02 - 2958 = .0172 172,000 05 - 2958 _ .0068 43Z000 1/2 02 _ 0172 .836 DS .0069 1/2 _ .526 [263 (1.75/2) 1/2 USE 3/4' ORIFICE BASIN fl DRAINAGE AREA - 9,869 S.F. VOLUME OF BASIN STORAGE REQUIRED FOR 1" RAINFALL: VOLUME REQUIRED _ 1/12 (9,869) _ 822 C.F. PLUS 20% _ 164 C.F. TOTAL STORAGE VOLUME REQUIRED - 986 C.F. 10' 1.67' 120 LF BASIN B STORAGE VOLUME - 120 [1/2(10) 1.67] 1002 CF DETERMINE ORIFICE FOR 2-5 DAY DRAWDOWN VOL _ 986 CF 2 DAYS - 172.000 SF 5 DAYS - 432,000 SF 02 = 986 - .0057 17Z000 05 _ 986 _ .0023 432,000 D2 _ .0057 1/2 _ .48 L0263 (1.75/2) 1/2] 1/2 D5 .0023 = .30 0263 (1.75/2) 1/2 USE 7/16' ORIFICE EROSION CONTROL PLAN NARRATIVE I.- OBTAIN PLAN APPROVAL 2. CONSTRUCT CONSTRUCTION ENTRANCE. 3. CONSTRUCT DRAINAGE BERM AND INSTALL SILT FENCE SEDIMENT TRAP AT EACH DRAIN TO INITIAL SITE GRADING, MAINTAIN IN GOOD CONDITION UNTILL NEW SURFACE IS ESTABLISHED. 4. STRIP TOPSOIL FROM ALL CUT OR FILL AREAS AND STOCKPILE. 5. ON ALL DISTURBED AREAS, CONTRUCT TO FINAL GRADE, SPREAD TOPSOIL, FERTILIZE, SEED AND MULCH IN ACCORDANCE WITH SEEDING SCHEDULE AT EARLIEST POSSIBLE DATE AND WITHIN 30 DAYS OF COMPLETING THE GRADING WORK. 6. WHEN GROUND IS ESTABLISHED, REMOVE SEDIMENT TRAPS, CHECK DAMS AND SILT FENCE, AND FERTILIZE, SEED AND MULCH IN ACCORDANCE WITH SEEDING SCHEDULE. m a Q a u = o a U a - - _ EXTENDED DRY BASIN (SEE PLANT SCHEDULE) - GRASS LINED BASIN DETAIL - BASIN A SCALE: 1 " = 10' 12.0' 11-1 11=1 i t-I I!=( 1111!IIIIIII1RIIlil�lill� BASIN A - CROSS SECTION A -A SCALE: 1" = 2' 0" 10.0' _ 3 RISER BASIN B - CROSS SECTION B-B SCALE: 1 " = 2' 0" 0 NO. 1 RIP -RAP 4' MINIMUM ROCK CHECK DAM 0 n RIP -RAP LINED SEDIMENT PIT 4' DIAMETER PERMENT POOL - BOTTOM ELEV.=46.0 EXTENDED DRY BASIN ELEV.=47 PERFORATED PIPE (ROCK FILLED) RIP -RAP LINED SEDIMENT PIT 4' DIAMETER PERMENT POOL - BOTTOM ELEV.=45.8 49 48 - - 47 RIP -RAP LINED SEDIME 4' DIAMETER PERMANE 12' _ ORIFICE=_47.0 INV. = 46.5 GAP • �GRAS�S �WAL L_ _46;3' ' INV.=46.4 \ EARTH BERM INV._46.0 GRASS LINED BASIN DETAIL - BASIN B SCALE: 1" = 10' CATCH BASIN 10' O O O TRASH RACK EARTH BERMTOP ELEVATION 49.2 OVERFLOW ELEV.-49.0 3/4" ORFICE DRILLED IN PIPE ELEV. 47.0 I I EEI I 1-III=I 11-I I I I I I -III I I! -I I GRASS SWALE ELEV.=46. I I I I I i Ic n 12" CMP 25 L.F. OF 12` CMP 01.2% GRADE _ l46.5 4 INV.=46.4 TO CATCH BASIN INV.-46.3 t 1 1 11! 1111, , ,III ,! I II I I - I I i l l (l i l! I; I! I I111 111-! ►-III I I I,,!. I i l ;III -III- -I I( -III I I I -III -I -III 11=1 :III-III-IIIIIIi 11-11 F I I-! 11-1 1I- I l'- El I BASIN A OUTLET PIPE DETAIL SCALE: 1" = 2' 0` TRASH RACK EARTH BERM - TOP ELEVATION = 48.7 OVERFLOW ELEV.-48.5 7/16" ORFlCE - DRILLED IN PIPE ELEV. 46.8I-I-IIi- III- I IIi-' I II GRASS SWALE ELEV.-46.1 EXTENDED DRY BASIN ELEV466 12" CMP L.F. OF 12" CMP ® 1.5% GRADE !=1 �yi I I 46. 6 I ` ° TO CATCH BASIN I ! INV.=4452 I I I =1 I E,I=1 -� I I I I ! 1-I I I 11=' I I I 1 I I I-; ! I I IIi=1 11=1 I I 11 III -iII !! I 1 461 1 I I I 11-1 I I -III- I=1 I I I I-1 1=111-1 I I 1 1 -' - III-j I I=1 I I -III 11 1 1 11 III-11 I III iII, III -I i I 1, III -III ! I 1-III- -IIi-III-III -1 I I i I -I I I I I I-! I -III I -I 11=1 11=1 ! I -I 1 11=1 I -I I I!-iII-I I-1 11=1 11- E, J I PERFORATED PIPE SCREEN I (ROCK FILLED) P�~4104 y °�`��oQ%s= BASIN B OUTLET PIPE DETAIL 2' 0" SCALE: 1" = STORMWATER PLAN SEDIMENTATION & EROSION CONTROL PLAN PREPARED FOR CLIFTON JACOBS JACKSONVILLE TOWNSHIP, ONSLOW COUNTY, NC PREPARED BY JOHN L. PIERCE - SURVEYING 409 JOHNSON BLVD. JACKSONVILLE, NC 28540 REVISED 4-15-96 PHONE: 910-346-9800 DATE: MARCH 21, 1996 REVISED 4-24-96 SCALE: AS NOTED FILE: CARDPG3 REVISED 5-2D-96 SHEET 2 OF 2 O