Loading...
HomeMy WebLinkAboutSW8100708_OTHER_20210302 (2)TOP TOBACCO, LP 2021 WAREHOUSE EXPANSION 204 Top Tobacco Rd. Lake Waccamaw Columbus County, NC STORMWATER BMP PEAK FLOW CALCULATIONS O �: oFES3/�•`/y�� _ 43222 = March 2021 Prepared by: GREEN ENGINEERING, P.L.L.C. N.C. Firm License No. P-01 15 303 Goldsboro Street East Wilson, North Carolina 27893 (252) 237-5365 GREEN ENGINEERING NO. 19-156 ``;�yt�t�.. �/�C�.�i� `.w. L�,C1A6,ca.0,� J '. v' 2 _'y f i. '•ry' 1 _ i n�UF,E 2'?���C�� < F� � �y 150 \�. ����'��i tt4���• �. .{: ^,y�:. "` � F �. . .� t, .:1 1 :! TABLE OF CONTENTS Project Narrative Stonnwater Summary Peak Flow Routing and Reductions Wet Detention Pond Design Summary Preliminary Pond Design Data Water Quality Volume (WQV) Calculation Wet Detention Basin Volumes Stormwater (HydraFlow Hydrograph) Calculations Aerial Photography USGS Quad Map NRCS Soils Map Sedimentation and Erosion Control Approval Letter Top Tobacco -EXPRESS (COLUM-2020-013) Deed USACE Correspondence Secretary of State Info Top Tobacco 2021 Warehouse Expansion Peak Flow Routing and Reductions STORMWATER BMP PRELIMINARY CALCULATIONS TOP TOBACCO 2021 WAREHOUSE EXPANSION OUTLET STRUCTURE (WQV ELEV=61.2', 1.5" ORIFICE INV. (Total Areaa=4.34 Acres) 1YR 2YR 60.50, 18" BARREL INV. 101(R j 25YR 60.40) I 100YR PRE -DEVELOPMENT 1 3.831 5.868 13.14 18.69 29.37 POST -DEVELOPMENT 9.103 11.7 5.502 7.236 9.702 ROUTED POST-DEV 1.223 2.5 5.502 7.236 9.702 % REDUCTION 68.08% 57.40% 58.13% 61.28% 66.97% MWSEL (FT) 61.51 61.71 62.33 62.73 63.37 Wet Detention Pond Design Summary Temporary Pool Elevation: 60.50' to 64.6' top of dike Maximum Elevation: 63.37' for a 100-yr storm event Inlet Box: Crest Elevation=63.0' Inlet Box=24"06" Weir Opening: One (1) -2.0 ft wide weir opening on one side of outlet structure Invert Elevation=61.20' Orifice Structure: 1.5" Orifice Invert Elevation=60.50' Barrel: Free Outfall Diameter= 18.0" Invert Elevation=60.40' @ 0.2% Emergency Spillway N/A Water Quality Volume Calculation DESIGNED TO CAPTURE 1.0" RUN-OFF I 1 _ _ waters) (The design depth required is 1-inch for non -coastal county that drains to either HOW o_ r ORWvJ D.A. BUILT UPON BUA.I Rv_ BMP DRAINAGE AREA(BUA)? D_.A. _ STORAGE REQUIRED (ELEV. 61.2P) STORAGE PROPOSED _ AREA AREA (SF) SF) I CF CF DENT10N BASIN 1 173,369 1 113,604 1 0.66 1 0.64 1 9,243 1 10,384 Wet Detention Basin Volumes PERMANENT POOL VOLUMES FOREBAY VOLUME (CF) I MAIN POND VOLUME (CF) I Elevation Area Incremental Storage Elevation Area Incremental Storage Volume Volume Volume Volume 56.00 SEDIMENT STORAGE SEDIMENT STORAGE 57.00 54.00 57.50 1,490 0 0 55.50 4,195 0 0 58.00 1,663 788 788 56.00 4,626 2,204 2,204 59.00 2,031 1,844 2,632 57.00 . 5,535 5,074 7,278 60.00 2,427 2,226 4,858 58.00 6,510 6,016 13,294 60.50 2,852 1,318 6,176 59.00 7,548 7,023 20,317 Total storage volume = 6,176 60.00 8,651 8,093 28,410 % OF MAIN POND VOLUME= 18.6% 60.50. 10,715 4,832 33,242 1 _ - 1_ -- - L _ Total storage volume = 33,242 TEMPORARY POOL VOLUMES r 62.00 1 17,194� 8,272� 23,358� 63.00 19,342 18,257 41,616 65.00 23,939� 22,9371 85,1851 Total storage volume = OKI 65,185 SA/DA Ratio and Average Depth Calculation PRELIMINARY POND DESIGN DATA DRAINAGE AREA (ACRES) IMPERVIOUS AREA 3.9E 2.60E 66°/ 3.( 850G 5. _ A_XIM_PERVIOUS AREA_ AVG. POOL DEPTH (FEET) TSS REMOVAL S_A_/DA RATIO (USE 70% IMP. AREA) MAIN POOL SURFACE AREA REQUIRED (SF) 9,051 10,711' MAIN POOLSURFACE AREA PROPOSED (SF) DRAW_D_OWN ORIFICE SIZE (INCHES) 1.; TEMP. POOL VOLUME PROVIDED (ELEV. 61.2') 10,38, _0.4' 0.0_31 3.11 DRIVING HEAD (FT) _ _ DISCHARGE (CFS) DRAWDOWN TIME (DAYS) EQUATION#2 de = Vpp/SA Vpp (Main pool wluma at permanent pool elev 60.5) SA (Main pool area at Elev_60.5') 33,24; Hydraflow Table of Contents Top Tobacco -Post Final.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2021 Tuesday, 03/2/2021 Hydrograph Return Period Recap........................................................................ 1 1 -Year SummaryReport ................................................................................................................... 2 HydrographReports............................................................................................................. 3 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 3 Hydrograph No. 2, Reservoir, Stormwater Pond................................................................ 4 Pond Report - Stormwater Pond.................................................................................... 5 2 - Year SummaryReport ................................................................................................................... 6 HydrographReports............................................................................................................. 7 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 7 Hydrograph No. 2, Reservoir, Stormwater Pond................................................................ 8 10 - Year SummaryReport ................................................................................................................... 9 HydrographReports........................................................................................................... 10 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ...................................... 10 Hydrograph No. 2, Reservoir, Stormwater Pond.............................................................. 11 25 - Year SummaryReport ................................................................................................................. 12 HydrographReports........................................................................................................... 13 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ...................................... 13 Hydrograph No. 2, Reservoir, Stormwater Pond.............................................................. 14 100 - Year SummaryReport ................................................................................................................. 15 HydrographReports........................................................................................................... 16 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ...................................... 16 Hydrograph No. 2, Reservoir, Stormwater Pond.............................................................. 17 Hydrograph Return Period Rey r4. Aw Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 2 SCS Runoff Reservoir ----- 1 9.103 1.223 11.70 2.500 ---- ---- 16.11 4.491 19.90 5.502 25.66 7.236 30.66 8.456 36.29 9.702 Top Tobacco 2020 Expansion Stormwater Pond Proj. Me: Top Tobacco -Post Final.gpw Tuesday, 03 / 2 / 2021 Hydrograph Summary Repoqydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 9.103 1 725 28,332 ----- ---- ---- Top Tobacco 2020 Expansion 2 Reservoir 1.223 1 757 21,194 1 61.51 15,325 Stormwater Pond Top Tobacco -Post Final.gpw Return Period: 1 Year Tuesday, 03 / 2 / 2021 Hydrograph Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 2 / 2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 9.103 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 28,332 cult Drainage area = 3.980 ac Curve number = 90+ Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (ArealCN) _ [(2.610 x 98) + (1.370 x 74)] / 3.980 Top Tobacco 2020 Expansion Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 12 / 2021 Hyd. No. 2 Stormwater Pond Hydrograph type = Reservoir Peak discharge = 1.223 cfs Storm frequency = 1 yrs Time to peak = 757 min Time interval = 1 min Hyd. volume = 21,194 cuft Inflow hyd. No. = 1 - Top Tobacco 2020 ExpanUm. Elevation = 61.51 ft Reservoir name = Stormwater Pond Max. Storage = 15,325 cuft Storage Indication method used. Stormwater Pond Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0 00 000 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 Time (min) — Hyd No. 2 — Hyd No. 1 IID1J77 Total storage used = 15,325 cult Pond Report 5 Hydraflow Hydrographs Extension for Autodesk(D Civil 3DO by Autodesk, Inc. v2021 Tuesday, 03 / 2 12021 Pond No. 1 - Storrnwater Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 60.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cult) Total storage (cult) 0.00 60.50 14,160 0 0 0.50 61.00 15,146 7,324 7,324 1.00 61.50 15,902 7,760 15,085 1.50 62.00 17,194 8,271 23,356 2.50 63.00 19,342 18,256 41,612 3.50 64.00 21,950 20,630 62,242 4.50 65.00 23,939 22,935 85,177 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 1.50 Inactive 0.00 Crest Len (ft) = 9.00 2.00 Inactive Inactive Span (in) = 18.00 1.50 0.00 0.00 Crest El. (ft) = 63.00 61.20 0.00 0.00 No. Barrels = 1 1 1 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 60.40 60.50 0.00 0.00 Weir Type = 1 Rect --- --- Length (ft) = 140.00 0.00 0.00 0.00 Multi -Stage = Yes Yes No No Slope (%) = 0.34 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 000 Note: CulverVOrifice outflows are analyzed under inlet (ic) and outlet (W) control. Weir risers checked for orifice conditions (ic) and submergence (a), Stage / Discharge Elev (ft) 65.50 64.50 63.50 62.50 61.50 6050 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 Discharge (cfs) Total 0 0 Hydrograph Summary Re pogydraflow Hydrographs Extension for Autodesk® Civil 300 by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 11.70 1 724 36,751 ----- ---- --- Top Tobacco 2020 Expansion 2 Reservoir 2.500 1 749 29,565 1 61.71 18,626 Slormwater Pond Top Tobacco -Post Final.gpw Return Period: 2 Year Tuesday, 03 / 2 / 2021 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 2 / 2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 11.70 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 36,751 cuft Drainage area = 3.980 ac Curve number = 90' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.52 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite (Area/CN) = [(2.610 x 98) + (1,370 x 74)] / 3.980 Q (Cfs) 12.00 10.00 MI 4.00 2.00 I Top Tobacco 2020 Expansion Hyd. No. 1 -- 2 Year Q (Cfs) 12.00 10.00 . II 4.00 2.00 KPINT411 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 0 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 31D® by Autodesk, Inc. v2021 Tuesday, 03 / 2 / 2021 Hyd. No. 2 Stormwater Pond Hydrograph type = Reservoir Peak discharge = 2.500 cfs Storm frequency = 2 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 29,565 cuft Inflow hyd. No. = 1 - Top Tobacco 2020 Expangm. Elevation = 61.71 ft Reservoir name = Stormwater Pond Max. Storage = 18,626 cuft Storage Indication method used. Stormwater Pond Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 12.00 12.00 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 300 600 900 1200 1500 1800 2100 2400 2700 3000 _ Time (min) Hyd No. 2 — Hyd No. 1 [l7 ❑7]J Total storage used = 18,626 cult 0 Hydrograph Summary Report, ydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 19.90 1 724 64,091 ----- ------ ----- Top Tobacco 2020 Expansion 2 i Reservoir 5.502 1 745 56,805 1 62.33 29,416 Stormwater Pond Top Tobacco -Post Final.gpw Return Period: 10 Year Tuesday, 03 12 12021 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 2 / 2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 19.90 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 64,091 cuft Drainage area = 3.980 ac Curve number = 90* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(2.610 x 98) + (1.370 x 74)1 / 3.980 Q (Cfs 21.00 15.00 12.00 wo M 3.00 Top Tobacco 2020 Expansion Hyd. No. 1 -- 10 Year Q (Cfs) 21.00 15.00 12.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) ® Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 / 2 12021 Hyd. No. 2 Stormwater Pond Hydrograph type = Reservoir Peak discharge = 5.502 cfs Storm frequency = 10 yrs Time to peak = 745 min Time interval = 1 min Hyd. volume = 56,805 cuft Inflow hyd. No. = 1 - Top Tobacco 2020 ExpanU=. Elevation = 62.33 ft Reservoir name = Stormwater Pond Max. Storage = 29,416 cuft Storage Indication method used Q (cfs) 21.00 18.00 15.00 12.00 W9 .m 3.00 Stormwater Pond Hyd. No. 2 -- 10 Year Q (cfs) 21.00 18.00 15.00 12.00 WE . We 3.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 1800 Time (min) — Hyd No. 2 —Hyd No. 1 [1=L11.J=❑ Total storage used = 29,416 tuft IT, Hydrograph Summary Re pogydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 25.66 1 724 83,840 ------ ------ ------ Top Tobacco 2020 Expansion 2 Reservoir 7.236 1 744 76,511 1 62.73 36,605 Stormwater Pond Top Tobacco -Post Final.gpw Return Period: 25 Year Tuesday, 0312I 2021 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil M by Autodesk, Inc. v2021 Tuesday, 03 l 2 12021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 25.66 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 83,840 cuft Drainage area = 3.980 ac Curve number = 90' Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) = [(2.610 x 98) + (1.370 x 74)] / 3.980 Q (cfs) 28.00 24.00 16.00 12.00 M 4.00 dfri Top Tobacco 2020 Expansion Hyd. No. 1 -- 25 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 IM 4.00 <1111U1 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 12 12021 Hyd. No. 2 Stormwater Pond Hydrograph type = Reservoir Peak discharge = 7.236 cfs Storm frequency = 25 yrs Time to peak = 744 min Time interval = 1 min Hyd. volume = 76,511 cuft Inflow hyd. No. = 1 - Top Tobacco 2020 ExpanU=. Elevation = 62.73 ft Reservoir name = Stormwater Pond Max. Storage = 36,605 cuft Storage Indication method used. Q (cfs) 28.00 24.00 16.00 12.00 IM 4.00 Stormwater Pond Hyd. No. 2 -- 25 Year VVE Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 0.00 0.00 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) — Hyd No. 2 —Hyd No. 1 [L1=II 117 Total storage used = 36,605 tuft 15 Hydrograph Summary Re po gydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 36.29 1 724 121,089 ----- ------ ------ Top Tobacco 2020 Expansion 2 Reservoir 9.702 1 745 113,705 1 63.37 49,189 Stormwater Pond Top Tobacco -Post Final.gpw Return Period: 100 Year Tuesday, 03 / 2 / 2021 Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.980 ac Basin Slope = 0.0 % Tc method = User Total precip. = 9.34 in Storm duration = 24 hrs *Composite (Area/CN) = [(2.610 x 98) + (1.370 x 74)1/ 3.980 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Tuesday, 03/2/2021 = 36.29 cfs = 724 min = 121,089 cuft = 90` = Oft = 5.00 min = Type III = 484 Top Tobacco 2020 Expansion Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 300 by Autodesk, Inc. v2021 Tuesday, 03 / 2 / 2021 Hyd. No. 2 Stormwater Pond Hydrograph type = Reservoir Peak discharge = 9.702 cfs Storm frequency = 100 yrs Time to peak = 745 min Time interval = 1 min Hyd. volume = 113,705 cuft Inflow hyd. No. = 1 - Top Tobacco 2020 ExpariNlax. Elevation = 63.37 ft Reservoir name = Stormwater Pond Max. Storage = 49,189 cuft Storage Indication method used. Q (cfs) 40.00 20.00 10.00 Stormwater Pond Hyd. No. 2 -- 100 Year 0.00 0 180 360 540 720 900 1080 1260 1440 — Hyd No. 2 — Hyd No. 1 U-1717 I l Total storage used = 49,189 cuft Q (cfs) 40.00 30.00 20.00 10.00 ==:�- 0.00 1620 Time (min) Hydraf low Table of Contents Top Tobacco-Pre-Devel.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2021 Tuesday, 03/2/2021 Hydrograph Return Period Recap........................................................................ 1 1 -Year SummaryReport ................................................................................................................... 2 HydrographReports............................................................................................................. 3 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 3 2 - Year SummaryReport ................................................................................................................... 4 HydrographReports............................................................................................................. 5 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 5 10 - Year SummaryReport ................................................................................................................... 6 HydrographReports............................................................................................................. 7 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 7 25 - Year SummaryReport ................................................................................................................... 8 HydrographReports............................................................................................................. 9 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ........................................ 9 100 - Year SummaryReport ................................................................................................................. 10 HydrographReports........................................................................................................... 11 Hydrograph No. 1, SCS Runoff, Top Tobacco 2020 Expansion ...................................... 11 Hydrograph Return Period Recrafl� Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff •---- 3.831 5,868 ----- 9.653 13.14 18.69 23.67 29.37 Top Tobacco 2020 Expansion Proj. file: Top Tobacco-Pre-Devel.gpw Tuesday, 03 12 12021 2 Hydrograph Summary Repo gydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 3.831 1 725 12,689 ------ ----- ------ Top Tobacco 2020 Expansion Top Tobacco-Pre-Devel.gpw Return Period: 1 Year Tuesday, 03 / 2 / 2021 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 0312 12021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 3.831 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 12,689 cuft Drainage area = 3.980 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.91 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Top Tobacco 2020 Expansion Q (Cfs) Hyd. No. 1 -- 1 Year 4.00 3.00 2.00 1.00 Ma Q (Cfs) 4.00 3.00 2.00 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 4 Hydrograph Summary Repoqydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow lots) Time interval (min) Time to Peak (min) Hyd. volume (cuk) Inflow hyd(s) Maximum elevation (it) Total strge used (cuk) Hydrograph Description 1 SCS Runoff 5.868 1 725 18,679 ----- ----- ----- Top Tobacco 2020 Expansion Top Tobacco-Pre-Devel.gpw Return Period: 2 Year Tuesday, 03 / 2 / 2021 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Tuesday, 03 12 / 2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 5.868 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 18,679 cuft Drainage area = 3.980 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.52 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Q (cfs) 6.00 5.00 4.00 R KII 2.00 1.00 W Top Tobacco 2020 Expansion Hyd. No. 1 -- 2 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) - Hydrograph Summary Re pogydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 13.14 1 725 40,525 ---- ---- ----- Top Tobacco 2020 Expansion Top Tobacco-Pre-Devel.gpw Return Period: 10 Year Tuesday, 03l 2l 2021 Hydrograph Report 7 Hydraflow Hydrographs Extension for Aulodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.980 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.44 in Storm duration = 24 hrs Tuesday, 03 / 2 / 2021 Peak discharge = 13.14 cfs Time to peak = 725 min Hyd. volume = 40,525 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Top Tobacco 2020 Expansion Q (cfs) Hyd. No. 1 -- 10 Year 14.00 12.00 10.00 8.00 . M 4.00 2.00 r Q (Cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 "! 0 120 240 360 .480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 0 Hydrograph Summary Re pogydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 18.69 1 725 57,633 ------ ------ ------ Top Tobacco 2020 Expansion Top Tobacco-Pre-Devel.gpw Return Period: 25 Year Tuesday, 03 / 2 / 2021 Hydrograph Report I Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 3.980 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.80 in Storm duration = 24 hrs Q (cfs) 21.00 15.00 12.00 • ut ,. M O 3.00 M Tuesday, 03/2/2021 Peak discharge = 18.69 cfs Time to peak = 725 min Hyd. volume = 57,633 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type III Shape factor = 484 Top Tobacco 2020 Expansion Hyd. No. 1 -- 25 Year Q (Cfs) 21.00 18.00 15.00 12.00 . IM 3.00 I4I4U7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 10 Hydrograph Summary Reportfydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 29.37 1 725 91,475 ------ ----- ---- Top Tobacco 2020 Expansion Top Tobacco-Pre-Devel.gpw Return Period: 100 Year Tuesday, 03 / 2 / 2021 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2021 Tuesday, 03 / 2 12021 Hyd. No. 1 Top Tobacco 2020 Expansion Hydrograph type = SCS Runoff Peak discharge = 29.37 cfs Storm frequency = 100 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 91,475 cuft Drainage area = 3.980 ac Curve number = 74 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.34 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Top Tobacco 2020 Expansion Q (cfs) Hyd. No. 1 -- 100 Year 30.00 25.00 20.00 15.00 10.00 5.00 W Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 M OO 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 CC a 00 19 Bpi Foe by 08= m ,. e � .,•:- � ✓; c- �� �: .,"a,.. �_ p" O 91 spe p ol oe � °b N O �� ti m' , o o O - �dd'' 1 \: �� O O 1 _♦ O�o° O0 �^ eb `rr rll. 4 ' `� OA °B ° K"opt, Me °o " ° ',v° ° < ,Q,g �� �• ° ca "gcti oo�_A a p .�� - �-� f1� y Nob. 00 p°m r. -J - �� 9au@Li F' Dp t p U- 19'43-N lM 191rN a Soil Map —Columbus County, North Carolina s y k k I H TP4m TI/4aP 7n4® Tll£A TIF,® Mae TIAp 3 ; y MaP Sole: 1:1,680 t printed on A peso[ (8.5' x I1') shceL W-te's k N o a, ao eo 121) Ao so ,m an so10 Map projection: on: Web Menator Cooordntes: WGS84 Edge bcs: LJIM Zo 17N WGW Lsi)A Natural Resources Web Soil Survey 4/7/2020 Conservation Service National Cooperative Soil Survey Page 1 of 3 W 19'4YN Soil Map —Columbus County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI Gt I Grifton fine sandy loam 0.1 0.9% Pe Pander fine sandy loam 14.6 99.1 % Totals for Area of Interest 14.8 100.0% Natural Resources Web Soil Survey 4/7/2020 Conservation Service National Cooperative Soil Survey Page 3 of 3 ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality May 11, 2020 LETTER OP APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Top Tobacco LP ATTN: Claus Platt, President 204 top Tobacco Road Lake Waccamaw, NC 28450 RE: Project Name: Top Tobacco - EXPRESS Acres Approved: 7.7 Project ID: COLUM-2020-013 County: Columbus City: Lake Waccamaw Address: 204'rop'robacco Road River Basin: Lumber Stream Classification: HQW Submitted By: Jonathan L. Meade, Ph.D., PE, Green Engineering, PLLC Date Received by LQS: May 8, 2020 Plan Type: Commercial Dear Mr. Platt: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Perfonnance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 1 13A-54.1)(b). As of April I, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. Ater the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eN01 form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eN01 form to Annette Lucas at Annetle.lucas a,ncdenr.eov or Paul Clark at Paul.clarknnedencKov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources Wilmington Regional office 1 127 Cardinal Drive Extension I M1lmington. North Carolina 28405 +�� / 910.796.7215 Letter of Approval with Modifications and Performance Reservations Top Tobacco LP May 11, 2020 Page 2 of 4 Title 15A NCAC 4B .01 18(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please now that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Rhonda Hall Assistant Regional Engineer Land Quality Section Enclosures: Modifications Required for Approval NPDES NCGOI Fact Sheet cc: Jonathan L. Meade, Ph.D., PE, Green Engineering, PLLC PO Box 609, Wilson, NC 27894 Wilmington Regional Office file Letter of Approval with Modifications and Performance Reservations Top Tobacco LP May ] 1, 2020 Page 3 of 4 MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: Top Tobacco Project ID: COLUM-2020-013 County: Columbus 1. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. 2. The developer is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A-54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed development unless otherwise noted. The removal of vegetation within any existing ditch or channel is prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to I vertical or less steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed, but stripping of vegetation is considered new earth work and is subject to the same erosion control requirements as new ditches (NCGS 113A-52(6)). 4. The developer is responsible for obtaining any and all pennits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stomtwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval; however, in the case of a Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act. 5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act, the developer is responsible for compliance with the requirements of the Division of Water Resources (DWR), the Corps of Engineers and the Environmental Protection Agency (EPA) respectively. Any erosion control measures that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to installation. The Land Quality Section must be notified of relocation of the measures in question to the transition point between the wetlands and the uplands to assure that the migration of sediment will not occur. If that relocation presents a problem or contradicts any requirements of either DWR, the Corps, or the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that an adequate contingency plan can be made to assure sufficient erosion control "remains on site. Failure to do so will be considered a violation of this approval (NCGS 113A-54.1(b)). Letter of Approval with Modifications and Performance Reservations Top Tobacco LP May 11, 2020 Page 4 of 4 6. Any borrow material brought onto this site must be from a legally operated mine or other approved source. Any soil waste that leaves this site can be transported to a permitted mine or separately permitted construction sites without additional permits under NCGS 74-49(7)(d). Disposal at any other location would have to be included as a permit revision for this approval. 7. This permit allows for a land disturbance, as called for on the application plan, not to exceed 7_7 acres. Exceeding that acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures (NCGS 113A-54.1(b)). 8. This phase of the project is approved for clearing and grading only in preparation of future development on the site. Any addition in impervious surface, over that already noted on the approved plan, would require a revised plan to verify the appropriateness of the erosion control measures and stormwater retention measures (NCGS 113A-54.1(b)). 9. The construction detail for the proposed silt fence requires reinforcing wire and steel posts a maximum of eight (8) feet apart. Omission of the reinforcing wire is a construction change that necessitates more posts for support, i.e., the spacing distance needs to be reduced to no greater than six (6) feet apart(E&SC Planning & Design Manual 6.63, Rev. 6/06). 10. Because the sediment traps and basins are shown on the plan as the primary sedimentation and erosion control devices on this project, it is necessary that the traps and basins and their collection systems be installed before any other grading takes place on site, and that every structure that receives more than one acre of drainage is built so that each dewaters only from the surface (NCG010000). If that proves to be impractical, a revised plan must be submitted and approved that addresses erosion and sediment control needs during the interim period until the traps and basins are fully functioning (113A-54.1(b)). 11. A graveled construction entrance must be located at each point of access and egress available to construction vehicles during the grading and construction phases of this project. Access and egress from the project site at a point without a graveled entrance will be considered a violation of this approval. Routine maintenance of the entrances is critical (I 13A-54.I (b)). 12. As a condition of the NPDES General Stonnwater Permit (NCG010000), the financially responsible party shall comply with the NCGO1 Ground Stabilization And Materials Handling requirements that became effective April 1, 2019. The NCG01 Ground Stabilization And Materials Handling standard detail can be printed from the deq.nc.gov/NCG01 website. 13. As a condition of the NPDES General Stonnwater Permit (NCGO10000), the financially responsible party shall comply with the NCGOI Self -Inspection, Recordkeeping and Reporting requirements that became effective April 1, 2019. The NCGOI Self -Inspection, Recordkeeping and Reporting standard detail can be printed from the deq.nc.gov/NCG0I website. 14. As a part of routine monitoring of the approved land -disturbing activity, the financially responsible party shall assure inspections of the area covered by the approved plan after each phase of the plan has been completed and after establishment of temporary ground cover in accordance with North Carolina General Statute 113A-54.1(e). Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities Book 087 Pogo 62 2010002924 COLUYSUa CO, He FEE $25 m ® STATE OF He REAL ESTATE EX,x r $1694.00 WtEN:MITDt REcd ' 06-17-2010 09:12:31 AM gi �NDANCE H WHITEHExD ��FLNAk MHHIFK4� BK: RB 987 PG:62-64 Excise Tex S 1694.00 1 f"ordin, Time. gook and pas Tax Lot Na.tProperty No.: 61853 6 87641 a/c 8-01338 Parcel Identifier No. TAX WFORMA11011 RECEIVED TM BY16�erf 04A A2d Mail Art recording to Too Tabuco L.P. 204 Tao TubecCQRd lake Waecamaw. NC 211450 This instrument was prepared by McCouaao. Wright. Worley R Bullard. LLP. Attorney, at Law P.O. Ban 457. Tabor City. N.C. 28463 IORW/eer?41721 NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED made this 28th day of may . 2010. by and between GRANTOR North Carolina Holdings LLC; a Delaware LLC with Certificate to do business in NC filed 10-08-2001 at 12:30 pm with the NC Secretary of Stale SOSID: 606532 2301 Ravine Way Glenview, Illinois 60025 GRANTEE Top Tobacco L.P.; a Delaware L.P. with a Certificate of Authority to transea business In NC filed 01.09-2007 of 09:20 am with the NC Secretary of State SOSID: 981396 204 Top Tobacco Rd. Lake Waccamnw, NC 29450 The designation Grantor and Gnnsee as used herein shall include mid parties, their heir, successor, and asnigm, and shall include singular, plural, masculine, feminine or Winer as required by context. WI7'NESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the remipi of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simpk, all that certain lot or panel of land situated in wocam us, Township, Cohnsiti82 County, North Carolina and snore particularly described as follows: TRACT ONE: Being that certain parcel of land in Waccamaw Township, Columbus County, North Carolina, containing 10A5 acres, more or less (10.00 oerea act of she right of way of SR 1736). according to a plus thereof prepared by David B. Goldstaa, R.L.S. ratified 'Pint for Donald Levin as trustee of she Donald Levin Revocable Trust U/A/D Juoe 17, 1977". dated I I December, 1987 to which reference is made for more particularity of demription, and being described by metes and bounds as follows: Beginning at a bolt in the reotedine of SR 1736, Sold boll lying South 99 degrees 40 minutes 18 "nods War 638.43 feet along said centerline from an existing spike set al the InteneMlon or 6111 1735 and SR 1736 in Columbus County; thence South 89 degrees 40 minutes 18 wands War 503.99 fees along mid centeHlne so a spike; thence North 04 degree, 11 minutes 53 wands West NO TITLE EX4MINATION HAS REENMADE UNLESS CERT/FICA TIONSTA TING OTHERR'ISE Thr arBer(a) fwrher acknowledge thr i0rmal1w regvbvdfor IRS Fora, /Opp hen been cnerectly sealed to the Law Flom ofAfcl'iougan. Wright. Worley. Harper d Bvilar4 LL P. Past I of3 Book 087 Page 85 to and with a cona1990.05 feel to an Iron In said nail; thence Soutb 76 degrees 06 minutes 52 seconds East 119.89 feel to an existing right of way monument, The right of way of new US 74; thence South 60 degrees 09 minutes 13 seconds East 349.75 feet to an existing right of way monument; thence South 45 degrees 42 minutes 12 woods Fast 213.89 feet to an Iron; thence South 00 degrees 19 minutes 42 swoods East 632.31 feet to the point of the beginning. Reference Is made to a previously recorded plot entitled "COLUMBUS COUNTY COMMITTEE OF 100" prepared by David B. Goldslon, Jr. R.L.S. dated 15 June, 19K recorded In Phil -Book 311, page 100 for mom particularity of description. For mum of title to The aforesaid tract nee feed from Pool Sutton, widower to Columbus County Committee of 100, Inc, recorded in Deed Book 357, Page 901. Columbus County Registry. As part of the description the above described bust Is Identified of the Columbus County Tat Office as 10.00 acres., property 61953, account 941339 as located at 204 Top Tobacco Mad. For chain of title reference is mode to Deed recorded April 18, 2000 a1 11:53 am In Deed Book 619 Page 103, CM Being that certain tract of 67.62 aces, won or less, described as tract I on n plat of Paul Sutton Estate, Wacramaw Township, Columbus County, North Carolina, dated 30 August, 2001, prepared by Billy M. Duaean land Surveying, recorded in Map Book 71, Page 3, Colombo County Registry, with that plat being incorporated herewith by reference for further certainty of the description of the tract of 67.62 acres, won or leas, bounded, now or formerly on the North by U.S. 74.76 Highway, being bounded on the Fast by North Carolina Holdings, LLC, bring bounded on the South by SR 1736 and land of Boys 6 Girls Home of North Carolina, Inc., and being bounded on the West by a tract of 4.00 acres, mom or less, Identified us tract IA on the obovereferenced map which Is recorded In Map Book 71, Page 3, Columbus County Registry, awned now or formerly by The Estate of Paul Sutton. The Columbus County Tax Office describes the above trout of land as 67.62 acres property 87641. account "1338 as being at 309 Top Tobacco Road. For chain of Hlle reference Is made to Deed recorded May 17, 2002 of 4:23 pm to Deed Book 691 Page 497, Columbus County Registry. The property hereinsbove described win acquired by Grantor by instrument recorded in A map showing the above -described property Is recorded in plat Book page TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in in simple. And rip Grantor covenants with the Grantee, that Grante, is seized of the premises in fee simple, has the right to convey the same in fee simptq that title is marketable oral free and clear of all encumbnno s, and that Grsm. will wenmt and defend the tide against the lawful Nelms of all penom whomsoever except for the exaptions heainaHer stated. Title to the property hereinabove described is subject to the following exceptions: IN WITNESS WHEREOF, the Grantor has hereunto se: his hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by in duly authorized officers cad its seal to be hereunto affixed by authority of is Board of Directors, the day and year rim above wrinen. North Carolina Holdings LLC By: Donald Levin Revocable Trust UTA/D 617.197 raging and Sole Member of North CaroBtfe )dings LLC By: (SEAL) Donald Levin. Trustee Pare 2 of Book eel Page 64 SEAL -STAMP ORIcuI r ElelE Ya aYID1Odaecs�on Soli w"em Notary Public of the me tumor, personally appeared before i of the fo�gV. inummrnt. this the ,Qi�, day of NORTU CAROLINA COLUMBUS COUNTY The foregoing or annexed certificate of L�SIQ Q('�1f1PZ a Notary Public has been verified to have a Signature, seal or stamp and an expimtion date. This instrument and this certificate ere duly registered at the Date and time and in the book and page shown on the rent page hereo(f (���,,�,,� t ` Y moj ��' ��"`^""� Register of Deeds for Columbus County by: Asst./Deputy Register of Dads x". 1 _pyik7 Pa`i! of Jon Meade From: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Sent: Tuesday, May 5, 2020 2:06 PM To: Jon Meade Cc: Leo Green; Mairs, Robb L Subject: RE: Top Tobacco Proposed 1.D Stream Crossing Good afternoon Jon, Yes I did meet Mr. (Leo) Green, the President of Green Engineering, and he did meet me at the project site. We did discuss the proposed crossing on June 26, 2019 and the 40' impact would be allowed for the crossing because, The ditch is not in the Corps jurisdiction. The JD # SAW-2009-02175 is the Corps # and is No Permit Required. Regards, Tom Tom Charles thomas.p.charies@usace.army.mil Regulatory Specialist 910-251-4101 cell 910-465-7602 https://www saw usace ariny mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/ The Wilmington District is committed to providing the highest level of support to the public. E-PCN WilniingtonNCREG@usace.army.mil PJDs' &JD's. http://saw-reg usace army mil/JD/FINALSAW-JD-REQUEST-FORM-20170508.pdf To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 From: Jon Meade <j.mead e@greeneng.com> Sent: Tuesday, May 5, 2020 8:06 AM To: Charles, Thomas P CIV USARMY CESAW (USA) <thomas.p.charles@usace.army.mil> Cc: Leo Green <elg@greeneng.com> Subject: [Non-DoD Source] Top Tobacco Proposed 1.D Stream Crossing Hey Tom, Appreciate your discussion of the Top Tobacco (Columbus County) project yesterday. Talked to Mr. (Leo) Green, the President of Green Engineering, and he indicated that he had met with you at the project site to discuss the proposed crossing on June 26, 2019 and that, to the best of his knowledge, a 40' impact would be allowed for the crossing. Please see attached 2009 JD letter, a topo survey by Kuske showing an earlier expansion and stream origination, USACE reference to the project and the proposed crossing location for the current proposed expansion. The crossing will allow access between the warehouses and existing facility to move product between them for production. Let me know if you have any questions and also the proper way to permit the proposed activity. Thanks! ion Jon Meade; PhD, PE Green Engineering, PLLC 303 Goldsboro Street E Limited Partnerships Legal Name Top Tobacco L.P. Information Sosld: 0891396 Status: Current -Active O Date Formed: 8/31/1990 Citizenship: Foreign State of Incorporation: DE Annual Report Due Date: Registered Agent: CT Corporation System Addresses Reg Office 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Reg Mailing 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 Malting 2301 Ravine Way Glenview, IL 60025 Google Earth - Andrew Jackson Hwy To`p, i obacco Rd-o - CD i 0 -i i %T Sam Potts Hwy ✓�[f -- -- — - 1 Church St ^ C j a, � ah U : Fc°" U ;ram ay10 00 e St \ O� � Y St_ - T Q -: m i O m 3 I1 a p' v i m 65 IAI J.. CU D: oak St. 013 © F CyOress St �` y\f ` `.' 2000 ft �, I1 I bn I 6 v _ J lAe SC - • lendrg L•1 y{��n± .• r - The Cove -- moo - ---- _ 00 Iso f S` 1 I \ I I C .•'► &MV Burah /alnnd Soil Map --Columbus County. North Carolina MAP LEGEND MAP INFORMATION Area of Interest (A01) 6 Spoil Arm The soil surveys that comprise your AOI were mapped at Area of Interest iAOb Q Stony Spot 124.000. Soils Very Stony Spot Waning: Soil Map may not be valid at this scale. Soil Map Umt Polygon. wet Spot Enlargement of maps beyond the scale of mapping can cause ..,,. Sou Map Unit Lines ° misunderstanding of the detail of mapping and accuracy of soil I Other line placement, The maps do not show the small areas of Soil Map Una Points contrasting soils that could have been shown at a more detailed Special Line Features Scale, Special Point Features V Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map ® Borrow Pit measurements. Transportation Clay Spot r" Rails Source of Map: Natural Resources Conservation Service Web Soil Survey URL. Closed Depression N Interstate Highways Coordinate System: Web Mercator (EPSG:3857) Gravel Pit -.� US Routes Maps from the Web Soil Survey are based on the Web Mercator Gravelly Spot projection. which preserves direction and shape but distorts Major Roads distance and area. A projection that preserves area. such as the 0 Landfill Local Roads Albers equal-area conic projection should be used it more Lava Flow accurate calculations of distance or area are required. A. Back round 9 46 Marsh or swamp Aenal Photography This product Is generated from the USDA-NRCS certified data as of the version date(s) listed below. Mine or Quarry Sal Survey Area. Columbus County. North Carolina 0 Miscellaneous Water Survey Area Data Version 21. Sep 16. 2019 0 Perenoal Water Soil map units are labeled (as space allows) for map scales .� Rock Outcrop 1:50.000 or larger. Dale(s) aerial images Were photographed Apr 22, 2015--Nov Saline Spot 28, 2017 - Sandy Spot The orthophoto or other base map on which the soil lines Were ® Severely Eroded Spot compiled and digitized probably differs from the background displayed on these maps. As a result, some minor Sinkhole shifting of map unit boundaries may be evident. shifting Slide or Slip jif Sodw Spot t150A Natural Resources Web Soil Survey 4172020 Conservation Service National Cooperative Soil Survey Page 2 of 3