Loading...
HomeMy WebLinkAbout20150346 Ver 1_SALVO SECTION VIEW_20150408N C H W Y 1 2 C / L E L E V . 7 . 0 5 LC DETAIL SE C T IO N - C R O S S S E C T IO N N C D E P A R T M E N T O F T R A N S P O R T A T I O N D I V I S I O N O F H I G H W A Y S Q U A D : C A P E H A T T E R A S B A S I N : P A S Q U O T A N K P R O J E C T : P I P E R E P L A C E M E N T END OF PIPES.NOTE: CLASS B STONE TO BE PLACE D A R O U N D D A T E : 0 3 / 2 0 / 2 0 1 5 D R A W N B Y : B J T D A T E : 0 4 / 0 1 / 2 0 1 5 R E V I S E D B Y : P A U L W I L L I A M S C O U N T Y : D A R E SC A L E 0 ’ 1 0 ’ 1 0 ’ P R O P O S E D C L A S S B R I P R A P MINIMUM OF 1’ BELOW STREAMBED E L E V . NOTE: BOTTOM OF NEW PIPE TO BE B U R I E D P R O P O S E D P I P E S : 2 @ 9 0 ’ X 2 4 " C A P ’ S E X I S T I N G P I P E S : 2 @ 8 8 ’ X 1 8 " C M P ’ S PROPOSED CLASS B RIP RAPELEVATIONSTREAMBED H I G H W A T E R N O R M A L N C H W Y 1 2 S T R E A M B E D E L E V A T I O N PROPOSED CLASS B RIP R A P N O R M A L H I G H W A T E R 6 " 6 " 2 F E E T = O N E I N C H E X I S T I N G P I P E : 2 @ 8 8 ’ X 1 8 " C M P ’ S PROPOSED PIPE : 2 @ 9 0 ’ X 2 4 " C A P ’ S