HomeMy WebLinkAbout20050511 Ver 1_Application_20050323
. ,.
~~@jgOW[g~
MAK 2 3 Z005
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DENR - WATER QUALITY
WETI.ANDSAND STORMWATER BRANCH
MICHAEL F. EASLEY
GoVERNOR
L YNDO TIpPEIT
SECRETARY
March 22, 2005
United States Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, NC 27899-1000
o~os't
A1TN:
Mr. Bill Biddlecome
NCDOT Coordinator-Division One
SUBJECT:
Nationwide 6 Permit Application:
US 17 From South of SR 1149 (Price Road) to US 17 South of SR 1536
(Hamilton Beach Road), Beaufort, North Carolina; TIP Project R-2510B;
Federal Aid Project No. MAF-75-3(26);
Dear Mr. Biddlecome,
The North Carolina Department of Transportation (NCDOT) is planning to build a bridge on new
location within the project limits of the proposed Washington Bypass in Beaufort County, North
Carolina. The proposed bridge will cross the Tar River north of the town of Washington on NC
17. A completed pre-construction notification form and appropriate permit drawings are
attached for your review.
Due to the fact that Tar River supports anadromous fish, notification to the appropriate agencies
through a Nationwide 6 Permit is required.
In order to build the new bridge over the Tar River, geotechnical test borings will need to be
done so that structure and foundation recommendations can be made. A total of up to 500 soil
borings or Cone Penetrometer probes will be performed. Of these, approximately 350 will fall
within the footprint of the proposed structure over the Tar River and associated wetlands. The
majority of these 350 borings and probes for the structure will be performed in the wetlands with
no more than 50 planned in the Tar River.
Boring activities and probes in the river will be preformed from a variety of barges and or boats.
The borings and probes will consist of turning or driving 3-inch to 6-inch diameter steel casing
into the sound bottom creating minimal disturbance. Other drilling tools will be inserted into the
steel casing to sample the sediments and advance the hole. When the boring is completed, the
steel casing will be removed from the river bottom '
MAIUNG ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEvELOPMENT AND ENvIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH Ne 27699-1548
TELEPHONE: 919-733-3141
FAX: 919-733-9794
LOCAnoN:
TRANSPORTAllON BUILDING
1 SOUTH WILMINGTON STREET
RALEIGH NC
WESS/n:: www.ncdot.org
. .
The borings on land will be performed with rubber tired drill rigs or low ground pressure tracked
drill rigs depending on the boring location. The land borings will be 3-inch to 8-inch in diameter.
All disturbances from the borings should be limited to within a 2-foot radius of the boring
location. The geotechnical work will occur in the study corridor depicted on the attached
mapping.
Because this area is located in sensitive waters, an in-water moratorium exists between February
15 through June 15. All in-stream work will take place outside the moratorium dates.
The NCDOT anticipates that these activities will be authorized by Nationwide Permit No.6.
NCDOT will follow the conditions set by a Nationwide Permit No.6 and by NCDWQ Water
Quality Certification # 3494. In accordance with 15A NCAC 2H.0501 (a), we are providing two
copies of this application to the NCDWQ for their records.
If you have any questions or would like additional information, please call Mr. Chris Underwood
at (919) 715-1451. Thank you in advance for your help in this matter.
Sincerely,
~"' ~ lA ~
q~ ~-;r. ;orpe, Ph.D.
Environmental Management Director
Project Development and Environmental Analysis Branch
CC: W/attachment
Mr. John Hennessy, NCDWQ (7 copies)
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Mr. Ron Sechler, NMFS
Mr. Michael Street, NCDMF
Mr. Cathy Brittingham, NCDCM
Mr. Bill Arrington, NCDCM
Mr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P .E., Structure Design
Mr. Mark Staley, Roadside Environmental
Mr. Njoroge W. Wainaina, State Engineering Geologist, P.E., Geotechnical Unit
Mr. C. E. Lassiter, P.E., Division Engineer
Mr. Jay Johnson, DEO
W /0 attachment
Mr. David Franklin, USACE, Wilmington (Cover Letter Only)
Mr. Jay Bennett,P.E., Roadway Design
Mr. Omar Sultan, Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Brian Yamamoto, P.E., PDEA
.
Fonn Version May 2002
050511
USACE Action In No. DWQ No.
(If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".)
Office Use Only:
I. Processing
1. Check all of the approval(s) requested for this project:
[g] Section 404 Permit [g]
o Section 10 Permit 0
o 401 Water Quality Certification
Riparian or Watershed Buffer Rules
Isolated Wetland Permit from DWQ
2. Nationwide, Regional or General Permit Number(s) Requested: NW 6
3. If this notification is solely a courtesy copy because written approval for the 401 Certification
is not required, check here: I2l
4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for
mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete
section VIII and check here: 0
5. If your project is located in any of North Carolina's twenty coastal counties (listed on page
4), and the project is within a North Carolina Division of Coastal Management Area of
Environmental Concern (see the top of page 2 for further details), check here: [g]
II. Applicant Information
1. Owner/Applicant Information
Name: NCDOT / PDEA Branch / Greg Thorpe
Mailing Address: 1548 Mail Service Center
Raleigh, NC 27699-1548
Fax Number: (919) 733-9794
Telephone Number: (919) 733-3141
E-mail Address:
2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter
must be attached if the Agent has signatory authority for the owner/applicant.)
Name:
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Fax Number:
Page 5 of 12
III. Project Information
Attach a vicinity map clearly showing the location of the property with respect to local
landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property
boundaries and development plans in relation to surrounding properties. Both the vicinity map
and site plan must include a scale and north arrow. The specific footprints of all buildings,
impervious surfaces, or other facilities must be included. If possible, the maps and plans should
include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property
boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion,
so long as the property is clearly defined. For administrative and distribution purposes, the
USACE requires information to be submitted on sheets no larger than 11 by 17-inch format;
however, DWQ may accept paperwork of any size. DWQ prefers full-size construction
drawings rather than a sequential sheet version of the full-size plans. If full-size plans are
reduced to a small scale such that the final version is illegible, the applicant will be informed that
the project has been placed on hold until decipherable maps are provided.
1. Name of project: US 17 Washington Bypass
2. T.I.P. Project Number or State Project Number (NCDOT Only): R-2510B
3. Property Identification Number (Tax PIN):
4. Location
County: Beaufort Nearest Town: Washington
Subdivision name (include phase/lot number):
Directions to site (include road numbers, landmarks, etc.):
Beginning N643060 E2565140
5. Site coordinates, if available (UTM or Lat/Long): Ending N670840 E2574875
(Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the
coordinates for each crossing of a distinct waterbody.)
6. Property size (acres):
7. Nearest body of water (stream/river/sound/ocean/lake): Tar River
8. River Basin: Tar-Pam
(Note - this must be one of North Carolina's seventeen designated major river basins. The
River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.)
9. Describe the existing conditions on the site and general land use in the vicinity of the project
at the time of this application: Wetlands and riparian forest with little development.
Page 6 of12
10. Describe the overall project in detail, including the type of equipment to be used:
Geotechnical test borings will be made in the surrounding wetlands. uplands. and river
bottom. Drilling rigs will be used to perform this work. Wheeled rigS for land work and
barges for work on the river.
11. Explain the purpose of the proposed work: To provide structure and foundation
recommendations for the proposed bridge.
IV. Prior Project History
If jurisdictional determinations and/or permits have been requested and/or obtained for this
project (including all prior phases of the same subdivision) in the past, please explain. Include
the USACE Action ill Number, DWQ Project Number, application date, and date permits and
certifications were issued or withdrawn. Provide photocopies of previously issued permits,
certifications or other useful information. Describe previously approved wetland, stream and
buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project,
list and describe permits issued for prior segments of the same T.I.P. project, along with
construction schedules.
Jurisdictional Determination from the USACE. AID # 199301143
v. Future Project Plans
Are any future permit requests anticipated for this project? If so, describe the anticipated work,
and provide justification for the exclusion of this work from the current application.
Yes. Individual permit will be applied for. Typical road construction for new location and
widening existing roadway.
VI. Proposed Impacts to Waters of the United StateslW aters of the State
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
wetlands, open water, and stream channels associated with the project. The applicant must also
provide justification for these impacts in Section VII below. All proposed impacts, permanent
and temporary, must be listed herein, and must be clearly identifiable on an accompanying site
plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a
delineation map, whether or not impacts are proposed to these systems. Wetland and stream
evaluation and delineation forms should be included as appropriate. Photographs may be
included at the applicant's discretion. If this proposed impact is strictly for wetland or stream
mitigation, list and describe the impact in Section VIII below. If additional space is needed for
listing or description, please attach a separate sheet.
1:. Provide a written description of the proposed impacts:
high ~ound. and river bottom.
Soil borings In the wetland.
Page 7 of 12
2. Individually list wetland impacts below:
Wetland Impact Area of Located within Distance to
Site Number Type of Impact* Impact 100-year Floodplain** Nearest Stream Type ofWetland***
(indicate on map) (acres) (yes/no) (linear feet)
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill,
excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding.
** 1000Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps
(FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or
online at htto://www.femae:ov. .
*** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond,
Carolina Bay, bog, etc.) Indicate if wetland is isolated (detennination of isolation to be made by USACE only).
List the total acreage (estimated) of all existing wetlands on the property:
Total area of wetland impact proposed:
3. Individually list all intermittent and perennial stream impacts below:
Stream Impact Length of Average Width Perennial or
Site Number Type of Impact* Impact Stream Name** of Stream Intermittent?
(indicate on map) (linear feet) Before Impact (please specify)
List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap,
dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain),
stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is
proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included.
** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest
downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at
www.us~s.~ov. Several internet sites also allow direct download and printing of USGS maps (e.g., WWW.toDOzone.com,
www.maoouest.com. etc.).
*
Cumulative impacts (linear distance in feet) to all streams on site:
4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic
Ocean and any other water of the U.S.) below:
Page 8 of 12
Open WaterImpact Area of Name of Water body Type of Water body
Site Number Type of Impact* Impact (if applicable) (lake, pond, estuary, sound,
(indicate on map) (acres) bay, ocean, etc.)
* List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging,
flooding, drainage, bulkheads, etc.
5. Pond Creation
If construction of a pond is proposed, associated wetland and stream impacts should be
included above in the wetland and stream impact sections. Also, the proposed pond should
be described here and illustrated on any maps included with this application.
Pond to be created in (check all that apply): D uplands D stream 0 wetlands
Describe the method of construction (e.g., damlembankment, excavation, installation of
draw-down valve or spillway, etc.):
Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond,
local stormwater requirement, etc.):
Size of watershed draining to pond:
Expected pond surface area:
VII. Impact Justification (Avoidance and Minimization)
Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide
information related to site constraints such as topography, building ordinances, accessibility, and
financial viability of the project. The applicant may attach drawings of alternative, lower-impact
site layouts, and explain why these design options were not feasible. Also discuss how impacts
were minimized once the desired site plan was developed. If applicable, discuss construction
techniques to be followed during construction to reduce impacts.
VIII. Mitigation
DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC
Division of Water Quality for projects involving greater than or equal to one acre of impacts to
freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial
streams.
~
USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide
PeRnits, published in the Federal Register on March 9, 2000, mitigation will be required when
necessary to ensure that adverse effects to the aquatic environment are minimal. Factors
Page 9 of 12
including size and type of proposed impact and function and relative value of the impacted
aquatic resource will be considered in determining acceptability of appropriate and practicable
mitigation as proposed. Examples of mitigation that may be appropriate and practicable include,
but are not limited to: reducing the size of the project; establishing and maintaining wetland
and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of
aquatic resource functions and values by creating, restoring, enhancing, or preserving similar
functions and values, preferable in the same watershed.
If mitigation is required for this project, a copy of the mitigation plan must be attached in order
for USACE or DWQ to consider the application complete for processing. Any application
lacking a required mitigation plan or NCWRP concurr~nce shall be placed on hold as
incomplete. An applicant may also choose to review the current guidelines for stream restoration
in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at
http://h2o.em.state.nc. us/ncwetlands/strmgide.html.
1. Provide a brief description of the proposed mitigation plan. The description should provide
as much information as possible, including, but not limited to: site location (attach directions
and/or map, if off site), affected stream and river basin, type and amount (acreage/linear feet)
of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view,
preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a
description of the current site conditions and proposed method of construction. Please attach
a separate sheet if more space is needed.
N/A
2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration
Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at
(919) 733-5208 to detenn.ine availability and to request written approval of mitigation prior
to submittal of a PCN. For additional information regarding the application process for the
NCWRP, check the NCWRP website at htto://h2o.em.state.nc.us/wrp/index.htm. If use of
the NCWRP is proposed, please check the appropriate box on page three and provide the
following information:
Amount of stream mitigation requested (linear feet): NI A
Amount of buffer mitigation requested (square feet): N/A
Amount of Riparian wetland mitigation requested (acres): N/A
Amount of Non-riparian wetland mitigation requested (acres): N/A
Amount of Coastal wetland mitigation requested (acres): N/A
IX. Environmental Documentation (required by DWQ)
Does the project involve an expenditure of public (federal/state) funds or the use of public
(federal/state) land?
Yes I8l No D
Page 10 of12
..
If yes, does the project require preparation of an environmental document pursuant to the
requirements of the National or North Carolina Environmental Policy Act (NEP NSEP A)?
Note: If you are not sure whether a NEPNSEPA document is required, call the SEPA
coordinator at (919) 733-5083 to review current thresholds for environmental documentation.
Yes ~ No D
If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a
copy of the NEP A or SEP A final approval letter.
Yes ~ No D
X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ)
It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to
required state and local buffers associated with the project. The applicant must also provide
justification for these impacts in Section VII above. All proposed impacts must be listed herein,
and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a
map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ
Regional Office may be included as appropriate. Photographs may also be included at the
applicant's discretion.
Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233
(Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and
Water Supply Buffer Requirements), or other (please identify )?
Yes D No [gIIfyou answered "yes", provide the following information:
Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer
mitigation is required calculate the required amount of mitigation by applying the buffer
multipliers.
Zone* Impact Multiplier Required
(square feet) Mitigation
1 3
2 1.5
Total
*
Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an
additional 20 feet from the edge of Zone 1.
If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation
of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or
Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as
identified within 15A NCAC 2B .0242 or .0260.
Page 11 of 12
XI. Stormwater (required by DWQ)
Describe impervious acreage (both existing and proposed) versus total acreage on the site.
Discuss stormwater controls proposed in order to protect surface waters and wetlands
downstream from the property.
N/A
XII. Sewage Disposal (required by DWQ)
Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of
wastewater generated from the proposed project, or available capacity of the subject facility.
N/A
XIII. Violations (required by DWQ)
Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules?
Yes D No [gI
Is this an after-the-fact permit application?
Yes D No [gI
XIV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
lbreatened Species, accessibility problems, or other issues outside of the applicant's control).
~ Li- L- 3/~~65
Ap licant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 12 of 12
R-2510B Permit Points
Point Northing Easting Station Line
31001 640,4 71 .27 2,563,847.58 212+00.00 -L-
31002 640,662.98 2,563,904.53 214+00.00 -L-
31003 640,854.70 2,563,961.49 216+00.00 -L-
31004 641,046.42 2,564,018.45 218+00.00 -L-
31005 641,238.14 2,564,075.40 220+00.00 -L-
31006 641,429.86 2,564,132.36 222+00.00 -L-
31007 641,621 .42 2,564,189.83 224+00.00 -L-
31008 641,811.18 2,564,252.96 226+00.00 -L-
31009 641,996.56 2,564,327.90 228+00.00 -L-
31010 642,176.27 2,564,415.59 230+00.00 -L-
31011 642,349.42 2,564,515.60 232+00.00 -L-
31012 642,515.18 2,564,627.44 234+00.00 -L-
31013 642,672.72 2,564,750.58 236+00.00 -L-
31014 642,821.30 2,564,884.40 238+00.00 -L-
31015 642,960.18 2,565,028.26 240+00.00 -L-
31016 643,088.68 2,565,181.46 242+00.00 -L-
31017 643,206.19 2,565,343.26 244+00.00 -L-
31018 643,312.12 2,565,512.85 246+00.00 -L-
31019 643,407.10 2,565,688.83 248+00.00 -L-
31020 643,496.67 2,565,867.65 250+00.00 -L-
31021 643,585.71 2,566,046.74 252+00.00 -L-
31022 643,674.75 2,566,225.82 254+00.00 -L-
31023 643,763.80 2,566,404.91 256+00.00 -L-
31024 643,852.84 2,566,583.99 258+00.00 -L-
31025 643,941.88 2,566,763.08 260+00.00 -L-
31026 644,030.92 2,566,942.17 262+00.00 -L-
31027 644,119.96 2,567,121.25 264+00.00 -L-
31028 644,209.00 2,567,300.34 266+00.00 -L-
31029 644,298.05 2,567,479.42 268+00.00 -L-
31030 644,387.11 2,567,658.49 270+00.00 -L-
31031 644,478.65 2,567,836.31 272+00.00 -L-
31032 644,579.00 2,568,009.26 274+00.00 -L-
31033 644,691.06 2,568,174.87 276+00.00 -L-
31034 644,814.40 2,568,332.26 278+00.00 -L-
31035 644,948.42 2,568,480.66 280+00.00 -L-
31036 645,092.46 2,568,619.35 282+00.00 -L-
31037 645,245.83 2,568,747.66 284+00.00 -L-
31038 645,407.78 2,568,864.96 286+00.00 -L-
31039 645,577.51 2,568,970.67 288+00.00 -L-
31040 645,754.20 2,569,064.28 290+00.00 -L-
31041 645,936.99 2,569,145.34 292+00.00 -L-
31042 646,124.99 2,569,213.46 294+00.00 -L-
31043 646,317.29 2,569,268.29 296+00.00 -L-
31044 646,512.94 2,569,309.58 298+00.00 -L-
31045 646,710.82 2,569,338.47 300+00.00 -L-
31046 646,909.49 2,569,361.50 302+00.00 -L-
31047 647,108.22 2,569,384.00 304+00.00 -L-
31048 647,306.95 2,569,406.49 306+00.00 -L-
31049 647,505.68 2,569,428.99 308+00.00 -L-
31050 647,704.41 2,569,451.48 310+00.00 -L-
31051 647,903.14 2,569,473.98 312+00.00 -L-
31052 648,101.87 2,569,496.47 314+00.00 -L-
31053 648,300.60 2,569,518.97 316+00.00 -L-
31054 648,499.33 2,569,541.46 318+00.00 -L-
31055 648,698.06 2,569,563.96 320+00.00 -L-
31056 648,896.79 2,569,586.46 322+00.00 -L-
31057 649,095.52 2,569,608.95 324+00.00 -L-
31058 649,194.89 2,569,620.20 325+00.00 -L-
31059 649,294.26 2,569,631.45 326+00.00 -L-
31060 649,393.62 2,569,642.69 327+00.00 -L-
31061 649,492.99 2,569,653.94 328+00.00 -L-
31062 649,592.35 2,569,665.19 329+00.00 -L-
31063 649,691.72 2,569,676.44 330+00.00 -L-
31064 649,791.08 2,569,687.68 331 +00.00 -L-
31065 649,890.45 2,569,698.93 332+00.00 -L-
31066 649,989.81 2,569,710.18 333+00.00 -L-
31067 650,089.18 2,569,721.43 334+00.00 -L-
31068 650,188.54 2,569,732.67 335+00.00 -L-
31069 650,287.91 2,569,743.92 336+00.00 -L-
31070 650,387.28 2,569,755.17 337+00.00 -L-
31071 650,486.64 2,569,766.42 338+00.00 -L-
31072 650,586.01 2,569,777.66 339+00.00 -L-
31073 650,685.37 2,569,788.91 340+00.00 -L-
31074 650,784.74 2,569,800.16 341+00.00 -L-
31075 650,884.10 2,569,811.41 342+00.00 -L-
31076 650,983.47 2,569,822.65 343+00.00 -L-
31077 651,082.83 2,569,833.90 344+00.00 -L-
31078 651,182.20 2,569,845.15 345+00.00 -L-
31079 651,281.56 2,569,856.40 346+00.00 -L-
31080 651,380.93 2,569,867.64 347+00.00 -L-
31081 651,480.30 2,569,878.89 348+00.00 -L-
31082 651,579.66 2,569,890.14 349+00.00 -L-
31083 651,679.03 2,569,901.39 350+00.00 -L-
31084 651,778.39 2,569,912.63 351+00.00 -L-
31085 651,877.76 2,569,923.88 352+00.00 -L-
31086 651,977.12 2,569,935.13 353+00.00 -L-
31087 652,076.49 2,569,946.38 354+00.00 -L-
31088 652,175.85 2,569,957.63 355+00.00 -L-
31089 652,275.22 2,569,968.87 356+00.00 -L-
31090 652,374.58 2,569,980.12 357+00.00 -L-
31091 652,473.95 2,569,991.37 358+00.00 -L-
31092 652,573.32 2,570,002.62 359+00.00 -L-
31093 652,672.68 2,570,013.86 360+00.00 -L-
31094 652,772.05 2,570,025.11 361 +00.00 -L-
31095 652,871.41 2,570,036.36 362+00.00 -L-
31096 652,970.78 2,570,047.61 363+00.00 -L-
31097 653,070.14 2,570,058.85 364+00.00 -L-
31098 653,169.51 2,570,070.10 365+00.00 -L-
31099 653,268.87 2,570,081.35 366+00.00 -L-
31100 653,368.24 2,570,092.60 367+00.00 -L-
31101 653,467.60 2,570,103.84 368+00.00 -L-
31102 653,566.97 2,570,115.09 369+00.00 -L-
31103 653,666.34 2,570,126.34 370+00.00 -L-
31104 653,765.70 2,570,137.59 371 +00.00 -L-
31105 653,865.07 2,570,148.83 372+00.00 -L-
31106 653,964.43 2,570,160.08 373+00.00 -L-
31107 654,063.80 2,570,171.33 374+00.00 -L-
31108 654,163.16 2,570,182.58 375+00.00 -L-
31109 654,262.53 2,570,193.82 376+00.00 -L-
31110 654,361.89 2,570,205.07 377+00.00 -L-
31111 654,461.26 2,570,216.32 378+00.00 -L-
31112 654,560.62 2,570,227.57 379+00.00 -L-
31113 654,659.99 2,570,238.81 380+00.00 -L-
31114 654,759.36 2,570,250.06 381 +00.00 -L-
31115 654,858.72 2,570,261.31 382+00.00 -L-
31116 654,958.09 2,570,272.56 383+00.00 -L-
31117 655,057.45 2,570,283.81 384+00.00 -L-
31118 655,156.82 2,570,295.05 385+00.00 -L-
31119 655,256.18 2,570,306.30 386+00.00 -L-
31120 655,355.55 2,570,317.55 387+00.00 -L-
31121 655,454.91 2,570,328.80 388+00.00 -L-
31122 655,554.28 2,570,340.04 389+00.00 -L-
31123 655,653.64 2,570,351.29 390+00.00 -L-
31124 655,753.01 2,570,362.54 391 +00.00 -L-
31125 655,852.38 2,570,373.79 392+00.00 -L-
31126 655,951.74 2,570,385.03 393+00.00 -L-
31127 656,051.11 2,570,396.28 394+00.00 -L-
31128 656,150.47 2,570,407.53 395+00.00 -L-
31129 656,249.84 2,570,418.78 396+00.00 -L-
31130 656,349.20 2,570,430.02 397+00.00 -L-
31131 656,448.57 2,570,441.27 398+00.00 -L-
31132 656,547.93 2,570,452.52 399+00.00 -L-
31133 656,647.30 2,570,463.77 400+00.00 -L-
31134 656,746.66 2,570,475.01 401+00.00 -L-
31135 656,846.03 2,570,486.26 402+00.00 -L-
31136 656,945.40 2,570,497.51 403+00.00 -L-
31137 657,044.76 2,570,508.76 404+00.00 -L-
31138 657,144.13 2,570,520.00 405+00.00 -L-
31139 657,243.49 2,570,531.25 406+00.00 -L-
31140 657,342.86 2,570,542.50 407+00.00 -L-
31141 657,442.22 2,570,553.75 408+00.00 -L-
31142 657,541.59 2,570,564.99 409+00.00 -L-
31143 657,640.95 2,570,576.24 410+00.00 -L-
31144 657,740.32 2,570,587.49 411+00.00 -L-
31145 657,839.68 2,570,598.74 412+00.00 -L-
31146 657,939.05 2,570,609.99 413+00.00 -L-
31147 658,038.42 2,570,621.23 414+00.00 -L-
31148 658,137.78 2,570,632.48 415+00.00 -L-
31149 658,237.15 2,570,643.73 416+00.00 -L-
31150 658,336.51 2,570,654.98 417+00.00 -L-
31151 658,435.88 2,570,666.22 418+00.00 -L-
31152 658,535.24 2,570,677.47 419+00.00 -L-
31153 658,634.61 2,570,688.72 420+00.00 -L-
31154 658,733.97 2,570,699.97 421 +00.00 -L-
31155 658,833.34 2,570,711.21 422+00.00 -L-
31156 658,932.70 2,570,722.46 423+00.00 -L-
31157 659,032.07 2,570,733.71 424+00.00 -L-
31158 659,131.43 2,570,744.96 425+00.00 -L-
31159 659,230.80 2,570,756.20 426+00.00 -L-
31160 659,330.17 2,570,767.45 427+00.00 -L-
31161 659,429.53 2,570,778.70 428+00.00 -L-
31162 659,528.90 2,570,789.95 429+00.00 -L-
31163 659,628.26 2,570,801.19 430+00.00 -L-
31164 659,727.63 2,570,812.44 431+00.00 -L-
31165 659,826.99 2,570,823.69 432+00.00 -L-
31166 659,926.36 2,570,834.94 433+00.00 -L-
31167 660,025.72 2,570,846.18 434+00.00 -L-
31168 660,125.09 2,570,857.43 435+00.00 -L-
31169 660,224.45 2,570,868.68 436+00.00 -L-
31170 660,323.82 2,570,879.93 437+00.00 -L-
31171 660,423.19 2,570,891.17 438+00.00 -L-
31172 660,522.55 2,570,902.42 439+00.00 -L-
31173 660,621.92 2,570,913.67 440+00.00 -L-
31174 660,721.28 2,570,924.92 441+00.00 -L-
31175 660,820.65 2,570,936.16 442+00.00 -L-
31176 660,920.01 2,570,947.41 443+00.00 -L-
31177 661,019.38 2,570,958.66 444+00.00 -L-
31178 661,118.74 2,570,969.91 445+00.00 -L-
31179 661,218.11 2,570,981.16 446+00.00 -L-
31180 661,317.47 2,570,992.40 447+00.00 -L-
31181 661,416.84 2,571,003.65 448+00.00 -L-
31182 661,516.21 2,571,014.90 449+00.00 -L-
31183 661,615.57 2,571 ,026.15 450+00.00 -L-
31184 661,714.94 2,571,037.39 451 +00.00 -L-
31185 661,814.30 2,571,048.64 452+00.00 -L-
31186 661,913.67 2,571,059.89 453+00.00 -L-
31187 662,013.03 2,571,071.14 454+00.00 -L-
31188 662,112.35 2,571,082.79 455+00.00 -L-
31189 662,211.50 2,571,095.78 456+00.00 -L-
31190 662,310.32 2,571,111.09 457+00.00 -L-
31191 662,408.59 2,571,129.60 458+00.00 -L-
31192 662,506.15 2,571,151.52 459+00.00 -L-
31193 662,602.89 2,571,176.84 460+00.00 -L-
31194 662,698.68 2,571,205.52 461 +00.00 -L-
31195 662,793.42 2,571,237.52 462+00.00 -L-
31196 662,886.98 2,571,272.81 463+00.00 -L-
31197 662,979.25 2,571,311.34 464+00.00 -L-
31198 663,070.12 2,571,353.07 465+00.00 -L-
31199 663,159.48 2,571,397.94 466+00.00 -L-
31200 663,247.22 2,571,445.91 467+00.00 -L-
31201 663,333.23 2,571,496.91 468+00.00 -L-
31202 663,417.41 2,571,550.88 469+00.00 -L-
31203 663,499.66 2,571,607.75 470+00.00 -L-
31204 663,580.03 2,571,667.25 471+00.00 -L-
31205 663,659.00 2,571,728.59 472+00.00 -L-
31206 663,737.16 2,571,790.97 473+00.00 -L-
31207 663,815.08 2,571,853.65 474+00.00 -L-
31208 663,893.00 2,571,916.33 475+00.00 -L-
31209 663,970.92 2,571,979.01 476+00.00 -L-
31210 664,048.84 2,572,041.69 477+00.00 -L-
31211 664,126.76 2,572,104.36 478+00.00 -L-
31212 664,282.60 2,572,229.72 480+00.00 -L-
31213 664,438.43 2,572,355.08 482+00.00 -L-
31214 664,594.27 2,572,480.44 484+00.00 -L-
31215 664,750.11 2,572,605.80 486+00.00 -L-
31216 664,905.95 2,572,731.15 488+00.00 -L-
31217 665,061.78 2,572,856.51 490+00.00 -L- ~
31218 665,217.62 2,572,981.87 492+00.00 -L-
31219 665,373.46 2,573,107.23 494+00.00 -L-
31220 665,529.30 2,573,232.58 496+00.00 -L-
31221 665,685.14 2,573,357.94 498+00.00 -L-
31222 665,840.97 2,573,483.30 500+00.00 -L-
31223 665,996.81 2,573,608.66 502+00.00 -L-
31224 666,152.65 2,573,734.02 504+00.00 -L-
31225 666,308.49 2,573,859.37 506+00.00 -L-
31226 666,464.33 2,573,984.73 508+00.00 -L-
31227 666,620.16 2,574,110.09 510+00.00 -L-
31228 666,776.00 2,574,235.45 512+00.00 -L-
31229 666,931.84 2,574,360.80 514+00.00 -L-
31230 667,087.68 2,574,486.15 516+00.00 -L-
31231 667,245.50 2,574,608.99 518+00.00 -L-
31232 667,411.00 2,574,721.17 520+00.00 -L-
31233 667,585.63 2,574,818.54 522+00.00 -L-
31234 667,768.07 2,574,900.33 524+00.00 -L-
31235 667,956.95 2,574,965.90 526+00.00 -L-
31236 668,150.82 2,575,014.76 528+00.00 -L-
31237 668,348.22 2,575,046.54 530+00.00 -L-
31238 668,547.63 2,575,061.00 532+00.00 -L-
31239 668,747.55 2,575,058.15 534+00.00 -L-
31240 668,946.97 2,575,043.07 536+00.00 -L-
31241 669,146.20 2,575,025.50 538+00.00 -L-
31242 669,345.42 2,575,007.93 540+00.00 -L-
31243 669,547.29 2,575,020.25 542+00.00 -L-
31244 669,746.51 2,575,002.68 544+00.00 -L-
31245 669,945.74 2,574,985.11 546+00.00 -L-
31246 670,144.97 2,574,967.54 548+00.00 -L-
31247 670,344.19 2,574,949.97 550+00.00 -L-
31248 670,543.42 2,574,932.40 552+00.00 -L-
31249 670,742.65 2,574,914.83 554+00.00 -L-
31250 670,941.87 2,574,897.26 556+00.00 -L-
31251 671,141.10 2,574,879.69 558+00.00 -L-
31252 671,340.33 2,574,862.12 560+00.00 -L-
31253 671,539.55 2,574,844.55 562+00.00 -L-
31254 671,738.78 2,574,826.99 564+00.00 -L-
31255 671,938.01 2,574,809.42 566+00.00 -L-
31256 672,137.23 2,574,791.85 568+00.00 -L-
31257 672,336.46 2,574,774.28 570+00.00 -l-
31258 672,535.69 2,574,756.71 572+00.00 -l-
31259 672,734.91 2,574,739.14 574+00.00 -l-
31260 645,362.76 2,567,999.85 6+00.00 -BY11-
31261 645,524.87 2,568,116.98 8+00.00 -BY11-
31262 645,705.44 2,568,194.54 10+00.00 -BY11-
31263 645,900.14 2,568,234.84 12+00.00 -BY11-
31264 644,281.23 2,569,542.28 6+00.00 -BY13-
31265 644,432.60 2,569,673.00 8+00.00 -BY13-
31266 644,620.68 2,569,698.51 10+00.00 -BY13-
31267 644,820.51 2,569,690.33 12+00.00 -BY13-
31268 645,020.35 2,569,682.15 14+00.00 -BY13-
31269 645,205.21 2,569,756.04 16+00.00 -BY13-
31270 645,389.29 2,569,834.24 18+00.00 -BY13-
31271 645,567.13 2,569,919.11 20+00.00 -BY13-
31272 644,094.20 2,566,990.28 6+00.00 -BY10RPB-
31273 644,238.92 2,567,128.32 8+00.00 -BY10RPB-
31274 644,383.64 2,567,266.36 10+00.00 -BY10RPB-
31275 644,533.11 2,567,399.17 12+00.00 -BY10RPB-
31276 644,691.50 2,567,520.95 14+00.00 -BY10RPB-
31277 644,854.44 2,567,636.92 16+00.00 -BY10RPB-
31278 645,017.36 2,567,752.93 18+00.00 -BY10RPB-
31279 645,180.24 2,567,868.99 20+00.00 -BY10RPB-
31280 644,200.85 2,567,332.14 6+00.00 -BY10RPC-
31281 644,248.62 2,567,526.35 8+00.00 -BY10RPC-
31282 644,296.71 2,567,720.48 10+00.00 -BY10RPC-
31283 644,343.78 2,567,914.82 12+00.00 -BY10RPC-
31284 644,379.18 2,568,111.66 14+00.00 -BY10RPC-
31285 644,439.17 2,568,301.71 16+00.00 -BY10RPC-
31286 644,509.93 2,568,488.77 18+00.00 -BY10RPC-
31287 644,640.14 2,568,637.27 20+00.00 -BY10RPC-
31288 644,804.27 2,568,797.20 6+00.00 -BY10RPD-
31289 644,949.11 2,568,935.12 8+00.00 -BY10RPD-
31290 645,112.65 2,569,046.19 10+00.00 -BY10RPD-
31291 645,296.29 2,569,122.55 12+00.00 -BY10RPD-
31292 645,491.80 2,569,164.68 14+00.00 -BY10RPD-
31293 645,687.31 2,569,206.82 16+00.00 -BY10RPD-
31294 645,883.60 2,569,244.03 18+00.00 -BY10RPD-
31295 645,192.98 2,567,895.16 6+00.00 -BY10lPB-
31296 645,015.53 2,567,802.90 8+00.00 -BY10lPB-
31297 644,829.16 2,567,808.25 10+00.00 -BY10lPB-
31298 644,715.18 2,567,952.43 12+00.00 -BY10lPB-
31299 644,771.99 2,568,116.20 14+00.00 -BY10lPB-
31300 644,901.03 2,568,269.00 16+00.00 -BY10lPB-
31301 665,432.18 2,572,796.65 6+00.00 -BY19RPA-
31302 665,576.18 2,572,935.45 8+00.00 -BY19RPA-
31303 665,720.17 2,573,074.25 10+00.00 -BY19RPA-
31304 665,849.01 2,573,226.87 12+00.00 -BY19RPA-
31305 665,973.98 2,573,383.02 14+00.00 -BY19RPA-
31306 666,098.95 2,573,539.17 16+00.00 -BY19RPA-
31307 664,299.01 2,572,151.73 8+00.00 -BY19RPB-
31308 664,480.56 2,572,235.62 10+00.00 -BY19RPB-
31309 664,662.12 2,572,319.50 12+00.00 -BY19RPB-
31310 664,841 .39 2,572,407.65 14+00.00 -BY19RPB-
31311 665,011.67 2,572,512.55 16+00.00 -BY19RPB-
31312 665,181.96 2,572,617.45 18+00.00 -BY19RPB-
31313 665,352.24 2,572,722.35 20+00.00 -BY19RPB-
31314 664,036.05 2,572,126.76 12+00.00 -BY19RPC-
31315 664,178.85 2,572,266.79 14+00.00 -BY19RPC-
31316 664,305.93 2,572,420.63 16+00.00 -BY19RPC-
31317 664,426.42 2,572,580.26 18+00.00 -BY19RPC-
31318 664,555.19 2,572,733.07 20+00.00 -BY19RPC-
31319 664,688.80 2,572,881.90 22+00.00 -BY19RPC-
31320 664,822.41 2,573,030.72 24+00.00 -BY19RPC-
31321 664,940.22 2,573,140.17 6+00.00 -BY19RPD-
31322 665,094.06 2,573,267.97 8+00.00 -BY19RPD-
31323 665,260.95 2,573,370.82 10+00.00 -BY19RPD-
31324 665,453.69 2,573,424.21 12+00.00 -BY19RPD-
31325 665,645.02 2,573,482.05 14+00.00 -BY19RPD-
31326 665,816.52 2,573,579.08 16+00.00 -BY19RPD-
31327 665,971.95 2,573,704.45 18+00.00 -BY19RPD-
,...,......,...,.,.,...........................................................................................................................................................................................................................,........................................................
~
~
~
~
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
PROJECT LENGTH
APPROXlMATELY=S.90 Miles
Beaufort County
/:I.
.
~:
.
.
.
.
.
.
:.It
~" ["J
Ii 7
r../: L
1'~.~
1: ChoLnnity
_. rwn
· -f':f'!l. ~,.f, ~ ''"
{ i ~..~~
~~~
US 17 BYPASS Ii
l!,~# #
~~##
#
" 9#~
..., #
*""' rt #
/I'~
, (.''Y
(~ ~~?'
Washington
~.
.......... I...............,..... I...,.... I............. I.................. I" I................ 1.1.1................ I I...... I I'" I'" I......,..... 1.1. I'" I I.......................... I I.............. I...........................,.. I...... I.............. I'" I.................,................
~
~
~
,~ U:
~~ ;S 7;-
~~
..~
~
...\Underwood\permit_ TSHJ2510.dgn 02/15/200503:49:34 PM
-
0
0
0
0
+
~
~
~
I ~
en
~
I
W
z
::i
:I:
(J
" ~
'"
~ :E
.t:.
..
Q.
.g
in
N
L
,,-
..
"
Ii
';l
0
~
,,-
..
!!
1
i
l:
,,-
"
e
L
0
Q.
,,-
.a
\Sl
in
N
- L
,,-
..
u
0
....
0
L
CL
0:
"
..
"
u
!>.,
0
L
CL
"
..
"
0
;l
0
'"
;l
..
0
>
;>;"
Q/,
Iy~
; y!
Yt- LO
XI --
x~fv)
f"-
co
~
~f ?1
F <<9 ~ )
----~-----~ -
- - - - - - - - - - - - - - -- - - - - - - - - - -- - - - --
~~ -
------------
}b
Y
\
"-
~
\Y \
X:2?:
~ :;;
~ \
\~~
LN
@
English
R-25IOB WostifK}lOn By/XISS
us nfr(}l1l 5aJth (f SR //49 (Price RdJ to us n
Swt1I (f SR /536 (Ham/ton 8eoch RdJ
8<<dort CQmIy
SCAlE: ram
a
C\J
fv)
----
----
------c..;:l---
--------
LN
LN
-----
----
-----
------
"WLB
",-Yy"\
WLB Y ~
--- \::=: ~ .:rWLB '\
""""'WlB Y
""'-y
PIlOJICI' IlIPEIlINCII NO. _ 1'10.
R-2510B /I
W#I _ NO.
IlOM1WAY DEIIClI'I H'I'llMWCI
INGMIl __
INCOMPLE PLANS
----- -
PRELlMIN RT PLANS
10 Mal' _ ~.~_._
-----
o
o
ci
LO
+
~
~
C/)
I
...J
I
W
z
::i
J:
U
~
:E
.
..
-
~ ~
lC)
C\J
tv")
I
o
o
o
10
+
'V
N
('I)
~
en
~
I
W
Z
~ Crwa-
!(
:E
--....
I I I ./"\ ---- (
ly y y. y y Y):;& / ) y '> :.Cl
II III /7 X
x I J C6'\~ X ~
/ X X Y -WLB j ~ I X ~ X X
G::J I X ~ _WLB,\ "- :J/ 1.
~ ~1. Y _~ I
/ I ~,-.~ X;J h 1.
/ . X 1.
~ X ) /: XX",X X
: ~ '" ~-$J ~\...'O"" X / 1. 1.
\ ~ ;'1/ X X ;' I /
' /. 1.
.~ ') /? ~ X ,: <0-. ,~'v<O X
. . '- . t....... X ~v'-.) 'l.'
3 l ~ \ l ~v /: / ~ I X
I V' X-L
1 / ..:t..
I
X
I
I
1.
X
X
X
X
X
1.
X
I
~
coI X
\ X /"-.
./ WLB
~~t>
C
at
"
~
.<:
"
Cl.
51
in
r;:
/
"
'0
C
"
?
"
~
/
"
~
'3
~
~
J:
/
"
~
"
Cl.
/
.D
""
in
N
c
-;;
u
!!,
e
0-
n:
/
"
"
u
!!,
e
0-
/
"
C
o
;;
"
[)l
;;
"
"
....>
oC
Q/
:gg
2~
, c
~
,/
NJ)
X
IX
X
X
~81
IX
L
1.
XX
X
X
~
.---
(h Y
X
HITT. JOH SLOAN,
ELIZABETH W P
X 1.
X
Y
y
X
L
y
X Y 1.
L
X
X
y
---
~\...~ 1.
\y
)Y :
y
X
X Y
y
y
X
y
L
~\...'O \ L
!X
\Y Y Y
X Y
y
y
X
X
y
X
X
X
L
L
Y
y X
L
Y
X
X
y
X
X
English
PIlOJECI' IlIPEIlENCI NO. IHIIT MO.
R-2510B 12
rNf IHIIT NO.
rt:JNJWAY IlEIIClN HYDlWJUCS
...- --
R-2.5IOB, woslington By/XISS
us nfrom SwIll oF SR 1/49 (PrlC8 RdJ to us 17
SQJth oF SR 1536 (Haml/fOll B80ch RdJ
&Jaufort (;QJ1IIy
SCALE:r=KXJ'
INCOMPLE E PLANS
DO NOT usa FOR I W ACQUlSrnoN
PRELIMIN RY PLANS
DO Mar VB CONSTRVCTlON
--L-
--L-
I \" X
Y Y~ ~
y
..:::L-
X
X X L
Y
~
y
L
y
1. ---.
y
X
y
~
f'r)YL
X
y
1.
y
X
X
y
Y
1. Y
o
o
X 0
LO
+
I'-
(t)
(t)
~
en
~
I
W
Z
=;
J:
(.)
~
:E
X
X
X
y
X
X
y
y
y
X
X
X
X
y
X Y
Y
X
1.
ERN.GAElt R &.
ROBERT A
1.
1..
y
y
1.
y
X
X
X
Y
X
X
X
X
1.
1.
X
1.
1.
X
y
X
X
X
y
1.
X
X
X
y
L
y
1.
L
L
1.1..
y
L
L
X
. .. \ L L L
L
L L L L
L "'~ L ~
L L ~
@- (Y
x L L ""\
L L
L ~ L X~
Y
1.. y ((Y x y X 1..
L~ L
:t-. \ y~- L
L (<9 \~X ~ L
1.. y\ Y
1.. X
co---. _____ L
___ -l X I
3: L
-wU3 I I
LL ~ L
X (<9 II 1..
\ 1.. X
X Y I
I
c
'"
'U
M
~
c.
sl
in
~
"
~
'U
c
o
"
"
Jt
~
~
~
'U
'"
I
"
+'
~
"
c.
"
.D
'"
in
~
~
U
~
~
"-
0:
~
+'
U
~
~
"-
"
~
C
o
OJ
o
()1
OJ
~
~
~C
Q/
_MO.
13
English
I'IIIOJICI'_NO.
R-2510B
rNf IHRT NO.
J/JN1WAY IlIIIGN
ENGINRI
HYDRAllUCS
_EEIl
L
y
IL
R-~ W<JSIingfCtl Bt{J(1S$
us I7from Stv1tI tf SR 1149 (Price RdJ to us 17
ScuttJ (f SR ISJ6 (Hqrd/tofl 8fJacII RdJ
BtJauforr CfUIy
SCALE,r-KXJ'
XY
INCOMPL E PLANS
DO llar usa rea ,... AOQVISlTION
L
L
y
y
\
--
x
IX
X I
X
X
X "'-
X ft/I...e
X 1..'-....
X
I
1..
XX
L
L
1..
1..
Y
1..
I
1..
X
X
L Y
I
1.. L
I @y Y
L OX
PA TRICK W H HRS l!)
Y Y tv) y
y
y X
Y L
L
Y X
o
o
ci
o
+
~
LO
(t)
~
en
~
I
y
X
X
1..
o
o
o
LO
+
I'- y
('I)
('I)
~1..
en
I
..J
I
W
Z
-
..J
J:
(,)
~
:5
~ y
L <'(Y "" ~
X
1..
y
y
X
XX~
y
y
X
y
y
L
1.. "'~
((Y
1.. '\
y
1..
L
y y
1..
-J
-
1..
L Y Y Y L W
Y Y L Z
Y -
Y ....J
~ 1.. ~ J:
Y L X ~
L X ~ PATRICK. <(
L '" L X L Y Y SEPI:N13 H~ :E
1..~ X X @ X
Y 0> \\N U3 ---- L 1.. L
Y Y \ y "'~
y <'
L X\ 1.. Y L <9",,~
1.. X X 1.. 1..
L "iX X
1.. 1.. X ~ Y X X
X X Y
y
<<9 L X
Y I\ X 1..
1.. L L L
X X\ I L
L Y 1..
1.. L Y 1..x X
L L Y
1..
X
y
1..
X
L
1..
L
y
1..~
1..
I
X 1..
L
L L
L
y L
L
1.. 1..
L 1..
XL X
1..
1..
X
cr
cr
.....
"-
;:::
CD
I
c
'"
"
~
~
Q.
'"
LO
~
-;;
"
C
o
';l
o
:>:
-;;
~
'3
o
L
-g.
J:
"
"
E
L
o
Q.
"
.D
'"
LO
~
-;;
U
.!!,
o
L
0-
a:
-;;
"
U
.!!,
o
c
0-
-;;
C
o
;;
o
01
;;
.
o
~~
Q/
x x \ x
xX \\
X (~X
X X X \
",-xX X \
.....................11', X X \-<\1.
............... (8..... v-
~ ~............... X X \
.:t:. .:t:. '-...0.:t:. .:t:. \ ~
1. .............. ~ 1.~ X 1.
X X ~............... 1. \
.:t:..:t:. .:t:. ------~ ,,10 .:t:.
X '" ~ X
Xx x~~ xX
1. ix\ '\'~
X \> OWZ8 '"
X OJx............... Ir{.
X X x ~~\ X 8
x \ X
/'
1.
X
0
0
ci X
0
+
-r-
Lt)
(Y)
~
en
~
I
W
z
::i
J:
0
~
:E
X
x
X
X
X X X
X
X
1.
x
~O:t
X X
X
1.1.
XX
Xx
X
X 1.
X
X
X
X
X
1.
X
X
Xx
X ~x
X
X
X
Xx y
X X
X
X
X
X @
X X
1.
X
X
1.
1.
X
X
1.
",X
""4: ~ 1.
<<9 <9
1.
1.
y
1.
1.1.
English
I'IIOJICl' _ NO.
R-2510B
rNf ItlI!Il' NO.
Jt>>DWAY DIllON
~
1.
1.
R-25I08 Wf18/I'.on Bypass
us ITfrom S<ntII cf SR 1149 (Pr/oe RdJ to us IT
South cf SR ISJ6 (Hom1/totJ 80acII RdJ
e.dort COUrly
SCALEI r-<<X1
_NO.
14
IftDWJlICI
_EEIl
1.
1.
1.
1.
1.
~1.~~
y
1.
X
1.
y
1.
y
.:t.,
X
1.
/8
.:t:. .:t:.;: ~
x
1/1. 1.
^'~ /
/~ X X <<>
X (,y~ -,--- 8
~/-"4 ~
~
(Y)
$
en
~
I
W
z
::i
J:
o
~
:E
X
1.
X
X
X X
X ()
@
1. (,()
PA TRICK, JOSEPH B HRS ~
1.
X
X X 1.
X
X
X
X X
X
X
X
X
X
X X
X 1. \~~
x ~\ 1. X X
.:t:. .:t:..:t:. ~ \\ .:t:.
.:t:. .:t:. ~ \ \
1. \~~ X
X '? \
.:t:..:t:..:t:. .:t:. .:t:..:t:. '" \ \ ~ .:t:. .:t:.
.:t:. .:t:. ~.:t:. ~ \ .:t:. .:t:. .:t:.
1. 1. * ~
X ,Y 1. X \ X~ \V /~
~ \...L-
1. 1. ~ V
1.\
1.1.1.1. 0
1.
x
wz8............... ..............11',- X X
1. X~............... 1. 1.
X ~~ X
X '-.. ~
\
1.
X
1.
(8 ~
.:t:. ~ ~
1. \V "'tr.
-L Z&
y ~
1.
X@ 1.
1..1.
1.
x
1.
1.
r-
1.
X
1.
1.~........,1.
.:t:. l , .:t:.
1. , "-
~ "" ',,\1.
/ \~ X X \V
\ " \ -L
\
\C.:t:. .:t:. .:t:. .:t:.
'\: X
1.
x
1.1.
\
1.
1.
\
Xx
\
\II"
~
y
HIQlECl' _ NO. IHBT 1lO.
R-2510B 15
rNI IHel' NO.
JDNIWA.Y DIIIGN Il'IIllWlUCS
ENG_ __
.::t. Y Q:;
~
/
QJ
English
..
y
y
R-25108 WosNngton Bypass
us flfrOl1l SWth (If SR 1149 (PrtCII RdJ to us fl
SwIh (If SR I~ (Han/1IOn 8<<1ch RdJ
&tdort Ccudy
SCALE/ r=1OO'
y
y
Y
y
)
INCOMPLE E PLANS
DO Nar usa FOR I W ACGUJSlTION
PRELlMIN RY PLANS
DO NOT VB PO CONSTRUCTION
/
Y
y
~
y Y
Y
Y Y
y
y
Y
~- L
y
y
y
y
Y
Y Y
/
Q:;
~
/
fa /
"'-
IV")
Y
y
/"""
~\,<o
/
y
y
'\
Y
y
y
y
y
y
~
y
.Y
y
Y
y
\
87M
""
Y
yY
y
y
y ~
~
cbWARD.
/EX ALL N
y
y
y
y
.Y
y
.Y
. -..........
,/'l.()
/ <-0
rvJ
Y
y
~y
I
, -.J
\~
: I y
I
.
.
........
y
y
y
y
Lr)
..h
~
.......
'- ~"\,~
/ y
QJ
~
.......
y
1
0)
\
y Vy
.
,
'\.
/
.Y
.Y
y
y y
y y y
~/
Y Y/ ~
o
o
o
o
+
~
~
en
...:..
I
W
z
:J
J:
~
<(
:E
Y
o
o
o
LO
+
......
......
('t)
~
en
~
I
W
/W1...8 ---- ~
(y~ ~
/ --l Y ~
~y Y
-.J Y
iY
/@: : ~
( y y y ~'v<Q
~e::- =s----
y
y
y
I
y
y
y
y
/
~^.~:.
/
.Y
y
y
C
01
'tJ
~
~
Q.
0;{
in
";:'
/
"
'tJ
C
o
?
o
:00
/
"
.3
,
~
-g,
J:
/
."
~
o
Q.
/
.D
'"
in
N
~
"
"
o
.!!,
~
n..
a:
/
"
.,
o
.!!,
~
n..
/
"
C
o
.;;
o
01
.;;
"
o
>
....c
Q/
y
y
y
y
y
/
y
y
y
y
y
y
y@-
Y
y
y
y
y
y
\ y
r-- -~ ~ [J'0,
( (' <:? ....-./' ---- ~
""" y y Y
8/41 Y Y Y
\..... ............... Y y
Y W1...8--.. ~ Y Y
Y _______ .......... y y
y y ~ [J/1/1 Y
---Wt.. ---- Y
Y 8............... ~
Y y yy~
y
y
I
~
Y/
Y
Y y
Y
y
Y
,''\.
/' '
\
y
Y
xl
y
Y
Y
/
y
"
Y
.......
Y
Y
........
y\ /
/
I /
Y
/
Y /
y
Y
I
Y
y
............ y Y
[J/4t
.......... ...............
Jtze
y ~
Y
/
Y
y
:t
~:t
/
y
y
yY
y
/
y
y
..
CT
CT
.....
r--
;:::
<D
I
c
'"
'0
~
-:;
a.
.,.;
iO
~
-;;
'0
C
o
?
.
3
-;;
II
,
.
c
~
:I:
"
"
~
.
a.
"
.D
\Sl
iO
~
"
~
I
~-
I I
I
/ ~
~y~
/ I I ~
I 'WL8_
II
~hY~:y yy
( I / \I ~
"--I a I
,,~y
...............I
o
o
o
LO
+
......
......
Cf)
~
UJ
I
....J
I
W
z
::i I
:r:
(.)
~ I
:E
23
I
I
I
I I
@Yt-I
I I
I
II
I I
~
~1r!..fJ ~
~ I
~
I
I
II
I
~
I
I
I
I
I
I
I
/ I
CrJ
~I
II
I
~y Y Y
II II~
I
I
I
II
I I
I
I
I
L
~
Y
L
I
I
I
y
L
Y
yY
Y
~
y
L
@
Y
Y
I
I
I
I
I
Ly
I
I
L
I
I
I
y
I
I
r
L I
I
I
y
I
y
y
I
y
y
I
y
I
I
I
Y
y
I
y
R-25I08 WosNnt;OfI Bypass
us I7fr()(fJ S<<IIh (f SR 1149 (PrIce RdJ to us 17
South (f SR 1536 (HafIi/t()(l 8<<Ich RdJ
&Kdort Ccvrty
SCN.Elr:::J(}()'
L
y
y
L
y
Ll() I
CO
fV)
L
I
I
L
I
y
I
y
L
I
y
I
I
I
y
y
y
I
21
I
y
L
I
I
I
L
I
y
L
Y
y
y
y
y
y
L
y
y
I
L
L
English
L
y
I
y
y
L
I
I
y
L
L
I'IlOJICT _ NO.
R-25/0B
INI IHm NO.
JtJN1W",y IlEIICll'l
~
It&r NO.
/6
/y yy Y
I
IlYDINJLlCS
--
INCOMPLE E PLANS
DO NOT usa POI. I W ACQUJ5lT1ON
PRELIMIN RY PLANS
DO NOT VB CONSTR11CTtON
y
I
a
0)
fV) y
I
o
o
o
Lt)
+
o
0)
Cf)
~
UJ
~
I
W
z
::i
:r:
(.)
y ~
:E
y
I
I
I
I
I,
0- English I'IlOJECI' ...-c:I NO. _MO.
.. 0- R-2510B fl
"- Y Y
"- Y
:::: y y rNf IHH1' NO.
eD
Y R-251OB VlasNiIgIon 9f/X1$$ JtJN1WAY lldIGIl HYIlMWCS
Y us flfrcm SccJth rf SR 1149 (Price RdJ to us fl ~ _EEl
Y Stdh rf SR /536 (Hamilton 8t>>c/I RdJ
@ Y j &wfort Courty
y SCALE, '-KXT
Y y Y -1..- -1..-
Y Y y
Y Y - y
l~ y
::'S. Y X
y
y y y
y y
y y
y y y
X LO y QK.
y y 0> C)
tv) y ~ y
X y
0 y y
0 X X 0
0 y y y 0
LO 0
+ LO
I 0 y y y +
0) ~
CW) y y
~ ~
- - - ~
en - - -
~ y en
I
I ..J
W I
Z Y W
::i y y y Z
c J: y ::i
01
'U Y
~ 0 X Y J:
{i !( y y y 0
Q. !(
'"
in :! y
';' :!
-:;
1) y
c
0
?
0
;"
/
n
~ y y
'3 Y X Y
~
-g,
J: X X Y
/
" Y X
E
c y
0 @
Q.
/ Y
.!l Y X
IS> Y
in Y SINGLETON B E JR & MARSHALL T
';'
-:; y y y
y X
X Y
y X Y
Y Y X Y Y
Y
Y y
y y X
Y X X X
X X
X Y
y
English PIlOJICI' --..a NO. _NO.
... R-2510B 18
Y Y R-25IOB W<J$/ingfcn 8y(X18$ 1M IHIIl' NO.
Y us flfrom South (f SR 1/49 (Price RdJ to us fl JtJN1WAY llIJIGlol HYIlIAWCS
Y ENGIolEl ENCIINHI
StUh (f SR 1536 (HomIlton 8tJach RdJ
Y Bet:Nfort Ctnr/y ~COMPLE E PLANS
Y y SCAlE: r=lOO' DO NOT usa POR ,. ACQ1JJS1TION
Y PRELIM~ RY PLANS
Y DO Nar 115K JI'O CONSTRucnoN
y y y
y y
y y
y y y
~ -
~ y
y y
y y y @ y
y y y SINGLETON 8 E JR & MARSHALL T
Y y y
L!) y C) y L!}
C) -- y --
"\t- y y y "\t- "\t-
o
0 y 0
0 y x. y ci
g ci y y Ll)
Ll) +
I + y co
~ y ~
y 'l:t
~ Y ~
~
VJ
VJ ~
~ .
'. w
w z
C z y ::J
'"
." ::J y
~ :I:
~ :I: Y Y Y 0
"-
'" 0 y ~
in X.
~ ~
-;; ..:t.. :E
1l
0 ::;:
0 y
;;
v
:0. y
-;; y
~
'3 Y Y y
~ y y
1l
:r>
:I:
" Y @
+' Y
~ Y y
v y
"- y SINGLETON 8 E JR & MARSHALL T
"
.0
'"
in
~
-;;
0 y ~
.!?, y x.
~ y
0- X. Y Y
co
-;; y
+' ~
0
!!, y y x.
~ y
0-
" Y
.
0
0 y
.;;
0
01 Y Y x.
.;;
. y y
0
0>
NC
2/
",+' Y ~
00
00 X.
N'
,+' X.
COO
",0
::;U
.!..~
N.Il
0
0
0
I it)
+
ca
~
~
~
en
I
...J
I
W
Z
C ::J
'"
"
~ J:
.t:
C 0
Q.
<Si ~
in
";'
-;; :E
"
c
c
';l
c
~
'"
c
~
'3
~
-g,
:I:
'"
"
E
L
0
Q.
'"
.!J
lSl
in
";'
'"
C
0
.!?,
~
0-
0:
-;;
"
0
.!?,
C
L
0-
'"
~
C
0
;:;
C
'"
;:;
~
0
>
NC
2/
~g
OC
N"
'c
~
..!...":::
NlJ)
t:..
y
y
y
y
R-Z5IOB WOSIinglon BytxJ$$
US "from SQJfh ~ $R 1149 (Price RdJ to US "
SQJfh d' SR 15J6 (Hollitton 8BacII RdJ
8etJufort CQJ1'I/y
SCALE:r-1OO'
-
~
y
y
y
y
-
y
y
y
y
y
y
y y @
y
SINGLETON B E JR & MARSHA~ T
Y Y Y
a
y ~
y
l.()
C\J
~
y
y
y
y
y
y
y
y
y y y
y
y y
y
y
y
@ y
SINGLETON B E JR & MARSHALL T
Y y
y
y
y
y
y
y
y
y
English
I'IIOlICI' _ NO. SIlIIT NO.
R-2510B /9
rNf .... NO.
rt>>l1WAY IlEIlGft IlYIIUWCS
ENGNIIl __
-
-
o
o
o
it)
+
m
N
~
~
en
~
I
W
z
::J
J:
to)
~
:E
...
I
o
o
ci
it)
+
0)
N
~
~
en
I
..J
I
W
z
:::::i
::I:
(,)
~
~
C
rn
"
osi
"l
{i
a.
csl
10
~
-;;
"
C
o
?
o
3
-;;
~
'3
o
L
~
J:
,
+'
~
o
a.
,
.0
""
10
'N
"
-;;
o
!?,
o
L
Cl.
a:
-;;
+'
o
.!!,
e
Cl.
-;;
C
o
~
o
rn
~
n
o
>
NC
Q/
R-25108 W(J8/ington Byf)(l$$
US Ilfrom ScufII of SR 1149 (Price R</J to us 11
ScufII of SR 1536 (HonillOn 8tJac/J R</J
8<<Jufort Coody
SCAI.E:f'-/OO'
I
~
-
~
C)
t'r)
"t
l!)
f'r)
"t
English
I'IIOJECT _ NO. SHEET NO.
R-2510B 20
rNf IHIIl' NO.
II!JN1WAY llEIICllol HYIlIAWCI
EIGNIlI II'lClINIB
INCOMPLE E PLANS
DO NOT usa FOR , W' A.COUJSlftON
PRELlMIN RY PLANS
DO NOT UD CONSTR11C'I1ON
C)
"t-
"t-
-
-
y
y
y
y
y
y y y
y
y @f
y
y y
y y
y
y y
y y y
o
o
ci
it)
+
~
~
en
I
..J
I
W
z
:::::i
::I:
(,)
~
~
English PIICJICT ...-a NO. .... NO.
" R-2.5/0B 2J
I I'H IHHr NO.
I y JDN/WAY ~ Il'IIlIWJUCS
Y ~ --
y y
y INCOMPLE E PLANS
R-2SIOB WQS/ingtO/l Byposs Y DO Nar USE POI. ~ W A.CQUISITION
US Ilfr()lll ScutII ~ SR 1149 (Price RdJ 10 us 17 y Y PRELIMIN RY PLANS
DO Mar VSB PO CONS1'1t.vcnoN
ScutII ~ 5R /536 (Haflin()fl Beach RdJ ----(L+ - y
8<<Jufort CWrty ~ Y
SCALE, r=J(J(J' I
I
Y Y y
I
y Y
I
Y Y Y I I
Y Y
y y y
a y l()
I Y
y l() l()
I ~ y y "\t-
y y y
0 y 0
I 0
0 y 0
0 I I I Y LO
LO Y Y I +
I + y LO
N Y I LO
~ I I ~
~
I y ~
~
-
en - en
I
~ ....I
I
I W
W
Z z
::i I II .r- ::i
c I I ::I:
'" ::c: y I
"l
i\j (.) I I (.)
.J: ~
. !;c y
Q.
.sl I I
in :E
~ :E
-;; @ I
'0 Y Y
c
0 y
+l I Y I
0 I
:>0
-;;
~ I y I I y
0 I Y Y
~ Y y
~ I I
I
" I
+'
~
0 y I I
Q. I
" I Y I Y
JJ Y
lSl
in
N Y y
~
"
. y
u y
.!?, y
~ y I
Q. I
I I I Y
I Y
I Y
I Y
Y I Y
Y Y
I I I I I
.. 5- English I'lIOJECT .-a NO. .-TNO.
R-2510B 22
"5- "5- 5- R-25IOB WasI'IntJIOIl 8y(XJ$$ JNf _ NO.
5- '5- us "from Sculh of SR 1149 (Pries RdJ 10 US 17 JfJN1WAY ll!IIClN IftDUUUCS
5- "5- SovIf1 of SR ISJ6 (Hanilton &ach RdJ ~ --
"5- 5- &wf0rl CCurty
'5- "5- SCALE: r=j(J(1
"5- '5- "5- 3-
"5- "5- '5-
t- "5- '5- "5- "5- "5-
"5- "5-
5- "5- "5- "5- "5- "5-
"5- "5- "5- @ "5- @"5- ~
/ '5- -
- '5-
'5- "5- RHEM,J DAN JR
"5- () '5- :r.- "5- t8
(..0'5- "5- "5- '5-
"5- "5- "'1- 5-
5- "5- '5- '\f "5- 5-
"5-
"5- $:-
"5- 5- '5- "5- 8
5-
I <6. "5- "5- "5- c:i
~
~ "5- ::.--: :..,....---:
~ f
~ ~ j> "5- ;5
J.. -'
'U, CI.)
5- ,
~ -;I
\ 5- !#
c ~ "5-
en
-u .......
oj -./
"l
i ~ ,~
a.
os: t; "5-
in
~ ~
-;:; ~"5- ~
-u
c
0 4!.
?
v ~
~
/ "5-
~
,g "5-
, "5-
0 "5-
~
-g,
:I;
/
" ~
E
~
v
a. ~"5-
,
J:J
<Sl
in "5- "5-
~ RHEM, J DAN SR
-;:; 5-
"5- "5- "5- "5- "5-
"5-
"5-
"5- "5- "5-
"5- "5-
5- "5-
"5- 5- "5-
"5- "5- "5-
"5- "5-
5- "5-
-.. ~ ~ PIlO.IECI'_NO. _NO.
~ ~ English R-2510B 23
~ ~ I'N IHRT NO.
~ KONIWAY DEIIGI'l H'IllRAULICS
-- &IGItlB
~ ~ CD R-251OB W<J$NngtOn 8ttxm
~ -y ..J
-y -y ~ $: us I7from SQAh (f SR 1149 (Price RdJ to US 17
\ SCtJfh (f SR 1536 (HoniIlOn Beach RdJ
-y -y ~ ~ Beavfort Cevnty
-y -y SCAI.E:r-1OO'
~ ~ ~ -y -y \
-y -y -y
c.- -y ~ -y ~
-y ~ ~
R~,JN SR -y /
-y -y -y CO C)
~
,0 -y -y -y -y ~-y I ~
~
-y -y -y "'t- (CHORD)
-y
0 ~ f___ _0
~ -y -y ------- ------- 0
I 0 -y~ -y --- 0
.0 -y -y -y \~ LO
+ +
cD cO<t) 0
~ ClO
~
< t5
'Ui
en
..) ~
I I
c uJ
'" %
'U -y -y
M
"I :J -y
-'ii
"- :I: -y -y -y -y
& -y I
in (,,) ~
~ -y -y I
-;; '<
'U
c -y \
0
';> 2
0 f ",--
:3' -y -j--rCHOIjD)
-;; -y ---
~
:; ---
0 --
~ --y
~ ~
J: -y -y (CHORD)
" -y
" -y
~
0 ~ -y
"- ~
"
.0 -y
OS> -y-y
in
~ -y -y
-;;
.r.. -y -y -y
~
/' -y -y
-y -y -y -y I
~
-y en
-J
-y ~ -y ~ s
:Y -y I
-y -y
~ -y -y
-y -y /
-y -y
-y -y -y -y -y