HomeMy WebLinkAbout20140710 Ver 2_SAW-2013-01863-PN_201504061 1
1���1
US Army Corps PUBLIC NOTICE
Of Engineers
Wilmington District
Issue Date: April 6, 2015
Comment Deadline: May 6, 2015
Corps Action ID Number: SAW - 2013 -01863
The Wilmington District, Corps of Engineers (Corps) received an application from
HDC- Wendover- Greensboro Partners, LP seeking Department of the Army authorization
to discharge fill material into waters of the United States, associated with constructing
access and infrastructure for Phase II (outparcel) of the Wendover Commons commercial
development in Guilford County, North Carolina.
Specific plans and location information are described below and shown on the attached
plans. This Public Notice and all attached plans are also available on the Wilmington
District Web Site at
http: / /www.saw.usace.anny.mil /Missions /Re u� latoo PermitProgram.aspx
Applicant:
AGENT (if applicable):
Authority
HDC - Wendover- Greensboro Partners, LP
Mr. Key Kasravi
12335 Kingsride Lane, Suite 280
Houston, Texas 77024
Pilot Environmental, Inc.
Mr. Michael Brame
Post Office Box 128
Kernersville, North Carolina 27285
The Corps evaluates this application and decides whether to issue, conditionally issue, or
deny the proposed work pursuant to applicable procedures of the following Statutory
Authorities:
® Section 404 of the Clean Water Act (33 U.S.C. 1344)
❑ Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403)
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972
(33 U.S.C. 1413)
Location
Version 7.8.2014 Page 1
Directions to Site: The proposed project area is an undeveloped tract immediately west of
the Phase I section of Wendover Commons (currently undeveloped), located
approximately 0.1 mile east of McClellan Place, and bounded on the north and South by
Sapp Road and Wendover Avenue, respectively, in Greensboro, Guilford County, North
Carolina
Project Area (acres): 7.81 acres (Phase II) Nearest Town: Greensboro
Nearest Waterway: Bull Run River Basin: 03030003
Latitude and Longitude: 36.05381N, - 79.909184W
Existing Site Conditions
The proposed project area is located within the Carolina Slate Belt of the Piedmont
Physiographic Province. Historically, the site has been primarily forested with low
density residential and commercial land use. Currently the site contains a small number
of residential houses among stands of pine and mixed deciduous forest of varying
maturity, as well as an area of drained pond behind a breached earthen dam. Based on
the North Carolina Wetland Assessment Methodology (NCWAM), wetlands within the
Phase II project area include Headwater Forest wetlands within the drainage formerly
occupied by the drained pond. Jurisdictional streams within the Phase II project area
include Bull Run, a Relatively Permanent Water, which flows to the Deep River, a
Traditionally Navigable Water.
Bull Run carries the NC Division of Water Resources (NCDWR) best usage
classification of "WS-TV"; this classification refers to those waters used as sources of
water supply for drinking, culinary, or food processing purposes where a WS -I, II or III
classification is not feasible. WS -IV waters are generally in moderately to highly
developed watersheds or Protected Areas. There are no designated Outstanding Resource
Waters (ORW), High Quality Waters (HQW), Water Supply I (WS -I), or Water Supply
(WS -II) waters within 1.0 mile of the project area.
The property is bordered to the east by Phase I of Wendover Commons (currently
undeveloped), to the south by Wendover Avenue, to the west by Shining Light Baptist
Church and a wooded lot, and to the north by Sapp Road. The area land use includes high
density commercial and residential to the east and lower density commercial and
residential to the west.
Elevation in the immediate vicinity of the site ranges from approximately 908 feet above
mean sea level (MSL) in the southwest extent of the property to 873 feet MSL along Bull
Run.
Pilot Environmental, Inc., consultant for the applicant conducted a jurisdictional
delineation for the proposed site in 2013. The jurisdictional boundaries were verified by
the Corps, and a Jurisdictional Determination (JD) was approved on July 31, 2014
(USACE ID No. SAW- 2013 - 01863, included with Nationwide Permit 39 verification
tearsheet).
Version 7.8.2014 Page 2
Background
Phase I of the Wendover Commons was authorized under Nationwide Permit 39 on July
31, 2015. This authorization included permanent fill in 0.464 acre of riparian wetlands
and 274 linear feet (0.025 acre) of stream channel. Compensatory mitigation was
required for these impacts including purchasing 0.8 riparian wetland credits and 382
warm water stream credits from the North Carolina Ecosystem Enhancement Program
(NCEEP).
Given that the current proposed impacts to Waters of the U.S., in combination with
impacts from the earlier phase, exceed the Nationwide Permit threshold, the current
proposal to construct Phase II of Wendover Commons is subject to Individual Permit
review.
Applicant's Stated Purpose
The purpose of the project is to build a fitness center and associated parking on a site that
meets required siting criteria in an area that has been identified as having marketplace
demand to support the development.
Project Description
The applicant has proposed to discharge fill material into an additional 0.571 acre of riparian,
non - riverine wetlands to construct Phase II of the Wendover Commons commercial
development, consisting of a fitness center and parking lot. No temporary impacts are
proposed. The proposed impacts to Waters of the U.S. are the direct result of fill for the
fitness center building pad and parking lot expansion.
If authorized, cumulative impacts for phases I and II of Wendover Commons would include
permanent fill in 1.035 acre of riparian, non - riverine wetlands and 274 linear feet (0.025
acre) of stream channel.
The applicant submitted an Alternatives Analysis that includes No Action, On -site, and Off -
site Alternatives. This information has been included with this Public Notice as well.
Supplemental documentation including project plans and a narrative can be found on the
District Website at
http: / /www.saw.usace.army.mil /Missions /Re ug latoI3 PermitProgram /PublicNotices.aspx.
Avoidance and Minimization
The applicant provided the following information in support of efforts to avoid and/or
minimize impacts to the aquatic environment:
In an effort to avoid and minimize impacts to streams and wetlands, a 1.01 acre tract on
the northwestern portion of the site is being placed into a conservation easement.
Approximately 88 linear feet of stream channel, the associated buffer and 0.132 acres of
adjoining wetlands are being avoided and protected. Headwalls are being used to avoid
Version 7.8.2014 Page 3
impacts to the stream and associated buffers and minimize the wetland impacts.
Additionally, 2:1 slopes have been designed adjacent to the wetland impacts to
minimize additional impacts associated with the proposed development. The
utilization of retaining walls to reduce impacts to wetlands by reduction of 2:1 fill
slopes, on the fill side of the proposed project was determined to not be feasible due
to the existing topographic constraints when compared to the proposed fill slopes
would only allow for a negligible amount of wetlands to be avoided and thus likely
would still considered as "take" by the USACE even if proposed to be avoided.
The proposed alternative has been designed to include the construction of an
approximate 15 to 20 foot tall retaining wall around the southern and southwestern
portions of the site to allow for the overall site plan to be shifted to the maximum
extent possible in efforts to avoid the impact to wetlands located on the site. The
proposed retaining wall increases the anticipated costs of construction by
approximately 80 to 100 thousand dollars but results in an overall reduction of impact
to jurisdictional features, including the stream and associated buffer located north of the
development area.
In addition to the on -site measures to avoid and minimize impacts, an approximate 30
acre parcel has been purchased down - gradient in the site's watershed, which allows the
site to off -set the proposed Build -Upon Area (BUA) of the proposed site
development. This parcel will remain in a protected easement, which not only off
sets the calculated BUA of the site but also benefits down - gradient waterbodies
within the site watershed. Thus, any potential jurisdictional features located on the
approximate 30 acre parcel will not be impacted by future development.
To further minimize impacts to down- gradient water bodies, sediment and erosion
control measures will be implemented to avoid indirect impacts due to sediment runoff
during construction. Silt fencing will be used to prevent erosion and capture sediment.
Disturbed areas will be reseeded promptly to prevent future erosion and sedimentation
runoff. Stockpiling excavated soil will be avoided where possible.
While it has been determined that additional avoidance and minimization is not practical
for this project, it should be noted that the wetland that is being impacted contains silted
soil conditions and is typical of wetlands that form in drained ponds or other man
altered landscapes such as stormwater treatment devices, similar to the one that will be
constructed on the southern portion of the site. The stormwater treatment device will
continue functioning to remove sediment from stormwater runoff.
A stormwater pond has been designed in non jurisdictional areas of the site. The
stormwater pond has been designed to treat 90% total suspended solids, preventing
sediment discharge from impervious surfaces that will be constructed on the site.
Version 7.8.2014 Page 4
Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable
functional loss to the aquatic environment:
Impacts to the wetlands will be compensated through mitigation payment to the NCEEP.
A 2:1 mitigation ratio is proposed for the wetland impacts associated with Phase 2.
Essential Fish Habitat
Pursuant to the Magnuson- Stevens Fishery Conservation and Management Act, this
Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The
Corps' initial determination is that the proposed project would not effect EFH or
associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management
Councils or the National Marine Fisheries Service.
Cultural Resources
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of
33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C,
the District Engineer consulted district files and records and the latest published version
of the National Register of Historic Places and initially determines that:
❑ Should historic properties, or properties eligible for inclusion in the National
Register, be present within the Corps' permit area; the proposed activity requiring
the DA permit (the undertaking) is a type of activity that will have no potential to
cause an effect to an historic properties.
® No historic properties, nor properties eligible for inclusion in the National
Register, are present within the Corps' permit area; therefore, there will be no
historic properties affected. The Corps subsequently requests concurrence from
the SHPO (or THPO).
❑ Properties ineligible for inclusion in the National Register are present within the
Corps' permit area; there will be no historic properties affected by the proposed
work. The Corps subsequently requests concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register,
are present within the Corps' permit area; however, the undertaking will have no
adverse effect on these historic properties. The Corps subsequently requests
concurrence from the SHPO (or THPO).
❑ Historic properties, or properties eligible for inclusion in the National Register,
are present within the Corps' permit area; moreover, the undertaking may have an
adverse effect on these historic properties. The Corps subsequently initiates
consultation with the SHPO (or THPO).
Version 7.8.2014 Page 5
❑ The proposed work takes place in an area known to have the potential for the
presence of prehistoric and historic cultural resources; however, the area has not
been formally surveyed for the presence of cultural resources. No sites eligible
for inclusion in the National Register of Historic Places are known to be present
in the vicinity of the proposed work. Additional work may be necessary to
identify and assess any historic or prehistoric resources that may be present.
The District Engineer's final eligibility and effect determination will be based upon
coordination with the SHPO and/or THPO, as appropriate and required, and with full
consideration given to the proposed undertaking's potential direct and indirect effects on
historic properties within the Corps- indentified permit area.
Endangered Species
Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area,
examined all information provided by the applicant and consulted the latest North
Carolina Natural Heritage Database. Based on available information:
❑ The Corps determines that the proposed project would not affect federally listed
endangered or threatened species or their formally designated critical habitat.
❑ The Corps determines that the proposed project may affect federally listed
endangered or threatened species or their formally designated critical habitat.
The Corps initiates consultation under Section 7 of the ESA and will not
make a permit decision until the consultation process is complete.
® The Corps is not aware of the presence of species listed as threatened or
endangered or their critical habitat formally designated pursuant to the
Endangered Species Act of 1973 (ESA) within the project area. The Corps will
make a final determination on the effects of the proposed project upon additional
review of the project and completion of any necessary biological assessment
and/or consultation with the U.S. Fish and Wildlife Service and/or National
Marine Fisheries Service.
The applicant submitted additional site - specific information on federally protected
threatened and endangered species, which can be found on the District Website at
http: / /www.saw.usace.army.mil/ Missions /Re ulatoD PermitProgram /PublicNotices.aspx.
Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the appropriate
State agencies for review.
Version 7.8.2014 Page 6
North Carolina Division of Water Resources ( NCDWR): The Corps will generally not
make a final permit decision until the NCDWR issues, denies, or waives the state
Certification as required by Section 401 of the Clean Water Act (PL 92 -500). The receipt
of the application and this public notice, combined with the appropriate application fee, at
the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a
401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this
request for certification within sixty days of receipt of a complete application. Additional
information regarding the 401 Certification may be reviewed at the NCDWR Central
Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North
Carolina 27604 -2260. All persons desiring to make comments regarding the application
for a 401 Certification should do so, in writing, by April 27, 2015 to:
NCDWR Central Office
Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit
(USPS mailing address): 1617 Mail Service Center, Raleigh, NC 27699 -1617
Or,
(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604
North Carolina Division of Coastal Management (NCDCM):
❑ The application did not include a certification that the proposed work complies
with and would be conducted in a manner that is consistent with the approved
North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2
(b)(2) the Corps cannot issue a Department of Army (DA) permit for the
proposed work until the applicant submits such a certification to the Corps and
the NCDCM, and the NCDCM notifies the Corps that it concurs with the
applicant's consistency certification. As the application did not include the
consistency certification, the Corps will request, upon receipt, concurrence or
objection from the NCDCM.
® Based upon all available information, the Corps determines that this application
for a Department of Army (DA) permit does not involve an activity which would
affect the coastal zone, which is defined by the Coastal Zone Management (CZM)
Act (16 U.S.C. § 1453).
Evaluation
The decision whether to issue a permit will be based on an evaluation of the probable
impacts including cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
Version 7.8.2014 Page 7
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain
values (in accordance with Executive Order 11988), land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property
ownership, and, in general, the needs and welfare of the people. For activities involving
the discharge of dredged or fill materials in waters of the United States, the evaluation of
the impact of the activity on the public interest will include application of the
Environmental Protection Agency's 404(b)(1) guidelines.
Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local
agencies and officials, including any consolidated State Viewpoint or written position of
the Governor; Indian Tribes and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects and the other
public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS)
pursuant to the National Environmental Policy Act (NEPA). Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider the application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. Requests for a
public hearing shall be granted, unless the District Engineer determines that the issues
raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to
the proposed work, as outlined above, until 5pm, May 6, 2015. Comments should be
submitted to David E. Bailey,Raleigh Regulatory Field Office,
3331 Heritage Trade Drive, Suite 105 ,Wake Forest, North Carolina 27587, at (919) 554-
4884 extension 30.
Version 7.8.2014 Page 8