Loading...
HomeMy WebLinkAboutAB Site Inspection MarchWetland Inspection Report Project Num: 19980260 Version: 8 Status: Issued Project Name: TPB NC DOT - Winston-Salem Northern Beltway Project Type: New Road/Highway County: Forsvtxhase 2 (R-2247/U-2579) Region: Winston-Salem Location: TPB NC DOT -Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579) Latitude: +360 10' 49" Longitude: -80' 16' 23" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 3/15/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: Phone: 336-776-9703 page 1 Site Number: 19980260 Owner: Thorpe, Greizory Inspection Date: 3/15/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: The Corps, DOT staff and contractors reviewed Sites 12, 10, 9, 25, 26 and 6 culverts and fill areas. All were built to plans. However, at Site 6 more work was needed at CWD and silt bag discharges to protect the stream bank. Site 25 needed more rip rap around wing walls. Site 10 discharge area need to be reshaped a little to match plans and to discourage opposite bank erosion from high flows. page 2