HomeMy WebLinkAboutAB Site Inspection MarchWetland Inspection Report
Project Num: 19980260 Version: 8 Status: Issued
Project Name: TPB NC DOT - Winston-Salem Northern Beltway Project Type: New Road/Highway
County: Forsvtxhase 2 (R-2247/U-2579) Region: Winston-Salem
Location: TPB NC DOT -Winston-Salem Northern Beltway Phase 2 (R-2247/U-2579)
Latitude: +360 10' 49" Longitude: -80' 16' 23"
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 3/15/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
Phone: 336-776-9703
page 1
Site Number: 19980260 Owner: Thorpe, Greizory
Inspection Date: 3/15/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: The Corps, DOT staff and contractors reviewed Sites 12, 10, 9, 25, 26 and 6 culverts and fill areas. All
were built to plans. However, at Site 6 more work was needed at CWD and silt bag discharges to
protect the stream bank. Site 25 needed more rip rap around wing walls. Site 10 discharge area need to
be reshaped a little to match plans and to discourage opposite bank erosion from high flows.
page 2