Loading...
HomeMy WebLinkAbout20150320 Ver 1_More Info Received_20150406Strickland, Bev From: Becky Ward <bward@wce'mrp.mm> Sent: Monday, April U6'ZUl5l:3ZPK4 To: Strickland, Bev Subject: RE: DVVQ#l5U3ZU Robertson's Mill Pond Preserve Attachments: Robertsons Complete set 3Z4 [opy.pdf Beverly: Please find attached the requested plans. Let me know if you have any additional questions or concerns. Thanks, 4805 Green Road, Suite 100 Raleigh, NC 27616-2848 Ph: 919-870-0526 email: bward(cDwce-cor1).co From: Strickland, Bev Sent: Monday, April U6 2015 11:25 AM To: Subject: DWQ# 150320 - Robertson's Mill Pond Preserve Ms. Beeky, Can you send meune|ec|roniecopyo[ the above site plans? PDyiofine. Thank Bev �evell,ly Stii,Idldaind, ��i aseii,fi'dlie������������� M[DEMR Division of Water Resources Physical: SLAhe1219,S12NSa|isbuny,NC Mailing: Mail Service Center 1617, Raleigh, NC27699-1617 Phone#g1g-707-8789 Email Address: Bev.Strickland@ncdenr.go 1 Appendix B Provided by Structural Engineer STRUCTURAL DESIGN DESIGN LOADS: PROJECT NAME Importance Factors: Wind (Iw) 1.0 Snow (Is) 1.0 Seismic (IEJ _1.0 Live Loads: Roof 20 psf Mezzanine N/A psf Floor _40_ psf 2012 Na Con[ a*Ld, PoUaele Ground Snow Load: 15_ psf Wind Load: Basic Wind Speed 100 mph (ASCE -7) Exposure Category TC Wind Base Shears (for MWFRS) Vx = _2.72 kips_Vy = _2.24 kips SEISMIC DESIGN CATEGORY: ❑ A ®B [IC ❑ D Provide the following Seismic Design Parameters: Occupancy Category (Table 1604.5) Ell ®II ❑ III ❑ IV Spectral Response Acceleration Ss 0.197 %g Si 0.078_ %g Site Classification (Table 1613.5.2) ❑ A ❑ B ❑ C ND ❑ E ❑ F Data Source: , ❑ Field Test ® Presumptive ❑ Historical Data Basic structural system (check one) ❑ Bearing Wall ❑ Dual w /Special Moment Frame ❑ Building Frame ❑ Dual w/Intennediate R/C or Special Steel ❑ Moment Frame ® Inverted Pendulum Seismic base shear: Vx = _0.42 Vy _ _0.42k Analysis Procedure: ® Simplified ❑ Equivalent Lateral Force ❑ Dynamic Architectural, Mechanical, Components anchored? ❑ Yes ® No LATERAL DESIGN CONTROL: Earthquake ❑ Wind SOIL BEARING CAPACITIES: Field Test (provide copy of test report) psf Presumptive Bearing capacity _2,000 psf Pile size, type, and capacity SPECIAL INSPECTIONS REQUIRED: ❑ Yes ® No ROBERTSON'S MILL POND PERMIT SET DHM PROJECT#, 14034.00 'o Wakki ns Rd t 0 E w ,e 9 A " Nc97.Nwy` 4*hl �'{�� II {I 1 Wr r KNIGHTDAU we"doo Blvd w L 0 WEkDELL VICINITY MAP STRUCTURAL DESIGN DESIGN LOADS: PROJECT NAME Importance Factors: Wind (Iw) _1.0 Snow (Is) _1.0� Seismic (Ie) _ _1.0_ Live Loads: Roof _N /A psf Mezzanine -' psf Floor —N/A ^50 _ psf 2012 NC Code, a-& PoUxZes. Ground Snow Load: 15_ psf Wind Load: Basic Wind Speed 100 mph (ASCE -7) Exposure Category ^C Wind Base Shears (for MWFRS) Vx ° N/A kips_ Vy = _N /A kips SEISMIC DESIGN CATEGORY: N/A (SEISMIC DOES NOT APPLY) ❑ A ❑ B ❑ C ❑ D Provide the following Seismic Design Parameters: Occupancy Category (Table 1604.5) ❑ I ❑ 11 ❑ III ❑ IV Spectral Response Acceleration Ss_ %g SI_ _%g Site Classification (Table 1613.5.2) ❑ A ❑ B ❑ C ❑ D ❑ E ❑ F Data Source: ❑ Field Test ❑ Presumptive ❑ Historical Data Basic structural system (check one) ❑ Bearing Wall ❑ Dual w /Special Moment Frame ❑ Building Frame ❑ Dual w/Intennediate R/C or Special Steel ❑ Moment Frame ❑ Inverted Pendulum Seismic base shear: Vx = V, = Analysis Procedure: ❑ Simplified ❑ Equivalent Lateral Force ❑ Dynamic Architectural, Mechanical, Components anchored? ❑ Yes ❑ No LATERAL DESIGN CONTROL: Earthquake ❑ Wind SOIL BEARING CAPACITIES: Field Test (provide copy of test report) _ psf Presumptive Bearing capacity __2,000_ psf Pile size, type, and capacity SPECIAL INSPECTIONS REQUIRED: ❑ Yes ® No N 0 1,600 3,200 6,4170 Feet 1 inch = 3,200 feet SCALE: AS SHOWN SITE DATA SUMMARY PROJECT NAME ROBERTSON'S MILL POND PRESERVE EXISTING STREET ADDRESS 6307 ROBERTSON POND RD., WENDELL, NC EXISTING LOT AREA 84.6 AC AREA OF PUBLIC RIGHT -OF -WAY DEDICATION N/A LOT AREA 84.6 AC CURRENT ZONING R4 OVERLAY DISTRICT(S) N/A PARCEL NUMBER 1775345450 REAL ID NUMBER 0023200 EXISTING GROSS BUILDING AREA VACANT STRUCTURE - 722 SF, UTILITY STRUCTURE - 400 SF EXISTING BUILDING USE(S) VACANT - UNMANNED STORAGE & A UTILITY STRUCTURE PROPOSED GROSS BUILDING AREA EROSION CONTROL DETAILS PROPOSED BUILDING USE VACANT STRUCTURE TO REMAIN UNMANNED STORAGE. UTILITY STRUCTURE TO BE REDUCED TO UNDER 250 SF EXISTING IMPERVIOUS .06 AC / 2,614 S.F. / .07% PROPOSED IMPERVIOUS 1.48 AC / 20,909 S.F. /.57% CONTACT INFORMATION PROPERTY OWNER WAKE COUNTY PO BOX 550 RALEIGH, NC 27602 / `l Ir—KIT WAKE COUNTY PARKS, RECREATION, AND OPEN SPACE PO BOX 550 RALEIGH, NC 27602 CONTACT: ERIC O. STAEHLE PHONE: 919.856.6369 EMAIL: ERIC.STAEHLE @WAKEGOV.COM LANDSCAPE ARCHITECT (PROJECT MANAGER) DHM DESIGN, INC. 218 SNOW AVENUE RALEIGH, NC 27603 CONTACT: GRAHAM H. SMITH PHONE: 919.805.3586 EMAIL: GSMITH@DHMRALEIGH.COM STRUCTURAL ENGINEER LYSAGHT & ASSOCIATES 120 ST MARYS STREET RALEIGH, NORTH CAROLINA 27603 CONTACT: CHUCK LYSAGHT, PE EMAIL: chuck @lysaghtassoclates.com PHONE: 919- 833 -0495 CIVIL ENGINEER WARD CONSULTING ENGINEERS 8386 SIX FORKS ROAD, SUITE 104 RALEIGH, NORTH CAROLINA 27615 CONTACT: BECKY WARD PHONE: 919- 870 -0526 EMAIL: BWARD @WCE- CORP.COM SHEET INDEX L100 EXISTING /DEMOLITION PLAN 1-101 SITE PLAN L102 SITE DETAILS 1-103 SITE DETAILS L104 SITE DETAILS 1-105 SITE DETAILS L200 GRADING PLAN L300 LANDSCAPE PLAN L301 LANDSCAPE NOTES AND DETAILS C1 EROSION CONTROL PLAN C2 EROSION CONTROL DETAILS C3 EROSION CONTROL DETAILS S101 FOUNDATION PLAN, ROOF FRAMING PLAN, SHELTER ELEVATION NOTES: a. Final zoning and site improvement inspection shall be required to verify site plan compliance before a Certificate of Compliance is issued by Wake County Building Inspections. b. Deteriorated or dead screening shall be repaired or replaced within six months c. No permanent construction can occur within buffer yards d. Septic tanks and septic drain lines are prohibited in required buffer yards. Storm water retention and detention facilities, storage tanks for any purpose, utility substations, and buildings housing utility substations and buildings housing utility commodities or equipment are also prohibited in required buffer yards. 1 11 LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. 1:1, 11111IJl,t Rol O \pN Sc ��` - ,1 Vii,_ x: :� 51 g _ - ''LL �7 - ,'fir 111111111111111 Z O 0. J 0 Q O 0 Cn Z Q O z_ Z0- --.11 OZ O 0 OQ U) C) U LU O z Lu CO Z >- J 1-- J Z W p O � 0 U W Y PROJECT NUMBER: 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: COVER SHEET NUMBER: cov SHEET 9 OF 9 DEMOLITION NOTES 1 ............... '— 1. THE CONTRACTOR SHALL NOTIFY THE N.C. ONE CALL CENTER AT 1- 800 - 632 -4949 PRIOR TO STARTING WORK. / 2. CONTRACTOR TO NOTIFY PUBLIC UTILITY PROVIDERS BEFORE START OF WORK. —' 3. THE CONTRACTOR SHALL NOT MAKE ANY LANE CLOSURES OR CHANGES TO THE EXISTING TRAVEL PATTERNS ON 50 RIPARIAN ::::::: — / / ✓ ANY PUBLIC STREET WITHOUT PRIOR APPROVAL FROM THE CITY OF RALEIGH TRANSPORTATION DEPARTMENT .. BUFFER AND /OR NCDOT. LIKEWISE, THE CONTRACTOR TO PROVIDE A CONSTRUCTION SEQUENCE PLAN 8. VEHICULAR AND — �--�, — — EXISTING COOP PEDESTRIAN DETOUR PLAN FOR AREAS WITHIN SITE PRIOR TO CONSTRUCTION. TO REMAIN / LIMITS OF WETLAND DELINEATION :::: r — — 4. THE CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL REQUIREMENTS REGARDING REMOVAL AND DISPOSAL OF MATERIALS AND DEBRIS. 5. CONTRACTOR SHALL REFER TO CIVIL SHEETS FOR REMOVAL AND RELOCATION OF EXISTING UTILITY LINES. .`....... / / I / / 6. RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S). / �P)� NO CONSTRUCTION 7. CLEANOUTS LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUCTION THAT ARE TO REMAIN, SHALL / STAGING OR PARKING n I BE PROTECTED FROM DAMAGE AND RAISED TO FLUSH WITH NEW GRADE. 1 8. ELECTRICAL OR GAS UTILITY SERVICES TO BE REMOVED SHALL BE REMOVED AND RELOCATED ( AS INDICATED ) BY O FEMA "�� x m x THE UTILITY PROVIDER. CONTRACTOR SHALL SCHEDULE AND COORDINATE THIS WORK WITH THE APPROPRIATE \ FLOOD ZONE AE / 2 z SERVICE PROVIDER. ALL SERVICES SHOULD BE RE- INSTALLED PRIOR TO THE INSTALLATION OF PAVEMENT, SIDEWALKS, BASE/FLOOD EL. = 291' / / / 3 CURB AND GUTTER, OR OTHER PERMANENT FEATURES. 9. REMOVE EXISTING CONCRETE (WHERE REQUIRED) TO FIRST COLD JOINT OR SAW CUT TO OBTAIN A CLEAN EDGE z FOR NEW CONSTRUCTION. SAWCUT EXISTING ASPHALT TO OBTAIN A CLEAN EDGE. I I I x / COUNTY OF WAKE / 10. CONTRACTOR SHALL RESTORE THE LAYDOWN AND STAGING AREA TO ORIGINAL CONDITIONS AND TO THE I� DB 15449, PG. 2570 / / �" SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. ::: BM 2013, PG. 1239 / — 11. CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL. COMPACTION OF THESE SOILS PERFORMED IN ACCORDANCE l PIN # 1775 -34 -5450 / :::.::;.:.:_:::?`` J l \ WITH SPECIFICATIONS AND SITE PLAN. ZONED R -40 WITH A RCOD -1 OVERLAY i •i / / / \ / \ \ \ I = - 12. ALL FENCING TO BE REMOVED SHALL BE REMOVED AT NEXT NEAREST POLE. / 13. ALL GRAVEL TO BE REMOVED (SURFACE OR SUBSURFACE) TO BE STOCKPILED AND REUSED ON SITE WHERE POSSIBLE. EXISTING / / / SHEDS 14. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY, INCLUDING ALL SUBGRADE SPECIMEN TREE �` / / / — — MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED. { EXISTING SHEDS 15. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE DISPOSED OF LEGALLY OFFSITE UNLESS OTHERWISE NOTED ON DUCK BO�. \ - — oG THIS PLAN. � � % EN 16. ALL STUMPS FROM TREES TO BE REMOVED SHALL BE GROUND DOWN TO A MINIMUM DEPTH OF 12" BELOW // 5 / TP \ PROPOSED FINISH GRADE. 8 " `d EXISTING UTILITY / 3 STRUCTURE _ — —� 2 \ PP EXISTING MILL 7 - � rp ' EXISTING MILL STONE � --- FOUNDATION PP N TO BE RELOCATED, SEE L101 _ EXISTING — l I N/F MILL DAMS "' / - \ JASPER LEE MOSLEY & SHIRLEY J. MOSLEY 6 ( DB 2136, PG. 560 4 BM 2013, PG. 1239 j / \ 4 PIN # 1775 -42 -6928 - - \ EXISTING WELL ` ZONED R -40 WITH RCOD -1 OVERLAY - -- - -- _ 7 EXISTING CONC. PAD I EXISTING GAS TANK, 0— _ _ _ �� �. / EXPOSED �, TO BE REMOVED _ ��� o Q BEDROCK 4 BY OWNER I CO i ` EXISTING / J — �, 7 ' ��- -� I R/w STORAGE - J� PF I — — Z2 LOD EP_ - — EX. 15" RCP TO BE REPLACED - — 6 P T SEE SHEETS L101 & L200 \ _ HW H� / j ROAD (SR 2324) R/w Riw- _ _ ROBERTSON POND O \�� s _ TP \ \ EP (60' PUBLIC R /W) & CABLE TV — �W 2g0� \ \ 1 TP GW — PP MCKIM & CREED, INC. CONTROL PT. # 2 \ REBAR /CAP NC GRID(NAD 83) N 752,714. 10' TRACT 1 E 2,174,349.57' EL. = 293.50'(NAVD88) 1 GRAPHIC SCALE 30 0 15 30 so ( IN FEET ) 1 inch = 30 ft. DEMOLITION KEYNOTE LEGEND * * 1❑ EXISTING T HT. CHAINLINK FENCE. �2 TREE PROTECTION FENCE. SEE DETAIL ON SHEET L -102. rP ❑3 LIMITS OF DISTURBANCE. LOD 4 � EXISTING STRUCTURE TO REMAIN AS IS. E5 EXISTING UTILITY STRUCTURE TO BE REVISED. SEE STRUCTURAL SHEETS ® E6 EXISTING STRUCTURE TO BE REMOVED COMPLETELY. 7❑ CLEAR AND GRUB ALL HARDWOOD VEGETATION UNDER 3" CALIPER. ® DUCK BOX TO BE RELOCATED BY COUNTY STAFF, NIC LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. H ROC o .•��at� � • • , 4,9 X�� ^ X IV Z 0 J p Q O 0 (n Z Q OZ 0- _j 0 Z � 0 OQ U) U LL LU O z Lu CO Z O _j ii-- m � J z w 0 �0 0 O Z Lv M >w a PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: EXISTING/ DEMOLITION PLAN SHEET NUMBER: Ll 00 ISHEET 9 OF 9 Parking Provided: 19 Standard l Oftxl 8ft spaces 4 Parallel Spaces 1 Accessible space GRAPHIC SCALE ( IN FEET ) 1 inch = 30 ft. NOTES: R LE! 16, PC 13, PC 775 - ) R -4( LAYOUT AND MATERIALS NOTES 1. EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE, ARE BASED ON A FIELD SURVEY PERFORMED BY McKIM & CREED AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL LOCATE EXISTING UTILITIES, UNDERGROUND LINES, AND STRUCTURES AS NECESSARY TO AVOID DAMAGING OR DESTROYING EXISTING SERVICES. 2. ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS SET FORTH AND APPROVED BY THE CITY OF RALEIGH. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED PERMITS. ALL TREE PROTECTION FENCING SHALL REMAIN IN PLACE DURING CONSTRUCTION. 3. TRAFFIC CONTROLS FOR ANY UTILITY WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE PERFORMED IN COMPLIANCE WITH STANDARDS OF THE NORTH CAROLINA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. (MUTCD). 4. ENGINEER AND /OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND /OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS. 5. CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD THE ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE GIVEN TO THE ENGINEER AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR RECORD KEEPING. 6. THE CONTRACTOR, AT ALL TIMES, MUST KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES OR HIS WORK. ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS. 7. IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITH THE EXPRESS WRITTEN PERMISSION OF THE OWNER. 8. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT LOCATION, SIZE, AND MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT. THE RELOCATION OF ANY UTILITY SERVICES REQUIRED TO COMPLETE ANY PORTION OF THESE CONSTRUCTION PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. KEYNOTE LEGEND ❑j FURNISH AND INSTALL TRIPLE - SHREDDED HARDWOOD MULCH ALL LANDSCAPE AREAS. SEE L300. 1 A CONTRACTOR TO RE -SEED ALL TURF AREAS DAMAGED BY CONSTRUCTION WITH TRI -BLEND FESCUE MIX. 1 B PLANTING BED. SEE LANDSCAPE SHEETS. 1 C REVEGETATION AREA, SEE L300 a FURNISH AND INSTALL GRAVEL DRIVE AND PARKING LOT. SEE DETAIL ON SHEET L102. 2A FURNISH AND INSTALL CONCRETE DRIVEWAY APRON. SEE DETAIL ON SHEET L102. FURNISH AND INSTALL 6" THICK CONCRETE WALKWAY WITH ASSOCIATED SUBGRADE - SEE 2B DETAIL ON SHEET L102. 2C FURNISH AND INSTALL LANDSCAPE BOULDERS AS SHOWN. ANCHOR PER DETAILS. SEE L102. 29 FURNISH AND CONSTRUCT DOCK STRUCTURE PUT -IN. SEE DETAIL ON SHEET L104. 2E NATURAL SHORELINE RESERVED FOR CANOE LAUNCH. MOW AND SEED, INSTALL SLOPE STABILIZATION BLANKET. 2F CONCRETE SIDEWALK, INTEGRAL COLOR, TEXTURED FINISH. 2G PEDESTRIAN FOOTBRIDGE, SEE DETAILS ON SHEET L103. 2H CONCRETE CURB. SEE DETAILS ON SHEET L102. 21 ASPHALT REPAIR. SEE DETAIL ON SHEET L103. �3 HANDICAP SIGN 3A MAIN ENTRY SIGN 3B DIRECTIONAL SIGN 3C RULES SIGN TYPE 1 3D RULES SIGN TYPE 2 3E FURNISH AND INSTALL PARKING SIGN �4 STOP BAR (24" WIDE) - SEE DETAIL ON SHEET L103. ® 4q FURNISH AND PAINT PAVEMENT MARKINGS AS SHOWN ON PLAN. 4B FURNISH AND INSTALL NCDOT STANDARD HIGH VISIBILITY CROSSWALK (NCDO STD. DWG. 1205) @ 10' WIDE. 0 ❑5 FURNISH AND INSTALL WOOD FENCE. SEE DETAIL ON SHEET L102. a. Final zoning and site improvement inspection shall be required to verify site plan compliance before a Certificate of Compliance is issued by Wake County Building Inspections. b. Deteriorated or dead screening shall be repaired or replaced within six months c. No permanent construction can occur within buffer yards d. Septic tanks and septic drain lines are prohibited in required buffer yards. Storm water retention and detention facilities, storage tanks for any purpose, utility substations, and buildings housing utility substations and buildings housing utility commodities or equipment are also prohibited in required buffer yards. 5q CHANLINK FENCE. SEE DETAIL ON SHEET L102. FURNISH AND CONSTRUCT LOW IMPACT STORM WATER DEVICE. SEE DETAIL ON SHEET L102. 6A FURNISH AND INSTALL STORM WATER PIPE. SEE DETAIL ON SHEET L102. 6B GRASS FLUME SEEDED OVER EROSION CONTROL FABRIC. FABRIC TO BE WOVEN CURLEX BLANKET 6C CHANNEL DRAIN. SEE DETAIL ON SHEET L105. 6D CONCRETE FLUME. F7 EXISTING UNMANNED STORAGE TO REMAIN, BUILDING TO BE SECURED AND UNOCCUPIED. 7q UTILITY STRUCTURE TO REMAIN. SEE STRUCTURE NOTES FOR MODIFICATIONS. 7g EXISTING HISTORIC DAM TO REMAIN. 79 EXISTING HISTORIC MILL FOUNDATION TO REMAIN. 7D RELOCATED EXISTING MILL STONE 7E EXISTING WELL STRUCTURE TO BE REBUILT BY OTHERS. El FROST - PROOF, LOCKABLE YARD HYDRANT. CONTRACTOR TO PROVIDE TYPE "K" COPPER LINE CONNECTING YARD HYDRANT TO WELL. 3/4" LINE, 24" DEEP. El BUOY SAFETY ZONE. PROVIDE BUOYS AND ANCHOR PER MANUFACTURER. PROVIDE TUFFBUOY, DUAL FLOATS, 14" YELLOW, STAINLESS STEEL CABLE THROUGH, ANCHOR PER MANUFACTURER AT EACH END OF DAM. LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. H RAC o a 'S 4e ; 51_ _ " A/, ....... '''•P��':' Z O 0 Q Q O 70 Y) Z Q OZ Z 0- OZ � 0 OQ U U L.L ~ W O Z Lu CO z O m�JZ W p O � 0 U 0C� W Y (.0 3: 31 PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE PLAN SHEET NUMBER: L101 SHEET 9 OF 9 4, 000 PSI concrete with medium O broom finish perpendicular to main traffic flow - Review with landscape architect prior to pouring. 12" t0 ABC O 0 Prepared subgrade (95% S.P.D.) 0 o B FLUSH GRAVEL TO CONCRETE TRANSITION Not to scale EXPANSION JOINT a DEPTH OF cl a R TYP. CONTROL JOINT NOTED AS CJ ON PLAN OR 10' O.C. MAX lF NOT NOTED ON PLAN "Bituminous expansion joint w/ self O 2 leveling epoxy sealant at vertical object. O24 " Wide tooled control joint. OBracker rod. ONon- compressible fill TYP. EXPANSION JOINT TYP. EXPANSION JO /NT NOTED AS EJ ON PLAN AT WALL OR VERTICAL OR 80'0, C. MAX IF ELEMENT NOT NOTED ON PLAN CONCRETE CONSTRUCTION JOINTS Not to scale r PLAN VIEW DRIVEWAY APRON Not to scale 4 t GRAVEL PARKING Not to scale OCABC Choked into REINFORCEMENT washed stone, 3" min. SIDEWALKS ACROSS DRIVE LANES /HC ACCESS final depth O2#3- #4 Washed Stone O3Compacted subgrade N/A - 95% S.P.D. OFinish grade. OZ Ornamental boulder: bury %3 depth of boulder. X x 4'x 2' min - 4' x 4'x 3' max in size. O2" depth of crushed rock. Work boulder into crushed rock until solidly set. NOTE: Final location to be field verified by landscape architect BOULDER Not to scale O%2 Expansion joints O2 Concrete driveway apron with 6" min thickness O3 Score line OY2 - 3/4 ,lip OValley gutter centerline OExisting curb & gutter O7Existing pavement O8 ABC 0 Prepared subgrade (9; a TYPICAL SECTION ETAIL 1 i E ET L102 12" ACCESSIBLE RESERVED PARKING /�r O MAXIMUM PENALTY 250 POST MOUNTED HANDICAP SIGN Not to scale iL:3f 5 � °r 4, 000 PSI concrete with medium O broom finish perpendicular to main traffic flow - Review with landscape architect prior to pouring. O2Concrete (Thickness and reinforcement per table below) OABC (Thickness per table below) OPrepared subgrade (95% S.P.D.) Note: See concrete construction joints detail on this page and joint locations on plan for additional joint information. PAVEMENT TYPE ABC REINFORCEMENT CONCRETE SIDEWALKS ACROSS DRIVE LANES /HC ACCESS 6" #4 BARS @ 12 "O.C. B.W. 6" PEDESTRIAN SIDEWALKS 4" N/A 4" CONCRETE PA VING Not to scale EQ. EQ. JI mll° ° II� 3,0" VT I I" 6" IF MIN. fi 14" FOOTER A' NTS CHAINL INK FENCE Not to scale O p l 12" VARIES 1 ZA Handicap parking sign (Van accessible) OB Reserved parking sign Maximum penalty $250 0 2" sq. powder coated U- channel O post per town standards and MUTCD standard O2 Slope top of concrete footing to drain HEIGHT OF R7 -8c RESERVED PARKING SIGNS AS PRESCRIBED BY N. C. DEPARTMENT OF TRANSPORTATION MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, SECTION 2A -23, FART 11. MOUNT ON BUILDING FACE AS SHOWN AND AS PER APPLICABLE CODE. o= 0 Of W 5' 0" or 8' -0" PER PLANS 3" OPENING 1 �IHIIIIII�III, -III = III - III -III - ' i 1 =1 I I- III - III -1 11 =� ° 1 -1 I I- III -I 11 =1 11 =1 11 =i � �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�llllllll = III = III = III = III = III = III =III- I � -1 11 =1 I I� 11 =1 11 =1 11 -• �' 1111111111111, Notes: 1. Place all fabric on outside of all posts. EQ. EQ. `I i• I I" 5'O" 6" MIN, 14" �I NTS F.G. CHAINL INK FENCE GA TE Not to scale 1 O Galvanized tension bar. Size ,J determined by manufacturers recommendations J 22 Galvanized domes cap, all posts J 4 (tYA) OGalvanized pipe elbows 5 D 44 #9 gauge galvanized chainlink 6 D 6 fabric - 2" mesh 5O 16 "x 4 "galvanized tension bar 0 Heavy duty, galvanized latch. Latch to be padlockable J O 1 a " o. d. galvanized side, top, & 1 bottom rails OGalvanized strap 90 27 "o. d. galvanized gatepost 10 Full swing, galvanized hinge (typ. - quantity as per manufacturers 1 recommendations) D 11 Concrete footer Type A'- See chainlink fence detail 12 Compacted subgrade 13 1 "i.d. x 6" deep galvanized steel sleeve - epoxyed flush in center of concrete 14 s " x24 "l. . galvanized cane bolt. To be installed per manufacturers recommendations Galvanized domes cap all posts (typ.) O OGalvanized cross rails. Top rail - 1 a " o. d. (8' ht ) Bottom rail - 1 e " o. d. (8' ht.) O3 9 gauge galvanized fabric ties, one (1) per vertical foot of height. 24" o. c. rails O9 gauge galvanized fabric with 2" mesh O2 a " o. d. 6' line posts 4 "o. d. 8'line, corner& end posts O6 Finish grade 07 Concrete footer Type A'- 8' line posts Type 'B'- Corner & end posts OSCompacted subgrade O9 Compacted aggregate Notes 1. Place all fabric on outside of all posts. LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. to H RCC � ^ X � 51 � - IV to Z 0 Q Q 0 0 U) Z Q 0z Z0- -, 0 0 Z OQ U) U U LL W 0 z Lu CO z 0 m [ J Z W 0 O � 0 U � W Y PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE DETAILS SHEET NUMBER: Ll 02 SHEET 9 OF 9 8, _ Off 1 2' - 6" In DOCK AND GANG WAY Not to scale r7)1 A A, 11/=IA/ 9, _ lo„ 29, _ 9 318 ff 5 1 it 9. IJ 81- 5„ II � II I II T TI T II II II I II II II I II II II I 'I I'II'I I'II'I I'II'I TII II II T r- rl- - rr - -Ili ,I L +I1L -11L T -Ti I I I T II II III II II I T - TI- I J +I- - TT - �L - -IT -T -I4 -J r LI- LL - II II II II II - -I1 -- - - IT II II II II -------11--------L--------- -- - - - - IT II I - - - I1 - - - IT I I II II � II II II -- - - ll- - - - LI - - - - - - - - - - -F1 TI II II II II II II II II 71 TI -- II II II II II II - - - -ll- - - - - - - - LI - - - - - - - - - - -- - - - -TI I II I I I II 1 II rot - - -- -- -T I II II T T 1 1 I I I I II II I I I I II II II II II II I - - - - - - - - - II II II - 1I-- ��----- IL - - -! - I I 00 - - T- I - - - -1 I - - IT II - - I -� I - - -TI _T I Ir - - -- II II II I O I "`J I I II I I II II II I I � - - - - I I- - - - I -I - - - - II I1 - - - I i I i - II II 11 - - LI - - - - - - - -H - - - - L - - - - - - - - - - -1 - - - - T - - - i i - - - T1 --- - - - - - TI - - - - r - - - I II I I II it i I �— 4 \ — DOCK AND GANG WAY Not to scale r7)1 A A, 11/=IA/ 9, _ lo„ 29, _ 9 318 ff 5 1 it 9. IJ 81- 5„ II � II I II T TI T II II II I II II II I II II II I 'I I'II'I I'II'I I'II'I TII II II T r- rl- - rr - -Ili ,I L +I1L -11L T -Ti I I I T 11 1 9 5 - L II II II T I II II 1 II II I 1 II II II II II 11 it 1 —1 LI LL -11 -J 11 I III I II II II II III II II I T - TI- I J +I- - TT - �L - -IT -T -I4 -J r LI- LL - II II II II II - -I1 -- - - IT II II II II -------11--------L--------- -- - - - - IT II I - - - I1 - - - IT I I II II � II II II -- - - ll- - - - LI - - - - - - - - - - -F1 TI II II II II II II II II 71 TI -- II II II II II II - - - -ll- - - - - - - - LI - - - - - - - - - - -- - - - -TI I II I I I II 1 II rot - - -- -- -T I II II T T 11 1 9 5 - L II II II T I II II 1 II II I 1 II II II II II 11 it 1 —1 LI LL -11 -J 11 I III I II II II II III II II I T - TI- I J +I- - TT - �L - -IT -T -I4 -J r LI- LL - -III JI - - -- -- -T I II II II T T 4f-2 % " 2 �I II II F_ +I__ -i L__I1_� I II II II I 1 -II II II_I T T - I II II II I I II II II I I II II II I I3�i, I I II II I I II II II I I II II II I I II II II I I II II II � T 7T 1 1 T I II II II I L - 1-- 44 - -14 -J � it II II JI L +' -!! -! 1 T- T� -It T- I 11 II II I I II II II I I II II II I I II II II I I I I I I I I I II II II I -i L_- 11_J__ T -tl T I II II II 1 �I II II T I. �� -17 T- I II II II I I II II II I I II II II I I II II 11 I I II II II � I II II II I _L I-- 4+- -I4 -1- T -TI T I II II II I -1 r IT 1 II 11 rLI At- - -It -J 1 II II II I T 1 II 11 T I II II II I I II II II I I II II II I � 11 II II I I II II II ' T -T1- 1 - -1-r T- I N M I N I N 1 section view, concrete landing SECTION VIEW O -1 N NOTE: Contractor to submit sealed shop drawings for review and approval of fixed dock and floating dock prior to construction. Shop drawings to include fasteners, hardware, lumber specified, and composite decking specified. N ee floating dock section 51L 904 OConcrete landing, set top flush with walkway & sidewalk. 3000 psi concrete. reinforced as shown using #3 bar. Chamfer all exposed edges 4 ". Circular rubbed finish all exposed surface O2 Fixed dock, see section view detail on sheet L 904 O3 Floating dock, see detail on sheet L 904 lO Solid expansion joint cover plate, stainless steel. O5 Railing, see section view detail on sheet L 904 O6 Column footing, see detail on sheet L 904 O7 Finish grade GWater 0 Gangway, see gangway detail on sheet L 104 10 Cast in ledge, 8" depth, to support end of dock. Anchor 4'x 10" ledger beam to concrete footing with 2 " diameter x 12" stainless steel anchor bolts, epoxy into face, 12" o. c. Attach stringers to ledger board using galvanized joist hangers. G2 "x 4 "x 4' pressure treated lumber. 12 4 "x 4 "pressure treated post GStainless steel cover plate. See detail on sheet L 104. 14 10" 0 anchor posts 15 Marine grade galvanized steel pipe hoops, secured to dock, for anchoring dock to anchor posts. 16 3" recessed platform with wood curb. 17 Handrail, galvanized steel, paint safety yellow 18 4'x10" Cross beam, continuous. 19 2'x10" Blocking 20 4'x10" Beams 20 #4 bars vertical, 6" o. c. #3 bars horizontal, 8" o. c. GENERAL NOTES AND SPECIFICATIONS. 1. Trex HS24 marine grade decking designed for 100 PSF live load at 24 "max span. Decking to be fastened using counter sunk decking screws, 3 2 " in length, epoxy coated, self drilling, rated for pressure treated lumber. All remaining fasteners and hanging straps are to be galvanized steel. 2. All lumber to be graded no.2 or above and free of knots, gouges, and cracks. 3. All surfaces are to be sealed using clear penetrating waterproof sealant. Dock floatation to be set to maintain a +/- 10 inch level above water surface, variable by max of 1 inch. LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, INC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. \:1y 1111 +rJ �I X01 o px sc 51 9_ _ CIO Z ,'fir 11111 E111j 11\\ Z 0 0. 0 Q O 0 U) Z Q 0Z Z0- __.l Z 0 0 0 OQ U U LU 0 z Lu m Z > O J 1­_ m � J Z W O O � 0 U LU Y PROJECT NUMBER: 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE DETAILS SHEET NUMBER: Ll 03 ISHEET 9 OF 9 ORelocated Mill Stone OConcrete Sidewalk O2" depth of crushed aggregate base course rock. Work mill stone into crushed stone until solidly set. OBoulder beyond, see landscape plans NOTE: Final location to be field verified by landscape architect MILLSTONE Not to scale 0 %/ if FIXED DOCK Not to scale MA TCH WIDTH OF TRA VEL LANE OHigh visibility, white thermoplastic paint STOP BAR Not to scale i 24" J C b 14' Max Span OWater 7 OTrex HS24 marine grade decking, 2" x 6 "x 8, color beige, secure using O RAIL stainless steel screws, countersunk into the decking per manufacturers specifications. O3 Hinged stainless steel plate, secure to floating dock using slip pins 20 4 "x 10" pressure treated stringer, continuous, typical O4 2 "x 8" marine grade pressure treated lumber, laminated to 2" x 10" rim joist. 30 Stainless steel joist hangers and fasteners O5 1 "x 4" actual dimension marine grade pressure treated nailer 40 2"x 10" P. T. blocking, secure using joist hangers and galvanized nails 9 O 2" x 4" marine grade pressure treated cross joist. 50 112" bolts, 2 per post, secure using washers and bolts, use washer at bolt 3 6 4 7 0 1"x 6" composite decking. Secure using stainless steel fasteners per manufacturer head and at nut, 4" 0. C. 0 4 "x 4" pressure treated timber post, mount using bolts as shown, trim bottom I I I T, d cfl O Curb stop 4 "x 4 "post on 2 "x 4 "blocking. O - - n 7 ------ �I - - -- galvanized screws with washers posts. X - a 2" x 6" "Trex" top rail, rounded edges to 8 "radius. secure using hardware per 1 manufacturer. I 90 1. 5" diameter galvanized metal pipe rail with welded bracket, secure to post 1 7ff using galvanized screws through bracket flange. 2 10 1 "x 6" intermediate rail, pressure treated I 11 I I %2" O. C. If - 1 �12 n o0 0 � in - - -- - - �I - - -- + - - -�I 1 I_ 0�11 lem rLrvv WOOD FOOTBRIDGE Not to scale L%4 "gap min. Xj .i z 12" OConcrete footer, set top flush with trail & bridge. 3000 psi concrete. reinforced as shown using #4 bar. Chamfer all exposed edges a " Circular rubbed finish all exposed surface O%2 ":0 galvanized threaded bolts epoxy set into concrete @ 2' o.c. pGalvanized washer and nut 7 (4D Stainless steel joist hangers per manufacturers instructions 50 Concrete footing with #4 rebar continuous & #4 rebar @ 12" o. c with 18" min. overlay splices. pRail. 4 "x 6" nominal pressure treated lumber for top rail, continuous. Mount on 2 "x 4" pressure treated blocks, fastened through block to beam below using 318 " diameter galvanized lag bolts and washers. Pre -drill guide holes. 0 2 "x 6" nom. composite lumber for decking, Trex HS24 or approved equal capable of 100psi . 80 4 "x 12" nom. pressure treated lumber 90 4 "x 12" nom. pressure treated lumber, stringers continuous members. 10 Finish grade 11 4" min compacted ABC QCompacted subgrade CROSS SECTION GENERAL NOTES AND SPECIFICATIONS: 1. Decking to be fastened using counter sunk decking screws, 3 - " in length, epoxy coated, self drilling, rated for composite lumber. All remaining fasteners and hanging straps are to be galvanized steel. 3. All lumber to be graded no.2 or above and free of knots, gouges, and cracks. 4. Change in elevation between top of bridge deck and finish grade below is not to exceed 29 inches at time of completion. Contractor to field verify all heights to ensure positive drainage under bridge while maintaining the maximum clearance. 5. All wood surfaces are to be sealed using clear penetrating waterproof sealant. X 10%91 Elevation —2518 ff GANG WA Y Not to scale ORailing, see section view OChamfer joist ends to allow for floating movement O3 Hinged stainless steel plate, secure to floating dock using slip pins O4 Extend handrail 12" beyond post, and return to post cap using end cap. O5 Stainless steel marine grade HD barrel hinge, for securing dock to gangway. O6 Stainless steel cover plate, secure using slip pins O7 Galvanized welded wire mesh, secure using galvanized screws with washers to posts. ** *For section view, see 41L 105, sim. FL OA TING DOCK Not to scale O O 0 8, - 5„ 4 "x 10" marine grade pressure treated cross beam. Galvanized steel shoe, anchor in concrete footing, see 5 &6 1L 105 Marine grade concrete, 4000 ps icals with #3 ties @ 8" I' - 6" dia. CONCRETE FOO TER Not to scale w grade FL OA TING DOCK Not to scale 0 2 "x 4" cross joist I" x 6" composite decking, Secure using stainless steel fasteners per manufacturer Rubber bumper 2 "x 8 "joist, laminate to rim joist 2 "x 10" rim joist Stainless steel marine grade P. T. bolts to connect floats to beams and nailers boards. 1 "x 4" actual dimension nail board, fasten to cross beams and blocking High density polyethylene foam - filled floats, 3' x 4'x 12" LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. lo H Ro rrf�'�, 51 ; - IV Z 0 0 Q Q O 0 U) Z Q OZ Z0- __,I 0 Z � 0 OQ U) U) U LL W O z Lu CO Z O m � J Z W p O � 0 U 0C� W Y (.0 3: 31 PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE DETAILS SHEET NUMBER: Ll 04 SHEET 9 OF 9 OWater line OTrex HS24 marine grade decking, 2" x 6 "x 8, color beige, secure using O High density polyethylene foam - filled floats, 3' x 4'x 12" stainless steel screws, countersunk into the decking per manufacturers specifications. O3 Hinged stainless steel plate, secure to floating dock using slip pins 20 4 "x 10" pressure treated stringer, continuous, typical O4 2 "x 8" marine grade pressure treated lumber, laminated to 2" x 10" rim joist. 30 Stainless steel joist hangers and fasteners O5 1 "x 4" actual dimension marine grade pressure treated nailer 40 2"x 10" P. T. blocking, secure using joist hangers and galvanized nails 9 O 2" x 4" marine grade pressure treated cross joist. 50 112" bolts, 2 per post, secure using washers and bolts, use washer at bolt 3 6 4 7 0 1"x 6" composite decking. Secure using stainless steel fasteners per manufacturer head and at nut, 4" 0. C. 0 4 "x 4" pressure treated timber post, mount using bolts as shown, trim bottom 5 8 O 4 "x 10 "marine grade pressure treated lumber with a 45° chamfer. All exposed edges to be sanded smooth to a 8 "radius. O Curb stop 4 "x 4 "post on 2 "x 4 "blocking. O At gangway section only: Provide galvanized welded wire mesh, secure using to n 7 galvanized screws with washers posts. X 2 80 2" x 6" "Trex" top rail, rounded edges to 8 "radius. secure using hardware per manufacturer. I 90 1. 5" diameter galvanized metal pipe rail with welded bracket, secure to post 1 7ff using galvanized screws through bracket flange. 2 10 1 "x 6" intermediate rail, pressure treated I, 3' - 0" 11 4 "x 4" post on 2 "x 4" blocking to create drainage gap. %2" O. C. If - 1 �12 n X 10%91 Elevation —2518 ff GANG WA Y Not to scale ORailing, see section view OChamfer joist ends to allow for floating movement O3 Hinged stainless steel plate, secure to floating dock using slip pins O4 Extend handrail 12" beyond post, and return to post cap using end cap. O5 Stainless steel marine grade HD barrel hinge, for securing dock to gangway. O6 Stainless steel cover plate, secure using slip pins O7 Galvanized welded wire mesh, secure using galvanized screws with washers to posts. ** *For section view, see 41L 105, sim. FL OA TING DOCK Not to scale O O 0 8, - 5„ 4 "x 10" marine grade pressure treated cross beam. Galvanized steel shoe, anchor in concrete footing, see 5 &6 1L 105 Marine grade concrete, 4000 ps icals with #3 ties @ 8" I' - 6" dia. CONCRETE FOO TER Not to scale w grade FL OA TING DOCK Not to scale 0 2 "x 4" cross joist I" x 6" composite decking, Secure using stainless steel fasteners per manufacturer Rubber bumper 2 "x 8 "joist, laminate to rim joist 2 "x 10" rim joist Stainless steel marine grade P. T. bolts to connect floats to beams and nailers boards. 1 "x 4" actual dimension nail board, fasten to cross beams and blocking High density polyethylene foam - filled floats, 3' x 4'x 12" LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. lo H Ro rrf�'�, 51 ; - IV Z 0 0 Q Q O 0 U) Z Q OZ Z0- __,I 0 Z � 0 OQ U) U) U LL W O z Lu CO Z O m � J Z W p O � 0 U 0C� W Y (.0 3: 31 PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE DETAILS SHEET NUMBER: Ll 04 SHEET 9 OF 9 10' O. C. I I n I 18" L__J PLAN VIEW ' 12„ FRONT VIEW 12" STACKED SPLIT —RAIL FENCE Not to scale O%4 " Chamfer O3000 PSI concrete curb 0 Finished grade O4 #3 Rebar, continuous O5 Compacted subgrade O6 Gravel parking lot 6" =III =III— ° a 4 A. �1 aA 1 I— III —III a° a s 1 I— III —III— 4" =1 I I— III -1111 � :III,;, 111,;,11 �, III,;, III,;, III ,;,111,;,111, „III,,III,,III„ 10” CONCRETE EDGE RESTRAINT Not to scale OApprox. 5" x 5" rough cut posts, locust, square, split finish. Bark House or approved equal. ORough split hemlock rails - 2 "x 4" min. Stagger boards 3" uniformly. Bark House or approved equal. O9 #3 galvanized rebar, continuous O4 Finished grade O5 Concrete footer, common trench ON V O4'x10" Stringer 0 4'x 10" Beam O3 Concrete Footing O4 5/8" carriage bolts, nuts, washers. 50 Galvanized Steel Shoe, a " thick steel, with (2) e " diameter bolts in 4x10 joist and (2) e "diameter xl2 " +4" Hook anchor bolts embedded into concrete. 10 Saw cut O2 Existing asphalt pExisting base O4 Existing subgrade O5 Tack coat O6 New asphalt paving; depth and type as specified O7 Stone base for new asphalt paving; depth and type as specified ASPHAL T PA VEMENT TRANSI TION Not to scale PLAN VIEW — SHOE A T DOCK FOO TING Not to scale O%4 " Chamfer ( #3 Rebar, continuous O3 Finished grade O4 3000 PSI concrete curb O5 Compacted subgrade O6 1 " Chamfer ' 1 CONCRETE CURB Not to scale O4'x10 " Stringer O2 4'x10" Beam 0 Concrete Footing O4 Galvanized Steel Shoe, a " thick steel, with (2) a " diameter bolts in 4x10 joist and (2) 8 "diameter xl2 " +4" Hook anchor bolts embedded into concrete. EL EVA TION VIEW — SHOE A T DOCK FOOTING Not to scale ig lot LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. + �iy U!U!l trill "vo Sc '%9 En _Z�; 51_ - IV E All Z 0 0 Q Q - O 0 U) Z Oz 0- _J 0 Z° OQ U) U) U LL W O z Lu CO z O J m�JZ W 0 O U � W Y PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: SITE DETAILS SHEET NUMBER: Ll 05 ISHEET 9 OF 9 GRAPHIC SCALE ( IN FEET ) 1 inch = 30 ft. GRADING NOTES ORIGINAL TOPOGRAPHIC INFORMATION SHOWN AS 'EXISTING' ON THIS PLAN HAS BEEN COMPILED FROM SURVEY DATA PROVIDED BY McKIM AND CREED. CONTRACTOR TO FIELD VERIFY ALL INFORMATION AND REPORT ANY DISCREPANCIES. 2. ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 3. INSPECTOR REFERS TO AUTHORIZED REGULATORY AGENCY SEDIMENTATION AND EROSION CONTROL INSPECTOR OR HIS /HER REPRESENTATIVE. FIELD INSPECTIONS MAY REQUIRE ADDITIONAL SEDIMENTATION AND EROSION CONTROL MEASURES AS DEEMED NECESSARY BY THE INSPECTOR, CLIENT, AND /OR CLIENT'S REPRESENTATIVES. 4. CONSTRUCTION AND MAINTENANCE OF ALL EROSION CONTROL DEVICES SHALL CONFORM TO THE STANDARDS SET FORTH IN THE SEDIMENT AND EROSION CONTROL ORDINANCE. 5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION CONTROL METHODS DURING CONSTRUCTION, AND THE OWNER IS RESPONSIBLE FOR MAINTENANCE OF ALL PERMANENT EROSION CONTROL METHODS AFTER CONSTRUCTION IS COMPLETE, IF ANY PERMANENT METHODS ARE REQUIRED. 6. DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES THAT ARE 4:1 OR STEEPER, MULCH SHALL BE ANCHORED. 7. MAXIMUM CROSS -SLOPE FOR ALL PEDESTRIAN WALKWAYS TO BE 2 %. 8. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED PRIOR TO ANY GRADING ON SITE. PLEASE CALL THE REGULATORY AUTHORITY FOR AN INSPECTION. 9. INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS. 10. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE. 11. LOCATE STOCKPILES UPSLOPE FROM EROSION CONTROL MEASURES. ALL SOIL STOCK PILES SHALL HAVE APPROPRIATE EROSION CONTROL PER THE LATEST VERSION OF THE SEDIMENT AND EROSION CONTROL ORDINANCE INCLUDING SEEDING AND SILT FENCE AROUND THE BASE OF THE STOCK PILE. 12. ALL AREAS ARE TO BE GRADED FOR POSITIVE DRAINAGE. NO AREAS OF STANDING WATER ARE TO REMAIN. 13. CONTRACTOR TO PROVIDE AS -BUILT VERIFICATION THROUGH SEALED SURVEY OF THE DETENTION AREA GRADING CONFIRMING CONSTRUCTED VOLUME MATCHES DESIGN INTENT. SEALED SURVEY TO BE SUBMITTED TO LANDSCAPE ARCHITECT AND ENGINEER FOR REVIEW. LEGEND FG FINISH GRADE (LAWN /MULCH) MG MEET GRADE LP LOW POINT HP HIGH POINT HPS HIGH POINT OF SWALE BD BOTTOM OF DECK TD TOP OF DECK XXX SLOPE DIRECTION - POINTS DOWNWARD GRADE BREAK LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. H RAC oa' 4,y ; 51 ; - IV Z O 0 Q O 0 U) Z Q Oz 0- _j OZ � 0 OQ U) U LL 111 O z Lu CO Z O m�Jz W p O � 0 U � W Y PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: GRADING PLAN SHEET NUMBER: L200 ISHEET 9 OF 9 O O I:.: 7ME V� PLANTING LEGEND SYMBOL TOTAL QTY SCIENTIFIC NAME COMMON NAME INSTALL SIZE INSTALL STYLE NOTES TREES AMEL 1 1 Amelanchier arborea American Serviceberry 2" CAL. B/B Full, Dense Crown LIQ 3 Liquidambar styraciflua American Sweetgum 2.5" CAL. B/B Full, Dense Crown QUN 17 Quercus nigra Water Oak 2.5" CAL. B/B Full, Dense Crown TDI 5 Taxodium distichum Bald Cypress 2" CAL. B/B Full SHRUBS CLE 13 Clethra alnifolia 'Ruby Spires' Summersweet 18 "HT. /SPR. Container Full, Dense IV] 19 ]tea virginica 'Henry's Garnet' Sweetspire 30" HT. /SPR. Container Full, Dense IV 14 Ilex verticillata 'Sparkleberry' Winterberry 4' HT. Container Full, Dense, Furnish two males I. verticillata 'Apollo'. Plant in back of row AM 3 Aronia arbutifolia Red Chokeberry 24 "HT. /SPR. Container Full, Dense PERENNIALS, GRASSES, GROUNDCOVERS, AND VINES ES 103 Eragrostis spectabilis Purple Lovegrass 12 "HT. /SPR. Container @ 15" O.C. PV 103 Panicum virgatum "Shenandoah" Switch Grass 16 "HT. /SPR. Container TURF /REVEGETATION LAWN Festuca arundinacea Tall Fescue Seed Contractor shall repair all areas damaged by construction 8610 S.F. See notes and details on sheet L -301 Preservation Mix Seed REVEG. 13253 S.F. See chart for details See chart for details See chart for details GRAPHIC SCALE ( IN FEET ) 1 inch = 30 ft. R LEI :6, PC 13, PC 775 - ) R -4( REVEGETATION AREA - STEM COUNT 500 PER AC. TOTAL PLANTS % SCIENTIFIC NAME COMMON NAME INSTALL SIZE INSTALL STYLE TREES 75% 40 Acer rubrum Red Maple Whip Container 124 plants 30 Nyssa sylvatica Tupelo Whip Container 30 Carya glabra Pignut Hickory Whip Container SHRUBS 25% 30 Cephalanthus occidentalis Buttonbush 3 gallon Container 41 plants 30 Alnus serrulata Smooth Alder 3 gallon Container 30 Hamamelis virginiana Witch Hazel 3 gallon Container GRASSES Slope Mix -See Notes and Details on L -301 Slope Mix Seed Seed NOTES 1. Furnish whips at least 3' in height with HDPE collar around the trees, split side to allow expansion. 2. Contractor to provide minimum of 175 total plants 3. Minimum 12' O.C. between trees. Groups of three equal distance apart. 4. Minimum 6' O.C. between shrubs. Groups of three equal distance apart. LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. H RAC rrf�'�, oa' 4,y ; 51 � - IV Z O 0 Q Q O 70 U) Z Q Oz Z0- --,1 Z O 0 OQ U U LL 111 O z Lu CO z O m�JZ W p O � 0 U 0�� W Y c0 3: 31 PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: LANDSCAPE PLAN SHEET NUMBER: L300 SHEET 9 OF 9 OPrune damaged or dead wood. O2 Do NOT cut leader. O3 12 Gauge galv. wire with diameter white PVC on entire length of each wire. O4 Specified tree strap. O5 Specified posts -Align NW /SE, 2 per tree set Min. 18" into undisturbed subgrade. O6 Wrap entire surface of trunk up to second branch w/ specified wrapping secured @ top and bottom & at 2 It intervals. O7 Plant tree w/ top of rootball2 "-4" above final grade. OS 3" deep mulch ring, Min. 48" 0, pull mulch back 2" 3" from trunk. O9 4" HT. water saucer in non -turf areas. 10 Spaded bed edge at tree rings TYP. 11 Specified backfill mixture as per specifications 12 After tree is set, remove all twine & wire from top and sides of rootball. Pull burlap back 3 (min.) 13 Set rootball on undisturbed subgrade - Do Not Over - Excavate. DECIDUOUS TREE PLANTING Not to scale PLANT SPACING AS SPECIFIED V- "\ \V\ \V` \o OApply specified mulch 3" deep. See specifications. OPlanting pit to be per specifications. OAmend backfill, RE: Specifications ORemove plastic pots prior to planting. Note: Mulch depth around plant base may be thinner. Do not bury plant with mulch. PERENNIAL S/GROUNDCO VERS Not to scale 32" min. width SIDE VIEW Varies (6' min.) 2X DIAMETER OF ROOTBALL, MIN SHRUB PLANTING Not to scale SPACING „D„ �_ ROWS + + + + + ,A„ -F-+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + OConcrete curb or sidewalk. 0 Prune all damaged or dead wood immediately prior to planting. 0 Set shrub 1 " higher than the grade at which it grew. O4 Dig plant pit twice as wide as the container or more. O5 Apply specified mulch 3" deep. 0 Rootball. O7 Roughen sides of plant pit, score sides of rootball of rootbound plants only. OS Fill plant pit with specified soil mix. O9 Compacted subgrade. Note: Any broken or crumbling rootballs will be rejected. Removing the containers will not be an excuse for damaged rootballs. PLANT SPACING CHART SPACING 'D" ROW 'A" PLANTS /s.f. 6" o.c. 5.20" o.c. 4.61 8" o.c. 6.93" o.c. 2.60 10 "o.c. 8.66" o.c. 1.66 12 "o.c. 10.40" o.c. 1.00 15" o. c. 13.00" o.c. 0.73 18 "o. c. 15.60" o.c. 0.51 24 "o. c. 20.80" o.c. 0.29 TRIANGULAR SPACING FOR GROUNDCOVERS Not to scale FRONT VIEW NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARL Y LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECUREL Y TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAYBE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TREE PROTECTION FENCE Vot to scale PLANTING AND SEEDING /SODDING NOTES 1. ROUGH GRADING TO BE COMPLETED PRIOR TO THE START OF PLANT INSTALLATION. SUBSTANTIAL COMPLETION SIGN -OFF BY PROJECT MANAGER OF THE ROUGH GRADING SHALL OCCUR PRIOR TO THE START OF PLANTING INSTALLATION. 2. CONTRACTOR RESPONSIBLE FOR LOCATING ALL UTILITIES AND UNDERGROUND IMPEDIMENTS PRIOR TO BEGINNING PLANTING. 3. ALL WEEDS, NON - NATIVE INVASIVE SPECIES, AND EXOTIC SPECIES LOCATED WITHIN THE PROJECT LIMITS SHALL BE ELIMINATED PRIOR TO PLANTING BED CREATION AND PLANTING. 4. PLANTING SHOULD OCCUR IMMEDIATELY AFTER CONSTRUCTION TO STABILIZE AREAS OF BARE SOIL. 5. PRIOR TO PERMANENT PLANTINGS AND SEEDINGS, THE SITE SOILS SHALL BE PREPARED FOR PLANTING. WHERE NEEDED THE SOILS SHOULD BE PLOWED OR RIPPED TO IMPROVE COMPACTED SOILS AND ELIMINATE CHANNELIZED FLOW FROM NON - TARGET AREAS. 6. IT SHALL BE NOTED THAT ALL SECTIONS OF THE SITE THAT ARE SLOPED 3:1 OR HIGHER WILL BE COVERED WITH EROSION CONTROL STABILIZATION COIR FABRIC (WITH 1" SQUARE OPENINGS) PRIOR TO PLANTING TO ENSURE IMMEDIATE STABILIZATION. LANDSCAPE CONTRACTOR SHALL CUT FABRIC AT EACH PLANT LOCATION AND PLACE PLANTS ACCORDING TO PLAN. ALL FABRIC SHALL BE RE- STAKED PER ENGINEERS ORIGINAL DRAWINGS IMMEDIATELY AFTER PLANTING. 7. PLANTS ARE TO BE PURCHASED BY SCIENTIFIC NAMES. THEY SHALL BE REPRESENTATIVE OF THEIR SPECIES, MEET ALL NOTED CONDITIONS OF SPECIFICATIONS, AND SHALL BE IN VIGOROUS GROWING CONDITION MEETING ANSI STANDARD Z60. 8. PROJECT MANAGER OR DESIGNEE MAINTAINS RIGHT TO REJECT ANY PLANT DUE TO AESTHETICS OR STRUCTURAL DEFICIENCY AT ANY TIME. 9. CONTRACTOR RESPONSIBLE FOR FURNISHING AND INSTALLING ALL PLANTS SHOWN ON PLANS IN LOCATIONS SHOWN. QUANTITIES GIVEN ON THE PLANT LEGEND ARE FOR CONTRACTOR'S CONVENIENCE ONLY. IF DISCREPANCIES OCCUR, THE PLANS SHALL OVERRULE THE PLANT LEGEND. CONTRACTOR SHALL LOCATE ALL PLANTS AWAY FROM KNOWN PERMANENT FIXTURES. IF CONFLICT ARISES WITH PLAN, CONTRACTOR SHALL NOTIFY PROJECT MANAGER OR DESIGNEE PRIOR TO PROCEEDING. 10. ALL PLANT MATERIAL SHALL CONFORM TO OR EXCEED THE AMERICAN STANDARD FOR NURSERY STOCK (LATEST EDITION) AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 11. ALL PLANT MATERIAL SHALL BE FREE OF ALL PESTS, DISEASES, AND CANKERS, IN HEALTHY CONDITION, AND FREE OF MECHANICAL DAMAGE AT THE TIME OF PLANTING. 12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE A HEALTHY AND VIABLE PLANT AND THE PLANT SHALL BE REJECTED IF DEEMED UNHEALTHY OR UNFIT AT ANY TIME DURING THE CONTRACT OR WARRANTY DURATION. 13. IF ANY SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, THEN NOTICE SHALL BE GIVEN TO PROJECT MANAGER OR DESIGNEE AT MINIMUM SEVENTY -TWO (72) HOURS (NOT INCLUDING WEEKENDS) PRIOR TO DESIRED ORDERING DATE /TIME. WHEN SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, SUGGESTED ACCEPTABLE REPLACEMENTS SHALL ALSO BE PRESENTED AT TIME FOR FULL AND COMPLETE REVIEW BY PROJECT MANAGER OR DESIGNEE. 14. BALLED AND BURLAPPED PLANTS /TREES TO BE PLANTED PRIOR TO CONTAINER OR BEDDING PLANTS. 15. BALLED AND BURLAPPED MATERIAL SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 15.1. TREES DESIGNATED B &B SHALL BE PROPERLY DUG WITH FIRM, NATURAL BALLS OF SOIL REATINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1. 15.2. ROOT BALLS SHALL BE FIRMLY WRAPPED WITH NONSYNTHETIC, ROTTABLE BURLAP AND SECURED WITH NAILS AND HEAVY, NONSYNTHETIC TWINE. 15.3. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBALL. 15.4. REMOVE ALL BURLAP, LACING, AND WIRE BASKET FROM AT LEAST THE TOP 1/2 OF THE ROOTBALL AND DISCARD FROM PLANTING HOLE. 15.5. DO NOT MANEUVER BY TRUNK. HANDLE BY ROOT BALL ONLY. 16. CONTAINERIZED PLANTS SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 16.1. MATERIAL SHALL HAVE FIRM, NATURAL BALLS OF SOIL RETAINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1 16.2. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBAL 16.3. REMOVE CONTAINER PRIOR TO PLANTING. SLOPE SEED MIXTURE - REVEGETATION AREA OSteel Post Application rate: 20 lbs. per acre, or %2 lb per 1,000 S.F. 20 Woven Wire Fabric. Application rate: 15 lbs. per acre, or %2 lb per 1,000 S.F. Panicum virgatum 'Shawnee' Always required COMMON NAME 30 Orange, UV resistant Indiangrass 30 high - tensile strength Andropogon gerardii 'Prairie View' Big Bluestem poly barricade fabric 5 40 Warning Sign 20 50 6" min. cover over skirt 40" O Anchor skirt as directed Agrostis perennans Autumn Bentgrass by engineer TREE PROTECTION AREA p7 Min. 10 gauge line DO NOT ENTER ** *NOTE: SLOPE SEED MIX MUST BE INSTALLED BETWEEN MARCH 1 UNLESS OTHERWISE ALLOWED BY LANDSCAPE ARCHITECT. - JUNE 15 wires 80 Min. 12 - Z gauge WARNING SIGN DETAIL intermediate wires 90 Grade NOTES: WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. LETTERS TO BE 3" HIGH MINIMUM, CLEARL Y LEGIBLE AND SPACED AS DETAILED. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. ATTACH SIGNS SECUREL Y TO FENCE POSTS AND FABRIC. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. ADDITIONAL SIGNS MAYBE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. TREE PROTECTION FENCE Vot to scale PLANTING AND SEEDING /SODDING NOTES 1. ROUGH GRADING TO BE COMPLETED PRIOR TO THE START OF PLANT INSTALLATION. SUBSTANTIAL COMPLETION SIGN -OFF BY PROJECT MANAGER OF THE ROUGH GRADING SHALL OCCUR PRIOR TO THE START OF PLANTING INSTALLATION. 2. CONTRACTOR RESPONSIBLE FOR LOCATING ALL UTILITIES AND UNDERGROUND IMPEDIMENTS PRIOR TO BEGINNING PLANTING. 3. ALL WEEDS, NON - NATIVE INVASIVE SPECIES, AND EXOTIC SPECIES LOCATED WITHIN THE PROJECT LIMITS SHALL BE ELIMINATED PRIOR TO PLANTING BED CREATION AND PLANTING. 4. PLANTING SHOULD OCCUR IMMEDIATELY AFTER CONSTRUCTION TO STABILIZE AREAS OF BARE SOIL. 5. PRIOR TO PERMANENT PLANTINGS AND SEEDINGS, THE SITE SOILS SHALL BE PREPARED FOR PLANTING. WHERE NEEDED THE SOILS SHOULD BE PLOWED OR RIPPED TO IMPROVE COMPACTED SOILS AND ELIMINATE CHANNELIZED FLOW FROM NON - TARGET AREAS. 6. IT SHALL BE NOTED THAT ALL SECTIONS OF THE SITE THAT ARE SLOPED 3:1 OR HIGHER WILL BE COVERED WITH EROSION CONTROL STABILIZATION COIR FABRIC (WITH 1" SQUARE OPENINGS) PRIOR TO PLANTING TO ENSURE IMMEDIATE STABILIZATION. LANDSCAPE CONTRACTOR SHALL CUT FABRIC AT EACH PLANT LOCATION AND PLACE PLANTS ACCORDING TO PLAN. ALL FABRIC SHALL BE RE- STAKED PER ENGINEERS ORIGINAL DRAWINGS IMMEDIATELY AFTER PLANTING. 7. PLANTS ARE TO BE PURCHASED BY SCIENTIFIC NAMES. THEY SHALL BE REPRESENTATIVE OF THEIR SPECIES, MEET ALL NOTED CONDITIONS OF SPECIFICATIONS, AND SHALL BE IN VIGOROUS GROWING CONDITION MEETING ANSI STANDARD Z60. 8. PROJECT MANAGER OR DESIGNEE MAINTAINS RIGHT TO REJECT ANY PLANT DUE TO AESTHETICS OR STRUCTURAL DEFICIENCY AT ANY TIME. 9. CONTRACTOR RESPONSIBLE FOR FURNISHING AND INSTALLING ALL PLANTS SHOWN ON PLANS IN LOCATIONS SHOWN. QUANTITIES GIVEN ON THE PLANT LEGEND ARE FOR CONTRACTOR'S CONVENIENCE ONLY. IF DISCREPANCIES OCCUR, THE PLANS SHALL OVERRULE THE PLANT LEGEND. CONTRACTOR SHALL LOCATE ALL PLANTS AWAY FROM KNOWN PERMANENT FIXTURES. IF CONFLICT ARISES WITH PLAN, CONTRACTOR SHALL NOTIFY PROJECT MANAGER OR DESIGNEE PRIOR TO PROCEEDING. 10. ALL PLANT MATERIAL SHALL CONFORM TO OR EXCEED THE AMERICAN STANDARD FOR NURSERY STOCK (LATEST EDITION) AS PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 11. ALL PLANT MATERIAL SHALL BE FREE OF ALL PESTS, DISEASES, AND CANKERS, IN HEALTHY CONDITION, AND FREE OF MECHANICAL DAMAGE AT THE TIME OF PLANTING. 12. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE A HEALTHY AND VIABLE PLANT AND THE PLANT SHALL BE REJECTED IF DEEMED UNHEALTHY OR UNFIT AT ANY TIME DURING THE CONTRACT OR WARRANTY DURATION. 13. IF ANY SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, THEN NOTICE SHALL BE GIVEN TO PROJECT MANAGER OR DESIGNEE AT MINIMUM SEVENTY -TWO (72) HOURS (NOT INCLUDING WEEKENDS) PRIOR TO DESIRED ORDERING DATE /TIME. WHEN SUBSTITUTIONS ARE REQUESTED BY CONTRACTOR, SUGGESTED ACCEPTABLE REPLACEMENTS SHALL ALSO BE PRESENTED AT TIME FOR FULL AND COMPLETE REVIEW BY PROJECT MANAGER OR DESIGNEE. 14. BALLED AND BURLAPPED PLANTS /TREES TO BE PLANTED PRIOR TO CONTAINER OR BEDDING PLANTS. 15. BALLED AND BURLAPPED MATERIAL SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 15.1. TREES DESIGNATED B &B SHALL BE PROPERLY DUG WITH FIRM, NATURAL BALLS OF SOIL REATINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1. 15.2. ROOT BALLS SHALL BE FIRMLY WRAPPED WITH NONSYNTHETIC, ROTTABLE BURLAP AND SECURED WITH NAILS AND HEAVY, NONSYNTHETIC TWINE. 15.3. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBALL. 15.4. REMOVE ALL BURLAP, LACING, AND WIRE BASKET FROM AT LEAST THE TOP 1/2 OF THE ROOTBALL AND DISCARD FROM PLANTING HOLE. 15.5. DO NOT MANEUVER BY TRUNK. HANDLE BY ROOT BALL ONLY. 16. CONTAINERIZED PLANTS SHALL COMPLY WITH THE FOLLOWING GUIDELINES: 16.1. MATERIAL SHALL HAVE FIRM, NATURAL BALLS OF SOIL RETAINING AS MANY FIBROUS ROOTS AS POSSIBLE, IN SIZES AND SHAPES AS SPECIFIED IN THE AMERICAN STANDARD FOR NURSERY STOCK ANSI Z60.1 16.2. ROOT COLLAR SHALL BE APPARENT AT SURFACE OF BALL, OR THE CONTRACTOR WILL BE RESPONSIBLE FOR REMOVING EXCESS SOIL FROM THE TOP OF THE ROOTBAL 16.3. REMOVE CONTAINER PRIOR TO PLANTING. SLOPE SEED MIXTURE - REVEGETATION AREA Ernst Native Detention Area Mix - ERNMX -183 or approved equal Ernst Eastern Native Grass Mix - ERNMX -177 or approved equal Application rate: 20 lbs. per acre, or %2 lb per 1,000 S.F. Total Acreage = 13253 s.f. = 0.30 a.c. COMMON NAME Application rate: 15 lbs. per acre, or %2 lb per 1,000 S.F. Panicum virgatum 'Shawnee' SCIENTIFIC NAME COMMON NAME PERCENT OF MIX Sorghastrum nutans Indiangrass 30 Virginia Wildrye Andropogon gerardii 'Prairie View' Big Bluestem 30 5 Panicum virgatum 'Shawnee' Switchgrass 20 Juncus effusus Elymus virginicus Virginia Wildrye 16 Ticklegrass Agrostis perennans Autumn Bentgrass 4 1 TOTALS = 100 ** *NOTE: SLOPE SEED MIX MUST BE INSTALLED BETWEEN MARCH 1 - JUNE 15 UNLESS OTHERWISE ALLOWED BY LANDSCAPE ARCHITECT. ** *NOTE: SLOPE SEED MIX MUST BE INSTALLED BETWEEN MARCH 1 UNLESS OTHERWISE ALLOWED BY LANDSCAPE ARCHITECT. - JUNE 15 ** *NOTE: SEED MAY ONLY BE APPLIED ONCE FINE GRADING IS COMPLETED. 17. TREES TO BE STAKED WILL BE DESIGNATED BY THE LANDSCAPE ARCHITECT. TREE STAKING FOR CANOPY AND LARGE EVERGREEN TREES SHALL NOT EXCEED 90 DAYS. 18. ALL PLANT BEDS ARE TO RECEIVE A MINIMUM OF 4" OF APPROVED TOPSOIL TILLED IN TO A DEPTH OF 8" TO ENSURE INTEGRATION WITH EXISTING SOIL. APPROVED TOPSOIL IS TO BE PREFERABLY FROM ON -SITE STOCKPILE FROM STRIPING OPERATIONS - SEE EROSION AND SEDIMENT CONTROL PLANS. IF ON -SITE TOPSOIL IS NOT AVAILABLE, CONTRACTOR SHALL PROVIDE TO SITE ACCORDINGLY. 19. ALL MULCH TO BE CERTIFIED TO BE FREE OF WEEDS, NON - NATIVE INVASIVE SPECIES AND THEIR LARVAE. MULCH SAMPLE SUBMITTAL WILL BE PROVIDED TO LANDSCAPE ARCHITECT BEFORE SITE DELIVER 20. SEED BED PREPARATION: ALL AREAS TO BE SEEDED ARE TO RECEIVE A MINIMUM OF 2" OF APPROVED TOPSOIL ALL DEBRIS, ROCKS, ETC. LARGER THAN .5" ARE TO BE REMOVED PRIOR TO SEEDING OR PLANTING. APPROVED TOPSOIL IS TO BE PREFERABLY FROM ON -SITE STOCKPILE FROM STRIPING OPERATIONS - SEE EROSION AND SEDIMENT CONTROL PLANS. IF ON -SITE TOPSOIL IS NOT AVAILABLE, CONTRACTOR SHALL PROVIDE TO SITE ACCORDINGLY. 21. ALL TREE PLANTINGS WILL REQUIRE A 2 YEAR WARRANTY AFTER THE FINAL INSPECTION OF PERMITTED PLANTING. 21.1. CONTRACTOR SHALL COMPLY WITH THE FOLLOWING WATERING INSTRUCTIONS FOR ALL TREE PLANTINGS 21.2. 2 -YEAR WATERING AND MAINTENANCE REQUIRED. 21.3. AFTER INSTALLATION TREES SHALL BE THOROUGHLY SOAKED AND WATERED AT LEAST TWICE PER WEEK UNTIL ESTABLISHMENT. 21.4. WATERING VOLUMES SHALL BE BASED UPON DELIVERY OF 1 INCH OF MOISTURE PER WEEK TO THE TREE IF PRECIPITATION DOES NOT MEET THAT AMOUNT DURING THE ACTIVE GROWING SEASON DEFINED AS APRIL 15TH THROUGH NOVEMBER 1ST. TREE PROTECTION NOTES 1. ALL EXISTING TREES THAT ARE DESIGNATED TO REMAIN SHALL BE PROTECTED ACCORDINGLY. 2. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. 3. TREE PROTECTION FENCING SHALL INCLUDE WARNING SIGNS POSTED IN BOTH ENGLISH AND SPANISH, AS FOLLOWS: "NO TRESPASSING /TREE PROTECTION AREA /PROHIBIDO ENTRAR / ZONA PROTECTORA PARA LOS ARBOLES." 4. PROTECTION OF EXISTING VEGETATION: AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE ON THE TREE ROOTS OUTSIDE OF THE TREE SAVE AREA. THIS SHALL OCCUR AT THE SAME TIME THAT OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE TREES IS COMPLETE. 5. ANY GRADING DESIGNATED TO OCCUR WITHIN AN EXISTING TREE'S ROOT ZONE SHALL BE DONE BY HAND TOOLS. 6. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED TREE AREA. 7. TYPICAL TREE PROTECTION AREA (UNLESS OTHERWISE SHOWN ON PLAN): EQUALS ONE FOOT OF RADIUS FOR EVERY 1.25 INCH OF DIAMETER OF EXISTING TREES, OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA. PRESERVATION MIXTURE - DETENTION AREA Ernst Native Detention Area Mix - ERNMX -183 or approved equal Total Acreage = 8610 s.f. = 0.20 a.c. Application rate: 20 lbs. per acre, or %2 lb per 1,000 S.F. SCIENTIFIC NAME COMMON NAME PERCENT OF MIX Panicum virgatum 'Shawnee' Switchgrass 32 Panicum rigidulum (P. stipitatum) Redtop Panicgrass 32 Elymus virginicus Virginia Wildrye 20 Scirpus atrovirens Green Bulrush 5 Agrostis perennans Autumn Bentgrass 5 Juncus effusus Soft Rush 3 Agrostis scabra Ticklegrass 2 Juncus tenuis Path Rush 1 TOTALS = 100 ** *NOTE: SLOPE SEED MIX MUST BE INSTALLED BETWEEN MARCH 1 - JUNE 15 UNLESS OTHERWISE ALLOWED BY LANDSCAPE ARCHITECT. ** *NOTE: SEED MAY ONLY BE APPLIED ONCE FINE GRADING IS COMPLETED. MULCH USING EXCELSIOR EROSION CONTROL BLANKET. PIN IN PLACE IN STORMWATER DETENTION AREA. LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. H X04 o a ' S N X 51 ; - Z O Q Q O 0 U) Z QIIIIIIIIIIIIN OZ Z 0- OZ � 0 OQ U) U LL 111 O z W °0 z O 11.- m�Jz W p O U 0C� W Y (.0 3: 31 PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: GHS DRAWN: JEP CHECKED: GHS REVISIONS: PERMIT SET 2.21.15 PERMIT RES. 3.23.15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: LANDSCAPE NOTES AND DETAILS SHEET NUMBER: L301 SHEET 9 OF 9 EROSION CONTROL NOTES: 1.THE CONTRACTOR SHALL EXERCISE PRECAUTIONS THROUGHOUT THE CONSTRUCTION SEQUENCE TO PREVENT EROSION AND OFF -SITE SEDIMENT EROSION CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED w ACCORDANCE WITH THE CONSTRUCTION SEQUENCE GENERAL SITE PREPARATION PROJECT PLANS, WAKE COUNTY GUIDELINES, AND AS DIRECTED BY THE DESIGNER. ALL SEDIMENTATION AND EROSION \\ 1. THE CONTRACTOR IS REQUIRED TO PERFORM AN INITIAL INSPECTION OF THE SITE AND TO TAKE CONTROLS ARE TO BE BUILT TO WAKE COUNTY AND NCDENR STANDARDS. PHOTOGRAPHS AND VIDEO OF THE PROPOSED CONSTRUCTION, STAGING, AND STOCKPILE AREAS U t � I b I BEFORE DISTURBING THE SITE IN ACCORDANCE WITH THE GENERAL CONDITIONS. APPROVAL TO 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL EROSION CONTROL MEASURES DURING INSTALL EROSION AND SEDIMENT CONTROL SHALL NOT BE GRANTED UNTIL THE CONTRACTOR HAS LANDSCAPE ARCHITECTURE CONSTRUCTION. THE MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY, AND SHALL �5� PROVIDED TO THE WAKE COUNTY AND RECEIVED WRITTEN APPROVAL OF THE CONTENT FROM WAKE LAND PLANNING BE CHECKED FOR MAINTENANCE ISSUES AFTER EVERY RAINFALL AT A MINIMUM. //� COUNTY. URBAN DESIGN 3.ALL DISTURBED AREAS TO BE SEEDED TO SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE PLANS. SEEDED AREAS / / / 2.PERFORM ALL UTILITY IDENTIFICATION AND MARKING /FLAGGING AS NECESSARY. 218 Snow Avenue SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO / 3.000RDINATE WITH UTILITY COMPANIES TO RELOCATE OR PROTECT UTILITIES. Raleigh, NC 27603 1 919.805.3586 OBTAIN A DENSE STAND OF GRASS. ALL DISTURBED AREAS THAT ARE NOT OTHERWISE STABILIZED SHALL BE TOP SOILED / \ _ \ I 4.STAKE CONSTRUCTION LIMITS AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. AND SEEDED, TEMPORARILY OR PERMANENTLY, IN ACCORDANCE WITH THE WAKE COUNTY STANDARDS. PERMANENT SEEDING / / r,.� , - ��-� 5.INSTALL A PLAN BOX AT A VISIBLE LOCATION WITHIN THE SITE TO KEEP A COPY OF THE REUSE OF DOCUMENT AND GRASS ESTABLISHMENT IS REQUIRED PRIOR TO PROJECT COMPLETION AND ACCEPTANCE. / � / This document is the property APPROVED EROSION CONTROL PLANS NPDES REPORTS ETC. POST THE EROSION CONTROL PERMIT 4.THE CONTRACTOR SHALL PROVIDE GROUND COVER AS SOON AS POSSIBLE BUT IN ANY EVENT WITHIN 14 DAYS ON 2 / / � B�FD• / / - - - - IN A VISIBLE LOCATION ON THE PLAN BOX. of DHM Design Corp. The ideas and M design incorporated on this DISTURBED FLAT AREAS AND 7 DAYS ON ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND SLOPES // Cti F'Q // - - - - - - - - 6.MOBILIZE CONSTRUCTION EQUIPMENT. document is an instrument of STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL. SEE GROUND STABILIZATION CHART. /, /' 2p, j / h professional service and shall not be G•<` - - - 7 INSTALL SEDIMENT /EROSION CONTROL FENCING TREE PROTECTION FENCING INLET PROTECTION used for any other project without GROUND STABILIZATION CHART SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES Pipe Pipe Pipe IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT SLOPES STEEPER THAN 3:1 7 DAYS STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH. ALL OTHER AIRES WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES. written authorization of DHM Design Corp. CONSTRUCTION ENTRANCE AND MOBILIZE EQUIPMENT TO THE PROJECT SITE. &CONSTRUCT SEDIMENT BASIN AND ALL OTHER EROSION CONTROL MEASURES NECESSARY AS SHOWN ON THE EROSION CONTROL PLAN. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE Z) - - - PRECAUTION THROUGHOUT THE CONSTRUCTION OF THE PROJECT TO PREVENT EROSION AND / / �► / / /\ / / EXISTI WOOD EDGE -\ OFF -SITE SEDIMENTATION. WHEN THE MEASURES ARE COMPLETE CALL FOR AN INSPECTION BY THE ENGINEER. 9.IDENTIFY STAGING AND STOCKPILE AREAS AS SHOWN ON PLANS. ALL EXCAVATED MATERIAL SHALL ; ovo a d y:Y BE STOCKPILED WITHIN STAGING AREAS OR THE LIMITS OF DISTURBANCE FOR LATER USE AS FILL U<..' 2 = 288 \/ // / 1 // I �T - 29i // I MATERIAL OR DISPOSAL. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING APPROPRIATE wJ „7 STABILIZATION MEASURES AROUND THE STOCKPILE AREA(S) TO PREVENT EROSION AND / PROPOSED SPILLWAY j - - - - - - _ SEDIMENTATION. ANY STOCKPILE MUST BE STABILIZED IF INACTIVE FOR MORE THAN 7 CALENDAR 'al\., .. n�. 1 1.5" FAIRCLOTH SKIMMER /,- , °p� f °O CLASS B RIPRAP 98- DAYS. illIN`V`` C3 / / 1/ o/ SKIMMER SEDIMENT BASIN 1 5. ALL DISTURBED AREAS TO BE PERMANENTLY GRASSED SHALL BE SEEDED WITH PERMANENT SEED MIX. SEDIMENT STORAGI�/ A EA_ / , ` SPILLWAY WEIR = 295.00 _0 _ C3 - - - - -X- I PARK IMPROVEMENTS SEDIMENT CLEANOUT -292. 0 6. THIS SITE IS LOCATED WITHIN THE NEUSE WATERSHED. BOTTOM CONTOUR TO �� /^ BOTTOM- 291.00 ELEVATION 291.00 o I / oo I 7. THE CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS, PARKING AREAS, AND DRAINAGE � 1 (FILL TO 292.00 ONCE C ST 10. BEGIN GRADING OPERATIONS. RUCTION - - - _ - X UJ / % '_ - - - - - - - - _ - � SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. WHERE SEDIMENT IS IS COMPLETED) o 11. INSTALL DRIVEWAY PIPE. TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACES, THE ROAD SURFACE SHALL BE CLEANED ��Q o PROPOSED 3 I 12. INSTALL CONCRETE WALKWAYS AND GRAVEL PARKING AREA. THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE SURFACES BY 2 EROSION j o° rn BAFFLES C2 - o _ _ , - _ x 13. INSTALL DOCK AND COMPLETE SHELTER ROOF IMPROVEMENTS. SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING C3 CONTROL �` / 1`��d o, - -- - - - - �I\ I 14. COMPLETE PARK IMPROVEMENTS. 0� SHALL BE ALLOWED ONLY AFTER EXCESS SEDIMENT IS REMOVED. MATTING / / I �v TEMPORARY 5 x `g 8. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING EE�NOTE 2) o° °o� DIVERSION C2 _ - °� UJ i V ` DITCH , - - - - J � GENERAL SITE COMPLETION ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN ON THE PLANS BUT NECESSARY TO , - X\ CONTROL EXCESS SEDIMENT, IF DETERMINED TO BE NECESSARY BY THE ENGINEER. / /� i'',,'� � h! �Vtij� I oo� _2 -- O/ ,/ / /V 15. COMPLETE SITE SEEDING AND PLANTING AS DESCRIBED IN THE CONSTRUCTION PLANS AND 9. NOTIFICATION OF LAND RESOURCES SEDIMENT AND EROSION CONTROL SELF - INSPECTION / o /, w PROGRAM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO / / ° ` o° EROSION 2 e e - - SPECIFICATIONS. REMOVE SEDIMENT FROM BASIN AND SEED AND MAT PERMANENT DRY DETENTION / / > CONTROL C3 e \I REQUIRE THAT PERSONS RESPONSIBLE FOR LAND- DISTURBING ACTIVITIES INSPECT A PROJECT � o / / � / MATTING �� � � I\ BASIN SLOPES AND BOTTOM. BAFFLES SHALL BE REMOVED FOR THE MATTING PLACEMENT AND AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND / o o >/ / /, / / oQ \ \ SHALL BE REPLACED UNTIL THE SITE IS STABILIZED. SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION o ; / d rnN / o,, \ 16. REPAIR AREAS USED FOR CONSTRUCTION ACCESS, CONSTRUCTION ACTIVITIES AND STOCKPILE OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. THE SELF - INSPECTION PROGRAM ;� / !' / // N Q / N TEMPORARY 4 PROPOSED LOCATIONS. IS SEPARATE FROM THE WEEKLY SELF - MONITORING PROGRAM OF THE NPDES STORMWATER r / T o / / LO CHECK DAM C2 SWALE 2 N (3.8 %, SLOPE, MAX) I / oo \ 17. SEED AND MULCH STAGING AREAS STOCKPILE AREAS ALL HAUL /ACCESS ROADS AND ANY Q PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF - INSPECTION REPORT IS <oa / / o� ' THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES / y�, / Q 3H:1V 302 ° REMAINING NON- VEGETATED AREAS. ACCORDING TO THE APPROVED PLAN. THE INSPECTION MUST BE CONDUCTED AFTER EACH SHEDS 18. COMPLETE SITE CLEANUP AND STABILIZATION AS CALLED FOR ON THE PLANS AND PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS �- TEMPORARY / SPECIFICATIONS. ESTABLISHED IN ACCORDANCE WITH NCGS 113A -54.1 AND 15A NCAC 48.0131. THE C2 DIVERSION // / �O� /COVE f / l \ DITCH SHEL R r 1/ • r, _ I ` \-- -- SHEDS 19. EROSION CONTROL DEVICES SHALL BE REMOVED FROM THEIR RESPECTIVE LOCATIONS ONLY WHEN SELF - INSPECTION REPORT FORM IS AVAILABLE AS AN EXCEL SPREADSHEET FROM / � f • r• • • 3p O DUCK J I / fr•. �/ '''' I f �`: t' r :'.` ;' =';. `,r• -�.r THE STABILIZATION OF THE ADJACENT GROUND HAS BEEN ESTABLISHED. HTTP://WWW.DLR.ENR. STATE. NC. US /PAGES /SEDIMENTATION_NEWHTML. IF YOU HAVE QUESTIONS BOX O ' C, �' ' 1 /XisTitr� l' \r -r : \ �_ OG 20. OBTAIN FINAL APPROVALS FROM WAKE COUNTY. OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919)791 -4200. / I �/�ss��LT�R "/' i . ';•. .. Qo� o<IPEN 10. THE PERSON RESPONSIBLE FOR MAINTENANCE: ERIC STAEHLE, WAKE COUNTY FACILITIES DESIGN / / `/''� ;; /., `�% 21. DEMOBILIZE / I d / /�` ` Ir 1 ' 22. WHEN VEGETATION IS ESTABLISHED CONTACT NCDENR LAND QUALITY INSPECTOR FOR FINAL AND CONSTRUCTION (919) 856 -6369. ( E'' \ ° - �px ��•���``���'��`'���� "''• BOXJ / f ° t / i ' r ��► 1 \ STAGING/ - o : Q / / / / `. r:. STOCKPILE AREA OH _�� OH ::;:::;3[:::: :•: OHE OHE - INSPECTION AND CERTIFICATE OF COMPLIANCE. - °� E OHE OH o .::k:: BOX �r / OH - - _ - 0 1 23. UPON RECEIPT OF THE CERTIFICATE OF COMPLIANCE THE CONTRACTOR SHALL REMOVE ALL 9 LP TEMPORARY EROSION CONTROL MEASURES. REMOVE BAFFLES AND SKIMMER FROM SEDIMENT N OHE OHE OHE e PP 96 - 1 I BASIN. L.L_ ::. X29 01E OHE i �--� Loo / N ' % , i - - �( / 1I o CONCRETE TRUCK 3 DUCK - / WASHOUT AREA C3 \ BOX �i LOW `oD- L / / o ,1 - - /// / ` Z AREA / i \ o / XIS o ^ 1 . / /� /�/ / �\ v I w z ` + \ \ HOUSE o moo' 1 // / \ ° � °\0 ° 1 0 0 \ \,� Z °5� \ ro I 96 LPo S 1 \ ��,� \ z �, _ Q \ \\ \ \ 1 I \ 2 O s / -TANK' / U PAD U �- 280_ _ _- - �l I l 1 \ �. .`1. - ` . `�,• / _ / ^ - I- I/ \�� ___ -���_ � I \ � / / 1 I / / / ti� �Q -• EXISTING � .�. �` +� / /� e��'-OD� � U oo� J `�• "` BUILDING �1- .I�W�I.`r` .\.'�` o / ` �' I� - - w 0 LEGEND z - 285-::7 = �_� . � � • I -� _ / .. � �2 ... / \ \,o \ I w - - _ _ _\ - _ J / \ C . \.`I. ,t.t, - -- - _ _` ,I, ,. - JI - - p CONSTRUCTION ENTRANCE O J z - - - - - - - - - -- \ ► 1 TEMPORARY GRAY \ - _ - - ` - --� 6W \- ^ boo - - - TEMPORARY DIVERSION DITCH w O _` EP - - - - - O I � I I CONSTRUCTION _ a' LoD Lo �ciD �_ � � X - X o --�_- -'- - - - - -�+ �I ~ ENTRANCE - - - _ - - -LLiD - �o - LOD _ - - - _ - _- -0-1 = PROPOSED BAFFLES O Z w - i r TEMPORARY - / w Q 296 -2g•1- - - - - - 293 _ - ° ° CHECK D -C2- - - - - - - - - - - / sF PROPOSED SILT FENCE 6 CLASS A RIPRAP � - - - - -- --- - - -- -- ---- ---- - -- _�_ / - - C3 OUTLET PROTECTION e / e - - SILT FENCE 2 \ -� - TP TREE PROTECTION FENCE 288 P - ,' /ROBERTSON POND�ROAD,(SR 2324 - cw 5H - ° ° / 60' PU LIC R/W ROCK PIPE INLET PROTECTION - TP - O� OH _ _ ° ° ° ° ° / ( ) PROJECT NUMBER: DATE -� -- 1" = a- a►�€, -__ _- __ \ ���� °�s� °� - DISTURBED AREA =1 .79 ACRES 14034 2015.01.23 284 - TP - ` 90� ° PROPOSED OUTLET PROTECTION DESIGNED: BLW 2 EROSION 1 TP cw - - � - - DRAWN: JSV 2a2 I C3 CONTROL - - - - - - GENERAL NOTES: -LOD LIMITS OF DISTURBANCE EROSION 2 1. EROSION CONTROL MATTING SHALL BE CHECKED: BLw MATTING I 6 STANDARD HORSESHOE CONTROL C3 CURLEX EROSION CONTROL MATTING REVISIONS: PROPOSED C2 INLET PROTECTION MATTING AMERICAN EXCELSIOR COMPANY CURLEX 1 om PERMIT SET 2 -21 -15 I 43 LF OF 18" RCP OR APPROVED EQUAL. PROPOSED STAGING AREA PERMIT RES. 3 -23 -15 INV. IN= 289.00 2. EROSION CONTROL MAT SHALL BE PLACED _ _ _ . _ _ PROPOSED STORM SWALE INV nl1T =98R nn 8� Il ON PERMANENT DRY DETENTION BASIN TO STONE CHECK DAM JOB DESCRIPTION: PROMOTE SEE ESTABLISHMENT. SITE PLAN CONCRETE TRUCK WASH PIT SUBMITTAL 30 15 0 30 60 SHEET TITLE: 13 a PROPOSED FENCE SCALE: 1 " =30' _x _x - EXISTING FENCE EROSION CONTROL R EVEG ETATI O N PLAN SHEET NUMBER: • 0 m Know what's below. Call before you dig. SHEET OF Driveway Culvert Pipe Pipe Pipe Full Flow Pipe "Q" Design Full Flow Elevation Elevation Length Slope Pipe Area Capacity Flow Velocity - - Pipe Segment Invert In Invert Out (ft) (ft /ft) (sf Conveyance (cfs) (cfs) (fps) 1 Erorri 'i'o Din .........) D ft () .. ri .......... S A p K Q c d .. ............... Velocity Y PI -1 - PO -2 18 1.5 289 288 36 0.013 0.028 1.767 105.04 17.51 3.37 9.91 / ON PERMANENT DRY DETENTION BASIN TO STONE CHECK DAM JOB DESCRIPTION: PROMOTE SEE ESTABLISHMENT. SITE PLAN CONCRETE TRUCK WASH PIT SUBMITTAL 30 15 0 30 60 SHEET TITLE: 13 a PROPOSED FENCE SCALE: 1 " =30' _x _x - EXISTING FENCE EROSION CONTROL R EVEG ETATI O N PLAN SHEET NUMBER: • 0 m Know what's below. Call before you dig. SHEET OF EXISTING ROADWAY I I A T EFFECTIVE: 01/3 50' MIN. \ 03 / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) BUT SUFFICIENT TO KEEP _TOP ELEVATION OF STORMWATER 0.5' -1' SEDIMENT ON SITE #5 WASHED 1 MAX. � / ' • 2 " -3" STONE TO BE USED.`.,"'.".' - STONE T �1 A 25' OR WIDTH OF °:' SURGE STONE R RAILROAD- ( 0 ':° EXISTING SLOPE ri #1 RIP -RAP PROPOSED STREET, BALLAST)':': :::','.. ;':'.::;:;: %:::..:''.. I PERSPECTIVE VIEW VARIES SIDE VIEW WHICHEVER IS EXISTING SLOPES GREATER. PLAN VIEW NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. 3. MAINTAIN GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING CONSTRUCTION SITE. ENTRANCE WILL REQUIRE PERIODIC REMOVAL OF SEDIMENT -LADEN STONE AND REPLACEMENT WITH FRESH STONE. 3 EXISTING ROADWAY 5' MIN. 15' MIN. 6" MIN. ,... .. UNDER STONE CROSS SECTION STANDARD CONSTRUCTION ENTRANCE STANDARD CONSTRUCTION ENTRANCE SCALE: NOT TO SCALE NEW CONSTRUCTION 12" MIN. CHECK DAM SCALE: NOT TO SCALE 2 5 \ 03 / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) 8' -0" MAXIMUM Tq _TOP ELEVATION OF STORMWATER 0.5' -1' - #5 WASHED 1 MAX. � / - STONE T �1 A STORAGE AREA GRADE EXISTING SLOPE ri #1 RIP -RAP III FRONT VIEW II I PERSPECTIVE VIEW VARIES SIDE VIEW i / NO SCALE EXISTING SLOPES (CUT, FILL, ETC.) FLOOD STORAGE ZONE HEADWALL NOTE: WOVEN WIRE FABRIC _ fist PIPE NATURAL GROUND CONSTRUCTION NOTES: 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA SILT FENCE FABRIC VARIES DOES NOT EXCEED 1/4 ACRE AND NEVER IN 1.5' _ I -TI T(�... I �1 ���i AREAS OF CONCENTRATED FLOW. o HEIGHT &WIDTH DETERMINED BY MAXIMUM SEDIMENT DEPTH #5 WASHED STONE (CLEAN OUT POINT) 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO 7 FILL SLOPE EXISTING TOPOGRAPHY AND PROVIDE STORAGE VOLUME FOR THE NEXT RAIN 04 A NO SCALE SEDIMENT STORAGE REQUIRED. COUNTY 0.5' -1' KEY RIP RAP INTO THE DAM EFFECTIVE: 01/31 /08 GRADE FOR STABILIZATION. 6" MINIMUM COVER r I KEYED RIP RAP o OVER SKIRT I 0 > N ANCHOR SKIRT AS DIRECTED (n z BY ENGINEER #5 WASHED STONE Z SIDE VIEW Q z J EXISTING Z o ry FRONT VIEW GROUND � o>Oicneo m STANDARD TEMPORARY SILT FENCE STEP SEQUENCE EFFECTIVE: 01/31108 2 NOTE: REMOVE SEDIMENT ACCUMULATION FROM BEHIND m ry O CHECK DAMS TO PREVENT DAMAGE TO CHANNEL VEGETATION. FLOW SHOULD BE MAINTAINED THROUGH THE DAM. W � J J W z � O~ COA O f1/ O C7 NORTH CA ROLI STANDARD CHECK DAM EFFECTIVE: 01/31/08 CHECK DAM SCALE: NOT TO SCALE 2 5 STANDARD TEMPORARY SILT FENCE SCALE: NOT TO SCALE \ 03 / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) 8' -0" MAXIMUM Tq SILT FENCE FABRIC INVERT RIP RAP HEADWALL ��� \ -► PIPE / / MINIMUM 10 GAUGE INSTALLED TO SECOND LINE WIRES MINIMUM GAUGE / WIRE FROM TOP INTERMEDILATE ATE WIRES UJ STORAGE AREA GRADE U) III FRONT VIEW II I PERSPECTIVE VIEW WASTE MATERIAL - COMPACT, i / NO SCALE STEEL POST (CUT, FILL, ETC.) FLOOD STORAGE ZONE HEADWALL NOTE: WOVEN WIRE FABRIC _ fist PIPE NATURAL GROUND 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA SILT FENCE FABRIC ;.: 3, FLOW DOES NOT EXCEED 1/4 ACRE AND NEVER IN 1.5' _ I -TI T(�... I �1 ���i AREAS OF CONCENTRATED FLOW. o z MAXIMUM SEDIMENT DEPTH #5 WASHED STONE (CLEAN OUT POINT) 2. REMOVE SEDIMENT DEPOSITED AS NEEDED TO 7 FILL SLOPE 0 PROVIDE STORAGE VOLUME FOR THE NEXT RAIN 04 A NO SCALE AND TO REMOVE PRESSURE ON THE SILT 5 COUNTY FENCE. J EFFECTIVE: 01/31 /08 GRADE J 6" MINIMUM COVER o OVER SKIRT I 0 N ANCHOR SKIRT AS DIRECTED (n z BY ENGINEER Z SIDE VIEW Q z J A Z o ry � o>Oicneo m STANDARD TEMPORARY SILT FENCE EFFECTIVE: 01/31108 2 STANDARD TEMPORARY SILT FENCE SCALE: NOT TO SCALE STANDARD TEMPORARY DIVERSION DITCH "M 3 PLAN VIEW FENCE AND FABRIC BURIED IN TRENCH STEEL POST TRENCH, BACKFILLED AND I� 2l' COMPACTED i_ SECTION VIEW AT OPENING STANDARD BAFFLES DETAIL SCALE: NOT TO SCALE NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 4. BAFFLE SHALL BE 700 G /M2 COI R EROSION BLANKET, S. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL CROSS SECTION SUPPORT ROPE SUPPORT POST TO WIRE TO 24" INTRO BOTTOM STAKE TO PREVENT SAGGING OR SIDE SUPPORT WI I / \ COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE STANDARD BAFFLES DETAIL \ 03 / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) NOTES: 1. TEMPORARY DIVERSION DITCH TO BE USED TO INTERCEPT FLOW AND /OR DIVERT TO A SEDIMENT CONTROL MEASURE OR BMP. INVERT RIP RAP HEADWALL ��� \ -► PIPE / / 2. SILT SHALL BE REMOVED WHEN DITCH IS ONE -HALF FULL. / 3. DTCH SHALL BE RECONSTRUCTED WHEN DAMAGED BY EQUIPMENT OR COVERED BY FILL. UJ STORAGE AREA 4. STABILIZE DIVERSION DITCH BERM WITH TEMPORARY SEEDING, MULCH WITH TAC, AND /OR EROSION CONTROL NETTING. U) 2' MIN. II I PERSPECTIVE VIEW WASTE MATERIAL - COMPACT, i / NO SCALE I —_ a SEED &MULCH AFTER VAR. CONSTRUCTION OF DITC H ' (CUT, FILL, ETC.) FLOOD STORAGE ZONE HEADWALL 2 10' . _ fist PIPE NATURAL GROUND f INVERT SOW ,_,.. ;.: 3, FLOW —I I— III — III — III —III III —� ?' �Q D VAR.2 I- 1I x —I —I —I 1.5' _ I -TI T(�... I �1 ���i 1 =1 11= 11 I I— III —I I —I I' II;.� I I z MAXIMUM SEDIMENT DEPTH #5 WASHED STONE (CLEAN OUT POINT) 111 III III, -I I III 12" 0 CROSS SECTIONAL VIEW A NO SCALE COUNTY A J EFFECTIVE: 01/31 /08 COUNT J NORiA CAROLIN STANDARD TEMPORARY DIVERSION DITCH EFFECTIVE: 01/31/08 0 STANDARD TEMPORARY DIVERSION DITCH "M 3 PLAN VIEW FENCE AND FABRIC BURIED IN TRENCH STEEL POST TRENCH, BACKFILLED AND I� 2l' COMPACTED i_ SECTION VIEW AT OPENING STANDARD BAFFLES DETAIL SCALE: NOT TO SCALE NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE 1ST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). PROVIDE 5 BAFFLES FOR DRAINAGE AREAS GREATER THAN 10 ACRES. 4. BAFFLE SHALL BE 700 G /M2 COI R EROSION BLANKET, S. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL CROSS SECTION SUPPORT ROPE SUPPORT POST TO WIRE TO 24" INTRO BOTTOM STAKE TO PREVENT SAGGING OR SIDE SUPPORT WI I / \ COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE STANDARD BAFFLES DETAIL STANDARD HORSESHOE INLET PROTECTION SCALE: NOT TO SCALE WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C -2619 4805 Green Rd, Suite 100 (919) 870 -0526 Raleigh, NC 27616 FAX (919) 870 -5359 Know what's below. Call before you dig LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 i: 7 �y � i 7� i 7� 7� 1 � l►�►�� This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. `,` �rr�lrrrrrrrr,' : <q Z:Z iy lI uimr = :r i i i i r �0 rrrf UJ \ 03 / CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) INVERT RIP RAP HEADWALL ��� \ -► PIPE / / / #5 WASHED STONE. 1' -0" THICK x 3' -0" HIGH MINIMUM !_ _ �SfOiyfNT UJ STORAGE AREA U) i I PERSPECTIVE VIEW UJ i / NO SCALE AREAS TO BE DISTURBED SEDIMENT STORAGE RIP RAP (CUT, FILL, ETC.) FLOOD STORAGE ZONE HEADWALL _ fist PIPE NATURAL GROUND f INVERT SOW ,_,.. ;.: 3, FLOW 0 1.5' _ I -TI T(�... I �1 ���i III III- CLASS 1 RIP -RAP z MAXIMUM SEDIMENT DEPTH #5 WASHED STONE (CLEAN OUT POINT) 0 SECTION THRU CATCH BASIN, FILTER AND CULVERT PIPE A NO SCALE COUNTY NORTHCAROUN STANDARD HORSESHOE INLET PROTECTION J EFFECTIVE: 01/31 /08 STANDARD HORSESHOE INLET PROTECTION SCALE: NOT TO SCALE WARD CONSULTING ENGINEERS, P.C. FIRM LICENSE N0: C -2619 4805 Green Rd, Suite 100 (919) 870 -0526 Raleigh, NC 27616 FAX (919) 870 -5359 Know what's below. Call before you dig LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 i: 7 �y � i 7� i 7� 7� 1 � l►�►�� This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. `,` �rr�lrrrrrrrr,' : <q Z:Z iy lI uimr = :r i i i i r �0 rrrf UJ UJ U) UJ 0 z 0 J J Q 0 (n z Z O a. Q z J O Z o ry � U � cy 2 m ry O z ~ W � J J W z � O~ � O f1/ O C7 z W w Ya PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: BLW DRAWN: JSV CHECKED: BLW REVISIONS: PERMIT SET 2 -21 -15 PERMIT RES. 3 -23 -15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: EROSION CONTROL DETAILS SHEET NUMBER: C2 SHEET OF. LONGITUDINAL ANCHOR TRENCH -� STAKE AT 3P-5'r INTERVALS P ��1 1 r 'RYA'YAYAY^YAYr^" - TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH IN CHECK SLOT AT 25' INTERVALS (MIN) ISOMETRIC VIEW WOODEN STAKES INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT STANDARD SKIMMER BASIN (DURING CONSTRUCTION) 2 SCALE. NOT TO SCALE 295.00 50' SPILL AY LENGTH _ 295.00 TOP OF y _3 295.00 TRIPRAP .00 CLASS B TOP OF BERM BERM SPILLWAY y y W r i y' y y y •p � i H' y � y y H' y� W H TIE TO EXISTING GRADE DRY DETENTION BASIN OUTLET DETAIL I- IrC J IURM LLCVM IIUIV - LyJ.0/_ THE 1 -YR STORM WILL INFILTRATE INTO THE SOILE, APPROXIMATELY 0.5 -1.0 INCHES /HOUR -YEAR STORM ELEVATION - 294.03 APPROXIMATE TIME TO DEWATER = 24 -48 HOURS -AR CTOPM FI FVATI11N - *?QA OR 3' MINIMUM 295.00 TOP OF BERM _411 1r 4 294.00 CLASS B y __ _RIPRAP SPILLWAY_ -- - - - - - - - - - - - - - - - - - - - - - - - - 292.00 BOTTOM OF DRY DETENTION BASIN DRY DETENTION BASIN OUTLET CROSS SECTION DETAIL COLLECTION ZONE CONSTRUCTION NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR DRY DETENTION BASIN LOCATION. 2. THE DRY DETENTION BASIN SHALL FUNCTION AS A TEMPORARY SEDIMENT TRAP DURING SITE GRADING AND CONSTRUCTION. 3. WHILE OPERATING AS A SEDIMENT TRAP, BAFFLES SHALL BE INSTALLED IN ACCORDANCE WITH NCDENR REQUIREMENTS. 4. DEWATERING OF THE SEDIMENT TRAP SHALL OCCUR THROUGH A 1.5" FAIRCLOTH SKIMMER (SEE DETAIL). 5. ONCE ENOUGH SEDIMENT HAS COLLECTED TO FILL THE 1 -FOOT SEDIMENT COLLECTION ZONE, THE BASIN SHALL BE DEWATERED USING PUMPS IN ORDER TO FACILITATE REMOVAL OF EXCESS SEDIMENT. WATER PUMPED OUT OF THE BASIN SHALL BE DISCHARGED INTO A SEDIMENT BAG BEFORE BEING ALLOWED TO DISCHARGE AS DIFFUSE FLOW INTO THE RIPARIAN BUFFER. 6. ONCE GRADING OPERATIONS AND CONSTRUCTION IS COMPLETED, THE SEDIMENT TRAP SHALL BE CONVERTED TO THE PROPOSED DRY DETENTION POND. THE 1 -FOOT SEDIMENT COLLECTION ZONE SHALL BE BACKFILLED TO 293.50 WITH ONSITE SOILS. ALL BAFFLES SHALL BE REMOVED. DRY DETENTION BASIN DETAIL (FINAL DESIGN) 4 SCALE: NOT TO SCALE 01 NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. CONCRETE WASHOUT BERM SIGN 12" TYPICAL WIDTH A•1 UNDISTURBED - OR COMPACTED SOIL TYPICAL EROSION CONTROL INSTALLATION SCALE: NOT TO SCALE 3 Table 6.10a Temporary Seeding Specifications for Winter and Early Spring Seeding mixture Species Rate (lb /acre) Rye (grain) 120 Seeding dates Mountains >2500ft 15 -Feb to 15 -May <2500 ft 1 -Feb to 1 -May Piedmont 1 -Jan to 1 -May Coastal Plain 1 -Dec to 15 -Apr Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize ifgrowth is not fully adequate. Reseed, refertilize and mulch immediately following erosionorotherdamage. Table 6.10b Temporary Seeding Specifications for Summer Seeding mixture Species Rate (lb /acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50lb /acre. Seeding dates Mountains 15 -May to 15 -Aug Piedmont 1 -May to 15 -Aug Coastal Plain 15 -Apr to 15 -Aug Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoringtool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10c Temporary Seeding Specifications for Fall Seeding mixture Species Rate (lb /acre) Rye (grain) 120 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 501b /acre. Seeding dates Mountains 15 -Aug to 15 -Dec Coastal Plain and 15 -Aug to 30 -Dec Piedmont Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000lb /acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50lb /acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb /acre Kobe (Piedmont and Coastal Plain) late February or early March. Permanent seeding see specifications. Use this table if not otherwise specified. Permanent Seeding Mixture Seed Mixtures Planting Rates Blend of 50% KY -31 Tall fescue and 50% mixture of two or more turf -type tall fescues 200 -250 Ibs /acre Or Blend of three or more turf -type tall fescues 200 -250 Ibs /acre Seeding Dates Best Possible Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Feb 1 - March 31 The above vegetation are those which do well under local conditions: other seeding rate combinations are possible. Seeding mix shall be approved by the Engineer before seeding of the project starts. TEMPORARY SEEDING SPECIFICATIONS 5 SCALE: NOT TO SCALE 'A -BERM CONCRETE WASHOUT AREA PLAN COMPACTED BERM AROUND THE PERIMETER SECTION A CONCRETE WASHOUT AREA 2% SLOPE GRAVE PAD STANDARD CONCRETE TRUCK CLEAN OUT PIT SCALE: NOT TO SCALE MIN . - W D I C� I RIP -RAP-7 I p I r5 NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR CONCRETE WASH OUT AREA (CWA) LOCATION. 2. DO NOT LOCATE AN UNLINED CWA WITHIN 400' OF ANY NATURAL DRAINAGE CONVEYANCE OR WATER BODY. DO NOT LOCATE WITHIN 1000' OF ANY WELLS OR DRINKING WATER SOURCES. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE SOILS EXIST ON SITE, THE CWA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (16 MIL MIN. THICKNESS) OR SURFACE STORAGE ALTERNATIVES USING PREFABRICATED CONCRETE WASHOUT DEVICES OR A LINE ABOVE GROUND STORAGE SHOULD BE USED. 3. THE CWA SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. ✓EL 4. CWA SHALL INCLUDE A FLAT SUBSURFACE PIT THAT IS AT LEAST 8' BY 8'. SLOPES LEADING OUT OF THE SUBSURFACE PIT SHALL BE 3:1 OR FLATTER. THE PIT SHALL BE AT LEAST 3' DEEP. 5. BERM SURROUNDING SIDES AND BACK OF THE CWA SHALL HAVE MINIMUM HEIGHT OF 1' 6. VEHICLE TRACKING PAD SHALL BE SLOPED 2% TOWARDS THE CWA 7. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CWA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CWA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 8. USE EXCAVATED MATERIAL FOR PERIMETER BERM CONSTRUCTION. CWA MAINTENANCE NOTES 1. THE CWA SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. L CONCRETE MATERIALS, ACCUMULATED IN PIT, SHALL BE REMOVED ONCE THE MATERIALS HAVE REACHED A DEPTH OF 2'. 2. CONCRETE WASHOUT WATER, WASTED PIECES OF CONCRETE, AND ALL OTHER DEBRIS IN THE SUBSURFACE PIT SHALL BE TRANSPORTED FROM THE JOB SITE IN A WATER -TIGHT CONTAINER AND DISPOSED OF PROPERLY. 3. THE CWA SHALL REMAIN IN PLACE UNTIL ALL CONCRETE FOR THE PROJECT IS PLACED. 4. WHEN THE CWA IS REMOVED, COVER THE DISTURBED AREA WITH TOP SOIL, SEED AND MULCH, OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE LOCAL JURISDICTION. CONSTRUCTION SPECIFICATIONS 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS 1RAL GRADE EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE M =3 (MIN) MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER- RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. 4" #57 WASHED STONE MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE LAYER OF FILTER FABRIC, GTF -150 OR EQUAL RECEIVING AREA OR SLIGHTLY BELOW IT. NOTE: MINIMUM IPE DIAMETER 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING SECTION B -B STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NOTES: OR MEDIAN SIZE OF RIP -RAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE THE ENGINEER. APRON. 2. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH 3. RIP -RAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 3:1 AND A HEIGHT NOT LESS THAN TWO VEGETATION (PRACTICES 6.10, TEMPORARY SEEDING, AND 6.11, PERMANENT THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF SEEDING). THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL THE AREA TO BE PAVED OR RIP - RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH MAINTENANCE SURFACE OF END. RECEIVING CHANNEL THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR CHANNEL MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. ALLOWED. RIPRAP OUTLET PROTECTION Z Z Q W INFLW APRON NCD OT STRUCTURE ZZ 18' MIN PIPE SIZE DISCHARGE TOP OF DAM W TARP PROTECTION Z O Q MEN DITCH AND BURY TARP EDGE (MIN. 12') 0' MIN WIDTH {ft} WEIR LENGTH TYPE OUTLET {in} Q25 (cfs) {ft} DEWATERING SECTION THRU WEIR EMERGENCY O Q DEVICE SPILLWAY U BAFFLES `C) 1N {in} PLAN VIEW DRIVEWAY ry F MIN FREEBOARD TOP OF BERM W O BAFFLES (STD) W Z INFLOW MERGENCY 3.74 6 STRUCTURE SPILLWAY 18 CLASS A SKIMME ELEVATION 0 DE ATERING Ow ZONE DISSIPATER PAD RIP RAP INLET SHALL BE CMP OUTLET PIPE PROTECTED (AS NEEDED) CROSS SECTION FROM EROSION WITH RIPRAP, TARP, MATTING OR EQUIVALENT, NOTES: 1) BASIN SHOULD BE CLEANED OUT WHEN CAPACITY REACHES AN ELEVATION REPRESENTING THAT THE BASIN IS HALF -FULL. 2) THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12-. THE UPSTREAM 12' TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 3) PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 4) BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 5) MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, SO THIS SHOULD BE READILY AVAILABLE FOR MAINTENANCE. 6) DURING THE CONSTRUCTION PHASE OF THE PROJECT, PERMANENT STORMWATER RISER SHALL ONLY DEWATER FROM THE TOP OF PIPE. 7) POND SHALL NOT BE CONVERTED FOR STORMWATER USE UNTIL APPROVED BY ENVIRONMENTAL ENGINEER. A COUNT NORTH CAROLINA STANDARD SKIMMER BASIN EFFECTIVE: 01/31/08 LONGITUDINAL ANCHOR TRENCH -� STAKE AT 3P-5'r INTERVALS P ��1 1 r 'RYA'YAYAY^YAYr^" - TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH IN CHECK SLOT AT 25' INTERVALS (MIN) ISOMETRIC VIEW WOODEN STAKES INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT STANDARD SKIMMER BASIN (DURING CONSTRUCTION) 2 SCALE. NOT TO SCALE 295.00 50' SPILL AY LENGTH _ 295.00 TOP OF y _3 295.00 TRIPRAP .00 CLASS B TOP OF BERM BERM SPILLWAY y y W r i y' y y y •p � i H' y � y y H' y� W H TIE TO EXISTING GRADE DRY DETENTION BASIN OUTLET DETAIL I- IrC J IURM LLCVM IIUIV - LyJ.0/_ THE 1 -YR STORM WILL INFILTRATE INTO THE SOILE, APPROXIMATELY 0.5 -1.0 INCHES /HOUR -YEAR STORM ELEVATION - 294.03 APPROXIMATE TIME TO DEWATER = 24 -48 HOURS -AR CTOPM FI FVATI11N - *?QA OR 3' MINIMUM 295.00 TOP OF BERM _411 1r 4 294.00 CLASS B y __ _RIPRAP SPILLWAY_ -- - - - - - - - - - - - - - - - - - - - - - - - - 292.00 BOTTOM OF DRY DETENTION BASIN DRY DETENTION BASIN OUTLET CROSS SECTION DETAIL COLLECTION ZONE CONSTRUCTION NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR DRY DETENTION BASIN LOCATION. 2. THE DRY DETENTION BASIN SHALL FUNCTION AS A TEMPORARY SEDIMENT TRAP DURING SITE GRADING AND CONSTRUCTION. 3. WHILE OPERATING AS A SEDIMENT TRAP, BAFFLES SHALL BE INSTALLED IN ACCORDANCE WITH NCDENR REQUIREMENTS. 4. DEWATERING OF THE SEDIMENT TRAP SHALL OCCUR THROUGH A 1.5" FAIRCLOTH SKIMMER (SEE DETAIL). 5. ONCE ENOUGH SEDIMENT HAS COLLECTED TO FILL THE 1 -FOOT SEDIMENT COLLECTION ZONE, THE BASIN SHALL BE DEWATERED USING PUMPS IN ORDER TO FACILITATE REMOVAL OF EXCESS SEDIMENT. WATER PUMPED OUT OF THE BASIN SHALL BE DISCHARGED INTO A SEDIMENT BAG BEFORE BEING ALLOWED TO DISCHARGE AS DIFFUSE FLOW INTO THE RIPARIAN BUFFER. 6. ONCE GRADING OPERATIONS AND CONSTRUCTION IS COMPLETED, THE SEDIMENT TRAP SHALL BE CONVERTED TO THE PROPOSED DRY DETENTION POND. THE 1 -FOOT SEDIMENT COLLECTION ZONE SHALL BE BACKFILLED TO 293.50 WITH ONSITE SOILS. ALL BAFFLES SHALL BE REMOVED. DRY DETENTION BASIN DETAIL (FINAL DESIGN) 4 SCALE: NOT TO SCALE 01 NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. CONCRETE WASHOUT BERM SIGN 12" TYPICAL WIDTH A•1 UNDISTURBED - OR COMPACTED SOIL TYPICAL EROSION CONTROL INSTALLATION SCALE: NOT TO SCALE 3 Table 6.10a Temporary Seeding Specifications for Winter and Early Spring Seeding mixture Species Rate (lb /acre) Rye (grain) 120 Seeding dates Mountains >2500ft 15 -Feb to 15 -May <2500 ft 1 -Feb to 1 -May Piedmont 1 -Jan to 1 -May Coastal Plain 1 -Dec to 15 -Apr Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize ifgrowth is not fully adequate. Reseed, refertilize and mulch immediately following erosionorotherdamage. Table 6.10b Temporary Seeding Specifications for Summer Seeding mixture Species Rate (lb /acre) German millet 40 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 50lb /acre. Seeding dates Mountains 15 -May to 15 -Aug Piedmont 1 -May to 15 -Aug Coastal Plain 15 -Apr to 15 -Aug Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000lb/acre straw. Anchor straw by tacking with asphalt, netting ora mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoringtool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10c Temporary Seeding Specifications for Fall Seeding mixture Species Rate (lb /acre) Rye (grain) 120 In the Piedmont and Mountains, a small- stemmed Sudangrass may be substituted at a rate of 501b /acre. Seeding dates Mountains 15 -Aug to 15 -Dec Coastal Plain and 15 -Aug to 30 -Dec Piedmont Soil amendments Follow recommendations of soil tests or apply 2 ton /acre ground agricultural limestone and 750lb /acrea 10 -10 -10 fertilizer Mulch Apply 4,000lb /acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Repair and refertilize damaged areas immediately. Topdress with 50lb /acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50lb /acre Kobe (Piedmont and Coastal Plain) late February or early March. Permanent seeding see specifications. Use this table if not otherwise specified. Permanent Seeding Mixture Seed Mixtures Planting Rates Blend of 50% KY -31 Tall fescue and 50% mixture of two or more turf -type tall fescues 200 -250 Ibs /acre Or Blend of three or more turf -type tall fescues 200 -250 Ibs /acre Seeding Dates Best Possible Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Feb 1 - March 31 The above vegetation are those which do well under local conditions: other seeding rate combinations are possible. Seeding mix shall be approved by the Engineer before seeding of the project starts. TEMPORARY SEEDING SPECIFICATIONS 5 SCALE: NOT TO SCALE 'A -BERM CONCRETE WASHOUT AREA PLAN COMPACTED BERM AROUND THE PERIMETER SECTION A CONCRETE WASHOUT AREA 2% SLOPE GRAVE PAD STANDARD CONCRETE TRUCK CLEAN OUT PIT SCALE: NOT TO SCALE MIN . - W D I C� I RIP -RAP-7 I p I r5 NOTES: 1. SEE CONSTRUCTION PLANS VIEW FOR CONCRETE WASH OUT AREA (CWA) LOCATION. 2. DO NOT LOCATE AN UNLINED CWA WITHIN 400' OF ANY NATURAL DRAINAGE CONVEYANCE OR WATER BODY. DO NOT LOCATE WITHIN 1000' OF ANY WELLS OR DRINKING WATER SOURCES. IF SITE CONSTRAINTS MAKE THIS INFEASIBLE, OR IF HIGHLY PERMEABLE SOILS EXIST ON SITE, THE CWA MUST BE INSTALLED WITH AN IMPERMEABLE LINER (16 MIL MIN. THICKNESS) OR SURFACE STORAGE ALTERNATIVES USING PREFABRICATED CONCRETE WASHOUT DEVICES OR A LINE ABOVE GROUND STORAGE SHOULD BE USED. 3. THE CWA SHALL BE INSTALLED PRIOR TO CONCRETE PLACEMENT ON SITE. ✓EL 4. CWA SHALL INCLUDE A FLAT SUBSURFACE PIT THAT IS AT LEAST 8' BY 8'. SLOPES LEADING OUT OF THE SUBSURFACE PIT SHALL BE 3:1 OR FLATTER. THE PIT SHALL BE AT LEAST 3' DEEP. 5. BERM SURROUNDING SIDES AND BACK OF THE CWA SHALL HAVE MINIMUM HEIGHT OF 1' 6. VEHICLE TRACKING PAD SHALL BE SLOPED 2% TOWARDS THE CWA 7. SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE CWA, AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE CWA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS. 8. USE EXCAVATED MATERIAL FOR PERIMETER BERM CONSTRUCTION. CWA MAINTENANCE NOTES 1. THE CWA SHALL BE REPAIRED, CLEANED, OR ENLARGED AS NECESSARY TO MAINTAIN CAPACITY FOR CONCRETE WASTE. L CONCRETE MATERIALS, ACCUMULATED IN PIT, SHALL BE REMOVED ONCE THE MATERIALS HAVE REACHED A DEPTH OF 2'. 2. CONCRETE WASHOUT WATER, WASTED PIECES OF CONCRETE, AND ALL OTHER DEBRIS IN THE SUBSURFACE PIT SHALL BE TRANSPORTED FROM THE JOB SITE IN A WATER -TIGHT CONTAINER AND DISPOSED OF PROPERLY. 3. THE CWA SHALL REMAIN IN PLACE UNTIL ALL CONCRETE FOR THE PROJECT IS PLACED. 4. WHEN THE CWA IS REMOVED, COVER THE DISTURBED AREA WITH TOP SOIL, SEED AND MULCH, OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE LOCAL JURISDICTION. CONSTRUCTION SPECIFICATIONS 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS 1RAL GRADE EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE M =3 (MIN) MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER- RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. 4" #57 WASHED STONE MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE LAYER OF FILTER FABRIC, GTF -150 OR EQUAL RECEIVING AREA OR SLIGHTLY BELOW IT. NOTE: MINIMUM IPE DIAMETER 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING SECTION B -B STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NOTES: OR MEDIAN SIZE OF RIP -RAP AND LENGTH, WIDTH AND DEPTH OF APRON TO BE DESIGNED BY NEEDED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE THE ENGINEER. APRON. 2. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH 3. RIP -RAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 3:1 AND A HEIGHT NOT LESS THAN TWO VEGETATION (PRACTICES 6.10, TEMPORARY SEEDING, AND 6.11, PERMANENT THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF SEEDING). THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL THE AREA TO BE PAVED OR RIP - RAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH MAINTENANCE SURFACE OF END. RECEIVING CHANNEL THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR CHANNEL MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95% OR GREATER. BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. ALLOWED. RIPRAP OUTLET PROTECTION Q APRON NCD OT PIPE PIPE SIZE DISCHARGE La LENGTH Z O Q WIDTH {ft} THICKNESS TYPE OUTLET {in} Q25 (cfs) {ft} O Q U `C) 1N {in} STONE DRIVEWAY ry W O z W Z 18 3.74 6 4.5 18 CLASS A CULVERT 0 o Ow � will LANDSCAPE ARCHITECTURE LAND PLANNING URBAN DESIGN 218 Snow Avenue Raleigh, NC 27603 1 919.805.3586 REUSE OF DOCUMENT This document is the property of DHM Design Corp. The ideas and design incorporated on this document is an instrument of professional service and shall not be used for any other project without written authorization of DHM Design Corp. zir q pLU M Z: ,,o ..•• 00,,. i,zz`, 1e 111NN \ \\ UJ UJ U) UJ 0 z O 0. J J Z O LLI m O 0� PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: BLW DRAWN: JSV CHECKED: BLW REVISIONS: PERMIT SET 2 -21 -15 PERMIT RES. 3 -23 -15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: RIP RAP APRON AT CULVERTS EROSION CONTROL 6 DETAILS SCALE: NOT TO SCALE WARD CONSULTING ENGINEERS, P.C. r Q7-:FIRM LICENSE N0: C -2619 4805 Green Rd, Suite 100 (919) 870 -0526 Raleigh, NC 27616 FAX (919) 870 -5359 SHEET NUMBER: Q�%P/ Know what's below. C3 Call before you dig. SHEET OF Q O L.L. Z O Q Z 1..1... J Z 0 ry O Q U `C) 1N L.L ry W O z W Z O J N I..L J w z 0 0 o Ow � PROJECT NUMBER: DATE 14034 2015.01.23 DESIGNED: BLW DRAWN: JSV CHECKED: BLW REVISIONS: PERMIT SET 2 -21 -15 PERMIT RES. 3 -23 -15 JOB DESCRIPTION: SITE PLAN SUBMITTAL SHEET TITLE: RIP RAP APRON AT CULVERTS EROSION CONTROL 6 DETAILS SCALE: NOT TO SCALE WARD CONSULTING ENGINEERS, P.C. r Q7-:FIRM LICENSE N0: C -2619 4805 Green Rd, Suite 100 (919) 870 -0526 Raleigh, NC 27616 FAX (919) 870 -5359 SHEET NUMBER: Q�%P/ Know what's below. C3 Call before you dig. SHEET OF