HomeMy WebLinkAbout20141034 Ver 2_CAMA Application_20150401Q �
-D v`
NCDENR
North Carolina Department of Environment and Natural Resource
Pat McCrory
Governor
March 27, 2015
Division of Coastal Management
MEMORANDUM
ice
FROM
SUBJECT
Applicant:
�R6 ROW CI(�}
FAP 1 2015 I�
Karen Higgins
401 & Buffer Permitting Unit
DWR/Water Quality Permitting
Q Y®
Of
Donald R van der Vaart
Secretary
Jonathan Howell, NC DENR -DCM Assistant Mayor Permits Coordinator
400 Commerce Avenue, Morehead City, NC 28557 (Courier 11- 12 -09)
CAMA Permit Application Review of Major Modification 101 -14
Barry Go /ob et al.
Project Location: 6615 - 6623 W Beach Dr, adjacent to the Atlantic Ocean, in Oak Island,
Brunswick County
Proposed Project: Applicant proposes to excavate approx 4,000 cubic yards from the "spit" located
on the west end of Oak Island, to cover existing sandbags
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Jonathan Howell at the address above by April 20, 2015. If you have
any questions regarding the proposed project, contact Tara MacPherson at (910)796 -7425
when appropriate, in depth comments with supporting data is requested
REPLY: This agency has no objection to the project as proposed
This agency has no comment on the proposed project
This agency approves of the project only if the recommended changes
are incorporated See attached
This agency objects to the project for reasons described in the attached comments
SIGNED DATE
N C Division of Coastal Management
127 Cardinal Drive Ext , Wilmington, NC 28405
Phone 910-796-7215 1 FAX 910 - 395 -3964 Internet www nccoastalmanagement net
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Barry Golob, et al
2. LOCATION OF PROJECT SITE: Project disposal site is located between 6615 & 6623 W Beach Drive, in
Oak Island, Brunswick County The proposed project excavation site, referred to as the "spit ", is located at the far
West end of Oak Island
Photo Index —
(Sandbags)
2006 8 -6161, W, 17 -18 2000
8 -68, W, 18 -19 1998
4 -61, S, 15 -16
( "Spit" Location)
2006 8-616,Q,9-10 2000
8 -67, Q, 10 -11 1998
4 -59, G, 11 -12
State Plane Coordinates —
(Sandbags)
X:2235472 Y: 60189
Lat:33 °5446.22 "N
Long: 78 113'26.44 "W
( "Spit Location)
X: 2232189 Y: 62488
Lat: 33 °55'03.27 "N
Long: 78 °14'09.35 "W
3. INVESTIGATION TYPE: CAMA/Dredge & Fill
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit —March 19, 2015
Was Applicant Present - No
5. PROCESSING PROCEDURE: Application Received — Complete 3/13/15
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Yaupon Beach (Town of Oak Island)
Land Classification From LUP - Developed
(B) AEC(s) Involved: OH, III
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing — Municipal
Planned - N/A
(F) Type of Structures: Existing — Single- family residences, existing sandbags
Planned - Sand excavation from the West end of Oak Island to
place on sandbags
(G) Estimated Rate of Erosion: 2' /yr
Source —2011 LTAASCR Update
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED
OTHER
(A) Vegetated Wetlands
§404 wetlands
(B) Non - Vegetated Wetlands
120,000 sq ft, sand
120,000 sq ft sand placed
Other — High ground
removed from spit
on existing sandbags
(D) Total Area Disturbed: — 240,000 sq ft (5 5 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SB Open No
8. PROJECT SUMMARY: The applicant proposes to excavate approximately 4,000 cubic yards from the "spit"
located on the West end of Oak Island to cover existing sandbags to protect threatened residences The applicant is
also requesting a two -week extension past the April 31, 2015 moratorium date in order to complete the requested
project
Barry Golob, et al. MODIFIED
Page Two
9. PROJECT DESCRIPTION
This CAMA major permit application is a modified version of the CAMA major permit application that was
submitted in September 2015 and issued on November 21, 2014 by CRC Variance for the installation of
sandbags to protect threatened homes on Oak Island, NC. The information presented in this application
package still includes the installation of a sand bag revetment. however, this proposal includes excavation
of approximately 4,000 cubic yards from the "spit" located on the West end of Oak Island to cover the
existing sandbags and an extension request past the April 31, 2015 moratorium date to complete the project.
The relative information of the new project is described below.
The project disposal site is located between 6615 & 6623 West Beach Drive, adjacent to the Atlantic Ocean,
within the Town of Oak Island, in Brunswick County To find the project site, travel south on US Highway 17 to
NC Highway 133 South Travel approximately 22 miles south on NC -133 to Dosher Cutoff SE/ NC -133 Turn
onto Dosher Cutoff and then turn right on Southport- Supply Rd SE/ NC -133 Travel approximately 0 8 mile and
turn left onto NC -133 Travel on NC -133 to Oak Island and turn right on E Oak Island Drive Turn left on
Middleton Drive Turn right on West Beach Drive and travel approximately 3 6 miles to 6615 W Beach Drive
The project area will be the next four properties on the left The project excavation site is located on the far west
end of Oak Island and can be viewed from the parking lot located at the terminal end of W Beach Drive
The properties consist of four single - family lots with a total area of approximately 25,000 square feet Each lot is
occupied by a single - family home The project area is bordered by West Beach Drive to the north, a lot with a
single - family residence to the east, a vacant lot to the west, and the Atlantic Ocean to the south The annual long-
term erosion rate for the project areas is 2' /year, per the Division of Coastal Management's 2011 Annual Erosion
Rate maps The project area is located outside, but immediately adjacent to the boundary of the Inlet Hazard Area
This particular area has been subject to "accelerated erosion" since the beginning of this year This necessitated
the permitting of sandbags under the general permit in May 22, 2014 for these four properties (general permits
#63904D- #63907D) At that time, the erosion escarpment was located as close as 6' to the foundation pilings of
the house at 6621 W Beach Dr The distance from the escarpment to the foundation of the other houses ranged
from approximately 18 -20' Sandbags were installed at the end of May 2014 to a height of 6' (3 bags in height)
but with a base width of approximately 10 -15'
On November 21, 2015 State Permit No 10 1- 14 was issued by CRC Variance to allow for additional sandbags to
be placed on top and landward of the existing sand bags to increase the height and width of the revetment The
height of the sandbag revetment has been maintained to the existing elevations at the top of the erosion
escarpment This elevation ranges from 1126' to 15 7'NAVD88 The sandbags were authorized to have a base
width of 30 ft The bottom of the existing escarpment ranged from approximately 5 5' to 7 5' NAVD 88 at that
time, which translated to a current elevation difference of approximately 6 -8' from top to bottom The applicants
proposed to truck in beach compatible sand from an upland source to cover the sandbags At this time a berm is
being created seaward of the sandbags as a result of the dredging of Eastern Channel as part of the Lockwoods
Folly Habitat Restoration Project authorized under State Permit No 21 -15 which was issued to the Town of Oak
Island on February 13, 2015
The waters of the Atlantic Ocean in this area are classified as SB by the North Carolina Division of Water
Resources The area is not designated as a Primary Nursery Area by the North Carolina Division of Marine
Fisheries and is CLOSED to the harvesting of shellfish
Barry Golob, et al. MODIFIED
Page Three
PROPOSED PROJECT:
The applicant proposes to excavate approximately 4,000 cubic yards of sand from the "spit" located on the West
end of Oak Island to cover existing sandbags protecting threatened residences The applicant is also requesting a
two -week extension past the April 31, 2015 moratorium date in order to complete the requested project.
According to the application package, site drawings and project narrative, the sand will be placed between the
house structure pilings and the sand bags and on top of the existing sandbag structure sloping upward to a height
of approximately 7 ft (This elevation ranges from 11' to 15' NAVD88) (see Sheet 3 of 3) The material will
ultimately tie into the berm created from beach nourishment activities associated with the dredging of Eastern
Channel The applicant proposes to cover the sand bags with sand from an area west of the project site, labeled
and referred to as the "spit" The spit is a broad, relatively flat, dry sand beach area that is located along the far
western section of the island The area is generally undisturbed (see Sheet 1 of 3) The applicant has submitted a
letter from the Town of Oak Island authorizing excavation of 4000 cubic yards of sand from the "spit" as
proposed in this modification request for State Permit No 101 -14
As proposed, the applicant would remove approximately 12 in -241n (top layer) from the spit, or approximately
4,000 cubic yards from within an area measuring approximately 400 ft m length by 300 ft m width All material
will be excavated from above normal high water (NHW) As planned, the construction methodology would
proceed as follows The homeowners, or their contractor, would use an excavator and/or front end loader to
remove the required amount of material from the spit Once loaded, the dry sand would be placed in trucks and
transported along the beach front to the homeowner properties located between 6615 & 6623 West Beach Drive
10. ANTICIPATED IMPACTS:
The applicant's proposal to remove sand from the "spit' would result in the disturbance of approximately 2 75
acres of dry sand beach, from which approximately 4,000 cubic yards of material would be removed The
excavated material would be pumped into an approximately 230 linear foot section of sand bags, which measure
approximately 30' in base width and up to a height of 15 7'NAVD88 Approximately 120,000 sq ft of material
would be placed at or landward of the existing sandbag structure The applicant has provided a copy of an
agreement from the Town of Oak Island for this project Impacts to the "spit" area, as a result of project
completion, are uncertain and unknown at this time Increases in turbidity should be expected during the project,
however, they should dissipate once the project is complete The request for an extension into the moratorium is
included in the application package
Submitted by: Tara MacPherson Date: March 27, 2015 Office: Wilmington
NARRATIVE PURSUANT TO SECTION 6A FOR MAJOR MODIFICATION TO
PERMIT NO. 101 -14 FOR 3/13/15 GOLOB PROJECT AT WEST END OF OAK ISLAND
The homeowners located at 6615, 6617, 6621 and 6623 West Beach Drive are applying for a
mayor modification to their existing Permit No. 101 -14 for the purpose of excavating
approximately 4000 cubic yards from a 400x300x2 feet area of the Spit located at the West end
of the beach on Oak Island, NC As per their existing Mayor Permit, the homeowners will place
this beach compatible sand on top of the existing sandbags at their properties, as well as to
backfill landward of the sandbags to the existing structures in order to combat the erosion that
has taken place over the past year Some sand will be placed on top of the newly created berm in
order to properly slope from above the sandbags waterward We estimate that sand may be
placed on approximately 40 feet of the berm seaward of the sandbags in order to properly slope
from above the sandbags
The homeowners propose to truck the sand from the Spit using backhoes, dump trucks,
excavators, and possibly bulldozers and bobcats The trucks will enter the site at the West end
Point and then excavate the sand and transport it along the beach to the homeowner properties
The trucks may also transport it on West Beach drive from the Spit to the homeowner properties.
The project will take approximately two weeks to complete All sand taken from the Spit area
will be from above the high water mark
RiECEI ED
D'CIVi VVI MINOTON, NC
MAR 1 3 2015
Dom NP4
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
°'
Business Name
N/A
All PS P
'1� 161 E
Business Name
Last Name
Project Name (if applicable)
MI
Last Name
/ 0
Applicant 1 First Name
MI
Last Name
Barry
P
Golob
Applicant 2 First Name
Ml
Last Name
Davenport, Litz and Atkinson as per Major
City
State
Permit No 101-14
Email
RECEW
mn>j %
If additional applicants, please attach an additional pages) with names listed
Mailing Address
PO Box
City
State
10820 Hob Nail Court
Potomac
MID
ZIP
Country
Phone No
FAX No
20854
Montgomery
301 - 920 - 6655 ext
202 - 618 - 4843
Street Address (if different from above)
City
State
ZIP
Email
bgolob@cozen com
pam w
'@ E� 0 '1 W— h
or N I . �;R
g
Business Name
N/A
Agent/ Contractor 1 First Name
MI
Last Name
Agent/ Contractor 2 First Name
MI
Last Name
Mailing Address
PO Box
City
State
ZIP
Phone No I
ext
Phone No 2
ext
FAX No
Contractor #
Street Address (if different from above)
City
State
Z11
Email
RECEW
mn>j %
Iry v� V-'J L U 1, NC
<Form continues on back> "VIAR 1 3 2015;
252-808-2808 -.: 1-888-4RCOAST . www. nccoasta I management net
Form DCM MP-1 (Page 3 of 5)
APPLICATION for
Major Development Permit
x, f "t,
f P i
Z W &
'oF "T i7
County (can be multiple)
Street Address
State Rd #
Brunswick
West Beach Road Spit located at West End Point
d Approximate elevation of tract above NHW (normal high water) or
Subdivision Name
City
State
Zip
e Vegetation on tract
Oak Island
NC
28465 -
Phone No
Lot No (s) (if many, attach additional page with list)
ext
I I I I
a In which NC river basin is the project located?
b Name of body of water nearest to proposed project
Lumber
Atlantic Ocean, Lockwood Folley
c Is the water body identified in (b) above, natural or manmade?
d Name the closest major water body to the proposed project site
ZNatural ❑Manmade ❑Unknown
Lockwood Inlet
e Is proposed work within city limits or planning jurisdiction?
f If applicable, list the planning jurisdiction or city limit the proposed
ZYes ❑No
work falls within
Oak Island, NC
N -j : YV_
'A'__ r4v_ ffl
0
Wr e'E- k i�
-10 T ". ' -7' -g' P f 0 ;c-- '�v
3dEwi IVA W"T A IV -�i
t en N ;� P_ " — — , " W " 4 'V I
a Total length of shoreline on the tract (ft )
b Size of entire tract (sq ft
250 ft for houses, approx 1/4 mile of shoreline at Spit
see 4a
c Size of individual lot(s)
d Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(lf many lot sizes, please attach additional page with a list)
4 feet ONHW or ❑NWL
e Vegetation on tract
None for Spit area, Houses have sandbags and dwellings
f Man-made features and uses now on tract
None
g Identify and describe the existing land uses adjacent to the proposed project site
Spit has West Point adjacent, Houses are residential adjacent
h How does local government zone the tract?
i Is the proposed project consistent with the applicable zoning?
(Attach zoning compliance certificate, if applicable)
ZYes ❑No ❑NA
j Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo
k Hasa professional archaeological assessment been done for the tract? If yes, attach a copy ❑Yes ZNo ❑NA
If yes, by whom?
I Is the proposed project located in a National Registered Historic District or does it involve a ❑Yes ZNo ❑NA
National Register listed or eligible property?
RECEIVED
<Form continues on next page> 10 C M 'A" I L M! NGT 0 N, N
MAR 1 3 2015
252-808-2808 :.- 1-888-4RCOAST :: www.nccoastaImanagement.net
Form DCM MP -1 (Page 4 of 5)
APPLICATION for
Mayor Development Permit
m (i) Are there wetlands on the site? ❑Yes NNo
(u) Are there coastal wetlands on the site? ❑Yes NNo
(iii) If yes to either (i) or (u) above, has a delineation been conducted? ❑Yes ❑No
(Attach documentation, If available)
n Describe existing wastewater treatment facilities
None for Spit, municipal for houses
o Describe existing drinking water supply source
None for Spit, municipal for houses
p Describe existing storm water management or treatment systems
N/A
t`'` av -'' :sp i ••':� ° a ; �: = Kt.'rj5 yz.c, .° "'� ,ri c��`�� °a ��'a "�u�x�" c �'�°�i su��,4si �5i �� n ��i �� �'C'fa`��C °r�e�'` ".F3 �.E.�s.� ��'i�€k �yj.s° i �r @t �iL'4�5''ii ;x € ��� r °' °� � �� �e� s�� �i:�yd� ���x
�. t�R #t�1 Impcfs _ r s la a�
y
°.� q W. 4€' `, 3��, ,
a Will the project be for commercial, public, or private use? ❑Commercial ❑Public/Government
®Private /Community
b Give a brief description of purpose, use, and daily operations of the project when complete
Excavate sand from Spit to place on top of existing sandbags and to backfill erosion between dwelling and sandbags
c Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored
Trucks will enter at public West end Point and excavate sand from Spit area and then drive along beach and /or road to
deposit sand on top of sand bags and between dwelling and sandbags
d List all development activities you propose
N/A
e Are the proposed activities maintenance of an existing project, new work, or both? No for Spit, Yes for houses
f What is the approximate total disturbed land area resulting from the proposed protect? 12000 for Spit, 14000 for houses
NSq Ft or ❑Acres
g Will the proposed project encroach on any public easement, public accessway or other area ❑Yes NNo ❑NA
that the public has established use of?
h Describe location and type of existing and proposed discharges to waters of the state
N/A
i Will wastewater or stormwater be discharged into a wetland? ❑Yes NNo ❑NA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes NNo ❑NA
Is there any mitigation proposed? ❑Yes NNo ❑NA
If yes, attach a mitigation proposal
ry -M WILMINGTON, NC
<Form continues on back>
MAR 1 3 2015
252 - 808 -2808 .. 1- 888- 4RCOAST :: www.nccoastaImanagement.net
Form DCM MP -1 (Page 5 of 5)
APPLICATION for
Major Development Permit
6. Addttionai !nforn►ation
M addition to this completecfapphcatron f0rm,- (MP -1) the following items below,,4 apphgAble, must be s0mitted rn order for the application
package to be complete ,AOM5 (a)'— (f) We`,alWays applicable to any -major development application PteaSe consult the appllobtion _
instmotlon booklet on how to ptnperly prejia4 the requrred tfertis below ` , -
a A project narrative
b An accurate, dated work plat (including plan view and cross - sectional drawings) drawn to scale Please give the present status of the
proposed project is,any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed
c, A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site
d A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e The appropriate application fee Check or money order made payable to DENR
f A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mad Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Dnnsion of Coastal Management
Nam@ Already approved for Major Permit 101 -14 = ..Phone No,
Address
Name Phone No
Address
Name _ Phone No
Address
g A list of previous state or federal permits issued for work on the project tract, Include permit numbers, permlttee, and issuing dates
Major Permit 101 -14-- Golob, Davenport, Litz, Atkinson --
November 21, 2014
h Signed consultant or agent authorization form, if applicable
I. Wetland delineation, if necessary
j. A signed AEC hazard notice for projects in oceanfront and inlet areas (Must be signed by property owner)
k A statement of compliance with the N C Environmental Policy Act (N C G S 113A 1 -10), if necessary If the project involves expenditure-
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act
Certi canon= aitd;,P,enni# #h'>fo -
I understand that any- permit issued in response to this application will allow only the development described in the application
The project will be subject to the conditions and restrictions contained in the permit
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow -up
monitoring of the project I
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _March 13, 2015 Print Name _Barry Golob
/s/ Barry Golob
Signature
Please indicate application attachments pertaining to your proposed project RECEIVED
®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
ODCM MP -3 Upland Development DCM WILMING ON, NC
❑DCM MP -4 Structures InformatioMAR
252- 808 -2808 .. 1- 888- 4RCOAST . vvvvvv.ncco-astalmanagement.net
Form ®CM MP -2
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1 Be sure to complete all other sections of the Joint
Application that relate to this proposed project Please include all supplemental information
Describe below the purpose of proposed excavation and /or fill activities All values should be given in feet
J l i� 5'�,- 4; , ;.^ . y .'U' 5,: °L "Nq' j ' s ¢ —
. 0`k :4io(^° 0010 . a
',t . a — a , °
.r "" " " fi� ';i' x°s r . 0, " "
a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated
cubic yards Sand from Spit
none
(i) Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
❑WL NNone
(ii) Describe the purpose of the excavation in these areas
Excavation of beach compatible material for placement on top of
sandbags and between sandbags and house due to erosion
d High- ground excavation in cubic yards
4,000
.s- z'47RIyat�.7"t . Si_ r , x1N pr 3 i° °.s° a s �`f"st�tz�rr'�
is _ spa
.,, k `its ';' n.x raa, Paz a' �E "tea�1 �.
a Location of disposal area b Dimensions of disposal area
c (Q Do you claim title to disposal area?
❑Yes ❑No ❑NA
(u) If no, attach a letter granting permission from the owner
e (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SIB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
OWL ❑None
(n) Describe the purpose of disposal in these areas
d (Q Will a disposal area be available for future maintenance?
❑Yes []No ❑NA
(u) If yes, where?
f (Q Does the disposal include any area in the water?
[]Yes ❑No ❑NA
(i) If yes, how much water area is affected?
E U E I V E
F
I IAI R 1 3 2015
252- 808 -2808 n 1- 888- 4RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06
Access
Other
Channel
Rock
(excluding
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Breakwater
shoreline
NWL )
stabilization
Length
400
Width
300
Avg Existing
10, °r �F.
NA
Depth
3
Final Project
' ��
i
excavation
Depth
�., �
�. ,
from Spit
lrtr*x�
area)
J l i� 5'�,- 4; , ;.^ . y .'U' 5,: °L "Nq' j ' s ¢ —
. 0`k :4io(^° 0010 . a
',t . a — a , °
.r "" " " fi� ';i' x°s r . 0, " "
a Amount of material to be excavated from below NHW or NWL in b Type of material to be excavated
cubic yards Sand from Spit
none
(i) Does the area to be excavated include coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
❑WL NNone
(ii) Describe the purpose of the excavation in these areas
Excavation of beach compatible material for placement on top of
sandbags and between sandbags and house due to erosion
d High- ground excavation in cubic yards
4,000
.s- z'47RIyat�.7"t . Si_ r , x1N pr 3 i° °.s° a s �`f"st�tz�rr'�
is _ spa
.,, k `its ';' n.x raa, Paz a' �E "tea�1 �.
a Location of disposal area b Dimensions of disposal area
c (Q Do you claim title to disposal area?
❑Yes ❑No ❑NA
(u) If no, attach a letter granting permission from the owner
e (i) Does the disposal area include any coastal wetlands /marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SIB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected
❑CW ❑SAV ❑SB
OWL ❑None
(n) Describe the purpose of disposal in these areas
d (Q Will a disposal area be available for future maintenance?
❑Yes []No ❑NA
(u) If yes, where?
f (Q Does the disposal include any area in the water?
[]Yes ❑No ❑NA
(i) If yes, how much water area is affected?
E U E I V E
F
I IAI R 1 3 2015
252- 808 -2808 n 1- 888- 4RCOAST :: www.nccoastaimanaaement.net revised: 12/26/06
Form DCM MP -2 (Excavation and Fill, Page 2 of 3)
3. &HORELINE STABILIZATION 0This section not applicable
(if development is a wood glnrn, use MP-4 — Structures)
a, i ype or snoreiine staoiiization
OBuikhead ORiprap OBreakwater /Sill []Other
c Average distance waterward of NHW or NWL
e Type of stabilization material
g Number of square feet of fill to be placed below water level
Bulkhead backfill Riprap
Breakwater /Silt Other
I Source of fill material
b Length
Width
d Maximum distance waterward of NHW or NWL
f O Has there been shoreline erosion during preceding 12
months?
OYes [QNo ONA
(u) If yes, state amount of erosion and source of erosion amount
information
h Type of fill material
4. OTHER FILL ACTI'6 IES OThis sectroh n6t applicable
(Excluding Shoreline $tabilizaition) -
a (i) Will fill material be brought to the site? OYes ONo ONA b M Will fill material be placed in coastal wetlandstmarsh 1CW1.
If yes,
(11) Amount of material to be placed in the water none
(iu) Dimensions of fill area 70x50 for each gf the 4 homes
totalino 14000
(iv) Purpose of fill
cover existing sandbags and fill erosion landward of
sandbags
S. GENERAL
a How will excavated or fill material be kept on site and erosion
controlled?
Trucked directly from Spit to homesites and placed immediately
over bags and in backfill area
c (i) Will navigational aids be required as a result of the project?
OYes ONo UNA
(it) If yes, explain what type and how they will be implemented
submerged aquatic vegetation (SAV), shell bottom (SS), or
other wetlands (WL}? If any boxes are checked, provide the
number of square feet affected
OCW QSAV OSB
OWL ®None
(u) Describe the purpose of the fill in these areas.
N/A
b What type of construction equipment will be used (e g , draglme,
backhoe, or hydraulic dredge)?
backhoe dumtrucks, excavator, possible bulldozer orbobcat
d (i) Will wetlands be crossed in transporting equipment to protect
site? OYes ONo ®NA
(r7 If yes, explain steps that will be taken to avoid or minimize
environmental impacts
3/13/15 � � _ 7CE1V— ;=
Date Barry Polob I. M )�� i��(�; '����, NC
Batri Gdlob Applicant Name _ M P R 13 20 15
Protect Name - Js/ Barry t3alQb
252 - 800 -2808 c: 111- 888- 4113ICtmAST :o wwwmccvastallwanaaLement. net revised: 42126f06
C;oosIc .
u Eye alt 9963 ft
-
C
O
cs
c
CM
V
Q
W
m
W
J
0
Z
Q
N
LL
O
Z
O
F-
Q
O
W
tA
O
M
O
m
D
w
`w
V
w
11
M
O
L N
N G�
V.q GJ
\ L
M Vf
W
U
N
0 r-I
�' a
(II
v
L
Q
LL
h
O
0-
O
L
CL
bz
.Q
O
co
L=
C)
N
O
00
00
Q
Z
Zn
c-i
i-I
ci
J
W
� U
O
� d
a) C:
U
a)
U
O
L
v
L n
ca LU
0
n3
c
tin
_H
X
W
J +
Q
U LU
a lz
J
W
Z P7-
L! _
X
Lu
LIl
Lq
111
J
LL
I
1
zI
I
I
I
I
I
1
1
on
X
LU
C
M
I cu
a)
R7
�F-
a)
O
Q
1
2
U
LU
a0
cn
w
z
a
Ln
J
a
z
0
a
'w
V^^
0-
0N
1^.J..
L1.
d
e--I
O
z
E
L
O
O
U
CO
G
L
O
c
I
M
O
Ln M
a-I
N �
ri aJ
M N
Ln
'I
o
P�
v
r
f13
U -v 0=
•L'
l l7
U
" ,
L!7
Ln
LU
l.ln
J
RECEIVED
DCM WILMINGTON, NC
MAR 2 3 2015
�Y,I 6ob ek.
3 jai .s
She�4 I ok 1