Loading...
HomeMy WebLinkAboutFoy Farm - DWR 2nd ReviewFrom: Hartshorn, Blake To: Baker. Caroline D Subject: FW: Foy Farm - DWR 2nd Review Date: Wednesday, March 15, 2023 3:57:23 PM Attachments: DWR Comments Summary Rev2.odf imaae001.ona Caroline, Please file email thread below with the attached document. title the file same as the subject of the email. Please combine email and pdf into 1 pdf before filing in LF. Thank you, Blake Hartshorn From: Hartshorn, Blake Sent: Wednesday, March 15, 2023 3:56 PM To: bjenkins@restorationsystems.com Cc: Merritt, Katie <katie.merritt@ncdenr.gov> Subject: Foy Farm - DWR 2nd Review Good afternoon Barrett, Pursuant to Titles 15A NCAC 02B .0295 and 15A NCAC 02B .0703 (e), a provider shall submit a project plan proposal to the Division for review and approval that includes specific elements of the project. On February 28, 2023, Restoration Systems, LLC (FBX) submitted a second draft of the Bank Parcel Development Package (Plan) for the Foy Farm Site, to the Division, for review and approval. DWR provided comments on the first draft of this Plan on March 15, 2023. According to the second review by DWR staff of the subject Plan, some elements were either not provided, not explained thoroughly, not accurate or lacking in sufficient information. Therefore, until DWR receives an updated Plan addressing all comments and edits provided in the attached 1) comment summary and 2) PDF version of the document itself, DWR cannot finalize the review of the Plan or issue an approval of the Plan. In an effort to be as efficient as possible at providing comments to IRS during this busy time, I have provided my comments in a different format. Attached are the comments & edits provided within the actual PDF of a condensed Plan (without Appendices) as well as a comment summary. When IRS is ready to submit their final project Plan, please include a summary of all RS' responses to the DWR comments acknowledging how IRS addressed the comments. Please upload the final Plan using our Mitigation Project Information Upload Form through this link: https://edocs.deq.nc.gov/Forms/Mitigation_ Information_ Upload . Please note the DWR ID#2020- 1366 (version 2) on all electronic submissions for this project. Thank you for your patience during this time and if you have any difficulty reading though the comments or edits please let me know. Blake Hartshorn (he/him) Mitigation Specialist, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 707-3684 blake.hartshorn(@ncdenr.gov r Q �meif c=xre�ao,rdenee Go- ar,7 ftm INS addffin �&&jett ro Me f fwfm Ca+uhba PWMc RecwVa Law and map be &wMsed fa Mvd pabe& 1D#* 20201366 Version* 2 Select Reviewer: " Katie Merritt Initial Review Completed Date 03/05/2023 Mitigation Project Submittal - 2128/2023 Is this a Prospectus, Technical Proposal cr a New Site?* Type of Mitigation Project: * Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact information Contact Name: Barrett Jenkins Project Information ID#:* 20201336 Existing ION Project Type: Project Name: County: DIMS Mitigation Bank Foy Farm NOG BPDP RS N04 Ubl Janes Document Information Yes No Email Address: * biers kips@ restorationsystems.com Version:* 2 Existing Version Mitigation Document Type:* Mitigation Plans File Upload: BPDP V2 Foy Farm 227.2023.pdf 29.69MB Please upload only one DO of the complete file that neads to 4e submilled. .. Signature Print Name: * Barrett Jenkins Signature: Summary of Comments on Revised Draft BPDP_Foy Farm Page: 16 Author: kymerritt Subject: Sticky Note Date: 3/15/2023 12:54:46 PM riparian buffers and adjacent riparian areas yAuthor: kymerritt Subject: Highlight Date: 3/15/2023 2:04:16 PM delete. Apologies for giving the wrong verbiage. Author: kymerritt Subject: Sticky Note Date: 3/15/2023 1:21:25 PM According to this map the pond is still being shown as creditable area because it is shown as restoration for NOC. Per the UMBI credit assets are measured from top of bank of feature perpendicular and landward out to 200ft. to correct this, credits should be measured from the origin off of feature 1 b (the radius is measured incorrectly, please see teal area) Author: kymerritt Subject: Rectangle Date: 3/15/2023 1:20:56 PM Author: kymerritt Subject: Sticky Note Date: 3/15/2023 1:14:20 PM Fix symbology to show ditches properly Author: kymerritt Subject: Sticky Note Date: 3/15/2023 1:45:07 PM As noted in previous comments, change "Restoration" to "Riparian Restoration" Author: kymerritt Subject: Sticky Note Date: 3/15/2023 1:39:17 PM Delete preservation symbology. Since the site is not generating buffer preservation credits, and all of these areas are already called out as open water, wetland, forested etc. the symbology is not necessary and it does not comply with the nutrient offset UMBI and it adds confusion. Page: 29 Author: kymerritt Subject: Sticky Note Date: 3/15/2023 1:48:36 PM See comment on Fig 7 to fix this area.