Loading...
HomeMy WebLinkAboutWQ0001077_Final Permit_20230127ROY COOPER Govemar ELIZABETH S. B1SER Secretory RICHARD E. ROGERS, JR. birector January 27, 2023 Mr. Kamlesh Patel (via email) Maheshvar Corporation 1440 East Franklin Blvd. Bethesda, Maryland 20816 RE: Monitoring Well Construction Permit Permit # WM0301262 Quick RC Shop 1416 E. Franklin Blvd, Gastonia Gaston County Dear Mr. Patel, In accordance with your completed application received on January 25, 2023, we are forwarding herewith Monitoring Well Construction Permit Numbered WM0301262 and issued for the construction of one (1) monitoring well located near the subject site in Gastonia, Gaston County. This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Should you have any questions, please contact Edward Watson at (704) 235-2199, or by email at edward.watson(a)ncdenr.gov. Sincerely, EA DocuSigned by: #uw N P: 4> ft F161F669A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources CC: WQROS, Central Office (via Laserfiche) Joanna Alley, Geological Resources, Inc. (via email) North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 601 East Center Avenue, Suite 3011 Mooresville, NC 28115 NORTH CAROLINA ^ 704.663.1699 n,o.m.m or �.n—1 o..izllkla� NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules and Regulations. PERMISSION IS HEREBY GRANTED TO Maheshvar Corporation (Geological Resources, Inc. as Agent) FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of one (1) monitoring well owned by Maheshvar Corporation, near the subject site located at 1914 East Franklin Blvd, in Gastonia, Gaston County. This Permit is issued in accordance with the application received on January 25, 2023, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as part of an investigation for contamination from an underground storage tank or dry cleaner incident. 2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application. 4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o). 5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. 7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well shall be grouted within one day after the casing is set or the well abandoned. 8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours) of completion of drilling the borehole. 9. Adequate permits shall be obtained from Gaston County Environmental Health. Permit issued the 271h day of January 2023 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION EA DocuSigned by: 4uw N P44-ft F161F669A2D84A3... Andrew H. Pitner, P.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WM0301262 North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NCRT:CCAP!�I_'NA � 704.6631699 m a°ann