Loading...
HomeMy WebLinkAboutNCC230690_Site Plan or Location Map_20230315SHELL BUILDING FOR, 11111"Now FRESENI S I KI NEY CARE F P1 1::: E k,.q- r L 1U I k B E R r( ::) 114 FKC Loc tion #100882=1=DN=EmB0m18 GENERAL NOTES l . ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES. 2. THESE CONSTRUCTION DRAWINGS AND SPECIFICATIONS ARE A SET AND SHALL BE DISTRIBUTED INTACT. IF SETS ARE DISASSEMBLED TO OBTAIN BIDS FROM SUB -CONTRACTORS, GENERAL CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR SUB -CONTRACTOR COORDINATION. 3. 4. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE NOT INDICATED ON THE DRAWINGS OR CONFLICTS ARE DISCOVERED, THE CONTRACTOR SHALL REQUEST CLARIFICATION FROM THE ARCHITECT OR BID THE HIGHEST PRICE ALTERNATIVE. "PROVIDE" MEANS TO FURNISH AND INSTALL.. L U M B E R T 0 N NC 5. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT SITE TO VERIFY EXISTING CONDITIONS, PRODUCTS TO BE USED, AND QUANTITIES REQUIRED. ALL CONTRACTORS REQUIRED TO FIELD VERIFY ALL EXISTING CONDITIONS FOR ALL TRADES INCLUDING DIMENSIONS, CONFIGURATION, AND UTILITY SYSTEMS. BIDS SHALL REFLECT ALL CONSTRUCTION NECESSARY TO COMPLETE WORK REQUIRED WITH CONSIDERATION GIVEN TO EXISTING CONDITIONS. 6. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY STATE AND LOCAL AUTHORITIES. 7. S. CONTACT STATE DIGGING HOTLINE FROM THE ONE CALL DIRECTORY PRIOR TO PERFORMING ANY UNDERGROUND UTILITY OR EXCAVATION WORK. GENERAL CONTRACTOR SHALL COORDINATE ALL SITE STAGING, DUMPSTER LOCATION, UTILITIES, EXCAVATION (WHERE APPLICABLE). ETC. WITH THE PROJECT TEAM LANDLORD. 9. MECHANICAL CONTRACTOR SHALL INSTALL COMPLETE HVAC SYSTEM IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND BUILDING STANDARDS. 10. PLUMBING CONTRACTOR SHALL INSTALL COMPLETE PLUMBING SYSTEM IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND BUILDING STANDARDS. ARCHITECT PROJECT CLIENT PROJECT CLIENT CONTRACTOR 11. ELECTRICAL CONTRACTOR SHALL INSTALL COMPLETE ELECTRICAL SYSTEM IN ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND BUILDING STANDARDS. 12. CONTRACTOR SHALL COORDINATE KEY ATIVE. ULEWITHTHEOWNERPRIORTOPROJECTSPACECOMPLETION.CLEARLYMARKEDKEYSWILLBE TURNED OVER TO OWNER'S REPRESENTATIVE. Dunn & Dalton Architects FRESENIUS MEDICAL CARE David Looper & Company David Looper & Company 13. FIRE EXTINGUISHERS SHALL BE LOCATED PER LOCAL, STATE, AND FEDERAL CODES. Russell M. Woods Aaron Carrow David Looper David Looper 14. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURE'S INSTRUCTIONS. IT IS GENERAL CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL DIMENSIONS OF EQUIPMENT AND MATERIAL WITH SUPPLIERS PRIOR TO ORDERING AND/OR INSTALLATION OF ALL PRODUCTS. 401 N Herritage St. 1983 W 5th Street 320 15th Street SE 320 15th Street SE Kinston, NC 28501 Washington, NC 27889 Hickory, NC 28603 Hickory, NC 28603 Phone: 252-527-1523 Phone: 252-975-5950 Phone: 828-324-1284 Phone: 828-324-1284 MECHANICAL ELECTRICAL STRUCTURAL CIVIL ENGINEER ENGINEER ENGINEER ENGINEER Atlantec Engineering Atlantec Engineering RPA Engineering Draper Aden Associates Brad Felts, P.E. Sujin Pramojaney Mark Roy, P.E. C. Tyrus Clayton, P.E. 3221 Blue Ridge Rd 3221 Blue Ridge Rd 102 Regency Blvd. Suite Al 46 W. Washington Street Raleigh, NC 27612 Raleigh, NC 27612 Greenville, NC 27834 Coats, NC 27521 Phone: 919-571-1 1 1 1 Phone: 91 9-571-1 1 1 1 Phone: 252-321-6027 Phone: 910-897-7070 SITE LOCATION PLAN APPLICABLE CODES ICC/ANSI Al 17.1: 2003 I.B.C.: 2018 m I.M.C.: 2018 Q I.P.C.: 2018 PROJECT SITE NATIONAL ELECTRICAL CODE: 2017 ru INTERNATIONAL FUEL GAS CODE: 2018 Iv ,9 Linkhaw Rd '948 INTERNATIONAL ENERGY CONSERVATION CODE: 2018 Linkhaw Rd Linkhaw Rd iq¢g Lumheruvood, nen,; d a a CHEER c c Pal ACCESSIBILITY REGULATIONS - IBC CH. 11 2018 a w 0. STANDARDS OF THE UNDERWRITERS LABORATORIES: 2018 HighlandAcresOCCUPATIONAL a Acreson anddReha latian Center m SAFETY AND HEATH ACT (OSHA) 100% PERMIT SET PROJECT RESPONSIBILffY SCHEDULE m a Date: August 17th, 2020 REF # DESCRIPTION LL FMC TENANT COMMENTS GC L7 n Affordabie Indian Djs T and wedding Mandaps Gavin Park Apartments v o Dr DRAWING INDEX 1 SHELL BUILDING PLANS X PROVIDE SET TO FMC FOR REVIEW &APPROVAL PRIOR TO PERMITTING 2 PERMITS/FEES X 3 CLEANUP AND SAFETY X 4 CIVIL/SITE DESIGN X PER FMC SITE DESIGN STANDARDS. PROVIDE TO FMC FOR REVIEW & APPROVAL PRIOR TO ARCHITECTURAL ENGINEERING PERMITTING n n Fu rsnsa Dr Furman T 1.0 TITLE SHEET T 1.1 ADDITIONAL CODE AND BUILDING INFORMATION S 1.1 S 1.2 FOUNDATION PLAN ROOF FRAMING PLAN 5 SITE UTILITIES X PROVIDE ALL UTILITIES PER MATRIX 6 REINFORCED CONCRETE DUMPSTER X VERIFY DESIGN REQUIREMENTS WITH LOCAL VICINITY MAP PAD W/BOLLARDS JURISDICTION A 1.0 ARCHITECTURAL SITE PLAN A 2.0 FLOOR PLAN S 2.1 S 3.1 FOUNDATION DETAILS ROOF FRAMING DETAILS 7 REINFORCED CONCRETE GENERATOR PAD W/ BOLLARDS X LL TO INCLUDE CONDUITS FOR TENANT SUPPLIED GENERATOR. DUMPSTER PAD AND GENERATOR PAD TO BE COMBINED. A 2.1 ROOF PLAN A 2.2 DOOR AND WINDOW SCHEDULE & DETAILS S 4.1 STRUCTURAL NOTES & MISC. DETAILS 8 HVAC CONDENSER UNIT PADS N/A 9 SITE LIGHTING (SIDEWALK, DROPOFF, EGRESS PATHWAYS, GENERAL YARD) x DESIGN TO MEET MINIMUM LOCAL STANDARDS ueense Urrlce IFA -31 IH4P - v- ; T oekrtd, 8f�� 3.0 EXTERIOR BUILDING ELEVATIONS A 4.0 BUILDING CROSS SECTIONS M 1.0 M 1.1 MECHANICAL SCHEDULES, DETAIL AND GAS RISER MECHANICAL PLAN 10 POWER RACEWAY FOR EXTERIOR X MONUMENT AND BUILDING SIGNAGE SIGNAGE rn�,M, Nursing, Alzheimer's.n i a ,l a GS.nR�s� R�tlwuo5�kgi � �� rsm"'��R" DamihO5PI2L3 i7PizzaHu, I Wesley Pines n` vl au VeY Branch � Wei try iveAME Peterson ToyotaT Y6ench iVey Branch Greater Chrysolite Zion Church - A 5.0 WALL SECTIONS A 5.1 WALL SECTIONS A 5,2 WALL SECTIONS P 1.0 P 2.0 P 2.1 E 1.0 PLUMING PLAN, NOTES AND DETAILS PLUMBING SHELL PLAN PLUMBING WASTE STUB UP PLAN ELECTRICAL SITE PLAN 11 CONCRETE SIGNAGE BASE XbV 12 EXTERIOR SIGNAGE X DESIGN TO MEET MINIMUM LOCAL STANDARDS 13 LANDSCAPING X DESIGN TO MEET MINIMUM LOCAL STANDARDS 14 SITE FENCING X DESIGN TO MEET MINIMUM LOCAL STANDARDS 15 PEST CONTROL X 16 SOIL TESTING X 17 ENGINEERED FOUNDATION AND X DESIGNED BY LICENSED ENGINER PER ALL STRUCTURAL SYSTEM APPLICABLE BUILDING CODES *�r"�ye a E 2.0 ELECTRICAL PLAN 18 INTERIOR FLOOR SLAB X MUST MEET FMC MOISTURE REQUIREMENTS xrs a 64 ° E 2.1 FIRE ALARM PLAN 19 EXTERIOR FACADE X COmtOrl Inn S 5ulles r �s x m Cakes and Pastries N a r� ! ytlom� ��E e.+=a.cMe"dwP.0 Pleasant Meadow a Baptist Church �artM�ad �d E 3.0 E 3.1 E POWER RISER, PANEL SCHEDULES & FIXTURE SCHEDULE FIRE ALARM RISER, NOTES AND DETAIL GENERAL NOTES, ENERGY COMPLIANCE WORKSHEET 20 ROOF ACCESS LADDER X 21 EXTERIOR WINDOWS x 22 EXTERIOR WALL AND CEILING x le 9 sr"�aaga 5.0 INSULATION w� „ San Jose Mexican Lumberton High School �7ramnrl NonheaatPark FPl .0 FIRE PROTECTION NOTES &DETAILS 23 DEMISING WALLS N/A 24 EXTERIOR DOOR, FRAME AND HARDWARE X 917oodLion CookOutp x - b Sd, � I PROJECT SITE '��r, or ALDI lneil Pool & spa FP2.0 FIRE PROTECTION SHELL PLAN 2s HVAC x 26 VESTIBULE WALL HEATER X e� riser Barre) {;� 30, ��dR a entry Store 7 ��' Town & Country r"'� t Four Thealre'1"` _� k Y 4 EdS�IEWOfl CI14 }Ile Name Park 27 EXHAUST VENTS X COORDINATE LOCATIONS WITH FMC 28 UNDERSLAB PLUMBING AND PIPING X 29 BACKFLOW PREVENTERS X COORDINATE LOCATIONS WITH FMC � ply Co 1433rda[ Shoney's 01 FiNl.'I.ri ��+ �o- Arby's o = P L 81 B Mobile Horne Park a Bullock NIHP 30 WATER METER X COORDINATE LOCATIONS WITH FMC 31 MAIN DISTRIBUTION PANEL X41 W 3Tnd S1 Sonic Drive -In ��°5r d1 32 SUB PANEL A X FOR ALL SHELL BUILDING POWER � wa1�1 sl w'°°''n Southeastern Regional Biggs ,� tr Dunkin' tt Park Mall o Risen �gplGl sti Food LJon Sun Bo 41 Philifps Auto Body Farms 33 GENERATOR ATS X PROVIDED BY FMC 34 FIRE SPRINKLER RISER, MAIN LINE X AND BRANCHES Medical Center walmarl v 41€� 35 DRY SPRINKLER SYSTEM N/A wells Fargo Bank W 261h 5[ s '�° Neighborhood Market v Nissan of Lumberton Carolina Country a Car City Peddlers Mall r 36 RECORD DOCUMENTS X 37 O/M MANUALS X ' 8 wx41hgt .ae Pier kl Seafood a s wa.mdserx Bowl ng Center v Zeno s_ talian #ow$S9fiGr r L E'Z dSr E:3nds} Vf21s S7.A 4 2 i 2761 S. t 411p W:PIh Si ¢ 6 [ O �yt'13� by+$ra nCil a RP[h Si Citi Trends'�v. - �,f Ly 153b b E 140 s1 TITLE SHEET 38 BUILDING SYSTEM COMMISSIONING X 39 FINAL DELIVERY / TURNOVER X 40 PUNCHLIST X w Tans SFr Winhsl z a 78[h3[ Lumber River Trading/ D5 ,b5 w 151R � 1� True Value Hardware � ,n 217A3 n..wa.. w.. w•wl rwi•[...f rw.J ■■ SCALE: AS NOTED M. �pE0 A,gC��� 8-17-2020 ate+ O Wo s x �.�N sZM y r O 0 Z 0 N4C a��NN 000 o DU 70 LU Q z 1 O m Z z O Q V =m 70 �Z LO �N z::D O 00 JJ Q Go 0 L.I_I � Q r W 9% �a �V Z W W wZ Wp LLI�LO T 1 • 0 Sheet Number THIS DRAWING IS THE PROPERTY OF DUNN & DALTON, ARCHITECT, P.A.. THIS DRAWING IS NOT TO BE COPIED IN WHOLE OR IN PART. THIS DRAWING OR THE INFORMATION HEREUPON IS NOT TO BE USED ON ANY OTHER PROJECT. COPYRIGHT 2014 DUNN & DALTON, ARCHITECTS, P.A. Drafted By: TWD Checked By: RMW Date Drawn: 8117/2020 Project #: FRE-20022 z O w 0 z O w w Q w