HomeMy WebLinkAbout20150328 Ver 1_Wetland and Stream Permit Drawings (2015-02-11)_20150401K,ARALRoodway\012593006 — Division 5BA9/0/61AHydroulics\PERMITS_Environmental\Drawings\9/0/61_hyd_prm_ wet_tsh.dgn
2/10/2015
r
See Sheet 1-A For Index of Sheets
See Sheet 1-8 For Conventional Symbols
CEDAR FORK\
\_i
fsR2.roh
300J ?oh,
PROJECT
LOCATION \ `\
VICINITY MAP
aI
KI
zl
of
OFF SITE DETOUR ROUTE
ro v
ENDELL
STATE OF NO
III
TH CAI'� OL7NA
DIVISION O 7 HIGHWAYS
WAKE COUNTY
LOCATION: BRIDGE NO. 161 OVER CEDAR FORK CREEK
ON SR 2300 (PULLEY TOWN RD)
TYPE OF WORK: GRADING, PAVING, DRAINAGE, AND STRUCTURE
WETLAND & STREAM IMPACTS
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
SHEETS
N.C.
DB5-910161
1
STATE PROL NO.
DESCRIPTION
17BP.5.R.47
N.A.
P.E.
17BP.5.R.47
N.A.
RAN & UTILITIES
17BP.5.R.47
N.A.
CONSTRUCTION
EXPRESS DESIGN BUILD: DIVISION 5B - YEAR 2
100% PERMIT DRAWINGS
BRIDGE # 910161
SUBMITTAL # S-123R1
SUBMITTAL DATE: 02/11/2015
BL�J- THE
-L-
SR 2300
PULLEY TOWN RD
20' BST
BEGIN PROJECT DB5-910161
-L- Sta. 12 128.00
END PROJECT DB5-910161
-L- Sta. 15+48.00
BEGIN BRIDGE END BRIDGE
-L- Sta. 13 + 53.00
-L- Sta. 14+23.00
BRIDGE NO. 161
I
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
0'
NC GRISRD 2007
WO8
PRELIMINARY PLANS
00 NOT USE FOR CONSTRUCTION
GRAPHIC SCALES
50 25 0 50
100
DESIGN DATA
ADT = 1300 VPD
D =
T
V = 45 MPH
FUNC CLASS = LOCAL
RURAL
SUB -REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY PROJECT DB5- 9101 b1 =0.048
LENGTH STRUCTURE PROJECT DB5-910161 = 0.013
PLANS PREPARED FOR Kimley»>Horn
THE NCDOT BY: Jo„
HYDRAULICS ENGINEER
PE
SIGNATURE:
�?�
C
amg
A
.
�
J
* HaRpAe
0�
o
aQ
�
CA
p���
2012 STANDARD SPECIFICATIONS
JEFFREY W. MOORE, P.E.
PLANS
50 25 0 50
100
RIGHT OF WAY DATE.
MAY 21, 2013
PROJECT ENGINEER
ELIZABETH W. LYNCH, P.E.
ROADWAY DESIGN ENGINEER
P.E.
11111
TOTAL LENGTH OF PROJECT DB5-910161 = 0.061
PROFILE (HORIZONTAL)
10 5 0 10
20
LETTING DATE:
MAY 21, 2013
PROJECT DESIGN ENGINEER
K. ZAK HAMIDI, P.E.
1 I 1 I I
PROFILE (VERTICAL)
NCDOT CONTACT
SIGNATURE:
2
/
10
/
2
0
15
NCDOT
K
:\
R
A
L
_
R
o
a
d
w
a
y
\
0
12
5
9
3
0
0
6
-
D
i
v
i
s
i
o
n
5
B
\
9
10
16
1\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
IT
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
9
10
16
1_
w
e
t
l
a
n
d
_
p
r
o
p
e
r
t
y
_
o
w
n
e
r
s
.d
g
n
OWNER’S NAME
1
ADDRESS
2
PERMIT DRAWING SHEET 2
SF - 910161
NAME AND ADDRESS
PROPERTY OWNER
08/01/2014
SR 2300 (PULLEY TOWN RD)
CEDAR FORK CREEK ON
BRIDGE NO. 161 OVER
PROJECT: SF-910161
WAKE COUNTY
DIVISION OF HIGHWAYS
Wake County
State of North Carolina
Raleigh, NC 27603-1300
116 W. Jones St.
State Property Office
Raleigh, NC 27602-0550
P.O. Box 550
Wake County Attorney’s Office
Hand Existing Existing
Permanent Temp. ExcavationMechanized ClearingPermanent Temp. ChannelChannelNatural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts ImpactsStream
No.(From/To)Size / Type Wetlands Wetlands Wetlandsin Wetlands Wetlandsimpacts impactsPermanentTemp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
STA. 13+72.38 TO
13+92.20 (CL)CAUSEWAY***<0.01 <0.01 <0.01 43
STA. 13+78.45 TO
14+00.92 (CL)EMBANKMENT <0.01 <0.01 35 5
STA. 14+01.56 TO
14+15.88 (LT)EMBANKMENT <0.01 <0.01 8 10
TOTALS:0.01 0.02 0.01 86*15**
ATN Revised 3/31/05
* TOTAL PERMANENT CHANNEL IMPACTS ALONG THE CENTERLINE OF
CEDAR FORK CREEK IS APPROXIMATELY 51 LINEAR FEET
** TOTAL TEMPORARY CHANNEL IMPACTS ALONG THE CENTERLINE OF
CEDAR FORK CREEK IS APPROXIMATELY 15 LINEAR FEET
*** CAUSEWAY SHOULD NOT BLOCK MORE THAN 50% OF THE CHANNEL
TO ALLOW FOR FLOW THRU REMAINDER OF CHANNEL
2/11/2015
WAKE COUNTY
DIVISION OF HIGHWAYS
PROJECT: SF-910161
SHEET 3
NC DEPARTMENT OF TRANSPORTATION
WETLAND PERMIT IMPACT SUMMARY
SURFACE WATER IMPACTSWETLAND IMPACTS
PROJECT REFERENCE NO.
nnm n il\ r vin sV9/0/6/ h d erm_wet_nsh (con)d�r
AREMENKIIMMEM
-L-
Pt Sto 11+38.97
= 9'25'23.4"(RT
)
D = 4 24' 26.5'
L = 213.81'
T = 107J4'
R = 4300000
DS ) 45 41PH
SE = EXISTING
RO = EXISTING
PI Sto 15+19.00 PI
= 12' 23' 580" (LT) p
D = 10' 25' 02.7' D
L = 1/903' L
T = 59.75'
R = 550.00'
DS = 40 MPH
SE = EXISTING
RO = EXISTING
DETAIL 1
RIP RAP AT EMBANKMENT
( Not to Scale)
Ditch
Grade
Type of Liner= Class II Rip Rap
W,Geotexlile Fabric
N '
tr
310
300
290
280
270
260
STA.13+76 -L-
STA. 13+85 -L- (RT)
STA.14+00 L
STA. 14+12 -L- (LT)
Sto 16+37.61
= 18'13'10.6"(LT )
= /5' 29' 07.2'
= 117.66'
T
R
OS
SE
RO
= 59.33'
= 370.00'
= 35 MPH
= EXISTING
= EXISTING
349_7')
125' 0
12 5' 25'
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN H* ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HV ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
WS.ELEVATION
AT DATE OF SURVEY
= 1800 CFS
= 25 YRS
= 288.4 FT
= 2400 CFS
= 100 YRS
= 290.49 FT
= 5360 CFS
= 500 + YRS
= 29224 FT
01/16/2014
= 282.6 FT
-L- POT
DETAIL 2
LATERAL 'V' DITCH
( Not to Scale)
Geolextile
Type of Liner= Class 'B' Rip -Rap
Min. D= 1.0 Ft.
Max. d= 1.0 Ft.
b= 5.0 Ft.
FROM
FROM
Sto. 10+00.00
STA. 14+12 TO STA. 14+50 -I.- (LT)
STA. 14+12 TO STA. 14+50 -L- (RT)
RIP RAP EMBANKMENT PROTECTI N IIIRIP RAP REMOVE EXISTING WALL
CLASSAND POURED CONCRETE
EST 0 TONS BEHIND THE 1NALL. LAY
EST IO GEO BACK SLOPES, AT I.5.1 TO
SEE DETAIL I RE-ESTABLISH STREAM BANKS
BEGIN PROJECT DB5-9/0/6t EXTEND
RIP GG ABUTMAP TO ENTOE
BEGIN CONSTRUCTION RIP RAP EMBANKEMENT
-L- POC Sto.12+28A0 PROTECTION. CLASS II RIP
EST 75 TONS
EST 75 SY CEO TOIL OFF
SEE DETAIL I CAUSEWAY
DETAIL 3
SPECIAL LATERAL 'V' DITCH
Nal to Scale)
Natural
Ground
Fill
Slope
Min. D= 1.0 Ft.
Geoteztile Max. d= 1.0 Ft.
Type of Liner= Closs 'B' Rip -Rap
FROM STA. 14+50 TO
FROM STA.14+50 TO
STA. 15 + 00 -L- (LT)
STA. 15 + 00 -L- (RT)
-L- PC St0.10+31.82 KE COUNTY
Go/ / e 9246 PG 93
/
/
PSLLEYTOWN In /
Z384,
-L- PT' Sto. 12+45.63
AP
BEGIN BRIDGE
-L- Sto.134`51.88
al N
'T✓ w
T - rl
STATE OF NORTH CAROLINA /
DB 2445 PG 62
REMOVE EXISTING CONCRETE FOOTER
A! PILES. PLACE CLASS IIRIP RAP TOE Of' CAUSEWAY
E BANKMENT PROTECTION. EXTEND RIP INSTALL CAUSEWAY I AROUwO EXTING
R P TO TOE OF SLOPING ABUTMENT INTERIOR BENT CONCRET =FOOTER
EST 70 TONS EST 37 TONS CLASS 'A' Re RAR-
EST 75 SY GEO EST 70 TONS CLASS 'II' RIP RAC
SEE DETAIL I PLACE GE077EXTIE FAB /C UNDER C
EST I10 SY GEOTEXTILE ABR
RIP RAP EMBANKME T P
CLASS II RIP RAP
EST 10 TONS
EST 10 SY GEO
SEE DETAIL I
( CLASS 'B' RIP R'AP.
TOESPROTECTION
/ SEEDETAILEST 20 �4EO
CLASS IIRIP RAP
TO ELEV 289.4'
(STRUCTURES
PAY, ITEM.TYPI
A 5t
BEGIN GRADE
-L- Sta.12+28.00
ELEV = 294.68'
III IInrI
xl�
0.67'
F
FTY
ddr.r„5
1':11:111P TB282G G1110701:k
Natural
Ground
d= 1.0 Ft.
b = 3.0 Ft. Geotextile
p Type of Liner= Class 'B' Rip -Rap
FROM STA. 12+75 TO STA. 13+41 -L- (RT)
_
\\1 I LATE DITCH
/ C 'SS 'B' RIP RAP
T 34 ,SY GEO
E D'TAIL 2
INSTALL 'HO.ULDER BERM, WAKE COUNTY
GUTTER OM STA. 14+35 73B 92x46 PG'.93
TO )4+4g -'L- (LT)
DETAIL 4
TOE PROTECTION
( Not to Scale) F'
Ox
b �
d
CIAL LATERAL 'V' DITCH \
`CLAS�S '1B'RIP RAP
ST 35 SGEO
SEE DETAIL "3 i
DETAIL 5
STANDARD 'V' DITCH
( Not to Scale)
Min. D= 1.0 Ft.
Max. d= 1.0 Ft.
Type of Liner= Class 'B' Rip -Rap
FROM STA. 13+85 TO STA. 14+12 -L- (RT)
-L- PCC Sto 15+7828
z9D- ENp PROJECT DB5-910161
END CONSTRUCTION
woes - ,L- POC'Sto.15+48D0
ECLLLABAITCH
/ CLASS RAP
20 TONS
EST DDETAIL 3GEO
-L- PC Slo. /4+5926
-15'RCP-IV
-INSTALL
4(L5E46GUTTER
uLRFRMST. 1+3TO1- ITI
ATE'V' DITCH
CLAS RIP RAP
ST- 15 TON
EST 30 SY G
SEE DETAIL 2
END BRIDGE
-L-N�Sto.14+24J3y N
(SEETSTRUCTURAL PLANS.TTYP)
EST
NpARDTONS
'V' DITCH W/ CLASS 'B' RIP RAP
EST 20 $Y SGEO
SEE DETAIL 5
R3/ S 2007
-L- POT Sto. 17+24.00
-L- PT Sto.16+95.94
STATE OF NORTH CAROLINA
DB 4186 PG 156
100% PERMIT DRAWINGS
D65-910161
PM SHEET NO.
ROADWAY DESIGN
ENGINEER
PRELIMINA
DO NOT USE FOP
SHEET NO.
4
HYDRAULICS
ENGINEER
RY PLANS
CONSTRUCTION
BLYTHE
Kimley» Horn
11111 � 1 �
•
BRIDGE EXCAVATION
NOTE:
CONTRACTOR MUST REMOVE ALL
PORTIONS OF EXIST CONC FOOTERS
AND PIERS. USE IMPERVIOUS DIKE
OR SIMILAR DEVICE TO DEWATER
AND ISOLATE WORK AREA FOR
REMOVAL OF IN -STREAM STRUCTURES.
REMOVAL MUST BE DONE IN THE DRY.
AFTER COMPLETE REMOVAL OF
CAUSEWAYS. CLASS IIRIP RAP SHALL
REMAIN ON STREAM BANKS TO
PROVIDE PERMANENT STABILITY
FOLLOWING DETAIL I. ITYPI
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DENOTES FILL IN
WETLAND
CL STA /3+88.00 -L-
1c70'
24"CORED SLABS
CL ELEV = 292.38
SKEW = 90'
BEGIN BRIDGE
-L- Sta.13+51.88
ELEV= 292.49'
PI = 12+85.00
EL = 29270'
VC = I/O'
K=35
DS = 29 MPH
- - CAUSEWAY I
i,- ELEV = 283,6'
CLASS 11 RIP RAP (TOP)
2' ITYP)
I.5d(TYP1
NORMAL TO
END BENT
CLASS 1l BANK
STABILIZATION
EXAL /NG BR10GE 25
BEGIN SPECIAL
DITCH GRADE RT
-L- STA 13+85.00
ELEV = 282.50
END BRIDGE
-L- Sta.14+24.13
ELEV= 29226'
PI = 14+73.00
EL = 292J1'
VC = 90'
K = 26
DS = 25 MPH
3.
ITYPI,
END GRADE
-L- Sto.15+48D0
ELEV = 294.44'
(+)3J067%_
" .l END SPECIAL
(416i %Y DITCH GRADE LT
�-' 1+15>� -L- STA 15+00D0
LOW POINT
-L- STA /4+3626
ELEV= 29224'
L BEGIN SPECIAL
DITCH GRADE LT I
-L- STA 14+12.00 I
ELEV = 285.00
-APPROX. EXCAVATION
ELEVATION = 284.0'
REMOVE EXISTING WALL
AND POURED CONCRETE
BEHIND THE WALL
CLASS II BANK STABILIZATION
AT 1.5:I (TOP)
-L- STA 14+00.00 RT
ELEV = 282.60
- (SR 2300) PULLEY TO A RD11
END SPECIAL
DITCH GRADE RT
-L- STA 15+00D0
ELEV = 290.71
-L- STA 14+I8D0 RT
ELEV = 285.00
•
310
300
290
280
270
BRIDGE EXCAVATION'
I I
I I
I I
260
11
12
13
14
15
16
17
=•MMWMS
MTNIInininglIVIMMNSICAIMEWHEIRMOIMMLVIIUMINIMEYNNIZVINIMM
Pt Sto 11+38.97
= 9'25'23.4"(RT
)
D = 4 24' 26.5"
L = 213.81'
T = 107J4'
R = 1.300 '
DS ) 45 4IPH
SE = EXISTING
RO = EXISTING
Ditch
Grade
PI Sto 15+1900 PI Sto 16+37.6/
= 12' 23' 58.0" (LT) p = 18' 13' 10.6" (LT)
D = 10' 25' 02.7" D = /5' 29' 07.2'
L = 1/9.03' L = 117.66'
T = 59.75' T = 59.33'
R = 550.00'
DS = 40 MPH
SE = EXISTING
RO = EXISTING
DETAIL 1
RIP RAP AT EMBANKMENT
( Not to Scale)
10 min
1.0'min. ,.
GEOTEXTILE
Type of Liner= Class II Rip Rap
W,Geotexlile Fabric
STA.13+76 -L-
STA. 13+85 -L- (RT)
STA. 14+00 L
STA. 14+12 -L- (LT)
N
Wag
_I t»".."i:ii!la= ii a='211" nL►!7
MINMIv ► o•:�wrl`��
Efi
II I
I� ; ;,r.�,F, .:i1. ' owl l■E
III : i allilEil , I
;�ak0Miellfa
OW, r.� Mil
310
300
290
280
270
260
R = 370.00'
OS = 35 MPH
SE = EXISTING
RO = EXISTING
125' 0$2.5 25'
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN MV ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HV ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
DATE OF SURVEY
WS.ELEVATION
AT DATE OF SURVEY
= 1800 CFS
= 25 YRS
= 288.4 FT
= 2400 CFS
= 100 YRS
= 290.49 FT
= 5360 CFS
= 500 + YRS
= 29224 FT
01/16/2014
= 282.6 FT
-L- PC Ste.10+31.82
EXISTING
DETAIL 2
LATERAL 'V' DITCH
( Not to Scale)
b
n 1"R
Geolextile
Type of Liner= Class 'B' Rip -Rap
FROM
FROM
Min. D= 1.0 Ft.
Max. d= 1.0 Ft.
b= 5.0 Ft.
STA. 14+12 TO STA. 14+50 -I.- (LT)
STA.14+12 TO STA.14+50 -I.- (RT)
RIP RAP EMBANKMENT PROTECTION
CLASS II RIP RAP A
EST 10 TONS
EST 10 SY GEO B
SEE DETAIL I R
BEGIN PROJECT DB5-91016/
BEGIN CONSTRUCTION R
-L- POC Sto.12+2800 E
DETAIL 3
SPECIAL LATERAL 'V' DITCH
Noi to Scold)
Natural
Ground
Min. D= 1.0 Ft.
Geoteztile Max. d= 1.0 Ft.
Type of Liner= Class 'B' Rip -Rap
FROM STA. 14+50 TO STA.15+00
FROM STA.14+50 TO STA. 15+00
EMOVE EXISTING I(ALL
No POURED
WALL.
ACK SLOPES AT 1.50 TO
E-ESTABLISH STREAM BANKS
XTEND RIP RAP TO TOE
F SLOPING ABUTMENT
IP RAP EMBANKEMENT
ROTECTION. CLASS II RIP F�AP
ST 75 TONS
EST 75 SY CEO T01° OF
Sto. /0+00.00 /F�/-/ 1 SEE DETAIL CAUSEWAY
BEGIN BRIDGE
-L- Sto.13+51.88
PULLEYTOWN RO
f
-L- PT Ste. 12+45.63
STATE OF NORTH CAROLINA
DB 2445 PG 62
CLASS 'B' RIP RAP
TOE PROTECTION
EST 20 TON
EST 40 SY GEO
SEE DETAIL 4
CLASS II RIP RAP
TO ELEV 289.4'
(STRUCTURES
PAY ITEM. TYP)
REMOVE EXISTING CONCRETE FOOTER
A D PIKES. PLACE CLASS II RIP RAP
TOE
E BANKMENT PROTECTION. EXTEND RIP INSTALL CAUSEWAY I AROU
R P TO TOE OF SLOPING ABUTMENT INTERIOR BENT CONCRE E.
EST 70 TONS EST 37 TONS CLASS 'A'
EST 75 SY GEO
SEE DETAIL I
IC
IC
T
Re
CAU•
0F
RAP
EST 70 TONS CLASS 'II' RIP RAP
PLACE GEOTEXTILE FAB IC UNDER C
EST IC SY GEOTEXTILE ABRII��
RIP RAP EMBANKME T P
CLASS II RIP RAP
EST 10 TONS
EST 10 SY GEO
SEE DETAIL I
1■■■ 1
SSTING
OOiER
OTECTI
1
-L- (LT)
-L- (RT)
WOODS
Natural
Ground
d= 1.0 Ft.
b= 3.0 Ft. Geotextile
Type of Liner= Class 'B' Rip -Rap
4- FROM STA. 12+75 TO STA. 13+41 -L- (RT)
En
ATE L 'V' DITCH
/ CL SS 'B' RIP RAP
T 1 TONS
E T 3 SY GEO
SEDTAIL 2
INST LL HOULDER BERM
GUT ER ROM STA.14+35
TO +45 -L- ILTI
WAKE COUNTY
DB 9246 PG 93
SP CIAL LATERAL 'V' DITCH
T 20STONS RIP RAP
ST 35 SY GEO
, SEE DETAIL 3
-L- PCC Sto 15+7828
D PROJECT DB5-910161
E D CONSTRUCTION
-L- POC Sto.15+4800
SPECIAL LATERAL 'V' DITCH
/ CLASS 'B' RIP RAP
ST 20 TONS
EST 35 SY GEO
SEE DETAIL 3
-L- PC Sto.14+5926
OAL4L5ER46GUTTER
uLRFRMSTA. 1+3TO1- ITI
yATE' V' DITCH
/ CLAS RIP RAP
ST 15 TON
EST 30 SY G
SEE DETAIL 2
END BRIDGE
-L-N�Sto.I4+24J3yy N
(SEE STRUCTURAL PLANS
EST
NpARDTONS
'V' DITCH W/ CLASS 'B' RIP
EST 20 $Y SGEO
SEE DETAIL 5
II
II
1
DETAIL 5
STANDARD 'V' DITCH
( Not to Scale)
Geoteolile
Type of Liner= Class 'B' Rip -Rap
Min. D= 1.0 Ft.
Max. d= 1.0 Ft.
FROM STA. 13+85 TO STA. 14+12 -L- (RT)
-L- POT Sto. 17+24.00
-L- PT Sto. 16+95.94
STATE OF NORTH CAROLINA
DB 4186 PG 156
11
1
1
100% PERMIT DRAWINGS
PROJECT REFERENCE NO.
DES-910161
SHEET NO.
4
POW SHEET NO.
ROADWAY DESIGN
ENGINEER
PRELIMINA
DO NOT USE FOP
HYDRAULICS
ENGINEER
RY PLANS
CONSTRUCTION
BLYTHE
Kimley» Horn
11111 � 1 �
BRIDGE EXCAVATION
NOTE:
CONTRACTOR MUST REMOVE ALL
PORTIONS OF EXIST CONC FOOTERS
AND PIERS. USE IMPERVIOUS DIKE
OR SIMILAR DEVICE TO DEWATER
AND ISOLATE WORK AREA FOR
REMOVAL OF IN -STREAM STRUCTURES.
REMOVAL MUST BE DONE IN THE DRY.
AFTER COMPLETE REMOVAL OF
CAUSEWAYS. CLASS IIRIP RAP SHALL
REMAIN ON STREAM BANKS TO
PROVIDE PERMANENT STABILITY
FOLLOWING DETAIL I. (TYP)
I
I
I
II
I
I
e EE
E
11
1
I I I
II 1 II II I I
E
I
I I II ''=3I1■'3
car�I
I EE
I•
I I
EI 1 I
EI II II I
I
I
E
I
I
I
II
BEGIN GRADE
-L- Sta.12+28.00
ELEV = 294.68'
I•
I•
I
CL STA /3+88.00 -L
IB70'
24" CORED SLABS
CL ELEV = 292.38
SKEW = 90'
BEGIN BRIDGE
-L- Sta.13+51.88
ELEV= 292.49'
PI = 12+85.00
EL = 29270'
VC = 110'
K=35
DS = 29 MPH
()3.4737, (-10.3/38.
CAUSEWAY I
ELEV = 285.6'
I.. CLASS 11 RIP RAP (TOP)
2' (TYP)
1.5.1 (TYP)
NORMAL TO
END BENT
CLASS 11 BANK
STABILIZATION
EXIST S.ELG iacE2.6'
BEGIN SPECIAL
DITCH GRADE RT
L STA 13+85.00
ELEV - 28250
-(R
II
1
)(l
0.67'
END BRIDGE
-L- Sta.14+24.13
ELEV- 29226'
LOW POINT
L- STA /4+3626
ELEV= 29224'
L BEGIN SPECIAL
DITCH GRADE LT
-L- STA 14412.00
ELEV = 285.00
-APPROX. EXCAVATION I
ELEVATION - 284.0'
REMOVE EXISTING WALL
AND POURED CONCRETE
BEHIND THE WALL
CLASS II BANK STABILIZATION
AT 1.51 (EYE)
L- STA 14+00.00 RT
ELEV = 282.60
PI = 14+73.00
EL = 292J1'
VC = 90'
K=26
DS = 25 MPH
(+)3J067%
END SPECIAL
top., %,Y DITCH GRADE LT
-L- STA 15+00D0
= -L- STA 14+I800 RT
ELEV = 285.00 I
ITYPI
)PU Y T
I
E I
11
DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
IMPACTS IN SURFACE WATER
DENOTES FILL IN
WETLAND
II E E I E E II E
END GRADE
-L- Sto.15+48.00
ELEV = 294.44'
I
E II I I II I
•• I
I E I
I
I
1
III.
I 1
II I
1111111
END SPECIAL
DITCH GRADE RT
-L- STA 15+0200
ELEV = 290.71
■III
III•
I
II
I•
I
I
I
I
I
■■■
II
BRIDGE-1 EXCAVATION I
I
II
I•
I
I
I
I
I
I
I
I•
I
I
I
11
iR�I17
PPM
CD
11
12
13
14
15
16
17
ohs 10
PROJ. REFERENCE NO.
DB5 - 910161
SHEET NO.
X-2
IH F
\RAL Roadwa \012593006 — Division 58\910161\Hydraulics PERMITS_Environmental\Drawings\910161_5zd_ .rm_xoll.d.
30L+
29oi
020
N
U.0
300
r
II
:85.00
-
-
-
-
.. 'I
L2E
0 t
II����II
alai
,
+i
,1IJ
"11
0.C20
E
0.020
1
-----
--
--
III
1��I
_
--
_-_--
--
__
2860
--
-
-
-
-
--
-
■E.
11111
14+00.0
111
3
z
'
295
0.020
E
0.020
r
�.
290
-
-
- -
-
-
-
_
-----
__
___,\�—,
.\
—
—
i
21
••
.,
11111111
a-
; 020 0:020
■
1.
1
l
271
i
r 2E
-L
265J-
13+50,01
��
7E
-!
-
PJL
EY
TOWN
'
D
(SR
2300)
A
4
40
130
1:+
+
,+
+
>+
+
+
1
+
+
20
10
0
10
20
30
40
50
60
70
B0
90
100
110
1?0
130
140
0
5
70
35
35
30
5
70
25
35
X)
35
30
75
35
35
30
'0
5
iE7
3
Estimate 37 Tons Class ’A’ Rip Rap
AREA OF CLASS ’A’ RIP RAP= 0.02 acres
QUANTITIES OF ESTIMATES: CAUSEWAY
3
Estimate 110 SY of Geotextile Fabric
VOLUME OF CLASS ’A’ RIP RAP= 27 yds
(CLASS II RIP RAP)
ROCK CAUSEWAY
PROPOSED BRIDGE DECK
NCDOT
2
/
10
/
2
0
15
(CLASS ’A’ RIP RAP)
WORKPAD
1.5
:1 1.5:1
02/06/2015
GEOTEXTILE FABRIC
1’
(NOT TO SCALE)
CAUSEWAY 1 DETAIL
Estimate 70 Tons Class II Rip Rap
ELEV. = 283.6’
TOP OF CAUSEWAY
PERMIT DRAWING SHEET DT-1
$
F
IL
E
S
$
AREA OF CLASS II RIP RAP= 0.02 acres
VOLUME OF CLASS II RIP RAP= 50 yds
SR 2300 (PULLEY TOWN RD.)
CEDAR FORK CREEK ON
BRIDGE NO. 161 OVER
PROJECT: SF-910161
WAKE COUNTY
DIVISION OF HIGHWAYS