HomeMy WebLinkAbout20150328 Ver 1_SF-910161 Buffer Permit Drawings (2015-02-11)_20150401K,ARALRoodway\012593006 — Division 58\910161AHydraulics\PERMITS_Envlronmental\Drawings\9/0/61_hyd_prm_buf_tsh.dgn
2/10/2015
r
See Sheet 1-A For Index of Sheets
See Sheet 1-B For Conventional Symbols
CEDAR FOR
\_i
rs.e2.roh
366; 4 90
PROJECT
LOCATION
�.<,..._.
VICINITY MAP
KII
zl
of
OFF SITE DETOUR ROUTE
ro v
STATE OF NO
III
TH CA II'� OLINA
DIVISION O 7 HIGHWAYS
WAKE COUNTY
LOCATION: BRIDGE NO. 161 OVER CEDAR FORK CREEK
ON SR 2300 (PULLEY TOWN RD)
TYPE OF WORK: GRADING, PAVING, DRAINAGE, AND STRUCTURE
BUFFER IMPACTS
STATE
STATE PROJECT REFERENCE NO.
SHEET
NO.
SHEETS
N.C.
DB5-910161
1
STATE PROL NO.
DESCRIPTION
17BP.5.R.47
N.A.
P.E.
17BP.5.R.47
N.A.
RAN & UTILITIES
17BP.5.R.47
N.A.
CONSTRUCTION
EXPRESS DESIGN BUILD: DIVISION 5B - YEAR 2
100% PERMIT DRAWINGS
BRIDGE # 910161
SUBMITTAL # S-123R1
SUBMITTAL DATE: 02/11/2015
BL�J- THE
-L-
SR 2300
PULLEY TOWN RD
20' BST
BEGIN PROJECT DB5-910161
-L- Sta. 12 128.00
BEGIN BRIDGE
-L- Sta. 13 + 53.00
END PROJECT DB5-910161
-L- Sta. 15+48.00
END BRIDGE
-L- Sta. 14+23.00
BRIDGE NO. 161
I
THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III
0'
NC D 2007
NAD 83✓$SR\05-
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
GRAPHIC SCALES
50 25 0 50
100
DESIGN DATA
ADT = 1300 VPD
D =
T
V = 45 MPH
FUNC CLASS = LOCAL
RURAL
SUB -REGIONAL TIER
PROJECT LENGTH
LENGTH ROADWAY PROJECT DB5-910161
9101b1
LENGTH STRUCTURE PROJECT DB5-910161 =
TOTAL LENGTH OF PROJECT DB5-910161 =
0.048
0.013ROADWAY
PLANS PREPARED FOR Kimley»>Horn
THE NCDOT BY: o„
HYDRAULICS ENGINEER
PE
SIGNATURE:
C
amg
A
.
�
0�
o
aQ
�
J
* NIONpAe
CA
p���
2012 STANDARD SPECIFICATIONS
JEFFREY W.MOORE,P.E.
PLANS
50 25 0 50
100
RIGHT OF WAY DATE:
MAY 21, 2013
PROJECT ENGINEER
ELIZABETH W. LYNCH, P.E.
DESIGN ENGINEER
P.E.
iiill
0.061
PROFILE (HORIZONTAL)
10 5 0 10
20
LETTING DATE:
MAY 21, 2013
PROJECT DESIGN ENGINEER
K. ZAK HAMIDI, P.E.
1 I 1 I I
PROFILE (VERTICAL)
NCDOT CONTACT
SIGNATURE:
ROAD
CROSSINGBRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
ROADWAY
STA. 13+19.01 TO
13+52.93 (LT)X 327 459 786
BRIDGE
STA. 13+52.93 TO
13+72.07 (LT)X 678 0 678
BRIDGE
STA. 14+06.61 TO
14+12.84 (LT)X 117 0 117
ROADWAY
STA. 14+12.84 TO
15+14.74 (LT)X 1680 541 2221
ROADWAY
STA. 13+07.91 TO
13+52.93 (RT)X 613 450 1063
BRIDGE
STA. 13+52.93 TO
13+66.00 (RT)X 324 0 324
BRIDGE
STA. 13+81.44 TO
14+12.84 (RT)X 741 0 741
ROADWAY
STA. 14+12.84 TO
14+48.13 (RT)X 236 376 612
TOTAL:4716 1826 6542
IMPACT
BUFFER IMPACTS SUMMARY
TYPE
SITE NO.
STRUCTURE SIZE /
TYPE STATION (FROM/TO)
ALLOWABLE MITIGABLE
BUFFER
REPLACEMENT
SHEET 2
PROJECT: SF-910161
2/11/2015
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
WAKE COUNTY
Rev. May 2006
-L--
100% PERMIT DRAWINGS
PROJECT REFERENCE NO.
DB5-9101 d1
SHEET NO.
4
— O1vtslan 5819101611ifydrdutics\PERMITSEnvlronmentaiNDrawlnus191016!_h✓d_Drm_twf_osh tcon)dan
6�
0
PI Sta 11+38.97
A = 9' 25' 23.4' (RT)
D = 4' 24' 26.5'
L = 213.81'
T = 107.14'
R = 1,300.00'
DS ) 45 MPH
SE = EXISTING
RO = EXISTING
PI Stu 15+19.00
A = 12' 23' 58.0'
D = 10' 25' 02.7'
L = 119.03'
T = 59.75'
R 550.00'
DS = 40 MPH
SE = EXISTING
RO = EXISTING
DETAIL 1
RIP RAP AT EMBANKMENT
Not to Scale)
Ditch
Grede
Ty of Liner- Class II Rip Rep
Vienlexlile rubric
ETA. 13 + 76 -L-
STA.13+85 -L- (RT)
ETA. 14+00 -L-
ETA. 14+12 -L- (LT)
P1 Sta 16+37.61
(LT) A 18'13' 10.6' (LT)
D = 15' 29' 07.2'
L = 117.66'
T = 59.33'
R = 370.00'
DS = 35 MPH
SE = EXISTING
RO = EXISTING
BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE = 1800 CFS
DESIGN FREQUENCY =25 YRS
DESIGN MN ELEVATION _ = 288,4 FT
BASE DISCHARGE = 2400 CFS
BASE FREQUENCY - 100 YRS
BASE NW - ELEVATION +-290.49 FT
OVERTOPPING FREOIJ DISCHARGE --500Q CFSY
OVERTOPPING
ENCY =-51?O +.YRS
OVERTOPPING ELEVATION = 29224 FT
.......... .
DATE OF SURVEY 01/16/2014
WS. ELEVATION
AT DATE OF SURVEY - 282.5 FT
31(}
30-0.-.
_290
280
270
-__260
SI A FE !it- IIORTI-I CARF11.
El ,.5 pr..
SHOVE EXISTING CONCRETE FDOTER
ND PILES. PLACE CLASS lI RIP RAP
MBANKMENT PROTECTION. EXTEND RP
AP TO TOE OFF SLOPING ABUTMENT
ST TO TONS
ST 75 SY GEO
EE DETAIL I
-L- POT
DETAIL 2
LATERAL 'V' DITCH
I Nato Sala)
Type of Liner= Class 'B' Rip -Rep
Min. D= 1.0 Ft.
Mox. d= 1.0 Ft.
b= 5.0 H.
FROM
STA. 14+12 TO STA. 14+50 -L- (LT)
FROM ETA. 14 +12 TO STA. 14+50 -L- (RT)
RIP RAP EMBANKMENT PROTECTION
CLASS II RIP RAP
EST ID TONS
EST 10 SY GEO
SEE DETAIL I
BEGIN PROJECT DB5-910161
BEGIN CONSTRUCTION
-L- POC Sta.12+28.00
Sta.10+00.00
-L- PC Sta. 10+31B2
DETAIL 3
SPECIAL LATERAL 'V' DITCH
INot te wale)
Fill
Slnpn
Min. 0= 1.0 R.
Type of Liner= Clots 'B' Rip -Rap Me,. d- 1.D H.
FROM STA.14+50 TO
FROM STA.14+50 TO
REMOVE EXISTING WALL
AND POURED CONCRETE
BEHIND THE WALL. LAY
BACK SLOPES AT 1.511 TO
RE-ESTABLISH STREAM BANKS
EXTEND RIP RAP TO TOE
OF SLOPING ABUTMENT
RIP RAP EMBANKEMENT
PROTECTION, CLASS II RIP FAP
EST 75 TONS
EST 75 SY GEC
SEE DETAIL 1 `
BEGIN BR1[
-L- StQ.13
N
I -L- PTr Sta. 12+45.6'3
f IfCLA1SS B' RIP .RAP.
I i ( TOE PROTEC /ION .'
( JJ i EST 20 TON'
f I EST 40 'SY/GEO
S.EE,DETA 4-
CLASS/II RIP RAP
TO, E EV.289.4'
• (SIR CTURES'
RAY ITEM.•;TYPI.-
RIP RAP EMBANKME/T PffOTEICTV 'N
CLASS II RIP RAP '
EST 10 TONS -
EST 10 SY CEO
SEE DETAIL I
BEGIN GRADE
-L- Sta.I2+28.00
ELEV = 294.68'
,1
STA.15+00 -L- (LT)
STA. 15+00 -L- (RT)
Neturnl
Ground
DETAIL 4
TOE PROTECTION
[Net to Scale)
b ryti�\\S\o
Id
d= 1.9 Ft.
b- 3.0 Ft. Geetextilo
Type of Liner= Class 'B' Rip -Rep
FROM STA. 12+75 TO STA. 13+41 -L- (RI)
ATE'
/ C
E T i'
E T, 3
S E,D
INSiT LL
GUT ER
TO,
I
L IV' DITCH
SS, 'B' RIP RAP
TAIL 2.
rvnl;:IT'r
OULDER• -�
OM'STA.I4+314+35''.�
4 f45 1, ITT)
SP CIALATERAL V' DITCH
iW `CLA 5 'B' RIP RAP
T 20 T S
ST 35 5W GEO
SEE DETAIL ‘,3
N \
DETAIL 5
STANDARD 'V' DITCH
I NaI to Seale;
Natured
p Ground
Gaele.lile
Typo of Liner= Class 'B' Rip-Rop
Min. D' -[.0 Ft.
Mox, d= 1.0 Ft.
PCC - ta, 15+7828-
I PROJECT DB5.7_910161
- ...END-- CONSTRUCTION....--
-L' POC 5b.15.+48.00
SPECIAL I ATERALJV'.PITCH
W/ CLASS 'B' RIP RAP
TONS
EST 35 SY GEO
SEE DETAIL 3
=L- PCSta.14+5926
-15' RCP -IV
-INSTALL SHOULDER BERM GUTTER
FROM STA, 14+35 TO 14+E5 -L- (RT)
LATERAL 'V' DITCH
WI. CLASS 'B' RIP RAP
ST'•I5 TONS
EST 30 SY GEO
SEE DETAIL 2 •
END BRIDGE
-L- Sta.I4+24-2-
EXISTING BRIDGE EXCAVATION
(SEE STRUCTURAL PLANS,TYP)
STANDARD 'V' DITCH W/ CLASS 'B' RIP RAP
EST Ia TONS
EST 20 SY GEO
SEE DETAIL 5
CL STA-13+88,00 -L-
1@7CY
24" CORED SLABS
CL ELEV = 29238
SKEW = ..90..
.-.........
BEGIN .BRIDGE
L S7'0.13+51.88
ELEV 292.49'
PI = 12185,00
EL = 292.70'
K = 35..
DS - 29 MPH
1 J03138%
. 134737i
CLASS IJ HIP RAP. tTYP).
2 FTYP)
NORMAL TO
ENO SEE?
CLASS II BANK
_......_. STABILLZATN
NORMAL' WS,E1., = 28215'
C EXISTING BRIDGE
BEGIN SPECIAL
DITCH GRADE HT
L= STA 13+85.00
ELEV - 282-50
END BRIDGE
-L Sto.14+24.13
E LEV= 292.26'
EL
Pt == 21-192,173,00
I'
VC = 90`
K = _E6...
DS = 25 MPH-
13.d067X
1 J END: SPEc1AL
5„UA GRADELT-L G
(+1 -L-•STA 15+00.00
ELEV - 290.10
END GRADE
-L- Sta.15+48.00.
ELEV = 294.44'
FROM ETA.13+85 TO STA. 14+12.. -L- (RT)
lltt1-311. z007
13I>D
L--POT Sta.17+24.00
-L- PT Stu. /6+95,94
J +lil i lr//Ul_R IA
r
LOW POINT
-L STA 14+35.26 I .I
ELEV..= 292.24'
1-BEGIN SPECIAL
DITCH: GRADE LT
-1.- STA I4-r•12,00
ELEV 285,00
APPROX. EXCAVATION'
ELEVATION -: 204J7.
- RE55OVE EXISTING Doti_
BENNNO TRHE. CONCRETE
CLASS HANK -ST
-L- STA.14+00D0 RT
ELEV = 282.60
35'
ITYP)
(SR 2300) PULLEY TOWN HD
ems:
END:SPECIAL.
Q1TCH.:GRADE' HT
-L- STA 15+0000
ELEV =.290.71
-L- STA 4+18A0 RT
ELEV = 285.00.
INN SHEET NO.
ROADWAY DESIGN
ENGINEER
HYDRALRICS
ENGINEER
PRELIMINARY PLANS
DO NOT USE FOR CONSTRUCTION
3 BLITHE
Kimley'» Horn
�BRRI�I�
BRIDGE EXCAVATION
NOTE:
CONTRACTOR MUST REMOVE ALL
PORTIONS OF EXIST CONC FOOTERS
AND PIERS. USE IMPERVIOUS DIKE
OR SIMILAR DEVICE TO DEBATER
AND ISOLATE WORK AREA FOR
REMOVAL OF IN -STREAM STRUCTURES.
REMOVAL MUST BE DONE IN THE DRY.
AFTER COMPLETE REMOVAL OF
CAUSEWAYS, CLASS II RIP RAP SHALL
REMAIN ON STREAM BANKS TO
PROVIDE PERMANENT STABILITY
FOLLOWING DETAIL I. ITYP)
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE MAPACTS LONE 2
11
12
13
14
15
16
17
al
N
P1 Ste 11+38.97
A = 9' 25' 23.4' (RT1
0 = 4' 24' 25.5'
L = 2/3.81'
T = 107.14'
R = 1,300.00'
DS ) 45 MPH
SE = EXISTING
R0 = EXISTING
P1 Sta 15+19.00 P1 Sta 16+37,51
A = 12'23'58.0x(LT) A - 18'13'10.6'(LT
1
D W IC' 25' 02.7' D = 15' 29' 072'
L r 119.03' L = 117.65'
T = 59.75'
R = 550.00'
OS = 40 MPH
SE = EXISTING
R0 = EXISTING
DETAIL 1
RIP RAP AT EMBANKMENT
( Not to Scale)
D;td,
Grade
Type of Liner Close 11 Rip Rap
WADeetexllle Fabric
STA.13+76 -L-
ETA. 13+85 -L- IRT)
STA. 14+00 -L-
ETA. 14+12 -L- (LT)
BRIDGE HYDRAULIC DATA
T = 59,33'
R = 370.00'
DS = 35 MPH
SE = EXISTING
RO = EXISTING
DESIGN DISCHARGE. = 1800 CFS =
--DESIGN FREQUENCY = 25 YRS -
DESIGN HiN ELEVATION = 288.4 FT :
BASE:DISCHARGE = 2400_ CFS__-
BASE FREQUENCY = 100 YRS
BASE. H4V: ELEVATION = 290.49 FT
OVERTOPPING DISCHARGE = 5360 CFS
OVERTOPPING FREQUENCY = 500 + YRS
OVERTOPPING ELEVATION = 29224 FT
DATE OF. SURVEY 01/16/2014
WS. ELEVATION
AT DATE OF SURVEY = 282.6 FT
31.0
300
290
280
270
260
DETAIL 2
LATERAL 'V' DITCH
Net le 5cdel
Type of Liner= Class 'B' Rip -Rap
Slops
Min. D= 1.0 FT.
Max, d= 1.0 Fl.
6= 5.0 F1.
FROM
FROM
STA.14+12 TO STA.14+50 -L (LT)
ETA.14+12 TO STA.14+50 -L- (RT)
RIP RAP EMBANKMENT PROTECTION
CLASS II RIP RAP
EST 10 TONS
EST ID SY GEO
SEE DETAIL I
BEGIN PROJECT DB5-910161
BEGIN CONSTRUCTION
-L- POC Sta, I2+28.O0
POT Sta. 10+00.00
-L- PC Sta. 10+31.82
cLLl11S
na „
I
DETAIL 3
SPECIAL LATERAL 'V' DITCH
I Net to Scale)
Fill
Slope
Geotexln° Max. d= 1.0 Ft.
Type of Liner. --Class 'B' Rip -Rap
Min. D= 1.0 R.
FROM STA.14+50 TO STA.15+00 -L- (LT)
FROM ETA. 14+50 TO STA. 15+00 -L- (RT)
REMOVE EXISTING WALL
AND POURED CONCRETE
BEHIND THE WALL. LAY
BACK SLOPES AT I.5:ITO
RE-ESTABLISH STREAM HANKS
EXTEND RIP RAP TO TOE
OF SLOPING ABUTMENT
RIP RAP EMBANKEMENT
PROTECTION, CLASS II RIP RAP
EST 75 TONS
EST 75 SY GEO
SEE DETAIL I
BEGIN BRIE
-L- PT Sta. 12+45.63
STATE. or- ! E]F111+. rr.00l
REMOVE EXISTING CONCRETE FOOTER
AND PILES. PLACE CLASS II RIP RAP
EMBANKMENT PROTECTION. EXTEND RIP
RAP TO TOE OF SLOPING ABUTMENT
EST 70 TONS
EST 75 5Y GEO
SEE DETAIL I
CLASS 'B' RIP RAP
TOE PROTECTION
EST 20 TON
EST 40 SY GEO
SEE DETAIL 4
CLASS II RP RAP
TO ELEV 289.4'
(STRUCTURES
PAY ITEM, TYP)
4
RIP RAP EMBANKME
CLASS II RIP RAP
EST ID TONS
EST 10 SY GEO
SEE DETAIL I
-L- Sta.I3f51.8
PROTECT(
BEGIN GRADE
-L- Sta.124-28.00
= ELEV 294.68'..:
4
Natural
Ground
d= 1.0 Ft.
b = 3.0 Ft.
DETAIL 4
TOE PROTECTION
1 *lb 5cde1 R\d�u
�H ,Z.�Fi\S\0Pe
I I
d
Geotexille
Type of Liner= Class 'B' Rip -Rep
FROM
STA.12+75 TO STA.13+41 -L- (RT)
/E
T CL
E T I
E T 3
S E D
LL
+45
L 'V' DITCH
SS 'B' RIP RAP
TONS
SY GEO
TAIL 2
BOULDER BERM
ROM STA.€4+35
-L- (LT)
CIAL LATERAL 'V' DITCH
CLASS 'B' RIP RAP
T 20 TONS
ST 35 SY CEO
SEE DETAIL 3
DETAIL 5
STANDARD 'V' DITCH
( Rollo Soule)
Min. D= 1.0 Ft.
Max. d= 1.0 Fi.
Type of Liner- Class 'B' Rip -Rap
PCC Sta. 15+7828
END PROJECT DB5-91016I
END CONSTRUCTION
-I.- POC 5ta.15+48.00
SPECIAL LATEB' RRIAP L 'VRA' PDITCH
W
SST 35 SYNGEO
SEE DETAIL 3
-L- PC Sta. 14+59.25
FROM STA. 13+85 TO STA. 14+12 -L- (RI)
1•� SR1S �0°7
r1AD 33M
--L- POT Sta. 17+24.00
-L- PT Sta. 16+95,94
I5' RCP -IV ,l r: I E Gr I n1„ 111 DI
INSTALL SHOULDER BERM GUTTER p11.
FROM STA. 14+35 TO 14+65 -L- (RT)
LATERAL 'V' DITCH
W/ CLASS 'B' RIP RAP
EST 15 TONS
SEE DETAIL 2E0
END BRIDGE
-L- Sta.pp14+24J3
(SEE STRUCTURAL PLANS �TYP)
H STANDARD 'V' DITCH W/ CLASS 'R' RIP RAP
EST 10 TONS
EST DETAIL 5E0
CL STA 13+88.00:
WO'
24"CORED SLA85. ...
CL ELEY 292,38
SKEW = 90
BEGIN BRIDGE
-L- Sta.13+51,88
ELEV- 292.49'
PI =-12+85,00
EL =- 292.70'
VC = 110'
K 35
DS 29 MPH
�`J34737i
-D.3138%
CLASS Ii RIP RAP (T5'P)
2'rTYP1
NCR.UILENTO
-... END RT..
_. .'CLASS: it HAfIK
'STARILIZ#TKIN
NORMAL-IS'SEL ..2825''.
O-EXISTING BRIDGE
BEGIN SPECIAL.
Was!"
0.67"
'DITCH GRADE RT
L- STA:13+85A0
ELEV"= 282.50
(SR
13
'I
END BRIDGE
L- Sta.14+24.1.3
ELEV= 292.26'
END GRADE
-L- Sta.15+48.00
ELEV =-294.44'
PI = 14-t73.00.::.
EL = 292:11'
VC = 90"..
K = 26
DS 25- MPH
+)3.f067
l J END SPECIAL
5P- ' I DITCHL ST GRADE 5+00.00_
ELEV = 29010 -L- STA 14+18.00 RT
3s LOW POINT
RYPJ -L- STA. 14-136.26
ELEV- 292.24.'
-BEGIN SPECIAL
DITCH GRADE LT
-L- STA 14+12.0R
ELEV -' 285.00 ..:..
-APPROX. EXCAYArroh,
ELEVALT, 2B4Y
(f�,lRpCA' !ONCRT:
E
8EH,ND-THE W..L
- CLASS f1RANK STADILIZAT10Y
AT LS,'trYPJ
- -L STA 14+00A0:RT
ELEV = 282.60
2300) PULLEY TOWN RD
ELEV = 285.00
END SPECIAL
-DITCH- GRADE HT,
L STA 1541a0D0
ELEV .= 290.71
100% PERMIT DRAWINGS
PROJECT REFERENCE NO.
DB5-910161
SHEET No,
4
RAP SHEET ND.
ROADWAY DESIGN
ENGINEER
HYDRAULICS
ENGINEER
PRELIMINARY PLANS
DO NOT USE PM CONSTRUCTION
'a BLITHE
Kimley>» Horn
2I'.111` zs
LIRIDGE EXCAVATION
NOTE:
CONTRACTOR MUST REMOVE ALL
PORTIONS OF EXIST CONC FOOTERS
AND PIERS. USE IMPERVIOUS DIKE
OR SIMILAR DEVICE TO DEBATER
AND ISOLATE WORK AREA FOR
REMOVAL OF IN -STREAM STRUCTURES.
REMOVAL MUST BE DONE IN THE DRY.
AFTER COMPLETE REMOVAL OF
CAUSEWAYS, CLASS IIRIP RAP SHALL
REMAIN ON STREAM BANKS TO
PROVIDE PERMANENT STABILITY
FOLLOWING DETAIL I. ITYPI
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
_300
_290_
280
I-0
��a 1
11
12
14 15
16
17