STATE OF NORT� CAROLINA
DEPARTMENT aF TRANSP(�RTATIUN
PAT McCRORY P. O. Bax 25241, Raleigh, NC 27�11-52�2 T(�NY TATA
C,.1CC�VER.NC)R PHONE: 919-733-2520 �ECRETARY
March 23, ZC�15
Mr. Andy W111iams
U. S. Army Corps of Engineers
Raleigh Regulatory Field (Jffice
3331 I�eritage Trade 1�rive, Suite 1 OS
Wake Forest, NC 27587
Subj ect: Nationwide Per�nit # 14
Replace Brldge # 106 on SR 13 00
Wilkes County, Narth Carol�na
Project l�Tumber: 1'1BP.11.R.11�6 (D'�Q Permit F�e: �24t1)
Dear l��r. Williams:
The North Carolina Department of Transportation is scheduled ta replac� �ridge # 1�6 with �.
nevv bridge at the same location under our Design �u11d Program. The existing bridge zs 4 s�ans
with total dimensions of 24' wide x 120' long. �he proposed new br�d�e is 3 spa�s �� 30' x
135'. Impacts associated with the bridge itself are limited to temporary work pacls. I-��vvev�r, v��
do have unnamed tributaries running parallel to th� road on both sides of the bridgee L�ue �a the
upgraded bridge width, we can avoid filling one of these tributaries but not bath. .A.s a result, w�
�vill be relacating a small intermittent stream in th� s�utheastern quadrar�t of th� structure. �'his
feature is much small�r than the perennial t.�T lo�ate�. �n the northwester�. quadra�t so it made
more sense to move this one. Project impacts will also i�clude a small amc�u�.t of banl�
stabilization and ane vvet pipe extenslon (see permit drawings). I��Iitigation will be provid�d
through EEP. No on-site detour is proposed.
Cor�struction of this proj ect will require impacts io waters of the LTn�ted States in �he �adkin
River Basin. The exisiing bridge crosses the North Prong of Lewis F�rk Creek (Class: �). The
subj ect proj ect will have no effect on an� federally listed endangered plant or animal species.
Cultural resource compliance work has been completed with na confllcts identified.
The praj ect impacts are not slgnificant in nature and s�ould not remove or degrade �xisting water
quality uses. Storm.water will be routed through gra�s or rock lined ditches, depend��g on the
ditch line slope. Total land disturbance will be less than 1 acre. P�pe sizes used will be th�
minimum necessary to create a safe roadvvay. All appropriate BIVIPs will b� us�d dur�ng
construction.
P. O. BOX 25�, N. WILKESBORO, NC 2�659
PHOr�E (336) �6?-9111 Fax (336) G67-4549
Mr. Andy Williams
Bridge # 106 on SR 13 00, Wilkes
Page 2
March 23, 2015
This proj ect vvas originally slated for the LIBI-� process so Nlarla has already �o:rnm�nted
(attachme�t I�) .
E�y copy of this electranic letter, it is requested that th� Division of Water (�uality, 401lWetlands
LTnit, issue the appropriate permlt far construction of th�s pro� ect. It �s requested that an.y
comments related to the 4Q 1 certification be forwarded directly tc� me wit�h a ca��r sen� to th� �.T�
Army Corps of Engineers.
We would like to begin construction as soon as possible. I�° fu�ther infa�matia� is r�qulred,
please let me know. Your early revievv and consid�ration will be appreciated.
Sincerely,
,
�Ieath Slaughter
Divls�Qn Envlrc�nmenta.I C�ffic�r
Enclosures
cc: Amy Chapman, Division of Water Resources
Dave Wanucha, Division of Water Resources
l��Iike Pettyj ohn, PE, Division Engineer
David VV'a�yne, PE, Bridge Maintenance Engineer
Jami Guynn, Division Bridge Program Manager
I�eath Slaughter, Division Environmental Off��er
Neil Trivette, Roadside Environmental Field Oper�ations Engineer
David Poindexter, Resident Eng�neer
� �j'� ,�` �`�'�'
�,��.. . . <..� ��fIC�' i�SE� Qt1l�':
�..�yr;���� ;r �
� � � F" .. � Corps action 1 D no.
� ...:.. �:�s:�::�rr�:.:.�::::��:;f .�
� � � � � DV\/Q project no.
� ..5.::....
...... Form Version �.3 Dec 10 20�8
Pre-Construction Noiifica�tion P+CN Form
A. A lic�nt Infarmation
1. Pracessing
1a. Type(s) of approval sought from the
Cor s: ��ection 4a4 Perr�it 0 Section 1 � Permit
�
1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP} number:
1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ��o
1d. Type(s) of approvai sought from the DWQ (check all that apply):
� 401 Water Quality Certi�ca#ion — Regular ❑ N�n-404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Ripari�n Buffer Authorization
1 e. Is this notification solely for the record Far the record only for DWQ 4�1 For the record ar�ly �nr Corps Permi�:
because written approval is not required? Certification:
0 Yes � No ❑ Yes � �in
1 f. Is payment into a mitigation bank or in-lieu fee program prc�posed for mitigation ���� ❑ N�
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
'1 g. Is the project located in any of NC's twenty coastal counties. If y�s, answer 1 h ��'�s ��1�
below.
1 h. Is the project lacated within a NC DCM Area of Environmental Cor�cern (AEC}? � Yes � No
2. Project Information
2a. Name of project: Bridge #106 on SR 1300
2b. County: Wilkes
2c. Nearest municipality / town: Parsonville
2d. Subdivision name:
2e. NCDC7T only, T.I.P. or state � 7gP.11.R.116
project no:
3. Owner Information
3a. Name(s) on Recorded Deed: NCDOT
3b. Deed Book and Page No.
3c. Responsible Party (for LLC i f
�pplicable):
3d. Street address: 801 Statesville Road
3e. City, state, zip: North Wilkesboro, NC 28659
3f. Telephone no.: 336-903-9202
3g. Fax no.: 336-667-4549
3h. Email address: hslaughter�C�ncdot.gov
Page 1 �f � �
PCN Form -- Version 1.3 December 10, 2Q�8 Versian
4. Applicant Information (if different from owner) �
4a. Applicant is: ❑ Agent ❑ Other, specifiy:
4b. Name:
4c. Busines s name
(if appiicable):
4d. Street address.
4e. City, sfiate, zip:
4f. Telephone no.:
4g. Fax na.:
4h. Email address:
5. Agent/Consultant Information {if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 c�f 10
PCN F�rm — Version 1.3 December 1 U, 20�8 Versian
B. Project Information and Priar Project History
1. Property Identification
1 a. Praperty identification no. (tax PIN or parcel ID}:
1 b. Site coordinates (in decimal degrees): L�titude: 36.21293 Longitude: -�1.35787
(DD.DDDDDD) (-DD.DDDDDD)
'fc. Property size: 0.� acres
2. Surface Waters
2a. Name af r�earest body of water (stream, river, etc.) to North Prong Lewis Fork �reek and UTs
proposed pro�ect:
2b. Wafier Quality Classification of nearest receiving water: C
2c. River basin: Yadkin
3. Project Description
3a. Describe the existing conditians on the site and the general I�nd use in the vicinity of the praject at the fiime af this
application:
�ubstandard bridge to be replaced in a rural area
3b. List the total estimated acreage af all existing wetlands on th� praperty:
0 acres
3c. List the total estimated linear feet of all existing streams (intermittent and perenniai) on the property:
250 linear feefi
3d. Explain the purpose of #he propased project:
Upgrade substandard stream crossing
3e. Describe the overall project in detail, including the type af equipment to be used:
�ee attached caver letter and permit drawings.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained fior this property /
project (including all prior phases) in the past? ❑ Yes � Nc� ❑ lJnknowr�
C�mments:
4b. If the Corps made the jurisdictianal determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if knawn): C�ther:
4d. !f yes, list the d�tes of the Corps jurisdictional determinations or �tate determinations �nd attach docun�ent�tion.
5. Project Histc�ry
5a. Have permits or certifications been requested or obtained for � Yes � No [� Unknor�n
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. ls this a phased project? ❑ Yes ��lo
6b. I� yes, explain.
Page3c�f10
P�N Form -- Version 1.3 December 1 a, 2008 Version
C. Proposed I m pacts I nventory
1. Impacts Summary
1a. Vi/hich sections were completed below for your project {check all that apply):
[] Wetlands � Streams - tributaries ❑ Buffer�
C] Open Waters ❑ Por�d Construction
2. Wetland Impacts
If fihere are wetiand impacts proposed on the site, then complete this question for each wet{and �rea impacted.
2a. Zb. 2c. 2d. 2e. 2f.
Wetland impact Type c�f jurisdictian
number — Type of impact Type of wetland Forested (Corps - 4U4, 10 �rea ofi imp�ct
Permanent (P) or (if known) DWQ -- non-4�4, other) (acres)
Tem orar T
[� Y�s �.,] Corps
W1 ❑ P Q T Nc� D
❑ ❑ WQ
❑ Yes ❑ Corps
W2 ❑P❑T No D
❑ ❑ WQ
[] Y�s 0 Carps
W3 ❑ P❑ T No DW
� ❑ �
❑ Y�s ❑ �orps
W4 ❑ P❑ T N o DUV
❑ 0 �
❑ Y�s ❑ Corps
W5 � P❑ T N o DW
❑ ❑ �
❑ Y�s [� Corps
W6 ❑ P❑ T N o DW
❑ ❑ �
2g. Totai wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent sfiream impacts (including tempor�ry impacts) pr�posed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
�tream impact Type of impact Stream name Perennial Type of jurisdiction Average �mp���
number - (PER) or (Corps -�404, 10 stream length
Permanent (P) or intermittent p�� _�Qn_4pq., width (��n���'
TemporarY (T) (INT)? other) (feet) feet)
Pipe & (� PER � Corps
�� � P�� Dewaterin UT #� fio NP�FC ��T �� 4 24
g ❑ � c�
� P�R � Corps
S2 � F' � T Bank Stab�lizat�on UT #2 to NPLFC �NT DWQ � 8
❑ �
P T Tem . Work Pa � P�� � COrpS
S3 [„� (� p ds NPLFC �,0 �Q
� 1 NT �j DWC�
❑ PER � Corps
S4 � P� T Stream Relocation UT #3 to NPLFC �NT p�� 1-2 128
� �
S5 P T ❑ ��R � Corps
❑ ❑ I NT DWQ
❑ ❑
[� PER [,] Corps
S6 ❑ P[� T I NT DW
❑ � �
3h. Total stream and tributary impacts �4p
3i. Comments: 9' pipe, 4' riprap, 123' stream relocation, 1 �4 Temparary dewatering
Page 4 of 14
P�N Form -- Version 1.3 December 1�, 2n08 Versian
4. Open Water Impacfis
If there are propased impacts ta lakes, ponds, estuaries, tributaries, sounds, the Atlantic CJcean, or any other open water of
the U.S. then individually list all open water impacts belaw.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbady
impact number — (if appiicable) Type af impact Waterbody fiype Rrea of impact (�cres}
F�ermanent (P) or
Tem orar T
C)1 C] P❑T
(J2 C] P❑T
03 ❑ P ❑ T
C}4 �P❑T
4f. Total apen water �mpacts
4g. Gommenfis:
5. Pond or L.ake Construction
If ond or lake consfiruction ro osed, then cam lefie the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts {acr�s) �tream Impacts (feet) Upland
Pond ID Praposed use or purpose �������
number of pond
Flooded Fiiled Exc�vated Fia�oded Filled Excavated F�looded
P1
P2
5f. Total
5g. Comments: N/A
5h. ls a dam high hazard permit required?
❑ Yes � No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pand watershed (acres):
5k. Method of construction:
6. Bufifer Impacts (fior DWQ)
lf project will impact a protected riparian buffer, then complete #he cha�t beiow. If yes, then individually list all buffer imp�cts
below. If an impacts require miti afiion, then ou MU�T fill o�t Section � of this form.
6a.
[.� N�use ❑ Tar-Pamiico [.� ather:
Project is in which pr�tected basin? ❑ Catawba ❑ Randlem�n
�b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number -- Reason BufFer Zone 1 impact �one 2 impact
Permanent {P) or far Stream name mitig�tion (square feet) (�qu�re feet)
Tem orar T im act re uired?
C�] Y�s
B1OP❑T ��
❑
B2 P T 0 Y�s
❑ ❑
❑ No
B3 P T ❑ Y�s
a a
c� ��
6h. Total buffer 1�npacts
6i. Comments:
Page 5 of 10
PCN Fc�rm -- Version 1.3 December '10, 20081/ersion
D. Impact Justif�cation and Mitigation
1. Avaidance and Minimization
1 a. �pecifically describe measures taken to avaid or minimize the proposed imp�cts in designing project.
No permanent impacts associated with bridge itself. Stream reloc�tion is unavoidable.
1 b. Specifically describe measures taken to avoid or minimi�e th� proposed impacts through construction t�chni�ues.
All appropriate BMPs will be used during construcfiion
2. Compensatc�ry Mitigation for Impacts to Waters of the U.�. or 1Naters of ihe State
2a. Does �he projecfi require Compensatory Mitigation for � Y�s ❑ No
impacts to Waters ofi the U.�. ar Waters of the State?
2b. If yes, mitigation is required by (check all that apply): ❑ C)WQ � Corps
❑ 1Vlitigation bank
2c. If yes, which mitigat ion option will be used for this
ro'ect? � Payment to in-iieu fee program
p J
❑ Permittee Responsible Mitigatian
3. Complete if Using a Mitigatian Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipfi and letter) iype Quantifiy
3c. Camments:
4. Complete if Making a Payment ta In-lieu Fee Pragram
4a. Approval letter from in-lieu fee program is attached. ❑ Yes
4b. Sfiream mitigation requested: 132 linear feet
4c. If using stream mitigation, stream temperature: ❑ w�rm ❑ caoi �cQld
4d. BufFer mitigation requested {DVVQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Caasfial (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigafiion plan, provide a description of the proposed mitig�tion plan.
Page6of1�
PCN Form -- Version 1.3 December 10, 20Q8 Version
6. Buffer Mitigatian (State Regulated Riparian Buffer Rules) -- required by DW�
6a. Will the project resuit in an impact wi#hin a protected riparian buffer that requires ❑ Yes j� �10
bufifer mitigation?
6b. If yes, then identify the square feet c�f impact to �ach zone of �he riparian buffer th�t requires ►�nitigation. �alcula�e the
amount of mitigation required.
6c. 6d. 6e.
Zor�e Reason for impact 1'otal impact Multi�lier Required miiiga�ion
(square feet) (squ�re �ee�)
Zone � 3 (2 for Catawb�)
Zone 2 1.5
6f. Total buffer mitiga�ion required.
6g. If buffer mitigatian is required, discuss what type af mitigation is propased (e.g., payment to private mitigation bank,
permittee respansible riparian buffer restorati�n, payment into an �pproved in-lieu fee fund).
6h. Comments.
Page 7 af 10
P�N Farm — Version 1.3 December 10, 2�0� Ver�iar�
E. Starmwater Managernent and Diffuse Flaw Plan (required by C�WQ)
'1. Diffuse Flow Plan
1 a. Daes the praject include or is it adjacent to protected riparian buff�rs identified C] Yes � Nc�
within one of the NC Riparian Buffer Protect�on Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
C] Yes � N�
Comments:
2. Starrnwater Mana ement Plan
2a. What is the overall percent imperviousness af this praject? °I�
2b. C�oes this project require a Stormwater Management Plan? [� Yes ��lo
2c. If this project DC1ES NOT require a Stormwater Management Plan, expiain why: Disturbing less th�n 1�cre
2d. If this project DOES require a�tormwater Management Plan, then provide a brief, narrative descriptic�n nf the plan.
0 Certified Local C�overnment
2e. Who will be responsible far the review of the Stormwater Management Plan? � DWQ Stormwater Pragr�m
❑ DWQ 4a1 tJnit
3. �ertified L.acal Government Stormwater Review
3a. ln which local government's jurisdiction is this project?
� Phase II
3b. Which of the followin locall -im lemented stormwater mana em�nt ro rams ���W
� Y p 9 p 9 �] IJ�M F�
apply (check all that apply):
[�] Water �upply Watershed
� Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes � Nca
att�ched?
4. DWQ Stormwater Pro ram Review
�] Coastal countie�
❑ H Q1N
4a. Which of the following state-implemented starmwater manag�mer�t programs apply � pR�
(check all that apply}:
[...� Sessior� L�w� 204�-24�
❑ Other:
4b. Has the approved Stormwafier Management Plan with proof of ap�roval been
attached? � Yes [,�] No
5. DWQ 441 U n it Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriat� requirements? 0��� ❑�yo
5b. Have all of the 4�1 Unit submittal requirements been met? ❑ Yes ❑�10
Page 8 af 10
P�N Form -- Version 1.3 Qec�mber 1�, 2008 Version
F. Supplementary Information
1. Environmental Dacumentation {DWQ Requirement)
1 a. Daes the project involve an expenditure of public (federalistate/lo�al) funds or the � Yes ��lo
use of public (federal/state) land?
1 b. If you answered "yes" to the abave, does the project require preparation of �n
er�vironmental document pursuant to the requirements of the National or State ❑ Yes ��1Q
(North Carolina) Environmenfial Paiicy Act (NEPA/SEPA)?
1 c. If you answered "yes" fio the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA ar �EPA final approval
letter.} Q Yes � �lo
Comm�nts:
Z. �liolations (DWQ Requirement)
2a. Is the site in violation af DWQ Wetland Rules {15A NCAC 2H .05a0), Isolated
Wetiand Rules (15A NCAC 2H .1304), DWQ SurFace Water ar W�tland Standards, ❑ Yes � No
or F�iparian Buffer Rules (15A NCAC 26 .020�)?
2b. Is this an after-the-facfi permit application? �] Yes ��o
2c. if you answered "yes" to one or bath of the above questions, provide an explanation of the violation(s):
3. Gumulative Impacts {DWQ Requirement)
3a. Wiil this project (based on past and reasc�nably anticipated future impacts) result in
additional development, which could im act nearb downstream �vater uaiit ? � Y�� ��°
p Y q Y
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short n�rrative description.
4. Sewage Disposal {DWQ Requirement)
4a. Cle�rly detaii the uitimate treatment methods and disposition (non�discharge or discharge) of wastew�ter �enerated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
P�RI Farm -- Version 1.3 December 1�, 2�08 Version
5. Endangered Species and Designated Crit�cal Habitat (Corps �equirement�
5a. Will this project occur in or near an area wifih federally protected �pecies or
habitat? � ��� � �'�
5b. Have you checked with the USFWS cancerning Endangered Species P�ct [� Yes (� Nc�
impacts?
❑ Raleigh
5c. If yes, ind icate the USFWS Field �ffice you have contacted.
[�,j Rsheville
5d. What data saurces did you use to determine whether your sit� wc�uld impact Endangered Species or Designated Critical
Habitat?
G1S and visual observation
6. Essential Fish Habita� {Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use to determine whether your sit� wc�uld impact Essentia! Fish Habit�t?
WRC has commented
7. Historic or Prehistoric Cultural Resources (Corps Requir�ment)
7a. Will this project occur in or near an area that the state, federal or �ribal
governments have designated as having historic or cultural preservation ��es ���
status (e.g., National Historic Trust des�gnation or praperties �ignificant in
North Carolina history and archaeology}?
7b. What data sources did you use to determine whether your site w�uld impact historic or archeological resources?
Project was reviewed by the OHE.
8. Flood Zone Designation (Corps Requirement)
8a. Wil[ this project occur in a FEMA-designated 100-year floodplain? 0 Yes � l�c�
8b. lf yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination?
J. I-�eath S laughter 3l� 3/ 15
�
Applicant/Agent's Print�d Name Applicant/Agent's Si fiure C��te
(Agent's signature is valid only if an authQri c�n letter fram the applicant
is provided.)
Page 1 f� �f 10
PGN F�rm — Version 1.3 December 1 U, 20�8 Versian
KÈ
KÈ
KÈ
KÈ
^_
SR 1 3 00 (Par
s
o
n
ville
R
d
)
SR
1
3
5
9
(
B
e
n
nyParso
n
s
R
d)
SR1300(Sum
m
it
R
d
)
North
ProngLe
w
i
s
F
o
r
k
BRIDGE 106
B R ID G E
N ORT H C ARO L I N A
S H E E T 1
0 2,000 4,000
Feet
Des i gn Bu i l d Br i d ge s - Ye ar 3Division 11
N C D O TDivision o f H i g h w a y s
Ü
?ıAı
K¼
?ı
AB163
Aı
?¬?¬
K¼
?ö
?ö
?ö
?ö
?´
Ix
!"b$
IxAp
Ap
!"b$
!"b$
?°
KÈAÊ
KÈ
KÈ KÈ
AÊ?ö
?ı
AÁ
KÄ
KÄ
KÄ
KÄ
Aı
Aı
It
Að
It
K¼
!"b$IxAö?¥
It
It
Aö
Ai
?¥?±
I¤
I¤
I¤
AB128
Iz
Aö
Ad
ST25
?±I¤
?±
K¼
AÔ
I¤K¼
Ai
?¬
K¼Aı
Aı
It
KÈKÄ
Ix
K¼
A`
It
Aö
Ai
I¤AÕ
^_
WILKES
SURRY
ASHE
MADISON
CALDWELLYANCEY
AVERY
WATAUGA
MITCHELL
ALEXANDER
ALLEGHANY
B R U N S W I C K
V I C I N I T Y M A P
106WILKES COUNTY
Ha
n
d
Existing Existing
Pe
r
m
a
n
e
n
t
T
e
m
p
.
E
x
c
a
v
a
t
i
o
n
M
e
c
h
a
n
i
z
e
d
C
l
e
a
r
i
n
g
P
e
r
m
a
n
e
n
t
T
e
m
p
.
C
h
a
n
n
e
l
C
h
a
n
n
e
l
N
a
t
u
r
a
l
Si
t
e
S
t
a
t
i
o
n
S
t
r
u
c
t
u
r
e
F
i
l
l
I
n
F
i
l
l
I
n
i
n
C
l
e
a
r
i
n
g
i
n
S
W
S
W
I
m
p
a
c
t
s
I
m
p
a
c
t
s
S
t
r
e
a
m
No
.
(
F
r
o
m
/
T
o
)
S
i
z
e
/
T
y
p
e
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
n
W
e
t
l
a
n
d
s
W
e
t
l
a
n
d
s
i
m
p
a
c
t
s
i
m
p
a
c
t
s
P
e
r
m
a
n
e
n
t
T
e
m
p
.
D
e
s
i
g
n
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
a
c
)
(
f
t
)
(
f
t
)
(
f
t
)
P
i
p
e
R
e
p
l
a
c
e
m
e
n
t
P
r
o
p
.
7
8
"
C
S
P
w
/
H
W
-
5
0
L
F
<
0
.
0
1
<
0
.
0
1
9
1
5
-
L
-
S
t
a
.
1
1
+
2
0
E
x
i
s
t
.
6
6
"
C
M
P
w
/
H
W
-
4
1
L
F
-
L
-
S
t
a
.
1
1
+
5
6
t
o
1
1
+
6
5
L
t
.
B
a
n
k
S
t
a
b
i
l
i
z
a
t
i
o
n
<
0
.
0
1
<
0
.
0
1
4
4
-
L
-
S
t
a
.
1
2
+
2
8
t
o
1
3
+
1
7
P
r
o
p
o
s
e
d
B
r
i
d
g
e
0
.
0
4
8
0
(
T
e
m
p
o
r
a
r
y
W
o
r
k
P
a
d
s
)
-
L
-
S
t
a
.
1
3
+
4
2
t
o
1
4
+
6
9
R
t
.
P
r
o
p
o
s
e
d
S
t
r
e
a
m
R
e
l
o
c
a
t
i
o
n
0
.
0
1
<
0
.
0
1
1
2
3
5
TO
T
A
L
S
*
:
0
.
0
1
0
.
0
4
1
3
6
1
0
4
0
*R
o
u
n
d
e
d
t
o
t
a
l
s
a
r
e
s
u
m
o
f
a
c
t
u
a
l
i
m
p
a
c
t
s
NO
T
E
S
:
Re
v
i
s
e
d
2
0
1
3
1
0
2
4
SH
E
E
T
2OF 5
W
E
T
L
A
N
D
P
E
R
M
I
T
I
M
P
A
C
T
S
U
M
M
A
R
Y
WE
T
L
A
N
D
I
M
P
A
C
T
S
SU
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
Wilkes County SF-960106 17BP.11.R.116
NC
D
E
P
A
R
T
M
E
N
T
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
DIVISION OF HIGHWAYS February 18, 2015
DIVISION OF HIGHWAYS
NCDOT
TEMPORARY WORK PAD DETAIL
1.0’
1.5:1
CLASS B RIP RAP
CLASS II RIP RAP
1.5:11.5:1 CLASS B RIP RAP
CLASS II RIP RAP
CHANNEL BED
NOT TO SCALE
SECTION A-A
SECTION B-B
SHEET 3 OF 5
BRIDGE NO. 106 OVER
ON SR 1300
NWS EL. =1,335.1’
NWS EL. =1,335.1’
WILKES COUNTY
PROJECT: 17BP.11.R.116
GEOTEXTILE FABRIC
GEOTEXTILE FABRIC
CENTERLINE PROP. BENT
N. PRONG LEWIS FORK CREEK
1/06/2015
40’ (EAST END)
48’ (WEST END)
PROP. BENT)
(NORMAL TO
7.0’ (EAST END)
6.1’ (WEST END)
= 1,338.3’ (EAST END)
= 1,336.3’ (WEST END)
TOP OF WORK PAD EL.
= 1,338.3’ (EAST END)
= 1,336.3’ (WEST END)
TOP OF WORK PAD EL.
T
8" CMP
6
6
" C
M
P
2
4
" C
MP
GR
GR
GR
HUNTER TODD PAGE
18"
RC
P
18
"
RC
P
SR
1300
PARSONV
ILLE
RD
.
TO
SR
13
04
(OLD
4
2
1
, BOO
NE
TRA
IL
)
TO
SR
1360
(B
IG
IVY
RD
)
EX
IST
ING
R
/W
E
X
IS
T
ING
R
/
W
5
0
.0
0
’
18" RCP
H
T
R
ROCK ROCK HW
ROCK HW
HOUSE RUINS
PIER
OLD BRIDGE
STE
PS
ROCK
WALL
8"
B
L
K
C
ON
C
1.5
S
F
D
BST
EXISTING
R
/W
EXISTING
R/W
2
1
.5
’
2
1.5
’
PATTERSON
LOUIS M.
EX
IST
ING
R
/W
EX
IST
ING
R
/W
ROCK HW
8" CMP
6
6
" C
M
P
ROCK HW
EXISTING
R/W
ROCK HW
.0
2
3
0
’
O
U
T
-
O
U
T
-L- POT STA. 11+89.15
BEGIN APPROACH SLAB
-L- POT STA. 13+48.75
END APPROACH SLAB
5
’-
3
"
10
’
10
’
2
’-
3
"
F
-
F
2
7
’-
6
"
STA. 13+60.00 LT.
END SBG
STA. 11+60.00 LT.
START SBG
-L- POT STA. 12+00.00
BEGIN BRIDGE
-L- POT STA. 13+37.90
END BRIDGE
N
A
D
8
3
(N
S
RS
2
0
0
7
)
-L-
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8
/
1
7
/
9
9
3
/
2
3
/
2
0
1
5
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
9
6
0
1
0
6
_
p
e
r
_
w
e
t
_
n
o
c
o
n
.
d
g
n
e
r
i
g
g
s
10+00
1330
4DIV11B - BRIDGE 960106 - WILKES COUNTY
BRIDGE WIDENED FOR SPREAD
TYPE-III
TYPE-III
TYPE-III
**
*
*
TL-2
GRAU 350
TYPE III
TL-2
GRAU 350
TL-2
GRAU 350
AT-1
17BP.11.R.116
1340
1350
1360
1340
1350
DB11B-960106
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
1"=30’
SCALE
1"=30’
SCALE
1"=30’
SCALE
1"=30’
SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WATER IMPACTS
TEMPORARY SURFACE
WORK PAD
TEMPORARY
WORK PAD
TEMPORARY
WATER IMPACTS
SURFACE
TEMPORARY
WATER IMPACTS
SURFACE
WATER IMPACTS
SURFACE
WATER IMPACTS
TEMPORARY SURFACE
WORK PAD
TEMPORARY
WORK PAD
TEMPORARY
SHEET 4 OF 5
PERMIT DRAWING
CONSTRUCTION SEQUENCE
3. REMOVE TEMPORARY WORK PAD FROM STREAM BED.
2. REMOVE EXISTING TIMBER BENT AND CONCRETE FOOTING.
THAN HALF THE STREAM SHALL BE BLOCKED DURING THIS OPERATION.
ONLY ONE WORK PAD SHALL BE IN THE STREAM AT A TIME AND NO MORE
SEE SHEET 3 OR EC-4A FOR DETAILS OF TEMPORARY WORK PAD.
1. PLACE TEMPORARY WORK PAD TO PROTECT STREAM AS SHOWN ON DRAWINGS.
WATER IMPACTS
SURFACE
WATER IMPACTS
TEMPORARY SURFACE
F
O
R
K
C
R
E
E
K
N
P
R
O
N
G
L
E
WIS
11+00 12+00 13+00 14+00 15+00 16+00
ROOT OF 15" BLACK OAK
8" SPIKE SET IN
N 904905 E 1304201
-L- STA. 11+36.34 OFF 93.09’ LEFT
BM#1 ELEV = 1343.11
10
F
F
FF
F
F
F
C
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
C
C
1,335.1’
NWS
V = 35MPH
V = 50MPH
V = 45MPH
-L- STA. 12+00.00
BEGIN BRIDGE
-L- STA. 13+37.90
END BRIDGE
PI = 12+75.00
EL = 1,349.41’
VC = 200’
K = 91
PI = 14+40.00
EL = 1,347.55’
VC = 120’
K = 80
EL = 1347.82’
-L- STA. 15+15.00
END GRADE
PI = 10+56.00
EL = 1,347.09’
(-)1.9978%(+)1.0600%
VC = 180’
K = 59
(+)1.0600%(-)1.1300%
EL = 1349.01
-L- STA. 9+60.00
BEGIN GRADE
(-)1.1300%(+)0.3613%
BRIDGE HYDRAULIC DATA
100 YEAR FREQUENCY
= 25
= 100 YRS
= 1341.2
= 1348.2
= 500+
= 2400
= 3300
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
= 1341.89
NORMAL WATER SURFACE ELEV = 1335.1 FT
STR #960106 Sta. 12+68.95 -L-
= 10148
DATE OF SURVEY = 9/13/2014
ELEV. 1337.88
PI STA. 13+75 RT
ELEV. 1335.15
STA. 13+50 RT
BEGIN 4’ LATERAL BASE DITCH
ELEV. 1338.99
STA. 14+40 RT
END 4’ LATERAL BASE DITCH
(+) 1.7093%
(+) 10.9120%
1,341.89’
100-YR
ELEV. 1347.97
STA. 9+50 RT
BEGIN SPEC. CUT DITCH
ELEV. 1346.29
STA. 10+50 RT
END SPEC. CUT DITCH
(+) 1.1905%
WORK PAD
TEMPORARY
1
2
3
HW
HW
TB 2GI-D
TB 2GI
R
ET
A
IN
15
"
15
"
7
8
" C
SP
RETAINRETAIN
24" CSP
REMOVE
SEE DETAILS C & D
LATERAL BASE DITCH
HEADWALLS
CMP WITH
REMOVE 66"
( Not to Scale)
DETAIL A
BANK STABILIZATION
GROUND
NATURAL
1.0’min.
2’
GEOTEXTILE
PIPE
FROM -L- STA. 11+61 TO STA. 11+69 LT
Type of Liner= CL II Rip-Rap w/ Geotextile Fabric
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
EST. 12 CL. B RIP RAP
FROM -L- STA. 13+50 TO STA. 13+75 RT
DETAIL C
b= 5 Ft.
B= 2 Ft.
Max. d= 1 Ft.
Min. D= 1 Ft.
*When B is < 6.0’
Type of Liner= CL B Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
( Not to Scale)
2:12:
1 D
B
b
LATERAL BASE DITCH
1"/Ft.
FROM -L- STA. 13+75 TO STA. 14+40 RT
DETAIL D
b= 5 Ft.
B= 2 Ft.
Min. D= 1 Ft.
Ground
Natural
Slope
Fill
5 SY GEO FAB
RIP RAP W/
1 TON CL B
SEE DETAIL A
BANK STAB.
EXIST. JS
TIE TO
Flatter4:1 or
D
2:
1
( Not to Scale)
SPECIAL CUT DITCH
FROM -L- STA. 9+50 TO STA. 10+50 RT
DETAIL B
Min. D= 1.0 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL B
SPECIAL CUT DITCH
w/MH
JB5 SY GEO FAB
RIP RAP W/
1 TON CL B
7
8
" CSP
HW
24" CSP
w/MH
JB
1
5
"
1331
1332
13
3
2
1
3
3
3
1333
133
4
1
3
3
4
133
5
1
3
3
5
1335
1
3
3
5
1
3
3
5
1335
1336
1336
1336
1337
13
37
13
3
7
13
3
8
133
8
133
8
1338
1339
13
3
9
1
3
3
9
13
3
9
13
3
9
1339
1340
1340
13
4
0
13
4
0
13
4
0
1340
1340
134
0
1
3
4
0
1
3
4
0
1340
1341
1341
13
4
1
1341
13
4
1
13
4
1
1341
1342
13
4
2
1342
1342
1342
13
4
2
13
42
1343
1343
1343
1343
1343
1343
1344
1344
1344
1344
13441345
1345
1345
13
4
5
1345
1345
134
5
13
4
5
1
3
4
5
1346
1346
1346
1346 13
4
6
1347
1347
1347
1347
1347
13
4
7
1347
13
4
8
1348
1348
1
3
4
8
13
4
8
1
3
4
9
1349
1349
1
3
4
9
13
5
0
1350
1
3
5
1
1
3
5
2
1353
13
3
2
1
3
3
3
1
3
3
5
1336
13
3
913451346
1
3
3
9
1340
1340
1341
1342 1343
T
8" CMP
6
6
" C
M
P
2
4
" C
MP
GR
GR
GR
HUNTER TODD PAGE
18"
RC
P
18
"
RC
P
SR
1300
PARSONV
ILLE
RD
.
TO
SR
13
04
(OLD
4
2
1
, BOO
NE
TRA
IL
)
TO
SR
1360
(B
IG
IVY
RD
)
EX
IST
ING
R
/W
E
X
IS
T
ING
R
/
W
5
0
.0
0
’
18" RCP
H
T
R
ROCK ROCK HW
ROCK HW
HOUSE RUINS
PIER
OLD BRIDGE
STE
PS
ROCK
WALL
8"
B
L
K
C
ON
C
1.5
S
F
D
BST
EXISTING
R
/W
EXISTING
R/W
2
1
.5
’
2
1.5
’
PATTERSON
LOUIS M.
EX
IST
ING
R
/W
EX
IST
ING
R
/W
ROCK HW
8" CMP
6
6
" C
M
P
ROCK HW
EXISTING
R/W
ROCK HW
.0
2
3
0
’
O
U
T
-
O
U
T
-L- POT STA. 11+89.15
BEGIN APPROACH SLAB
-L- POT STA. 13+48.75
END APPROACH SLAB
5
’-
3
"
10
’
10
’
2
’-
3
"
F
-
F
2
7
’-
6
"
STA. 13+60.00 LT.
END SBG
STA. 11+60.00 LT.
START SBG
-L- POT STA. 12+00.00
BEGIN BRIDGE
-L- POT STA. 13+37.90
END BRIDGE
N
A
D
8
3
(N
S
RS
2
0
0
7
)
-L-
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.8
/
1
7
/
9
9
3
/
2
3
/
2
0
1
5
R
:
\
H
y
d
r
a
u
l
i
c
s
\
P
E
R
M
I
T
S
_
E
n
v
i
r
o
n
m
e
n
t
a
l
\
D
r
a
w
i
n
g
s
\
9
6
0
1
0
6
_
p
e
r
_
w
e
t
_
c
o
n
.
d
g
n
e
r
i
g
g
s
1330
4DIV11B - BRIDGE 960106 - WILKES COUNTY
BRIDGE WIDENED FOR SPREAD
TYPE-III
TYPE-III
TYPE-III
**
*
*
TL-2
GRAU 350
TYPE III
TL-2
GRAU 350
TL-2
GRAU 350
AT-1
17BP.11.R.116
1340
1350
1360
1340
1350
DB11B-960106
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
PLANS PREPARED BY :
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
RUMMEL, KLEPPER & KAHL, LLP
NC LICENSE NO. F-0112 (919) 878-9560
1"=30’
SCALE
1"=30’
SCALE
1"=30’
SCALE
1"=30’
SCALE
S S SURFACE WATER
DENOTES IMPACTS IN
TS TS
IMPACTS IN SURFACE WATER
DENOTES TEMPORARY
WATER IMPACTS
TEMPORARY SURFACE
WORK PAD
TEMPORARY
WORK PAD
TEMPORARY
WATER IMPACTS
SURFACE
TEMPORARY
WATER IMPACTS
SURFACE
WATER IMPACTS
SURFACE
WATER IMPACTS
TEMPORARY SURFACE
WORK PAD
TEMPORARY
WORK PAD
TEMPORARY
SHEET 5 OF 5
PERMIT DRAWING
CONSTRUCTION SEQUENCE
3. REMOVE TEMPORARY WORK PAD FROM STREAM BED.
2. REMOVE EXISTING TIMBER BENT AND CONCRETE FOOTING.
THAN HALF THE STREAM SHALL BE BLOCKED DURING THIS OPERATION.
ONLY ONE WORK PAD SHALL BE IN THE STREAM AT A TIME AND NO MORE
SEE SHEET 3 OR EC-4A FOR DETAILS OF TEMPORARY WORK PAD.
1. PLACE TEMPORARY WORK PAD TO PROTECT STREAM AS SHOWN ON DRAWINGS.
WATER IMPACTS
SURFACE
WATER IMPACTS
TEMPORARY SURFACE
F
O
R
K
C
R
E
E
K
N
P
R
O
N
G
L
E
WIS
11+00 12+00 13+00 14+00 15+00 16+0010+00
ROOT OF 15" BLACK OAK
8" SPIKE SET IN
N 904905 E 1304201
-L- STA. 11+36.34 OFF 93.09’ LEFT
BM#1 ELEV = 1343.11
10
F
F
FF
F
F
F
C
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
C
C
1,335.1’
NWS
V = 35MPH
V = 50MPH
V = 45MPH
-L- STA. 12+00.00
BEGIN BRIDGE
-L- STA. 13+37.90
END BRIDGE
PI = 12+75.00
EL = 1,349.41’
VC = 200’
K = 91
PI = 14+40.00
EL = 1,347.55’
VC = 120’
K = 80
EL = 1347.82’
-L- STA. 15+15.00
END GRADE
PI = 10+56.00
EL = 1,347.09’
(-)1.9978%(+)1.0600%
VC = 180’
K = 59
(+)1.0600%(-)1.1300%
EL = 1349.01
-L- STA. 9+60.00
BEGIN GRADE
(-)1.1300%(+)0.3613%
BRIDGE HYDRAULIC DATA
100 YEAR FREQUENCY
= 25
= 100 YRS
= 1341.2
= 1348.2
= 500+
= 2400
= 3300
DESIGN FREQUENCY
DESIGN DISCHARGE
DESIGN HW ELEVATION
100 YEAR DISCHARGE
100 YEAR HW ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE
OVERTOPPING ELEVATION
YRS
CFS
FT
CFS
FT
YRS
CFS
FT
= 1341.89
NORMAL WATER SURFACE ELEV = 1335.1 FT
STR #960106 Sta. 12+68.95 -L-
= 10148
DATE OF SURVEY = 9/13/2014
ELEV. 1337.88
PI STA. 13+75 RT
ELEV. 1335.15
STA. 13+50 RT
BEGIN 4’ LATERAL BASE DITCH
ELEV. 1338.99
STA. 14+40 RT
END 4’ LATERAL BASE DITCH
(+) 1.7093%
(+) 10.9120%
1,341.89’
100-YR
ELEV. 1347.97
STA. 9+50 RT
BEGIN SPEC. CUT DITCH
ELEV. 1346.29
STA. 10+50 RT
END SPEC. CUT DITCH
(+) 1.1905%
WORK PAD
TEMPORARY
1
2
3
HW
HW
TB 2GI-D
TB 2GI
R
ET
A
IN
15
"
15
"
7
8
" C
SP
RETAINRETAIN
24" CSP
REMOVE
SEE DETAILS C & D
LATERAL BASE DITCH
HEADWALLS
CMP WITH
REMOVE 66"
( Not to Scale)
DETAIL A
BANK STABILIZATION
GROUND
NATURAL
1.0’min.
2’
GEOTEXTILE
PIPE
FROM -L- STA. 11+61 TO STA. 11+69 LT
Type of Liner= CL II Rip-Rap w/ Geotextile Fabric
( Not to Scale)
LATERAL BASE DITCH
2:
1 D
B
b
d
2:1 1"/Ft.
EST. 12 CL. B RIP RAP
FROM -L- STA. 13+50 TO STA. 13+75 RT
DETAIL C
b= 5 Ft.
B= 2 Ft.
Max. d= 1 Ft.
Min. D= 1 Ft.
*When B is < 6.0’
Type of Liner= CL B Rip-Rap
Ground
Natural
Slope
Fill
GEOTEXTILE
( Not to Scale)
2:12:
1 D
B
b
LATERAL BASE DITCH
1"/Ft.
FROM -L- STA. 13+75 TO STA. 14+40 RT
DETAIL D
b= 5 Ft.
B= 2 Ft.
Min. D= 1 Ft.
Ground
Natural
Slope
Fill
5 SY GEO FAB
RIP RAP W/
1 TON CL B
SEE DETAIL A
BANK STAB.
EXIST. JS
TIE TO
Flatter4:1 or
D
2:
1
( Not to Scale)
SPECIAL CUT DITCH
FROM -L- STA. 9+50 TO STA. 10+50 RT
DETAIL B
Min. D= 1.0 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL B
SPECIAL CUT DITCH
w/MH
JB5 SY GEO FAB
RIP RAP W/
1 TON CL B
7
8
" CSP
HW
24" CSP
w/MH
JB
1
5
"