HomeMy WebLinkAboutNCC230632_ESC Approval Submitted_20230310Plan Review Assignment Notification - Lot 16 Arbors at Brookberry - SFD Construction
From: Matthew Osborne <matthewo@cityofws.org>
Sent: Thursday, February 23, 2023 1:46 PM
To: Kent Wall <kentw@citvofws.org>
Subject: RE: [EXTERNAL] Plan Review Assignment Notification - Lot 16 Arbors at Brookberry - SFD
Construction
Kent,
I have stamped the plan and approved as noted the review. They will now need to upload an NCGO 1
COC for the lot before providing them with fee payment instructions.
Matthew Osborne, CFM, CPESC
Erosion Control/Floodplain Program Manager
City Of Winston-Salem
Field Operations Department
Erosion Control Division
PO Box 2511 (Mailing)
100 E. First Street, Suite 328 (Physical
Winston-Salem, NC 27101
Office: 336-747-7453
Mobile: 336-462-74801
Fax: 336-727-270
Electronic Plan Review Application Portal:
httns://winston-salem.idtvlans.com/secure/
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading & Erosion Control
Project: Lot 16 Arbors at Brookberry - SFD Construction
A/P #: EN2300033
Acreage to be Disturbed: 0.25
https://wnston-salem. geocivix.com/secure/project/?proj ectid=950827
Hello X Canter Builder, LLC.,
Thank you for submitting your project to City of Winston-Salem. Review of the Erosion Control Plan
for this project has been completed. The design is adequate to meet the ordinance standards and the plan
has been approved.
Be aware that this plan shall expire three (3) years following the date of approval, if no land disturbing
activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Also, acceptance and
approval of this plan is conditioned upon compliance with Federal and State water quality laws,
regulations, and rules.
If you have not already done so, please provide an original signed and notarized Financial
Responsibility/Ownership (FRO) form as applicable. This document is required prior to the issuance of
the Grading/Erosion Control Permit. If this has already been provided, then please disregard this
statement. Reminder that a completed FRO form is not required in the instance where a project qualifies
to use the HB 489 Sketch Erosion Control Plan document.
If this project will disturb more than I acre or is part of a larger common plan of development, the
Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under
the NCGO1 Construction Stormwater Permit (NPDES) has been obtained. Please obtain coverage under
the permit at the following website (https://edocs.deci.nc.eov/Forms/NCGOI-NOI). Once coverage is
obtained, please upload a copy to the project documents in the electronic plan review system. The
Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO1 is
provided. *** This approval email serves as the "Approval Letter" that must be uploaded when
filing the a-NOI application to obtain the NCGOI Certificate of Coverage. ***
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth County, Village
of Clemmons, Town of Lewisville, and Town of Walkertown, Erosion Control Division staff may
periodically inspect sites of land disturbing activity to determine compliance with the Erosion Control
ordinances and the approved Erosion Control Plan. No person shall willfully resist, delay, or obstruct an
authorized representative, employee, or agent of the Erosion Control Division while that person is
inspecting or attempting to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please contact Matthew Osborne at 336-462-7480
or matthewo&cityofws.org.