Loading...
HomeMy WebLinkAboutNCC230505_ESC Approval Submitted_20230309ROY COOPER Govern or ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 30, 2022 LETTER OF APPROVAL Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis 61 Terminal Drive, Suite 1 Fletcher, NC 28732 RE: Project Name: South Parking Area - Phase 1 - Clearing Acres Approved: 11.07 Project ID: BUNCO-2023-009 County: Buncombe City: Asheville Address: 61 Terminal Drive River Basin: French Broad Stream Classification: B Submitted By: AVCON, INC. - Mr. James Moose, P.E. Date Received by LQS: November 14, 2022 Plan Type: Airport Dear Mr. Bleiweis, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOi form may be accessed at deq.nc.gov/NCG01. Please direct North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 I Swannanoa, North Carolina 28778 NOR�MCARGLJN DW.a Im d E1MZ-at9 On"� 828.296.4500 Letter of Approval Greater Asheville Regional Airport Authority ATTN. Mr. Lew Bleiweis November 30, 2022 Page 2 of 3 questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Mic el Smith Assista t Region l Engineer Land Quality Section Letter of Approval Greater Asheville Regional Airport Authority ATTN: Mr. Lew Bleiweis November 30, 2022 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Mr. James Moose, P.E. jmoose@avconinc.com cc: Regional Office file CD oeD � '"'' Mom•+ CD CD CD �. A7 ► � � AD r4l CDrD m' CD n It CD o ►�. � . cn elf- v ZCD CD G CD ;� • O c > ^ vCy. a u. Mom+ • r+ CAD '� �' � O O C � CD .' a CD � �• y � o �D CD M CD n C *-W JI � �CDow �M� . C°'O—W CD N n y rp c � © �° fD ''� ,