HomeMy WebLinkAbout20150257 Ver 1_02_EB-5508 New Hope Road Buffer Permit Drawings (0215-03-04)_20150310ROAD
CROSSINGBRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
MULTI-USE PATH
-L1- STA. 20+96.10 TO
22+70.25 X 3258 1517 4775
MULTI-USE PATH
-L1- STA. 28+60.10 TO
28+93.95 X 301 1022 1323
PED. BRIDGE/
BOARDWALK
-L1- STA. 28+93.95 TO
29+28.64 X 507 0 507
PED. BRIDGE/
BOARDWALK
-L1- STA. 29+61.17 TO
29+98.92 X 211 163 374
TOTAL:4277 2702 6979
IMPACT
BUFFER IMPACTS SUMMARY
TYPE
SITE NO.
STRUCTURE SIZE /
TYPE STATION (FROM/TO)
ALLOWABLE MITIGABLE
BUFFER
REPLACEMENT
SHEET 2
PROJECT: EB-5508
2/24/2015
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
WAYNE COUNTY
Rev. May 2006
ZONE 1
(ft2)
ZONE 2
(ft2)
-L1- STA. 28+71.91 -L1- STA. 29+00.74 322 372
TOTAL:322 372
WETLANDS IN BUFFER IMPACTS SUMMARY
SHEET 3
PROJECT: EB-5508
2/24/2015
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
WAYNE COUNTY
WETLANDS IN
BUFFERS
SITE NO.
STATION
(FROM/TO)
Rev. Jan 2009