Loading...
HomeMy WebLinkAbout20150257 Ver 1_02_EB-5508 New Hope Road Buffer Permit Drawings (0215-03-04)_20150310ROAD CROSSINGBRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) MULTI-USE PATH -L1- STA. 20+96.10 TO 22+70.25 X 3258 1517 4775 MULTI-USE PATH -L1- STA. 28+60.10 TO 28+93.95 X 301 1022 1323 PED. BRIDGE/ BOARDWALK -L1- STA. 28+93.95 TO 29+28.64 X 507 0 507 PED. BRIDGE/ BOARDWALK -L1- STA. 29+61.17 TO 29+98.92 X 211 163 374 TOTAL:4277 2702 6979 IMPACT BUFFER IMPACTS SUMMARY TYPE SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) ALLOWABLE MITIGABLE BUFFER REPLACEMENT SHEET 2 PROJECT: EB-5508 2/24/2015 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY Rev. May 2006 ZONE 1 (ft2) ZONE 2 (ft2) -L1- STA. 28+71.91 -L1- STA. 29+00.74 322 372 TOTAL:322 372 WETLANDS IN BUFFER IMPACTS SUMMARY SHEET 3 PROJECT: EB-5508 2/24/2015 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WAYNE COUNTY WETLANDS IN BUFFERS SITE NO. STATION (FROM/TO) Rev. Jan 2009