HomeMy WebLinkAbout20150257 Ver 1_04_EB-5508 New Hope Rd Multi-Use Path 75% Plans (2015-03-05)_20150310CMF
REE
D
Y B
RAN
CH
CMF
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
s
h
.d
g
n
GRAPHIC SCALE
PLANS
PROFILE (HORIZONTAL)
PROFILE (VERTICAL)
0
2010
42
1
SHEET NO.PROJECT REFERENCE NO.
N
A
D
8
3
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
EB-5508
OWNER:
ENGINEER:
SURVEYOR:
GEOTECHNICAL:
MAYOR
ALFONZO KING
2010
C 2015
CITY OF GOLDSBORO
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
CITY MANAGER
SCOTT STEVENS
jason.lawing@kimley-horn.com
919.677.2153
JASON LAWING, P.E.
CARY, NC 27513
3001 WESTON PARKWAY
KIMLEY-HORN AND ASSOCIATES, INC.
0
0
jhamm@falconengineers.com
919.302.9758
JEREMY HAMM, P.E.
RALEIGH, NC 27607
SUITE 110
1210 TRINITY ROAD
FALCON ENGINEERING, INC.
PAVEMENT MARKINGS AND EROSION CONTROL
TYPE OF WORK: GRADING, PAVING, DRAINAGE,
LOCATION: FROM HARE ROAD TO WAYNE MEMORIAL DRIVE
bcroom@goldsboronc.gov
919-580-4278
BOBBY CROOM, P.E.
GOLDSBORO, NC 27530
200 NORTH CENTER STREET
CITY OF GOLDSBORO
rcoley@goldsboronc.gov
919-750-0219
RONNIE COLEY
GOLDSBORO, NC 27530
200 NORTH CENTER STREET
CITY OF GOLDSBORO
NTS
VICINITY MAP
70
BUS
INDEX OF SHEETS
SHEET NO.DESCRIPTION
TITLE SHEET1
GRADING AND EROSION CONTROL PLANS
MULTI-USE PATH AND DRAINAGE PLANS
MULTI-USE PATH AND ROADWAY CROSS SECTIONS
CD-1 TO CD-5
2 CONVENTIONAL SYMBOLS
C-1 TO C-8
S-1 TO S-?
-L1- STA 10+04.58
BEGIN PROJECT EB-5508
-L2- STA 58+04.85
END PROJECT EB-5508
1
2
3
4
5 6
7
8
(SR 1003)NEW HOPE ROAD
C
ASSE
D
ALE
D
RIVE
C
O
M
M
U
N
I
T
Y
C
O
L
L
E
G
E
E
N
T
R
A
N
C
E
T
O
W
A
Y
N
E
(SR 1570)
H
A
RE RO
A
D
(
S
R
1
5
5
6
)
W
A
Y
N
E
M
E
M
O
R
IA
L
D
R
IV
E
NEWHARE DRIVE
R
E
E
D
Y
B
R
A
N
C
H
-L2- STA 40+00.00
-L1- STA 35+96.07
T
O
M
M
YS
R
O
A
D
W A
Y
N
E ME MO
R
IA
L D
R
.
END PROJECT
BEGIN PROJECT
R
D.
NE
W
H
OPE
H
ARE RD
.
111
P
A
TETO
W
N
RD
111
CIT
Y LI
MITS
C
ITY
L
IM
IT
S
GOLDSBORO, WAYNE COUNTY
N
A
D
83
X-1 TO X-10
EC-1 TO EC-13
PROJECT NOTES, TYPICAL SECTIONS AND CONSTRUCTION DETAILS
BOARDWALK AND BRIDGE PLANS *
* TO BE INCLUDED IN FUTURE SUBMITTAL
3
/
3
/
2
0
15
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
s
h
.d
g
n
O
Proposed Power Pole
P
U/G Power Cable Hand Hole
Existing Joint Use Pole
Proposed Joint Use Pole
R
}
T
p
Q
O O
GAS:
Gas Valve
Gas Meter
Recorded U/G Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Recorded SS Forced Main Line
Designated SS Forced Main Line (S.U.E.*)
Above Ground Gas Line
Above Ground Sanitary Sewer
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line
m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
Designated U/G Gas Line (S.U.E.*)
U/G Test Hole (S.U.E.*)
CB
Abandoned According to Utility Records
S
P
P
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Baseline Control Point
RIGHT OF WAY:
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of Way Line
C
F
Existing Easement Line
Proposed Temporary Construction Easement
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Utility Easement
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;
z
v
W
K
Proposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Power Manhole
Power Line Tower
Power Transformer
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Booth
Telephone Pedestal
U/G Telephone Cable Hand Hole
l
e
]
/
b
H-Frame Pole
POWER:
TELEPHONE:
Telephone Cell Tower
Recorded U/G Power Line
Recorded U/G Telephone Cable
Designated U/G Telephone Cable (S.U.E.*)
Recorded U/G Telephone Conduit
Designated U/G Telephone Conduit (S.U.E.*)
Recorded U/G Fiber Optics Cable
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
Recorded U/G Water Line
4
I
H
a
TV:
TV Satellite Dish
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
Recorded U/G TV Cable
Recorded U/G Fiber Optic Cable
Designated U/G Fiber Optic Cable (S.U.E.*)
r
|
I
]
n
c
d
o
A/G Water
A/G Gas
Above Ground Water Line
A/G Sanitary Sewer
F
S
3
?
CONC
CONC WW
v
v
Drainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
Designated U/G Power Line (S.U.E.*)
Designated U/G Fiber Optics Cable (S.U.E.*)
Designated U/G Water Line (S.U.E.*)
Designated U/G TV Cable (S.U.E.*)
*S.U.E. = Subsurface Utility Engineering
WLB
EIP B
ECM
CONC HW
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
Note: Not to Scale
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
Proposed Permanent Easement with
Iron Pin and Cap Marker
Proposed Temporary Utility Easement TUE
Iron Pin and Cap Marker
Proposed Right of Way Line with
DUEProposed Permanent Drainage / Utility Easement
AUEProposed Aerial Utility Easement
CRProposed Curb Ramp
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVENTIONAL PLAN SHEET SYMBOLS
UST
Known Soil Contamination: Area or Site
Potential Soil Contamination: Area or Site
Concrete or Granite R/W Marker
Proposed Right of Way Line with
C
A Concrete C/A Marker
Proposed Control of Access Line with
SHEET NO.PROJECT REFERENCE NO.
EB-5508 2
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
y
p
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
CD-1
NOT TO SCALE
AND GENERAL NOTES
STANDARD DRAWINGS
LIST OF ROADWAY
LIST OF ROADWAY STANDARD DRAWINGS
DESCRIPTIONSTD NO.
200.02 METHOD OF CLEARING - METHOD II
225.02 GUIDE FOR GRADING SUBGRADE - SECONDARY AND LOCAL
1101.01 WORK ZONE ADVANCE WARNING SIGNS
1101.02 TEMPORARY LANE CLOSURES
1101.04
1101.11 TRAFFIC CONTROL DESIGN TABLES
1110.01
1110.02 PORTABLE WORK ZONE SIGNS
1130.01 DRUM
1135.01 CONES
1145.01
1150.01 FLAGGING DEVICES
1180.01 SKINNY DRUM
SHEET NOTES
SITE NOTES
UTILITY NOTES
STATIONARY WORK ZONE SIGNS
GENERAL NOTES
DEMOLITION NOTES
TEMPORARY SILT FENCE1605.01
1606.01 SPECIAL SEDIMENT CONTROL FENCE
1607.01 GRAVEL CONSTRUCTION ENTRANCE
APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS:
DESIGN BRANCH-N.C. DEPARTMENT OF TRANSPORTATION-RALEIGH, N.C., DATED JANUARY 2012 ARE
THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY
TEMPORARY SHOULDER CLOSURES
876.02 GUIDE FOR RIP RAP AT PIPE OUTLETS
BARRICADES - TYPE III
DEMOLITION NOTES (CONTINUED)
TEMPORARY ROCK SILT CHECK TYPE ’A’1633.01
1630.06 SPECIAL STILLING BASIN
CURB RAMP (PROPOSED CURB)
AS DIRECTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN.
GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES
OR FUTURE SURFACE AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS.
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
GRADE LINE:
ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS, DATED 2012.
MULTI-USE PATH, BRIDGE AND BOARDWALKS. ALL CONSTRUCTION SHALL BE IN
THE PROJECT GENERALLY CONSISTS OF THE CONSTRUCTION OF A 10’ WIDE
STATEMENT OF CONSTRUCTION
2012 SPECIFICATIONS
SO THAT TOPS/RIMS ARE FLUSH WITH FINISHED GRADE UNLESS OTHERWISE NOTED.
ALL UTILITIES THAT ARE LOCATED WITHIN LIMITS OF DISTURBANCE SHALL BE SET
AGENCY, OR COMPANY.
OF ALL EXISTING UTILITIES IN COORDINATION WITH THE APPROPRIATE UTILITY,
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION
"NORTH CAROLINA ONE CALL."
LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF
EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT
1-800-632-4949) AT LEAST 72 HOURS PRIOR TO BEGINNING CONSTRUCTION OR
CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (TELEPHONE
300.01 METHOD OF PIPE INSTALLATION
838.01 CONCRETE ENDWALL FOR SINGLE AND DOUBLE PIPE CULVERTS - 15" THRU 48" PIPE 90 SKEW
840.31 CONCRETE JUNCTION BOX - 12" THRU 66" PIPE
840.54 MANHOLE FRAME AND COVER
846.01 CONCRETE CURB, GUTTER AND CURB & GUTTER
848.05
852.01 CONCRETE ISLANDS
ALL RC PIPES SHALL BE CLASS III OR CLASS IV AS SHOWN ON PLANS.
PONDING.
CONTRACTOR TO GRADE FILL SLOPES AROUND EXISTING MANHOLES TO AVOID
TRAFFIC CONTROL DEVICES) AND NCDOT STANDARDS.
ALL SIGNS AND PAVEMENT MARKINGS ARE TO MEET MUTCD (MANUAL ON UNIFORM
WHEN WALKS ARE 10’ WIDE. MATCH WIDTH UNDER 10’.
PROVIDE CONSTRUCTION JOINTS IN CONCRETE WALKWAYS EVERY 10’ MAXIMUM
NOTED.
CENTER TO CENTER ON STRIPES, AND/OR TO FACE OF CURB, UNLESS OTHERWISE
ALL DIMENSIONS ARE TO RADII, EDGE OF PAVEMENT, TO CENTERLINE,
PROVIDED IN THE CONTRACT DOCUMENTS.
FIELD CONDITIONS BE ENCOUNTERED THAT VARY FROM THE INFORMATION
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY SHOULD ANY
ORDERING MATERIALS.
ELEVATION OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION OR
BE RESPONSIBLE FOR FIELD VERIFYING EXACT LOCATION, ORIENTATION, AND
LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. CONTRACTOR SHALL
FOR ANY ADDITIONAL INFORMATION ON EXISTING WATER AND SEWER UTILITIES.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE CITY
AND FOR DAMAGES RESULTING FROM FAILURE TO DO SO.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR FIELD LOCATING ALL UTILITIES
ON THESE PLANS ARE FROM CITY AND UTILITY COMPANY RECORDS ONLY.
LOCATIONS AND SIZES OF EXISTING PUBLIC AND PRIVATE UTILITIES SHOWN
LIMITS SHOWN.
ALL WORK MUST BE COMPLETED WITHIN EASEMENTS AND CONSTRUCTION
THERMOPLASTIC AND/OR PAINT PAVEMENT MARKINGS.
ALL PAVEMENT MARKINGS USED FOR PROJECT SHALL BE NCDOT STANDARD
APPLICABLE PERMITS AND THE BID DOCUMENTS.
TREE PROTECTION MEASURES SHALL BE PROVIDED DURING CONSTRUCTION PER
MULCH, AND STOCKPILED FOR FUTURE USE.
ALL TREES AND VEGETATION NOTED TO BE REMOVED SHALL BE GROUND INTO
OFFSITE UNLESS OTHERWISE NOTED ON THIS PLAN.
ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE DISPOSED OF LEGALLY
WITH NEW GRADE.
THAT ARE TO REMAIN, SHALL BE PROTECTED FROM DAMAGE AND RAISED TO FLUSH
CLEANOUTS LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUCTION
PROVIDER(S).
RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY
ALL DEMOLITION WORK WILL BE COORDINATED BY CONTRACTOR.
AND DEBRIS.
FEDERAL REQUIREMENTS REGARDING REMOVAL AND DISPOSAL OF MATERIALS
THE CONTRACTOR IS RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND
FROM THE CITY AND/OR NCDOT.
EXISTING TRAVEL PATTERNS ON ANY PUBLIC STREET WITHOUT PRIOR APPROVAL
THE CONTRACTOR SHALL NOT MAKE ANY LANE CLOSURES OR CHANGES TO THE
THE CONTRACTOR SHALL NOTIFY THE CITY PRIOR TO STARTING WORK.
BE REMOVED.
INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO
ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY,
DRAWINGS.
AND REUSED ON SITE WHERE POSSIBLE IF IT CONFORMS TO SPECIFICATIONS AND
ALL GRAVEL TO BE REMOVED (SURFACE OR SUBSURFACE) SHALL BE STOCKPILED
PERFORMED IN ACCORDANCE WITH SPECIFICATIONS AND DRAWINGS.
CLEAN SOILS SHALL BE UTILIZED FOR BACKFILL COMPACTION OF THESE SOILS
AT THE CONCLUSION OF THE PROJECT.
CONDITIONS AND TO THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION
CONTRACTOR SHALL RESTORE THE LAY-DOWN AND STAGING AREA TO ORIGINAL
ARE MET.
APPROVE ALL SAWCUT LIMITS PRIOR TO REMOVAL TO ENSURE THAT CITY STANDARDS
ASPHALT DRIVE AT LIMITS OF NEW CURBING TO OBTAIN A CLEAN EDGE. CITY SHALL
CUT TO OBTAIN A CLEAN EDGE FOR NEW CONSTRUCTION. SAW CUT EXISTING
REMOVE EXISTING CONCRETE (WHERE REQUIRED) TO FIRST COLD JOINT OR SAW
OF 3 FEET FROM EDGE OF TRAIL OR AS DIRECTED BY THE ENGINEER.
ALL SIGNS SHALL BE MOUNTED WITH SIGN EDGE AND TO BE LOCATED A MINIMUM
SERVICE PROPOSED FOR CONNECTION OR USE ON THIS PROJECT.
LOCATION, SIZE AND MATERIAL COMPOSITION OF ANY EXISTING WATER OR SEWER
THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE ACTUAL AND EXACT
PERMISSION OF THE OWNER.
CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE EXPRESS WRITTEN
SHALL BE SUBMITTED TO THE OWNER FOR REVIEW. NO DEPARTURES FROM THE
BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF
IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY
ALL DEBRIS SHALL BE REMOVED FROM THE PROJECT SITE ON A DAILY BASIS.
OF WASTE MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES OR HIS WORK.
THE CONTRACTOR SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS
RECORD KEEPING.
GIVEN TO THE ENGINEER AT REGULAR INTERVALS THROUGHOUT THE PROJECT FOR
ACTUAL LOCATION OF ALL PIPING PRIOR TO CONCEALMENT. DRAWINGS SHALL BE
CONTRACTOR SHALL MAINTAIN AN "AS BUILT" SET OF DRAWINGS TO RECORD THE
AND/OR METHODS ASSOCIATED WITH THE PROJECT AS SET FORTH IN THESE PLANS.
ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS
DRAWINGS AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
SHALL BE PERFORMED IN COMPLIANCE WITH STANDARDS OF THE NCDOT STD.
TRAFFIC CONTROLS FOR ANY WORK WITHIN THE PUBLIC RIGHT OF WAY
REMAIN IN PLACE DURING CONSTRUCTION.
OBTAINING ALL REQUIRED PERMITS. ALL TREE PROTECTION FENCING SHALL
APPROVED BY THE CITY . THE CONTRACTOR IS RESPONSIBLE FOR
IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS SET FORTH AND
ALL DEMOLITION, AND ANY SUBSEQUENT CONSTRUCTION, SHALL BE PERFORMED
BEST AVAILABLE RECORD DRAWINGS.
ARE BASED ON A FIELD SURVEY PERFORMED BY THE CITY AND THE
EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE,
1515.02 FIRE HYDRANT
SURVEYS HAVE BEEN PROVIDED BY CITY OF GOLDSBORO.
EXISTING SURVEYS:
SHALL CONFORM TO NCDOT 2012 STANDARD DRAWINGS FOR TRAFFIC CONTROL.
INCLUDED IN THIS PLAN SET. ALL TRAFFIC CONTROL DEVICES AND OPERATIONS
TRAFFIC CONTROL GENERAL NOTES, DETAILS, AND A LIST OF STANDARDS ARE
TRAFFIC CONTROL:
ENGINEER PRIOR TO PLACING EROSION CONTROL MEASURES.
BY THE ENGINEER IN THE FIELD. THE CONTRACTOR SHOULD CONSULT WITH THE
THE FINAL SIZE AND LOCATION OF ALL EROSION CONTROL DEVISES MAY BE ADJUSTED
EROSION CONTROL:
ADEQUATE PROJECT LIMITS, FENCING, AND SIGNAGE.
PEDESTRIAN AND BICYCLE SAFETY MUST BE MAINTAINED AT ALL TIMES BY
SAFETY:
INTERSECTION WITH TRANSITION TO 10’ WIDTH OF MULTI-USE PATH.
CONTRACTOR TO ADAPT STANDARD DETAIL TO CONSTRUCT 8’ MIN. DROP CURB AT
ALL CURB RAMPS IN ACCORDANCE WITH NCDOT STD 848.05 AND 848.06.
CURB RAMPS ARE SHOWN ON THE PLANS AT APPROXIMATE LOCATIONS. CONSTRUCT
CURB RAMPS
EXCEPT AS SHOWN ON THE PLANS.
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS,
DUKE ENERGY
AT&T
TIME WARNER CABLE
CITY OF GOLDSBORO
UTILITY OWNERS ON THIS PROJECT ARE:
UTILITIES:
PARTICULAR ITEMS INVOLVED.
PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE
SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS
THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE
SIDE ROADS:
THE TYPICAL SECTIONS.
SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON
THE MULTI-USE PATH IS TO BE SUPERELEVATED AS SHOWN ON PLAN SHEETS.
SUPERELEVATION:
BY METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED
CLEARING:
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
y
p
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
PAVEMENT SCHEDULE
PROPOSED COMPACTED EARTH MATERIAL
PROP. APPROX. 1.5" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD.C1
T
GROUND
EXISTING
TYPICAL SECTION
02
J3 J3
02 1 :1
6"
POINT
GRADE
5’5’2’2’1 :1 02 02
CL
GROUND
EXISTING C1
1
3:
1
08
3:
1
J1T T
6"
CD-2
TYPICAL SECTIONS
3’ MIN
6’ MAX
5’ MAX
4’ MINCL
MULTI-USE PATH
PAVEMENT MARKING LINES & SYMBOLS LEGEND
NOT TO SCALE
J1
J2
J3 PROPOSED AGGREGATE BASE COURSE (SHOULDER)
PROPOSED 8" AGGREGATE BASE COURSE
PROPOSED 6" AGGREGATE BASE COURSE
CL
POINT
GRADE
0202
GROUND
EXISTING
2.5’5’5’
6"
1 :1 2’
08
-L2-
2
-L2- STA 57+44.67 TO 57+62.98
TYPICAL SECTION
T
C1
J1
-L2- STA 40+43.98 TO STA 57+44.67
-L1- STA 30+26.98 (END BOARDWALK) TO STA 35+53.17
-L1- STA 10+62.84 TO STA 28+93.95 (BEGIN BOARDWALK)
SEE NOTE 4
SIDEWALK
CONCRETE
EXISTING
REMOVE
-L1-, -L2-
EXISTING CURB & GUTTER
1
SIGN PLACEMENT DETAIL
KIMLEY-HORN AND ASSOCIATES, INC.
5’
50’
PAVEMENT MARKINGS DETAIL
P2
PH
SIGNING AND PAVEMENT MARKING NOTES:
PAY ITEM NOTES (SIGNING):
C. REMOVE AND STOCKPILE EXISTING SIGN(S).
B. ERECT EXISTING SIGN ON STEEL "U" CHANNEL POST.
A. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST.
PAVEMENT MARKING AND SIGNING DETAILS
5. VARIES TO 5’ WIDTH IN SELECT LOCATIONS (SEE CROSS SECTIONS).
NATURAL GROUND (SEE CROSS SECTIONS).
CONTINUING 0.02 FT/FT SHOULDER SLOPE UNTIL TIE-IN WITH
4. SLOPE SHOULDERS FOR POSITIVE DRAINAGE. OFTEN REQUIRES
TRANSITIONS. (2% MAX SUPERELEVATION)
3. SEE PLAN SHEETS FOR MULTI-USE PATH SUPERELEVATION
2. PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE NOTED.
1. SEE PLANS FOR SPECIFIC MULTI-USE PATH LOCATIONS.
NOTES:
3:1
DIRECTED BY CITY.
6. RETAIN ALL OTHER EXISTING SIGNS NOT SHOWN ON SIGNING PLAN UNLESS OTHERWISE
GOLDSBORO TO USE AT THEIR DISCRETION.
5. CONTRACTOR TO STOCKPILE ANY REMOVED SIGNS AND PARKING SIGNS FOR CITY OF
4. DO NOT PLACE PAVEMENT MARKINGS WITHIN CROSSWALKS UNLESS NOTED.
WITH PROPOSED.
3. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS AND/OR SYMBOLS IN CONFLICT
2. CONTRACTOR SHALL TIE PROPOSED MARKINGS TO EXISTING MARKINGS.
1. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC AND/OR PAINT.
C2
PROP. APPROX. 2.0" ASPHALT CONCRETE SURFACE COURSE, TYPE SF9.5A,
AT AN AVERAGE RATE OF 220 LBS. PER SQ. YD.
SEE NOTE 5
KIMLEY-HORN AND ASSOCIATES, INC.
4
J2
C2
HEAVY DUTY ASPHALT DETAIL
020202
POINT
GRADE
EXISTING GROUND
ASPHALT, OR
TIE TO SIDEWALK,
GUTTER
CURB &
TRANSITION TOP OF CURB TO GUTTER ELEVATION
KIMLEY-HORN AND ASSOCIATES, INC.
PAN UP TO TOP OF CURB ELEVATION
* FOR TIES TO SIDEWALK, TRANSITION GUTTER
6’ TRANSITION
R=20’
2’
FULL DEPTH ASPHALT
C&G
20’
3 CURB TRANSITION DETAIL
7"
UM - THERMOPLASTIC 12" YIELD LINE TRIANGLE (90 MIL)
UI - THERMOPLACTIC ALPHANUMERIC CHAR. (120 MIL)
UD - THERMOPLASTIC COMBO. LEFT/STRAIGHT ARROW (90 MIL)
UB - THERMOPLASTIC RIGHT TURN ARROW (90 MIL)
TQ - THERMOPLASTIC WHITE CROSSWALK LINE (8" WHITE, 120 MIL)
TE - THERMOPLASTIC WHITE SOLID LANE LINE (4", 120 MIL)
T2 - THERMOPLASTIC WHITE STOP BAR (24" WHITE, 120 MIL)
PH - YELLOW SINGLE CENTER LINE (4")
P9 - 3FT.-9FT./SP YELLOW MINISKIP (4")
P2 - WHITE STOP BAR (24")
P9
THIS LINE
GRADE TO
GROUND
EXISTING
11"
T
6"
D1E1
1 :1 (MAX)
023:
1
(M
A
X
)
3:1 (MAX)
R1
18" MIN2’5.0’
C3
PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,
E1 AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
D1 TYPE 119.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE,
AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF 2 LAYERS
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
C3
R1 PROPOSED 2’ CONCRETE CURB AND GUTTER
3 TYPICAL SECTION
ASPHALT PAVEMENT
SAWCUT EXIST
-L1- STA 10+51.49 TO STA 10+90.32
VEH
I
C
LES
TU
RN
I
N
G
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
y
p
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
6
A B
C
EQ
EQ
EQ
1’ - 6’’
4’ - 6’’
1’
4’’
A
B C
METAL HAND RAIL
1’ - 1.5’’
GRAVEL BASE
6’-6"
FINISHED GRADE
8. ON CONCRETE SECTIONS OF TRAIL, INSTALL #4 BARS UP TO 1’ X 1’ SQUARE FOOTING
7. CONCRETE FOOTING TO BE 1’ X 1’ SQUARE
6. ALL WELDS TO BE GROUND SMOOTH TO THE TOUCH
OR AS DIRECTED BY THE TOWN.
5. AFTER INSTALLATION PAINT ASSEMBLY WITH 1 COAT METAL PRIMER AND 2 COATS BROWN ALL WEATHER ENAMEL
4. ALL JOINTS TO HAVE A 1/2’’ FILLET WELD AT ALL JOINTS.
3. INSTALL NO CLOSER THAN 1’-6" FROM THE EDGE OF THE TRAIL
2. TYPE OF PIPE TO BE USED IS 1-5/8’’ MAX. O.D. STEEL PIPE
1. ALL CONCRETE TO BE 3500 P.S.I. COMPRESSIVE STRENGTH
NOTES:
CONCRETE FOOTING
CD-3
FROM STA. 30+34 TO STA. 30+88 -L1- (RT)
FROM STA. 30+34 TO STA. 30+61 -L1- (LT)
FROM STA. 25+92 TO STA. 28+89 -L1- (LT)
Fill Slope3:1 or Flatter
b= 2.0 Ft.
d= 1.0 Ft.
Type of Liner= Class ’B’ Rip-Rap
b
DETAIL 2
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
Geotextile
3:
1 3:1
D
( Not to Scale)
STANDARD ’V’ DITCH
FROM STA. 28+94 TO STA. 29+16 -L1- (RT)
Min. D= 1.0 Ft.
DETAIL 3
Ground
Natural
Ground
Natural
( Not to Scale)
TOE PROTECTION
d
FLATTER3:1 OR
FROM STA. 33+90 TO STA. 34+60 -L1- (RT)
FROM STA. 30+88 TO STA. 31+50 -L1- (RT)
DETAIL 4
b
b= 2.0 Ft.
d= 1.0 Ft.
Type of Liner= PSRM
GROUND
NATURAL
SLOPE
FILL
NOT TO SCALECONSTRUCTION DETAILS
ASSOCIATES, INC.
KIMLEY-HORN AND
AS SHOWN ON PLANS
PROPOSED ASHPALT PATH
D
HI-VISIBILITY YELLOW
STEEL BOX PAINT
2"x4"x1/4" CHANNEL
D
D
D
FOR ANCHOR BOLTS
" STEEL BASE PLATE-DRILLED
D
BOLTS-D. 12"
" DIA ANCHOR
D
CONCRETE FOOTING
CAST IN PLACE
D
2
.0
’
D
D
3
.0
’
D
D
D
2
"
D
1"
DESIGN AS APPROVED BY THE CITY.
* CONTRACTOR MAY PROVIDE ALTERNATE BOLLARD
HINGED BOLLARD*
1" DIA STEEL ROD HINGE PIN
HOLE, DRILLED FOR PADLOCK HASP
" DIA STEEL ROD LOCKING LUG
WELDED CAP
D
2
"
D
D
2
"
4
"
2
"
2
"
D
D
"
2"1"
D
2"2"
2"
2"
D
2
"
D
1"
D
D
D
D
10
’
1’1’
MARKINGS DETAIL
TYPICAL BOLLARD
BOLLARD
DD
CL
BOLLARD
HINGED
NO SCALE
TYPICAL BOLLARD PLACEMENT AT ENTRANCE
5’D D
3
.0
’
D
M
I
N
.
D
5
BY THE CONTRACTOR.
3. BOLLARD AND SIGNS TO BE INSTALLED
INTERSECTIONS IS A MINIMUM OF 5 FEET.
2. BOLLARD PLACEMENT OFFSET FROM
BE REFLECTORIZED.
1. BOLLARD POSTS AT INTERSECTIONS TO
BOLLARD NOTES:
PH
BOLLARD DETAILS
5’
( Not to Scale)
SPECIAL LATERAL ’V’ DITCH
3:
1 D
FROM STA. 51+50 TO STA. 54+00 -L2- (LT)
FROM STA. 48+00 TO STA. 51+25 -L2- (LT)
FROM STA. 34+00 TO STA. 35+00 -L1- (RT)
FROM STA. 26+00 TO STA. 28+94 -L1- (RT)
FROM STA. 21+40 TO STA. 22+50 -L1- (RT)
Min. D= 1.0 Ft.
DETAIL 1
Ground
Natural
Flatter3:1 or
Slope
Fill
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
y
p
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
1C
CURB RAMP
NCDOT TYPE 3
NUMBER 848.05 SHEET 3 OF 3 FOR ALL RAMP NOTES.
1. REFER TO ROADWAY STANDARD DRAWING
NOTES:
1B
CURB RAMP
NCDOT MEDIAN ISLAND
NUMBER 848.05 SHEET 3 OF 3 FOR ALL RAMP NOTES.
1. REFER TO ROADWAY STANDARD DRAWING
NOTES:
CONCRETE
ASPHALT PATH
MULTI-USE
(PLAN VIEW)
8’ DROP CURB
CONCRETETRANSITION
6’ CURB
TRANSITION
6’ CURB
TO EXISTING CURB AND GUTTER
TIE PROPOSED WHEELCHAIR RAMP
EXPANSION JOINT
SCORED CONTRACTION JOINT
CURB AND RAMP
TRANSITION TAPER FOR
EXPANSION JOINT
#848.05/#848.06 (CURB RAMP) APPLY.
ALL REQUIREMENTS OF NCDOT STANDARD DRAWING
SEE NOTE 2
"CONCRETE MULTI-USE PATH CURB RAMPS"
"CONCRETE MULTI-USE PATH CURB RAMPS WITH DETECTABLE DOMES" AND
PRICE PER EACH:
3. CONCRETE MULTI-USE PATH CURB RAMPS WILL BE PAID FOR AT THE CONTRACT UNIT
AND NOTED ON THE PLANS.
2. DETECTABLE DOMES SHALL ONLY BE PROVIDED ON WHEEL CHAIR RAMPS AS SHOWN
AND A 70% CONTRASTING COLOR TO THE SIDEWALK.
1. CONSTRUCT THE WALKING SURFACE OF THE DETECTABLE DOMES WITH SLIP RESISTANCE
NOTES:
RAMP
CURB
CONC.
2%
MAX
8.33%
MAX
8.33%
MAX
8.33%
TYP 6’
SEE PLANS
VARIES
1A
PATH CURB RAMP
CONCRETE MULTI-USE
ASSOCIATES, INC.
KIMLEY-HORN AND
CONSTRUCTION DETAILS
CD-4
NOT TO SCALE
1D
CUT THROUGH CURB RAMP
NCDOT MEDIAN ISLAND WITH
NUMBER 848.05 SHEET 3 OF 3 FOR ALL RAMP NOTES.
1. REFER TO ROADWAY STANDARD DRAWING
NOTES:
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
t
y
p
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
D
E
P
A
R
TE
N
O
F ANSPORTA
T
I
O
N
T
A
E
OF NORTH
ROL
N
A
W
O
R
K
Z
O
N
E TRAFFIC
CO
N
T
R
O
L
D
IV ISION OF
HI
G
H
W
A
Y
S
T
S
C
A
I
M
T
TR
-Y- LINE
STATIONARY SIGN
DIRECTION OF TRAFFIC FLOW
MAIN ROADWAY WORK ZONE
LEGEND
GENERAL NOTES
CONSTRUCTION LIMITS
LIMITS
CONSTRUCTION
LIMITS
CONSTRUCTION
-Y- LINES
ROAD WORK
END
48"X24"
G20-2a
48"X24"
G20-2a
D
E
P
T
.
O
F
T
R
A
N
S
P
O
R
T
A
T
I
O
N
D
I
V
I
S
I
O
N
O
F
H
I
G
H
WA
Y
S
R
A
L
E
I
G
H
,
N
.
C
.
D
E
T
A
I
L
D
R
A
WI
N
G
F
O
R
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
T
WO
-
WA
Y
U
N
D
I
V
I
D
E
D
WO
R
K
Z
O
N
E
WA
R
N
I
N
G
S
I
G
N
S
HIGHWAY WORK ZONE
ROADWAYS INTERSECTING ALONG 2 WAY UNDIVIDED WORK ZONE (Y-LINES)
SHEET 1 OF 1
X
X X
X
AHEAD
WORK
ROAD
ROAD WORK
END WORK
ROAD
AHEAD
END
ROAD WORK
END
ROAD WORK
AHEAD
WORK
ROAD
AHEAD
WORK
ROAD
48"X24"
G20-2a
48"x24"
G20-2a
TWO-WAY UNDIVIDED ** (L-LINES)
SIGNS AS DETERMINED BY THE ENGINEER.
- ** TWO-WAY UNDIVIDED ADVANCE WARNING SIGN CONFIGURATION MAY BE USED ON URBAN MULTI-LANE FACILITIES WHERE CONDITIONS LIMIT THE USE OF DUAL MOUNTED
- DO NOT BACK BRACE SIGN SUPPORTS.
- WHEN NECESSARY, USE SPLICING IN ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1110.01. REMOVE ENTIRE POST WHEN REMOVING SIGNS WITH SPLICED POSTS.
SQUARE STEEL TUBING POSTS WITH SIGNS WILL BE MADE ACCORDING TO STANDARD SPECIFICATION "WORK ZONE SIGNS" SECTION 1110.
3 LB STEEL U-CHANNEL POST ARE ALSO ACCEPTABLE FOR USE. ERECT SIGNS PER ROADWAY STANDARD DRAWING 1110.01. PAYMENT FOR WOOD POSTS, 3LB STEEL U-CHANNEL AND
SECTION 1094-1(B), MAY BE GALVANIZED STEEL, OR MAY BE PAINTED GREEN BY THE POST MANUFACTURER. SQUARE STEEL TUBING POSTS HAVING EQUIVALENT STRENGTH OF THE
- USE 3LB STEEL U-CHANNEL POST OR 4" X 4" WOOD POST FOR ALL WORK ZONE SIGNS. 3LB STEEL U-CHANNEL POSTS MUST MEET THE REQUIREMENTS OF STANDARD SPECIFICATION
- ALL SIGN SPACING DIMENSIONS ARE APPROXIMATE, FIELD ADJUST AS NECESSARY OR AS DIRECTED.
IS USED, SIGNS MAY BE PORTABLE MOUNTED.
THIS SIGNING APPLICATION IS OPTIONAL; MAY USE ONLY APPLICABLE ROADWAY STANDARD DRAWINGS INSTEAD. HOWEVER, IF THIS SIGNING APPLICATION
- SIGNS SHOWN ARE REQUIRED FOR WORK ZONES THAT WILL REMAIN IN EFFECT OVERNIGHT. FOR SHORT-TERM DAILY MAINTENANCE TYPE OPERATIONS,
- DO NOT INSTALL ADVANCE WARNING SIGNS MORE THAN 3 DAYS PRIOR TO BEGINNING OF WORK.
- USE FLUORESCENT ORANGE SHEETING (TYPE VII OR HIGHER) ON ALL ADVANCED WORK ZONE SIGNS.
48"X48"
W20-1
48"X48"
W20-1
48"X48"
W20-1
48"X48"
W20-1
(M.P.H.)
POSTED SPEED LIMIT
SIGN SPACING
MINIMUM
RECOMMENDED
X
> 55
< 50 500’
1000’
X
X
SEAL
APPROVED:DATE:
WORK ZONE WARNING SIGNS
UNDIVIDED AND URBAN FREEWAYS
DETAIL DRAWING FOR TWO-WAY
NOT TO SCALE
GENERAL NOTES
TRAFFIC CONTROL
NOTES AND DETAILS
TRAFFIC CONTROL
CD-5
THE "TEMPORARY TRAFFIC CONTROL" PAY ITEM.
S) ALL ITEMS DESCRIBED ABOVE AND IN THE TRAFFIC CONTROL DETAILS ARE CONSIDERED INCIDENTAL TO
THE PROJECT.
R) INSTALL TYPE III BARRICADE WITH "TRAIL CLOSED" SIGN (R11-2, 48" X 30") AT BOTH ENDS OF
Q) STOCKPILE EXISTING SIGNS FOR USE WHEN NEEDED IN TEMPORARY LOCATIONS DURING CONSTRUCTION.
MISCELLANEOUS
WORK AREA.
MOUNT "SIDEWALK CLOSED" SIGNS ON EACH BARRICADE. PLACE A BARRICADE AT ALL APPROACHES TO THE CURRENT
P) WHEN CONSTRUCTING NEW SIDEWALK OR MULTI-USE PATH, CLOSE EXISTING WALK WITH TYPE II BARRICADES,
FENCING, AND SIGNAGE.
O) PEDESTRIAN AND BICYCLIST SAFETY MUST BE MAINTAINED AT ALL TIMES BY ADEQUATE PROJECT LIMITS,
PEDESTRIAN AND BICYCLIST SAFETY
N) REPLACE ANY PAVEMENT MARKINGS THAT HAVE BEEN DAMAGED BY THE END OF EACH DAY’S OPERATION.
M) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING LINES.
DATED JANUARY 2012 FOR APPLICATION TIMES AND TEMPERATURE CONDITIONS FOR PAVEMENT MARKINGS.
L) REFER TO SECTION 1205 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES
AND ROADWAYS AS SHOWN IN THE PLANS.
K) INSTALL PAVEMENT MARKINGS AND PAVEMENT MARKERS ON THE FINAL SURFACE OF THE MULTI-USE PATH
PAVEMENT MARKINGS AND MARKERS
CLOSURES ARE NOT IN EFFECT.
EXCEPT 10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN TRAVELWAY, WHEN LANE
J) SPACE CHANNELIZING DEVICES IN WORK AREAS NO GREATER THAN TWICE THE POSTED SPEED LIMIT (MPH),
TRAFFIC CONTROL DEVICES
ZONE WARNING SIGNS, AS DIRECTED BY THE ENGINEER.
WHEN NO WORK IS BEING CONDUCTED FOR A PERIOD LONGER THAN ONE WEEK, REMOVE OR COVER ALL ADVANCE WORK
AND NO MORE THAN THREE (3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
I) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN 100 FT FROM THE EDGE OF TRAVEL LANE
SIGNING
BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE ENGINEER.
BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH POSTED SPEED LIMITS LESS THAN 45 MPH.
BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH POSTED SPEED LIMITS OF 45 MPH OR GREATER.
AN OPENED TRAVEL LANE THAT HAS A DROP-OFF AS FOLLOWS:
H) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING PAVEMENT IN AREAS ADJACENT TO
PAVEMENT EDGE DROP OFF REQUIREMENTS
A TWO-LANE, TWO-WAY ROAD.
G) DO NOT WORK SIMULTANEOUSLY, ON BOTH SIDES OF AN OPEN TRAVELWAY, WITHIN THE SAME LOCATION, ON
DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL.
AND WITHIN 5 FT OF AN OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY STANDARD
F) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER ADJACENT TO AN UNDIVIDED FACILITY
BY BARRIER OR GUARDRAIL.
NEAREST OPEN SHOULDER USING ROADWAY STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED
E) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 40 FT OF AN OPEN TRAVEL LANE, CLOSE THE
CLOSURE OR WHEN A LANE CLOSURE IS NO LONGER NEEDED, OR AS DIRECTED BY THE ENGINEER.
D) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING PERFORMED BEHIND THE LANE
LANE AND SHOULDER CLOSURE REQUIREMENTS
C) DO NOT STOP TRAFFIC FOR MORE THAN 15 MINUTES WITHIN THE PROJECT LIMITS.
FROM 4 PM TO 7 PM
B) DO NOT STOP TRAFFIC WITHIN THE PROJECT LIMITS FROM MONDAY THROUGH FRIDAY FROM 6 AM TO 9 AM AND
MONDAY THROUGH FRIDAY FROM 6 AM TO 9 AM AND FROM 4 PM TO 7 PM
A) DO NOT CLOSE OR NARROW TRAVEL LANES ON ANY OF THE ROADWAYS WITHIN THE PROJECT LIMITS FROM
TIME RESTRICTIONS
WHEN OTHERWISE NOTED IN THE PLANS, OR DIRECTED BY THE ENGINEER.
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF THE CONSTRUCTION PROJECT, EXCEPT
REMOVAL OF DEVICES.
UNDESIRED OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, SUPPLEMENTING, COVERING OR
DETAIL DRAWINGS, STANDARD DETAILS AND ROADWAY DETAILS ARE NOT ATTAINABLE, OR RESULT IN DUPLICATE, OR
SAFE AND EFFICIENT TRAFFIC MOVEMENT. CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE
ADAPT THE CONSTRUCTION PLANS, WHEN DIRECTED BY THE ENGINEER, TO MEET FIELD CONDITIONS TO PROVIDE
W
V
S
IG
N
BOLLARDS
16" D.I. WATER
1
6
" D
.
I.
W
A
T
E
R
(60’ PUBLIC R/W)
(SR 1003)
NEW HOPE ROAD
(
S
R
1
5
7
0
)
H
A
R
E
R
O
A
D
EXIST 20’ UTILITY AND MULTI-USE EASEMENT
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
0
0
HORIZ
VERT
2010
42
3
/
4
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
1.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-1
N
A
D
8
3
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
LI
N
E
-
L
1-
S
T
A
1
5
+
2
5
(
S
E
E
S
H
E
E
T
C-
2
)
10 11 12 13 14 15
112
116
120
124
128
132
136 136
132
128
124
120
116
112
DRAINGRADE TO
INV = 120.2
ELBOWS18" CSP W/12 LF -
EST 23 SY GEO
EST 10 TONS
OUTLET PROTECTION
CLASS ’B’ RIP RAP
ELEV = 124.31’
-L1- STA 10+62.84
BEGIN GRADE
GROUND
EXISTING
GRADE
PROPOSED
PI = 10+72.84
EL = 124.34’
(+)0.3000%(-)2
.9200%
(-)0.3128%
(-)0.3128%
PI = 11+04.00
EL = 123.43’
K = 15
VC = 40’
K = 6
VC = 20’PI = 15+10.00
EL = 122.16’
VC = 70’
K = 25
BEGIN CONSTRUCTION
-L1- STA. 10+04.58
BEGIN PROJECT EB-5508
TIE TO EXIST CURB
FIRE HYDRANT
RETAIN EXIST
"ENTRANCE" SIGN
REMOVE EXIST
7’R
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
-L1-
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
CURB RAMP PER DETAIL 1A/CD-4
CONSTRUCT MULTI-USE PATH
0
2
F
F
C
F
C
F
C
F
F
F
F
F
F
-L1- PRC Sta. 11+45.39
-L1- PRC Sta. 11+15.72
-L1- PC Sta. 10+61.68
-L1- POT Sta. 10+00.00
PI Sta 11+30.67
L = 29.67’
D
-L1-
PI Sta 10+89.38
D
L = 54.04’
T = 27.70’
R = 100.00’
D
T = 14.94’
R = 100.00’
CURB TRANSITION
SEE DETAIL 3/CD-2 FOR
1
5
+
0
0
STOP
VEHICLES
MOTOR
NO
24" X 24"
W5-3
-L1- STA 10+68 RT
T
YP
POLE AND GUY WIRES
RETAIN EXIST POWER
20’R
P2
PH
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
-L1- STA 10+62.84
BEGIN GRADE
TQ
TQ
10
+
0
0
18" X 18"
R1-1
-L1- STA 10+68 LT
T
Y
P
0
2
PI Sta 14+07.84
L = 510.83’
T = 262.45’
R = 903.00’
PAVEMENT MARKINGS
REMOVE CONFLICTING
T2
UB UD
YIELD
TO
VEHICLES
TURNING
-L1- STA 10+98 RT
30" X 30"
R10-15R
-L1- STA 10+33 RT
18" X 30"
R4-7C
P9
P9
PROP 12 LF 6" X 12" CURB
4" B25.0B
3" S9.5B, 4" I19.0B, AND
PROP ASPHALT PATCH
PROP 53 LF OF 2’ C&G
(SURFACE MOUNTED)
9 SY MONO ISLAND
REPLACE WITH PROP
AND BOLLARDS
REMOVE EXISTING ISLAND
LOCATION
RESET IN EXISTING
SEE NOTES A&B/CD-2
EXIST STREET SIGNS
IN RAMP AREA
ENSURE POSITIVE DRAINAGE
LANDSCAPED ISLAND
LEFT TO 6" CURB TO MAINTAIN EXIST
REPLACE MONOLITHIC ISLAND ON
SEE DETAIL 1D/CD-4
AND DETECTABLE WARNING DOMES
MEDIAN ISLAND WITH CUT THROUGH
W
V
W
V WV
E
X
.
3
0
"
R
C
P
C
U
L
V
E
R
T
E
X.
24"
R
C
P
F
L
O
W
INV.(OUT)=119.05
INV.=117.84
FO BOXFO BOX
16" D.I. WATER
E
X
IS
T
.
1
2
"
D
IP
S
A
N
.
S
E
W
E
R
EXIST. 12" PVC SAN. SEWER
INV=101.20
TOP=122.59
S/S MH INV=97.22
TOP=122.06
S/S MH
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
N
E
W
H
A
R
E
D
R
I
V
E
P.C. "M" SLIDE 53-J
CITY OF GOLDSBORO
EXIST UTILITY EASEMENT FOR
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
1
P.C. "G" PG. 210
D.B. 1616, PG. 494
0
0
HORIZ
VERT
2010
42
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
2
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-2
N
A
D
8
3
DRAINAGE PLAN
MULTI-USE PATH AND
MA
T
C
H
LIN
E
-
L1-
S
T
A
15
+
2
5
(S
E
E
S
H
E
E
T
C
-
1)
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
2
0
+
7
5
(
S
E
E
S
H
E
E
T
C
-
3
)
112
116
120
124
128
132
108
16 17 18 19 20
132
128
124
120
116
112
108
R
E
T
A
IN
SYSTEM
RETAIN EXISTING
POSITIVE DRAINAGE
45 LF TO ACHIEVE
DITCH APPROXIMATELY
CLEAN OUT EXISTING
NCDOT STD. 838.01
ENDWALL
INV OUT (S) = 117.84
INV IN (E) = 118.8
INV IN (W) = 119.1
INV IN (N) = 117.84
TOP = 122.9
NCDOT STD. 840.31 AND 840.54
TO EXIST 30" RCP
TIE PROP JB W/ MH
DRAIN
GRADE TO
INV = 120.2
ELBOWS
18" CSP W/
12 LF -
INV = 120.7
W/ ELBOWS
12 LF - 15" CSP
(SEE CROSS SECTIONS)
FROM STA 15+50 TO 15+78 -L1- (RT)
AND ROADWAY SHOULDER
BETWEEN PATH SHOULDER
FILL IN EXISTING HOLE
INV OUT = 117.7
24 LF - 30" RCP-III
EST 23 SY GEO
EST 10 TONS
OUTLET PROTECTION
CLASS ’B’ RIP RAP
GROUND
EXISTING
GRADE
PROPOSED
(+)2.4364%(-)3
.0000%
(-)0.3151%
(-)0.8435%
(-)0.8435%
(-)2.3672%
PI = 15+65.00
EL = 123.50’
VC = 40’
K = 7
PI = 16+10.00
EL = 122.15’
VC = 50’
K = 19
PI = 16+83.00
EL = 121.92’
VC = 90’
K = 171 PI = 19+77.00
EL = 119.44’
VC = 60’
K = 39
ELEV = 117.77’
STA 15+64.08
PROP 30" RCP
AND WATER VALVES
RETAIN EXIST FIRE HYDRANT
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
2
0
+
0
0
F
C
F
F
C
F
F
F
F
C
C
C
C
F C
C
C
C
-L1- PT Sta. 19+36.07
-L1- PRC Sta. 19+13.75
-L1- PC Sta. 18+69.09
-L1- PRC Sta. 18+91.42
-L1-
-L1- PT Sta. 16+56.22
PI Sta 14+07.84
D
L = 510.83’
T = 262.45’
R = 903.00’
PI Sta 18+80.26
D
L = 22.33’
T = 11.18’
R = 200.00’
PI Sta 19+02.63
D
L = 22.33’
T = 11.21’
R = 100.00’
PI Sta 19+24.92
D
L = 22.33’
T = 11.18’
R = 200.00’
-L1-
-L1-
POWER POLE
RETAIN EXIST
POWER POLE
RETAIN EXIST
RIM ELEV = 122.08’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
RETAIN EXIST TWC BOX
RETAIN EXIST AT&T MARKER
(BY OTHERS)
MARKER
RELOCATE AT&T
MANHOLE
SANITARY SEWER
RETAIN EXIST
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
T
YP
0
2
T
YP
0
2
P9P9
2" SF9.5A, 8" ABC. SEE DETAIL 4/CD-2
-L1- STA 16+37.17 TO 16+77.17
PROPOSED HEAVY DUTY ASPHALT
W
V
E
X.
3
6
"
R
C
P
F
L
O
W
INV.=104.56
INV.=103.13
FO BOX
WOODS
16" D.I. WATER
EXIST. 12" PVC SAN. SEWER
EXIST. 12" PVC SAN. SEWER
INV=94.26
TOP=114.89
S/S MH
INV=92.59
TOP=104.30
S/S MH
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 53-J
CITY OF GOLDSBORO
EXIST UTILITY EASEMENT FOR
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
1
0
0
HORIZ
VERT
2010
42
3
/
4
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
3
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-3
N
A
D
8
3
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
2
0
+
7
5
(S
E
E
S
H
E
E
T
C
-
2
)
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
2
6
+
5
0
(
S
E
E
S
H
E
E
T
C
-
4
)
120
116
112
108
104
100
21 22 23 24 25 26
96
120
116
112
108
104
100
96
R
E
T
AI
N
INV = 109.8
28 LF - 18" RCP-III
INV OUT (N) = 104.56
INV IN (N) = 104.56
TOP = 114.7
NCDOT STD. 840.31 AND 840.54
TO EXIST 36" RCP
TIE PROP JB W/ MH
24 LF - 36" RCP-III
INV OUT (W) = 105.3
INV IN (S) = 105.3
INV IN (E) = 109.0
TOP = 115.0
NCDOT STD. 840.31 AND 840.54
PROP JB W/ MH
INV = 106.0
36 LF - 36" RCP-III
NCDOT STD. 838.01
ENDWALL
INTO EXISTING
TIE PROPOSED DITCH
(SEE CROSS SECTIONS)
FROM STA 21+40 TO 22+19 -L1- (RT)
RE-ESTABLISH 6 LF ROADWAY SHOULDER
DETAIL 2/SHEET CD-3
EST 200 SY GEO
EST 90 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
GROUND
EXISTING
GRADE
PROPOSED
(-)1.0662%
(-
)4
.005
7%
(-
)4
.005
7%
PI = 24+26.00
EL = 112.35’
VC = 60’
K = 20
PI = 26+00.00
EL = 105.38’
VC = 80’
K = 31
(-)2.3672%
(-)1.0662%
PI = 21+54.00
EL = 115.25’
VC = 60’
K = 46
ELEV = 105.42’
STA 21+61.40
PROP 36" RCP
ELEV = 110.54
-L1- STA 22+50
DITCH GRADE RT
END SPECIAL
ELEV = 113.19
-L1- STA 21+40
DITCH GRADE RT
BEGIN SPECIAL
(-)1.63%
E
L
E
V
=
112
.2
1
-
L
1-
S
T
A
2
2
+
0
0
E
L
E
V
=
111.3
8
-
L
1-
S
T
A
2
2
+
19
(-)4
.3
7%
ELEV = 103.64
-L1- STA 26+00
DITCH GRADE RT
BEGIN SPECIAL
(-)0.26%
ELEV = 103.51
-L1- STA 26+50
(-)1.4644%
(-)2
.71%
GROUND
EXISTING
PI Sta 22+47.63
D
L = 283.59’
T = 141.85’
R = 4,000.00’
PI Sta 25+89.47
D
L = 27.12’
T = 13.80’
R = 60.00’
PI Sta 26+19.60
D
L = 32.76’
T = 16.80’
R = 60.00’
-L1- PT Sta. 23+89.37
-L1- PC Sta. 21+05.78
-L1- PRC Sta. 26+02.80
-L1- PC Sta. 25+75.67
-L1- PCC Sta. 26+35.56
-L1-
METAL BOLLARD
REMOVE EXIST
RIM ELEV = 112.75’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
RIM ELEV = 105.36’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
-L1-
RETAIN TWC BOX
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
FIRE HYDRANT
RETAIN EXIST
2
5
+
0
0
0
0
F
C F
F
F
F
F
C
C
C F
C
C F F
C
C
F
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
+
8
5
.5
6
0
2
+
9
8
.0
6
0
1
TREE
REMOVE EXIST
F
21+73 (LT)
-L1- STA 21+33 TO
SEE DETAIL 6/CD-3
PROP METAL HANDRAIL
T
YP
0
2
0
20
1
P9
P9
WOODS
SWAMP
WOODS
SWAMP
FO BOX
BOX CULVERT
7’x6’ DOUBLE CELL
INV/CULVERT=93.19’
TOP HD/WALL=100.98’
WOODS
R
E
E
D
Y
B
R
A
N
C
H
16" D.I. WATER
16" D.I. WATER
EX. 18" PVC SAN. SEWER
E
X
I
S
T
.
2
4
"
S
A
N
.
S
E
W
E
R
E
X
I
S
T
.
2
4
"
P
V
C
S
A
N
.
S
E
W
E
R
EXIST. 12" SAN. SEWER
EXIST. 12" PVC SAN. SEWER
INV OUT=99.39
INV IN=101.46
TOP=114.92
S/S MH
INV=89.20
TOP=99.50
S/S MH
INV OUT=86.11
INV IN (N, E)=86.86
INV IN (W)=87.42
TOP=101.38
S/S MH
IPF
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 20’ UTILITY EASEMENT
P.C. "M" SLIDE 39-B
EXIST PERMANENT UTILITY EASEMENT
P.C. "M" SLIDE 99-J
EXIST UTILITY AND MULTI-USE EASEMENT
P.C. "M" SLIDE 99-J
EXIST UTILITY AND MULTI-USE EASEMENT
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
0
0
HORIZ
VERT
2010
42
3
/
4
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
4
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-4
N
A
D
8
3
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
2
6
+
5
0
(
S
E
E
S
H
E
E
T
C
-
3
)
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
3
2
+
2
5
(S
E
E
S
H
E
E
T
C
-
5
)
114
110
106
90
102
27 28 29 30 31 32
98
94
90
94
98
102
106
110
114
(STRUCTURES PAY ITEM)
CLASS II RIP RAP TO ELEV. 101.1
(STRUCTURES PAY ITEM)
CLASS II RIP RAP TO ELEV. 101.1
FLOODPLAIN
500 YR FEMA
FLOODPLAIN
100 YR FEMA
FEMA FLOODWAY
FEMA FLOODWAY
FLOODPLAIN
500 YR FEMA
FLOODPLAIN
100 YR FEMA
DETAIL 2/SHEET CD-3
EST 35 SY GEO
EST 15 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 2/SHEET CD-3
EST 20 SY GEO
EST 10 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 3/SHEET CD-3
STANDARD ’V’ DITCH
DETAIL 2/SHEET CD-3
EST 200 SY GEO
EST 90 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
SHEET CD-3
DETAIL 4/
EST 40 SY PSRM
TOE PROTECTION
PI = 29+79.34
EL = 103.33’
PI = 29+88.87
EL = 103.33’
(+)0.0000%
(-)0.5735%
PI = 30+90.00
EL = 102.75’
(+)7.5082%VC = 115’
K = 14
GRADE
PROPOSED
(+)0.3053%
PI = 28+39.00
EL = 101.88’
PI = 28+84.00
EL = 102.94’
(+)2.3556%
PI = 29+03.95
EL = 103.10’
(+)0.8020%
VC = 20’
K = 13
(-)1.4644%
VC = 70’
K = 18
(-)1.4644%
ELEV = 103.31
-L1- STA 29+73.95
END BRIDGE
ELEV = 103.10
-L1- STA 29+03.95
BEGIN BRIDGE
ELEV = 103.11
-L1- STA 30+26.98
END BOARDWALK
ELEV = 103.02
-L1- STA 28+93.95
BEGIN BOARDWALK
ELEV = 99.00
-L1- STA 29+16
DITCH GRADE RT
END SPECIAL
(-)1.45%
E
L
E
V
=
10
1.3
3
-
L
1-
S
T
A
2
8
+
0
0
(-)2.00%ELEV = 103.51
-L1- STA 26+50
GROUND
EXISTING
PI Sta 26+92.59
D
L = 114.02’
T = 57.03’
R = 1,800.00’
PI Sta 28+46.63
D
L = 31.85’
T = 16.31’
R = 60.00’
PI Sta 28+78.44
D
L = 31.78’
T = 16.27’
R = 60.00’
PI Sta 30+05.13
D
L = 50.47’
T = 25.78’
R = 100.00’
PI Sta 30+87.75
D
L = 112.79’
T = 57.94’
R = 200.00’
-L1- PT Sta. 27+49.58
-L1- PRC Sta. 28+62.17
-L1- PC Sta. 28+30.32
-L1- PC Sta. 29+79.34
-L1- PRC Sta. 30+29.81
-L1- PT Sta. 28+93.95
-L1- PT Sta. 31+42.60
-L1-
-L1-
-L1-
-L1-
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
RIM ELEV = 112.64’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
3
0
+
0
0
0
0
0
0
F
F
F
F
F
F
F
F
F
F
F
C
C
MANHOLE
SANITARY SEWER
RETAIN EXIST
MANHOLE
SANITARY SEWER
RETAIN EXIST
SEE STRUCTURE PLANS
-L1- STA 30+26.98
END 10’ WIDE BOARDWALK
AND GUY WIRE
POWER POLE
RETAIN EXIST
AND GUY WIRE
POWER POLE
RETAIN EXIST
TWC BOX
RETAIN EXIST
S
LI
P
P
E
R
Y
W
H
E
N
W
E
T
S
L
I
P
P
E
R
Y
W
H
E
N
W
E
T
T
YP
0
2
+
7
6
.
9
8
0
2
+
5
1.
9
8
0
1
+
4
4
0
2
+
6
9
0
1
1/CD-2
SEE DETAIL
T
YP
0
2
1/CD-2
SEE DETAIL
-L1- STA 28+85 RT
12" X 9"
W8-10P
18" X 18"
W8-10
12" X 9"
W8-10P
-L1- STA 30+37 LT
18" X 18"
W8-10
-L1- STA 29+73.95
END BRIDGE
SEE STRUCTURES PLANS & DETAILS
PEDESTRIAN BRIDGE
PREFABRICATED STEEL
PROPOSED 10’ WIDE
-L1- STA 29+03.95
BEGIN BRIDGE
SEE STRUCTURE PLANS
-L1- STA 28+93.95
BEGIN 10’ WIDE BOARDWALK
SEE DETAIL 5/CD-3
PROP HINGED BOLLARD
P9
P9
SEE DETAIL 5/CD-3
PROP HINGED BOLLARD
PKNF
W
V
WV
S
IG
N
3
6
"S
D
3
6
"S
D
3
6
"S
D
3
6
"S
D
18" RCP
CBL BOXATT BOX
WOODS
WOODS
WOODS
CBL BOX
STOP
STOP
16" WATER
EX. 18" PVC SAN. SEWER
W
V
P
O
WE
R
U
N
DE
R
G
R
O
U
N
D
SANITARY DISTRICT)
(FORK TOWNSHIP
6" WATER
ATT BOX
CBL BOX
CBL BOX
EX. 18" DIP SAN. SEWER
INV=107.18
TOP=121.94
S/S MH
INV OUT=103.58
INV IN=105.52
TOP=118.11
S/S MH
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
C
A
S
S
E
D
A
L
E
D
R
I
V
E
P.
C.
"M
"
S
L
I
D
E
82-
D
E
X
I
S
T
25’
P
E
R
M
A
N
E
N
T
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
P.C. "M" SLIDE 82-D
EXIST 20’ UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
0
0
HORIZ
VERT
2010
42
3
/
3
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
5
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-5
N
A
D
8
3
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
3
2
+
2
5
(
S
E
E
S
H
E
E
T
C
-
4
)
MAT
CH
LINE
-
L2
-
S
T
A 4
2
+
0
0
(S
E
E
S
H
E
E
T
C-
6
)
128
124
120
116
33 34 35 40 41 42
112
108
104
128
124
120
116
112
108
104
INTO EXISTING
TIE PROPOSED DITCH
DETAIL 4/SHEET CD-3
EST 50 SY PSRM
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
RETAIN EXISTING SYSTEM
PI = 32+73.00
EL = 116.49’
(-)2.2486%
VC = 70’
K = 7
PI = 34+50.00
EL = 112.51’
(+)7.0323%
VC = 160’
K = 17
PI = 35+43.00
EL = 119.05’
(-)1.9666%
K = 2
VC = 20’
GROUND
EXISTING
GRADE
PROPOSED
ELEV = 118.85’
-L1- STA 35+53.17
END GRADE
(+)7.5082%
ELEV = 112.90
-L1- STA 34+00
DITCH GRADE RT
BEGIN SPECIAL
ELEV = 114.93
-L1- STA 35+00
DITCH GRADE RT
END SPECIAL
(+)2.03%
PI = 40+84.00
EL = 122.13’
(+)7.9940%
VC = 50’
PI = 41+86.00
EL = 123.85’
(+)1.6863%
VC = 30’
K = 8
K = 12
ELEV = 118.93
-L2- STA 40+43.98
BEGIN GRADE
STA 40+42.22
EXIST 36" RCP
PI Sta 33+87.28
D
L = 144.64’
T = 72.67’
R = 600.00’
PI Sta 34+85.07
D
L = 48.77’
T = 25.82’
R = 60.00’
PI Sta 35+30.70
D
L = 43.37’
T = 22.68’
R = 60.00’
PI Sta 40+88.91
D
L = 55.61’
T = 44.94’
R = 27.00’
PI Sta 41+28.29
D
L = 57.16’
T = 28.70’
R = 250.00’
-L1- PC Sta. 33+14.61
-L1- PRC Sta. 34+59.25
-L1- PT Sta. 35+51.38
-L1- PRC Sta. 35+08.02
-L2- POT Sta. 40+00.00
-L1- POT Sta. 35+96.07
-L2- PI Sta. 40+35.98
-L2- PRC Sta. 40+99.58
-L2- PC Sta. 40+43.98
-L2- PT Sta. 41+56.74
-L1--L2-
-L1-
-L1-
-L2-
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
RIM ELEV = 121.02’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
3
5
+
0
0
0
0 02
0
0
C
C
C
F
F
C
F
F
C
F
C
F
F
F
C
C
F
F F
C
C
C
RIM ELEV = 118.62’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
CABLE BOX
RETAIN EXIST
AT&T BOX
RETAIN EXIST
CABLE BOX
6" CURB TO MANTAIN EXIST
REPLACE RIGHT FLARE WITH
CURB RAMP PER DETAIL 1A/CD-4
CONSTRUCT MULTI-USE PATH
+
7
1.7
8
7.7
8’
R=25’
CURVE WIDENING
CURB RAMP PER DETAIL 1B/CD-4
CONSTRUCT MULTI-USE PATH
CURB RAMP PER DETAIL 1C/CD-4
CONSTRUCT MULTI-USE PATH
STOP
VEHICLES
MO
TOR
NO
STOP
24" X 24"
W5-3
-L1- STA 35+48 LT
VEHICLES
MO
TO
R
NO
-L2- STA 40+36 RT
24" X 24"
W5-3
P2
0
.0
7
+
10.6
7
0
1
+
8
5
.
6
7
0
2
T
YP
0
2
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL PH
1/CD-2
SEE DETAILPH
P2
01
+
8
8
.9
8
0
1
+
03.98
02
T
YP
0
2TQ
TQ
-L1- STA 35+53.17
END GRADE
-L2- STA 40+43.98
BEGIN GRADE
18" X 18"
R1-1
-L2- STA 40+49 LT
18" X 18"
R1-1
-L1- STA 25+48 RT
STOP
PAVEMENT MARKINGS
REMOVE CONFLICTING
SEE NOTES A &B/CD-2
STREET SIGN
EXIST DIVIDED
UI
STOP
UM
UI
TE T2T2
YIELD
TO
VEHICLES
TURNING
-L1- STA 35+53 LT
-L2- STA 40+36 RT
30" X 30"
R10-15R
TO
HERE
YIELD
HERE
TO
YIELD36" X 36"
R1-5L
-L1- STA 35+87 LT
36" X 36"
R1-5R
STA 35+41 RT
RELOCATE TO -L1-
SEE NOTES A&B/CD-2
EXIST STOP SIGN
P9
P9
P9
FIRE HYDRANT
EXISTRELOCATE
W
V
E
X.
3
0"
R
C
P
16" WATER
EX. 18" PVC SAN. SEWER
EX. 18" PVC SAN. SEWER
RWM
RWM
INV=107.71
TOP=123.80
S/S MH
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
0
0
HORIZ
VERT
2010
42
3
/
4
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
6
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-6
N
A
D 83
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
2
+
0
0
(
S
E
E
S
H
E
E
T
C
-
5
)
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
7
+
5
0
(
S
E
E
S
H
E
E
T
C
-
7
)
136
132
128
124
120
116
112
42 43 44
136
132
128
124
120
116
112
45 46 47
R
E
T
AI
N
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
(-)0.7388%
PI = 43+20.00
EL = 122.86’
(-)0.3048%
VC = 40’
PI = 44+25.00
EL = 122.54’
(+)0.5000%
VC = 40’
PI = 45+27.00
EL = 123.05’
VC = 40’
PI = 46+07.00
EL = 122.81’
(-)0.3000%
VC = 40’
(+)0.3000%
K = 92 K = 50 K = 50
K = 67
GRADE
PROPOSED
GROUND
EXISTING
PI = 47+47.00
EL = 123.23’
VC = 40’
K = 24
PI Sta 45+59.08
D
L = 40.84’
T = 20.42’
R = 750.00’
PI Sta 45+95.14
D
L = 31.27’
T = 15.64’
R = 750.00’
-L2- PC Sta. 45+38.66 -L2- PRC Sta. 45+79.50
-L2- PT Sta. 46+10.77
-L2-
-L2-
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY RIM ELEV = 122.92’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
HYDRANT AND WATER VALVE
RETAIN EXIST FIRE
4
5
+
0
0
C
C C
C
C
C
C
C F
C C
F
F
F
F
AT&T MARKER
RETAIN EXIST
T
YP
0
2
1/CD-2
SEE DETAIL
T
YP
0
2
P9
W
V
15" RCP18"RCP
F/O BOX
EX. 18" PVC SAN. SEWER
F/O BOX
INV=108.13
TOP=123.13
S/S MH
IPF
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
3
D.B. 1892, PG. 813
CITY OF GOLDSBORO
0
0
HORIZ
VERT
2010
42
3
/
4
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
7
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-7
N
A
D 83
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
7
+
5
0
(
S
E
E
S
H
E
E
T
C
-
6
)
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
5
3
+
0
0
(
S
E
E
S
H
E
E
T
C
-
8
)
136
132
128
124
120
116
112
48 49 50 51 52 53
136
132
128
124
120
116
112
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
INV OUT = 121.5
INV IN = 121.7
40 LF - 15" RCP-IV
INV OUT = 121.4
INV IN = 121.6
36 LF - 15" RCP-IV
GROUND
EXISTING
GRADE
PROPOSED
ELEV = 121.60
-L2- STA 48+00
DITCH GRADE LT
BEGIN SPECIAL
ELEV = 122.58
-L2- STA 51+25
DITCH GRADE LT
END SPECIAL
(+)0.30%
ELEV = 121.70
-L2- STA 51+50
DITCH GRADE LT
BEGIN SPECIAL
(+)0.30%
PI = 48+00.00
EL = 124.29’
(+)2.0000%(-)0.8400%
VC = 50’
K = 18
PI = 49+75.00
EL = 122.82’
(-)0.8400%
VC = 40’
K = 24
PI = 51+50.00
EL = 124.30’
(+)0.8457%
VC = 40’
K = 22
PI = 52+89.00
EL = 122.91’
(-)1.0000%
VC = 100’
K = 71
ELEV = 121.52’
STA 47+95.47
PROP 15" RCP
ELEV = 121.62’
STA 51+45.47
PROP 15" RCP
-L2-
5
0
+
0
0
F
F
F
F
F
F
F
F
F
F
F
F
C
RIM ELEV = 123.23’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
AT&T BOX
RETAIN EXIST
AT&T MARKER
RETAIN EXIST
HYDRANT AND WATER VALVE
RETAIN EXIST FIRE
2’ GRAVEL SHOULDERS
MULTI-USE PATH WITH
10’ WIDE ASPHALT
1/CD-2
SEE DETAIL
T
YP
0
2
1/CD-2
SEE DETAIL
T
YP
0
2
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
EASEMENT (TYP)
DRAINAGE
PERMANENT
P9
P9
EASEMENT (TYP)
DRAINAGE
PERMANENT
WVWV
WV
15"RCP
15" RCP
WOODS
34" OAK
CBL BOX
12" WATER
16" WATER
EX. 18" PVC SAN. SEWER
16" WATER
SANITARY DISTRICT)
(FORK TOWNSHIP
6" WATER
CBL BOX
E
X
.
1
5
"
P
V
C
S
A
N
.
S
E
W
E
R
INV OUT=109.10
INV IN=109.13
TOP=127.47
S/S MH
INV=108.56
TOP=123.68
S/S MH
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
(
8
0
’
P
U
B
L
I
C
R
/
W
)
(
S
R
1
5
5
6
)
W
A
Y
N
E
M
E
M
O
R
I
A
L
D
R
I
V
E
EASEMENT AREA
EXIST PERMANENT UTILITY
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
RAY OF HOPE CHURCH
3
D.B. 1892, PG. 813
CITY OF GOLDSBORO
0
0
HORIZ
VERT
2010
42
3
/
5
/
2
0
15
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
p
s
h
0
8
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
C-8
N
A
D 83
DRAINAGE PLAN
MULTI-USE PATH AND
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
5
3
+
0
0
(
S
E
E
S
H
E
E
T
C
-
7
)
136
132
128
124
120
116
112
53 54 55 56 57 58
136
132
128
124
120
116
112
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
GROUND
EXISTING
GRADE
PROPOSED
ELEV = 128.00’
-L2- STA 57+62.98
END GRADE
ELEV = 122.45
-L2- STA 54+00
DITCH GRADE LT
END SPECIAL
(+)0.30%
(+)0.3992%
PI = 55+27.00
EL = 123.86’
VC = 100’
K = 56
PI = 56+60.00
EL = 126.78’
(+)2.1955%
VC = 30’
K = 30
(+)1.1847%
5
’
W
I
D
E
S
I
D
E
W
A
L
K
PI Sta 54+60.84
D
L = 91.86’
T = 45.99’
R = 750.00’
PI Sta 55+84.64
D
L = 155.30’
T = 77.93’
R = 750.00’
PI Sta 56+99.81
D
L = 74.73’
T = 37.81’
R = 200.00’
PI Sta 58+05.38
D
L = 89.15’
T = 68.64’
R = 45.00’
-L2- PC Sta. 54+14.85
-L2- PRC Sta. 55+06.71
-L2- PCC Sta. 56+62.01
-L2- PRC Sta. 57+36.74
-L2- PT Sta. 58+25.88
-L2-
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
5
5
+
0
0
0
0
0
1
0
2
0
0
0
1
0
2
C
F
F
C
F
F
F
F
F
F
F
RIM ELEV = 123.17’
CAST INTO A FLAT TOP SECTION.
GRADE. MANHOLE FRAME SHALL BE
AND COVER FLUSH WITH PROPOSED
AND WATERTIGHT MANHOLE FRAME
AND REPLACE WITH A FLAT TOP LID
EXISTING ECCENTRIC CONE SECTION
RETAIN EXIST SS MANHOLE. REMOVE
AND GUY WIRE
POWER POLE
RETAIN EXIST
TREE
RETAIN EXIST
TREES
RETAIN EXIST
WATER VALVES
RETAIN EXISTING
AT&T MARKER
RETAIN EXIST
GUY WIRES
SIGNAL POLE AND
RETAIN EXIST
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAIL
1/CD-2
SEE DETAILPH
T
YP
0
2
+
0
0
0
2
+
2
5
0
1
+
0
0
0
2
+
150
1
END CONSTRUCTION
TIE TO EXIST SIDEWALK
-L2- STA. 58+04.85
END PROJECT EB-5508
PROPOSED CONSTRUCTION LIMITS
REMOVE EXIST SIDEWALK WITHIN
WITH 10’ RAMP WIDTH
PER NCDOT STD. 848.06
CONSTRUCTION CURB RAMPS
-L2- STA 57+62.98
END GRADE
IN CONCRETE
ENCASE COMPLETELY
PROP GRADE
BOX FLUSH WITH
ADJUST AT&T CABLE
P9
P9
EASEMENT (TYP)
CONSTRUCTION
TEMPORARY
CMF
REE
D
Y B
RAN
CH
CMF
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
E
C
-
1A
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
5
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
(SR 1003)NEW HOPE ROAD
C
O
M
M
U
N
I
T
Y
C
O
L
L
E
G
E
E
N
T
R
A
N
C
E
T
O
W
A
Y
N
E
(SR 1570)
H
A
RE RO
A
D
R
E
E
D
Y
B
R
A
N
C
H
N
A
D
83
EC-2 EC-3
EC-4 EC-5 EC-6
EC-7
EC-8
DENUDED AREAS
300150
EC-1A
NARRATIVE
PROJECT DENUDED AREAS
DISTURBED AREAS
NEW HOPE ROAD MULTI-USE PATH
IMPERVIOUS AND PERVIOUS SURFACES IN
(
S
R
15
5
6
)
W
A
Y
N
E
M
E
M
O
R
IA
L
D
R
IV
E
PROPOSED PERVIOUS SURFACE = 2.53 AC
PROPOSED IMPERVIOUS SURFACE = 0.98 AC
vegetatively stabilized with grass and permanent plantings.
during the construction of this project. Also, approximately 2.53 acres will be
citizens at the Wayne Community College. Approximately 3.51 acres will be disturbed
near Hare Road and the existing sidewalk on Wayne Memorial Drive and access to
connectivity between the existing multi-use path at the Goldsboro Worship Center
pedestrian use. It is being constructed by the City of Goldsboro to provide
The New Hope Road Multi-Use Path is a linear multi-use path for bicycle and
Project Description
Total Disturbed Area (shaded) = 3.51 acres
EC-
1
1.42 AC
0.49 AC
1.58 AC
0.02 AC
(NoA, Ra, CrB2, CrC2, Js, KaD, NoB, Ex, Go, & Ly).
The soil types throughout the project limits are mostly sandy loams
Soils
show signs of significant erosion soils.
The fill slopes and drainage ditches around the project appear to be stable and do not
by the Neuse Riparian Buffer and contains a 50-foot Riparian Buffer protection area.
River thus no new drainage patterns will be introduced. The Neuse River is protected
series of existing ditches and storm drain systems and eventually flows into the Neuse
fully developed. Drainage from the project site sheet flows or makes its way through a
bordered by moderate slopes. Land use along the project is undeveloped as well as
The site is generally flat and contains one drainage way, Reedy Branch that is
Site Description
along the south side of New Hope Road to the intersection with Wayne Memorial Drive.
project site begins at the intersection of New Hope Road and Hare Road continues west
The New Hope Road Multi-Use Path is located in Wayne County, Goldsboro, NC. The
W
V
47
S
IG
N
BOLLARDS
16" D.I. WATER
1
6
" D
.
I.
W
A
T
E
R
125
125
125125
125
125
125
(60’ PUBLIC R/W)
(SR 1003)
NEW HOPE ROAD
(
S
R
1
5
7
0
)
H
A
R
E
R
O
A
D
EXIST 20’ UTILITY AND MULTI-USE EASEMENT
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
1.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-1
N
A
D
8
3
M
A
T
C
H
LI
N
E
-
L
1-
S
T
A
1
5
+
2
5
(
S
E
E
S
H
E
E
T
E
C-
2
)
(APPLIES TO ALL SHEETS)
LEGEND
CONSTRUCTION LIMIT
(LABELED ON PLANS)
LIMITS OF DISTURBANCE
C
TPF
PROPOSED CONTOUR
EXISTING CONTOUR
(SEE DETAIL SHEETS)
STORM DRAIN INLET PROTECTION
(SEE DETAIL SHEETS)
WATTLE CHECK
(NCDOT STD 1630.06)
SPECIAL STILLING BASIN
(SEE DETAIL SHEETS)
TREE PROTECTION FENCE
(SEE DETAIL SHEETS)
TEMPORARY SILT FENCE
TYPE A (SEE NCDOT STD 1633.01)
TEMPORARY ROCK SILT CHECK DAM,
ENTRANCE (SEE NCDOT STD 1607.01)
TEMPORARY CONSTRUCTION
(SEE DETAIL SHEETS)
SILT FENCE OUTLET
SPECIAL SEDIMENT CONTROL FENCE/
F
TREE PROTECTION NOTES
GENERAL NOTE
NATURAL RESOURCES DIVISION OF WATER QUALITY.
ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND
NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 3, 2011
WITH THE REGULATIONS SET FORTH BY THE
THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY
TIMEFRAME EXCEPTIONS
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
7 DAYS FOR SLOPES GREATER THAN 50’ IN
NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
LENGTH.
NONE
NONE
14 DAYS
14 DAYS
7 DAYS
7 DAYS
7 DAYS
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1
SLOPES 3:1 OR FLATTER
SLOPES STEEPER THAN 3:1
HIGH QUALITY WATER (HQW) ZONES
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
GRAVEL SHALL BE CREATED TO PROTECT THE SOIL. THE ROAD BED MATERIAL SHALL BE REPLENISHED AS NECESSARY TO MAINTAIN A 6-INCH DEPTH.
IF TEMPORARY HAUL OR ACCESS ROADS MUST PASS OVER THE ROOT AREA OF TREES TO BE RETAINED, A ROAD BED OF 6 INCHES OF MULCH OR 11.
ANY ROOTS DAMAGED DURING GRADING OR CONSTRUCTION SHALL BE EXPOSED TO SOUND TISSUE AND CUT CLEANLY WITH A SAW.10.
CONSULTING ARBORIST.
ANY GRADING, CONSTRUCTION, DEMOLITION OR OTHER WORK THAT IS EXPECTED TO ENCOUNTER TREE ROOTS MUST BE MONITORED BY THE 9.
SO THAT APPROPRIATE TREATMENTS CAN BE APPLIED.
IF INJURY SHOULD OCCUR TO ANY TREE DURING CONSTRUCTION, IT SHOULD BE EVALUATED AS SOON AS POSSIBLE BY THE CITY OR AUTHORIZED AGENT 8.
USED ON SITE MUST BE TREE-SAFE AND NOT EASILY TRANSPORTED BY WATER.
ANY HERBICIDES PLACED UNDER PAVING MATERIALS MUST BE SAFE FOR USE AROUND TREES AND LABELED FOR THAT USE. ANY PESTICIDES 7.
BY A QUALIFIED ARBORIST AND NOT BY CONSTRUCTION PERSONNEL.
COORDINATE WITH CITY PRIOR TO PERFORMING ADDITIONAL TREE PRUNING REQUIRED FOR CLEARANCE DURING CONSTRUCTION MUST BE PERFORMED 6.
NO MATERIALS, EQUIPMENT, SPOIL OR WASTE OR WASHOUT WATER MAY BE DEPOSITED, STORED, OR PARKED WITHIN THE TREE PROTECTION ZONE.5.
THE PROTECTION AREA, THEY SHALL BE TUNNELED OR BORED UNDER THE TREE.
ALL UNDERGROUND UTILITIES AND DRAIN LINES SHALL BE ROUTED OUTSIDE OF THE TREE PROTECTION ZONE. IF LINES MUST TRAVERSE 4.
CONSTRUCTION TRAILERS AND TRAFFIC AND STORAGE AREAS MUST REMAIN OUTSIDE THE TREE PROTECTION ZONE AT ALL TIMES. 3.
REMOVED WITHOUT THE WRITTEN PERMISSION OF THE CITY OR AUTHORIZED AGENT.
TREE OR GROUP OF TREES. FENCES ARE TO REMAIN UNTIL ALL SITE WORK HAS BEEN COMPLETED. FENCES MAY NOT BE RELOCATED OR
TEMPORARY FENCES SHOULD BE ERECTED TO PROTECT TREES TO BE PRESERVED. FENCES DEFINE A SPECIFIC PROTECTION ZONE FOR EACH 2.
WORK PROCEDURES, ACCESS ROUTES, STORAGE AREAS, AND TREE PROTECTION MEASURES.
BEFORE BEGINNING WORK, THE CONTRACTOR IS REQUIRED TO MEET WITH THE CITY OR AUTHORIZED AGENT AT THE SITE TO REVIEW ALL 1.
TREE PRESERVATION CONSTRUCTION SPECIFICATIONS:
45
FILTER SACK INLET PROTECTION
INLET TUBE "SILT SOCK"/
NPDES GENERAL STORMWATER PERMIT
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
EROSION CONTROL PLAN
BE REPAIRED AT THE CONTRACTORS EXPENSE.
EXISTING CURB AND GUTTER AT OR NEAR CONSTRUCTION ENTRANCES MUST
PROJECT DURATION UNLESS DIRECTED BY CITY ENGINEER. ANY DAMAGE TO
TO THIS PROJECT ARE FREE OF DEBRIS, DIRT, AND EQUIPMENT DURING THE
CONTRACTOR TO ENSURE THAT ALL ROADWAYS AND CURB LINES ADJACENT
DRAINGRADE TO
INV = 120.2
ELBOWS18" CSP W/12 LF -
EST 23 SY GEO
EST 10 TONS
OUTLET PROTECTION
CLASS ’B’ RIP RAP
D
LIMITS OF DISTURBANCE, TYP
DD
ENTRANCE, TYP
GRAVEL CONSTRUCTION
INSTALL TEMPORARY
D
LIMITS OF DISTURBANCE, TYP
D
SILT FENCE, TYP
INSTALL TEMPORARY
200’ OF SILT FENCE), TYP
(MAX. SPACING EVERY
FENCE OUTLET
SEDIMENT CONTROL
INSTALL SPECIAL
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
0
2
F
F
C
F
C
F
C
F
F
F
F
F
F
1
5
+
0
0
T
YP
10
+
0
0
T
Y
P
0
2
W
V
W
V WV
E
X
.
3
0
"
R
C
P
C
U
L
V
E
R
T
E
X.
24"
R
C
P
F
L
O
W
INV.(OUT)=119.05
INV.=117.84
FO BOXFO BOX
16" D.I. WATER
E
X
IS
T
.
1
2
"
D
IP
S
A
N
.
S
E
W
E
R
EXIST. 12" PVC SAN. SEWER
INV=101.20
TOP=122.59
S/S MH INV=97.22
TOP=122.06
S/S MH
115
120
120
120
120 120 120
12
0
1
2
0
12
0
12
0
12
0
120
120
12
0
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
N
E
W
H
A
R
E
D
R
I
V
E
P.C. "M" SLIDE 53-J
CITY OF GOLDSBORO
EXIST UTILITY EASEMENT FOR
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
1
P.C. "G" PG. 210
D.B. 1616, PG. 494
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
2
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-2
N
A
D
8
3
MAT
C
H
LIN
E
-
L1-
S
T
A
15
+
2
5
(S
E
E
S
H
E
E
T
E
C
-
1)
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
2
0
+
7
5
(
S
E
E
S
H
E
E
T
E
C
-
3
)
EROSION CONTROL PLAN
R
E
T
A
IN
SYSTEM
RETAIN EXISTING
POSITIVE DRAINAGE
45 LF TO ACHIEVE
DITCH APPROXIMATELY
CLEAN OUT EXISTING
NCDOT STD. 838.01
ENDWALL
INV OUT (S) = 117.84
INV IN (E) = 118.8
INV IN (W) = 119.1
INV IN (N) = 117.84
TOP = 122.9
NCDOT STD. 840.31 AND 840.54
TO EXIST 30" RCP
TIE PROP JB W/ MH
DRAIN
GRADE TO
INV = 120.2
ELBOWS
18" CSP W/
12 LF -
INV = 120.7
W/ ELBOWS
12 LF - 15" CSP
(SEE CROSS SECTIONS)
FROM STA 15+50 TO 15+78 -L1- (RT)
AND ROADWAY SHOULDER
BETWEEN PATH SHOULDER
FILL IN EXISTING HOLE
INV OUT = 117.7
24 LF - 30" RCP-III
EST 23 SY GEO
EST 10 TONS
OUTLET PROTECTION
CLASS ’B’ RIP RAP
STOCKPILE/STAGING AREA
STOCKPILE/STAGING AREA
D
INLET, TYP
AT PROPOSED PIPE
IN EXISTING DITCH
INSTALL WATTLES
D
FENCE OUTLET, TYP
SEDIMENT CONTROL
INSTALL SPECIAL
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
LIMITS OF DISTURBANCE, TYP
D
(50’ SPACING), TYP
IN EXISTING DITCH
INSTALL WATTLES
D
LIMITS OF DISTURBANCE, TYP
INSTALLATION
SUBMITTED FOR APPROVAL PRIOR TO CONSTRUCTION. COFFER DAM IS INCIDENTAL TO CULVERT
INSTALLATION) OR PROVIDE COFFER DAM AND PUMP AROUND. COFFER DAM DETAIL MUST BE
PIPES SHALL BE INSTALLED IN THE DRY (WITH A MIN. 3 DAYS OF DRY WEATHER DURING
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
D
PROTECTION, TYP
INSTALL INLET
DENSE, VEGETATIVE COVER.
SEEDING (SEE SHEET EC-9), AND MULCH TO MAINTAIN A VIGOROUS,
DISTURBED AREAS AND STREAM BANK SLOPES USING EROSION CONTROL MATTING,
AFTER BRIDGE AND CULVERTS ARE SET, CONTRACTOR IS TO STABILIZE ALL4.
DIKES, SPECIAL STILLING BASINS, AND BYPASSING PUMPING.
CONTRACTOR TO DEWATER EXCAVATED AREAS AS NEEDED USING IMPERVIOUS3.
IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT IMPACTS.
GREENWAY PATH FOOTPRINT. USE MUD MATS (SEE EROSION CONTROL DETAILS)
CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED2.
CLEARING AND GRUBBING IS PERFORMED.
CONTRACTOR TO INSTALL ALL EROSION CONTROL MEASURES BEFORE ANY1.
BRIDGE AND CULVERT EROSION CONTROL PHASING:
2
0
+
0
0
F
C
F
F
C
F
F
F
F
C
C
C
C
F C
C
C
C
T
YP
0
2
T
YP
0
2120
120
W
V
E
X.
3
6
"
R
C
P
F
L
O
W
INV.=104.56
INV.=103.13
FO BOX
WOODS
16" D.I. WATER
EXIST. 12" PVC SAN. SEWER
EXIST. 12" PVC SAN. SEWER
INV=94.26
TOP=114.89
S/S MH
INV=92.59
TOP=104.30
S/S MH
105
10
5
105
105
105
105
105
10
5
110
110 110 110
110
110
110
110 110
110
110
110
110
110110110
110
110
110
110
110
110
110
110
110
110
110
115
115
115
1
1
5
115
115
115
115115
115 115 115 115
115
115
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 53-J
CITY OF GOLDSBORO
EXIST UTILITY EASEMENT FOR
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
1
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
3
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-3
N
A
D
8
3
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
2
0
+
7
5
(S
E
E
S
H
E
E
T
E
C
-
2
)
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
2
6
+
5
0
(
S
E
E
S
H
E
E
T
E
C
-
4
)
EROSION CONTROL PLAN
R
E
T
AI
N
INV = 109.8
28 LF - 18" RCP-III
INV OUT (N) = 104.56
INV IN (N) = 104.56
TOP = 114.7
NCDOT STD. 840.31 AND 840.54
TO EXIST 36" RCP
TIE PROP JB W/ MH
24 LF - 36" RCP-III
INV OUT (W) = 105.3
INV IN (S) = 105.3
INV IN (E) = 109.0
TOP = 115.0
NCDOT STD. 840.31 AND 840.54
PROP JB W/ MH
INV = 106.0
36 LF - 36" RCP-III
NCDOT STD. 838.01
ENDWALL
INTO EXISTING
TIE PROPOSED DITCH
(SEE CROSS SECTIONS)
FROM STA 21+40 TO 22+19 -L1- (RT)
RE-ESTABLISH 6 LF ROADWAY SHOULDER
DETAIL 2/SHEET CD-3
EST 200 SY GEO
EST 90 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
D
FENCE OUTLET, TYP
SEDIMENT CONTROL
INSTALL SPECIAL
D
ROCK SILT CHECK, TYPE A, TYP
INSTALL TEMPORARY
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
LIMITS OF DISTURBANCE, TYP
D
LIMITS OF DISTURBANCE, TYP
D
(50’ SPACING), TYP
IN EXISTING DITCH
INSTALL WATTLES
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
INSTALLATION
SUBMITTED FOR APPROVAL PRIOR TO CONSTRUCTION. COFFER DAM IS INCIDENTAL TO CULVERT
INSTALLATION) OR PROVIDE COFFER DAM AND PUMP AROUND. COFFER DAM DETAIL MUST BE
PIPES SHALL BE INSTALLED IN THE DRY (WITH A MIN. 3 DAYS OF DRY WEATHER DURING
D
INSTALL INLET PROTECTION, TYP
DENSE, VEGETATIVE COVER.
SEEDING (SEE SHEET EC-9), AND MULCH TO MAINTAIN A VIGOROUS,
DISTURBED AREAS AND STREAM BANK SLOPES USING EROSION CONTROL MATTING,
AFTER BRIDGE AND CULVERTS ARE SET, CONTRACTOR IS TO STABILIZE ALL4.
DIKES, SPECIAL STILLING BASINS, AND BYPASSING PUMPING.
CONTRACTOR TO DEWATER EXCAVATED AREAS AS NEEDED USING IMPERVIOUS3.
IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT IMPACTS.
GREENWAY PATH FOOTPRINT. USE MUD MATS (SEE EROSION CONTROL DETAILS)
CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED2.
CLEARING AND GRUBBING IS PERFORMED.
CONTRACTOR TO INSTALL ALL EROSION CONTROL MEASURES BEFORE ANY1.
BRIDGE AND CULVERT EROSION CONTROL PHASING:
D
-L1- STA 21+40 TO 22+50 RT
INSTALL TEMPORARY LINER: JUTE NET
D
-L1- STA 26+00 TO 29+16 RT
SINGLE FIBERGLASS ROVING
INSTALL TEMPORARY LINER:
D
-L1- STA 25+70 TO 27+50
FOR ACCESS IN WETLAND
INSTALL MUD MATS AS REQUIRED
2
5
+
0
0
0
0
F
C F
F
F
F
F
C
C
C F
C
C F F
C
C
F
+
8
5
.5
6
0
2
+
9
8
.0
6
0
1
F
T
YP
0
2
0
20
1
1
0
5
110
115
115
WOODS
SWAMP
WOODS
SWAMP
FO BOX
BOX CULVERT
7’x6’ DOUBLE CELL
INV/CULVERT=93.19’
TOP HD/WALL=100.98’
WOODS
R
E
E
D
Y
B
R
A
N
C
H
16" D.I. WATER
16" D.I. WATER
EX. 18" PVC SAN. SEWER
E
X
I
S
T
.
2
4
"
S
A
N
.
S
E
W
E
R
E
X
I
S
T
.
2
4
"
P
V
C
S
A
N
.
S
E
W
E
R
EXIST. 12" SAN. SEWER
EXIST. 12" PVC SAN. SEWER
INV OUT=99.39
INV IN=101.46
TOP=114.92
S/S MH
INV=89.20
TOP=99.50
S/S MH
INV OUT=86.11
INV IN (N, E)=86.86
INV IN (W)=87.42
TOP=101.38
S/S MH
95
95
100100100
100
100
10
0
100 100 100
100
100
100
10
0
100
1
0
0
100
105
105
105
10
5
10
5
105
105
105
105
110
110
110
IPF
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 20’ UTILITY EASEMENT
P.C. "M" SLIDE 39-B
EXIST PERMANENT UTILITY EASEMENT
P.C. "M" SLIDE 99-J
EXIST UTILITY AND MULTI-USE EASEMENT
P.C. "M" SLIDE 99-J
EXIST UTILITY AND MULTI-USE EASEMENT
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
1
STREET CHURCH OF GOD
TRUSTEES OF CLINGMAN
ROGER B. WADE
BILLY REX GURLEY
WILLIAM CRUSE
P.C. "G" PG. 210
D.B. 1616, PG. 494
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
4
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
4
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-4
N
A
D
8
3
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
2
6
+
5
0
(
S
E
E
S
H
E
E
T
E
C
-
3
)
M
A
T
C
H
L
IN
E
-
L
1-
S
T
A
3
2
+
2
5
(S
E
E
S
H
E
E
T
E
C
-
5
)
EROSION CONTROL PLAN
(STRUCTURES PAY ITEM)
CLASS II RIP RAP TO ELEV. 101.1
(STRUCTURES PAY ITEM)
CLASS II RIP RAP TO ELEV. 101.1
FLOODPLAIN
500 YR FEMA
FLOODPLAIN
100 YR FEMA
FEMA FLOODWAY
FEMA FLOODWAY
FLOODPLAIN
500 YR FEMA
FLOODPLAIN
100 YR FEMA
DETAIL 2/SHEET CD-3
EST 35 SY GEO
EST 15 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 2/SHEET CD-3
EST 20 SY GEO
EST 10 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 3/SHEET CD-3
STANDARD ’V’ DITCH
DETAIL 2/SHEET CD-3
EST 200 SY GEO
EST 90 TONS
CLASS ’B’ RIP RAP
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
SHEET CD-3
DETAIL 4/
EST 40 SY PSRM
TOE PROTECTION
D
UNDER CONSTRUCTION ENTRANCE
INSTALL TEMPORARY 15" PIPE
TPF TPF TPF TPF TPF TPFD
PROTECTION FENCE, TYP
INSTALL TREE
D
LIMITS OF DISTURBANCE, TYP
D
ENTRANCE, TYP
GRAVEL CONSTRUCTION
INSTALL TEMPORARY
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
(50’ SPACING), TYP
IN PROPOSED DITCH
INSTALL WATTLES
D
STILLING BASIN, TYP
INSTALL SPECIAL
D
LIMITS OF DISTURBANCE, TYP
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
FENCE OUTLET, TYP
SEDIMENT CONTROL
INSTALL SPECIAL
INSTALLATION
SUBMITTED FOR APPROVAL PRIOR TO CONSTRUCTION. COFFER DAM IS INCIDENTAL TO CULVERT
INSTALLATION) OR PROVIDE COFFER DAM AND PUMP AROUND. COFFER DAM DETAIL MUST BE
PIPES SHALL BE INSTALLED IN THE DRY (WITH A MIN. 3 DAYS OF DRY WEATHER DURING
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
DENSE, VEGETATIVE COVER.
SEEDING (SEE SHEET EC-9), AND MULCH TO MAINTAIN A VIGOROUS,
DISTURBED AREAS AND STREAM BANK SLOPES USING EROSION CONTROL MATTING,
AFTER BRIDGE AND CULVERTS ARE SET, CONTRACTOR IS TO STABILIZE ALL4.
DIKES, SPECIAL STILLING BASINS, AND BYPASSING PUMPING.
CONTRACTOR TO DEWATER EXCAVATED AREAS AS NEEDED USING IMPERVIOUS3.
IN WETLAND AREAS AND OTHER LOW AREAS TO LIMIT IMPACTS.
GREENWAY PATH FOOTPRINT. USE MUD MATS (SEE EROSION CONTROL DETAILS)
CONTRACTOR TO ACCESS BRIDGE AND CULVERT LOCATIONS USING PROPOSED2.
CLEARING AND GRUBBING IS PERFORMED.
CONTRACTOR TO INSTALL ALL EROSION CONTROL MEASURES BEFORE ANY1.
BRIDGE AND CULVERT EROSION CONTROL PHASING:
UNDER CONSTRUCTION ENTRANCE
INSTALL TEMPORARY 15" PIPE
DD
-L1- STA 26+00 TO 29+16 RT
SINGLE FIBERGLASS ROVING
INSTALL TEMPORARY LINER:
D
BRIDGE CONSTRUCTION
GRAVEL WORKPAD FOR
ONLY WITHIN WETLANDS
BRIDGE/BOARDWALK FOOTPRINT
MINIMUM CLEARING WITHIN
D
-L1- STA 30+27 TO 30+77
FOR ACCESS IN WETLAND
INSTALL MUD MATS AS REQUIRED
3
0
+
0
0
0
0
0
0
F
F
F
F
F
F
F
F
F
F
F
C
C
T
YP
0
2
+
7
6
.
9
8
0
2
+
5
1.
9
8
0
1
+
4
4
0
2
+
6
9
0
1
T
YP
0
2
100
100
PKNF
W
V
WV
S
IG
N
3
6
"S
D
3
6
"S
D
3
6
"S
D
3
6
"S
D
18" RCP
CBL BOXATT BOX
WOODS
WOODS
WOODS
CBL BOX
16" WATER
EX. 18" PVC SAN. SEWER
W
V
P
O
WE
R
U
N
DE
R
G
R
O
U
N
D
SANITARY DISTRICT)
(FORK TOWNSHIP
6" WATER
ATT BOX
CBL BOX
CBL BOX
EX. 18" DIP SAN. SEWER
INV=107.18
TOP=121.94
S/S MH
INV OUT=103.58
INV IN=105.52
TOP=118.11
S/S MH
105
105
110
110110
110 110
110
110
110
110
1
1
0
110
110
115
115
115
115
115
115
115
115
115
115
115
12
0
12
0120
120
120
120
12
0
120
120
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
C
A
S
S
E
D
A
L
E
D
R
I
V
E
P.
C.
"M
"
S
L
I
D
E
82-
D
E
X
I
S
T
25’
P
E
R
M
A
N
E
N
T
U
T
I
L
I
T
Y
E
A
S
E
M
E
N
T
P.C. "M" SLIDE 82-D
EXIST 20’ UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1503, PG. 821
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
5
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-5
N
A
D
8
3
M
A
T
C
H
L
I
N
E
-
L
1-
S
T
A
3
2
+
2
5
(
S
E
E
S
H
E
E
T
E
C
-
4
)
MAT
CH
LINE
-
L2
-
S
T
A 4
2
+
0
0
(S
E
E
S
H
E
E
T
E
C-
6
)
EROSION CONTROL PLAN
INTO EXISTING
TIE PROPOSED DITCH
DETAIL 4/SHEET CD-3
EST 50 SY PSRM
TOE PROTECTION
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
RETAIN EXISTING SYSTEM
T
P
F
T
P
F
T
P
F
T
P
F
T
P
F
T
P
F
TPF TPF TPF
T
PF
TPF
TPF
TPF D
TYPE A, TYP
ROCK SILT CHECK,
INSTALL TEMPORARY
D
LIMITS OF DISTURBANCE, TYP
D
LIMITS OF DISTURBANCE, TYP
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
D
200’ OF SILT FENCE), TYP
(MAX. SPACING EVERY
CONTROL FENCE OUTLET
INSTALL SPECIAL SEDIMENT
DITCH (100’ SPACING), TYP
IN EXISTING/PROPOSED
INSTALL WATTLES
D
PROTECTION FENCE, TYP
INSTALL TREE
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
D
EXISTING CURB INLETS, TYP
INLET PROTECTION IN
"SILT FENCE"/ FILTER SACK
INSTALL INLET TUBE
D
-L1- STA 34+00 TO 35+00 RT
INSTALL TEMPORARY LINER: JUTE NET
3
5
+
0
0
0
0 02
0
0
C
C
C
F
F
C
F
F
C
F
C
F
F
F
C
C
F
F F
C
C
C
0
.0
7
+
10.6
7
0
1
+
8
5
.
6
7
0
2
T
YP
0
2
01
+
8
8
.9
8
0
1
+
03.98
02
T
YP
0
2
110
115
W
V
E
X.
3
0"
R
C
P
16" WATER
EX. 18" PVC SAN. SEWER
EX. 18" PVC SAN. SEWER
RWM
RWM
INV=107.71
TOP=123.80
S/S MH
120
120
120
120
120
120
120
120
120
120
125
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
6
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-6
N
A
D 83
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
2
+
0
0
(
S
E
E
S
H
E
E
T
E
C
-
5
)
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
7
+
5
0
(
S
E
E
S
H
E
E
T
E
C
-
7
)
EROSION CONTROL PLAN
R
E
T
AI
N
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
D
LIMITS OF DISTURBANCE, TYP
D
LIMITS OF DISTURBANCE, TYP
D
DITCH (50’ SPACING), TYP
IN EXISTING/PROPOSED
INSTALL WATTLES
DD
SILT FENCE, TYP
INSTALL TEMPORARY
200’ OF SILT FENCE), TYP
(MAX. SPACING EVERY
CONTROL FENCE OUTLET
INSTALL SPECIAL SEDIMENT
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
4
5
+
0
0
C
C C
C
C
C
C
C F
C C
F
F
F
F
T
YP
0
2
T
YP
0
2
W
V
15" RCP18"RCP
F/O BOX
EX. 18" PVC SAN. SEWER
F/O BOX
INV=108.13
TOP=123.13
S/S MH
IPF
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
2
COMMUNITY COLLEGE
TRUSTEES OF WAYNE
D.B. 1893, PG. 173
3
D.B. 1892, PG. 813
CITY OF GOLDSBORO
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
7
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-7
N
A
D 83
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
4
7
+
5
0
(
S
E
E
S
H
E
E
T
E
C
-
6
)
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
5
3
+
0
0
(
S
E
E
S
H
E
E
T
E
C
-
8
)
EROSION CONTROL PLAN
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
INV OUT = 121.5
INV IN = 121.7
40 LF - 15" RCP-IV
INV OUT = 121.4
INV IN = 121.6
36 LF - 15" RCP-IV
D
DISTURBANCE, TYP
LIMITS OF
D
LIMITS OF DISTURBANCE, TYP
D
DITCH (100’ SPACING), TYP
IN EXISTING/PROPOSED
INSTALL WATTLES
DD
SILT FENCE, TYP
INSTALL TEMPORARY
D
SILT FENCE, TYP
INSTALL TEMPORARY
100’ OF SILT FENCE), TYP
(MAX. SPACING EVERY
CONTROL FENCE OUTLET
INSTALL SPECIAL SEDIMENT
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
5
0
+
0
0
F
F
F
F
F
F
F
F
F
F
F
F
C
T
YP
0
2
T
YP
0
2
WVWV
WV
15"RCP
15" RCP
WOODS
34" OAK
CBL BOX
12" WATER
16" WATER
EX. 18" PVC SAN. SEWER
16" WATER
SANITARY DISTRICT)
(FORK TOWNSHIP
6" WATER
CBL BOX
E
X
.
1
5
"
P
V
C
S
A
N
.
S
E
W
E
R
INV OUT=109.10
INV IN=109.13
TOP=127.47
S/S MH
INV=108.56
TOP=123.68
S/S MH
125
125
125 125
125
12
5
(SR 1003)
NEW HOPE ROAD
(60’ PUBLIC R/W)
(
8
0
’
P
U
B
L
I
C
R
/
W
)
(
S
R
1
5
5
6
)
W
A
Y
N
E
M
E
M
O
R
I
A
L
D
R
I
V
E
EASEMENT AREA
EXIST PERMANENT UTILITY
P.C. "M" SLIDE 82-D
EXIST 25’ PERMANENT UTILITY EASEMENT
RAY OF HOPE CHURCH
3
D.B. 1892, PG. 813
CITY OF GOLDSBORO
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
0
8
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
5
/
2
0
15
0 2010
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-8
N
A
D 83
M
A
T
C
H
L
I
N
E
-
L
2
-
S
T
A
5
3
+
0
0
(
S
E
E
S
H
E
E
T
E
C
-
7
)
EROSION CONTROL PLAN
GRADING IF NEEDED.
STAKE OF PATH TO ROADSIDE DITCH AND PROVIDE MINOR
CONTRACTOR TO ENSURE POSITIVE DRAINAGE FROM SLOPE
FROM STA. 42+90 TO 55+00 -L2- (RT)
DITCH AS MUCH AS POSSIBLE TO AVOID UTILITY CONFLICTS.
POSITIVE FLOW. MAINTAIN EXISTING LOW ELEVATION IN
CLEAN OUT VEGETATION IN EXISTING DITCH TO PROMOTE
DETAIL 1/SHEET CD-3
SPECIAL LATERAL ’V’ DITCH
D
RETAIN TREE
D
RETAIN TREE
D
RETAIN TREE
D
RETAIN TREES
D
DISTURBANCE, TYP
LIMITS OF
D
DISTURBANCE, TYP
LIMITS OF
D
D
DITCH (100’ SPACING), TYP
IN EXISTING/PROPOSED
INSTALL WATTLES
D
ENTRANCE
GRAVEL CONSTRUCTION
INSTALL TEMPORARY
D
DISTURBANCE, TYP
LIMITS OF
D
SILT FENCE, TYP
INSTALL TEMPORARY
D
SILT FENCE, TYP
INSTALL TEMPORARY
200’ OF SILT FENCE), TYP
(MAX. SPACING EVERY
CONTROL FENCE OUTLET
INSTALL SPECIAL SEDIMENT
STORMWATER PERMIT. REFER TO CROSS SECTIONS.
OR AS REQUIRED BY NPDES GENERAL
STABILIZATION ON ALL SLOPES WITHIN 14 DAYS
CONTRACTOR SHALL PROVIDE SOIL
NOTE: SLOPES ON THIS PROJECT ARE 3:1.
WITH CONCRETE WASHOUT
STOCKPILE/STAGING AREA
5
5
+
0
0
0
0
0
1
0
2
0
0
0
1
0
2
C
F
F
C
F
F
F
F
F
F
F
T
YP
0
2
+
0
0
0
2
+
2
5
0
1
+
0
0
0
2
+
150
1
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
-
d
t
l
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
NOT TO SCALE
DETAILS
EROSION CONTROL
Shoulders, Side Ditches, Slopes (3:1)
Date Type Planting Rate
Jun. 15-Aug. 15
(Nov. 1-Mar. 1)
combinations are possible.
those which do well under local conditions: other seeding rate
vegetation of denuded areas. The above vegetation rates are
for additional information concerning other alternatives for
Consult Conservation Engineer or Soil Conservation Service
or Add Weeping Lovegrass
or Add Hulled Common Bermudagrass
Tall Fescue ***
& Browntop Millet ***
or Sorghum-Sudan Hybrids ***
(unhulled-unscarified)
& Tall Fescue
Add Abruzzi Rye
Sericea Lespedeza
may be shaded out.
grow over 12 inches in height before mowing, otherwise, fescue
desired permanent vegetation. Do not allow temporary cover to
*** Temporary - Reseed according to optimum season for
SEEDING SCHEDULE
Date Type
Aug. 15-Nov. 1
Nov. 1-Mar. 1
Mar. 1-Apr. 15
Mar. 1-Jun. 1
(Mar. 1-Jun. 30)
(Mar. 1-Apr. 15)
(Mar. 1-Jun. 30)
Jun. 1-Sep. 1
Sep. 1-Mar. 1
Tall Fescue
Tall Fescue
Tall Fescue
Tall Fescue
Slopes (3;1 to 2:1)
& Abruzzi Rye
Hulled Common Bermudagrass
& Browntop Millet ***
or Sorghum-Sudan Hybrids ***
Sericea Lespedeza (scarified)
and
Add Tall Fescue
25 lbs./acre
25 lbs./acre
12 lbs./acre
35 lbs./acre
30 lbs./acre
50 lbs./acre
5 lbs./acre
8 lbs./acre
35 lbs./acre
30 lbs./acre
70 lbs./acre
Apr. 15-Jun. 15
1)
2)
3)
4)
5)
6)
7)
seeded and planted to a depth of six inches.
After rough grading is completed, till soil in areas to be
disturbed areas to be vegetated.
Apply agricultural lime, fertilizer, and superphosphate to
40 lbs. 50% superphosphate/1000 sq. ft. (1750 lbs/acre)
35 lbs. 10-10-10 fertilizer/1000 sq. ft. (1500 lbs/acre)
90 lbs. limestone/1000 sq. ft. (2 tons/acre)
Seeding permanent grass.
November 15.
February 15 through May 15 or August 15 through
3.0 lbs. KY-31 tall fescue/1000 sq. ft. (130 lbs./acre) during
-OR-
sq. ft. during November 15 through February 15.
3.0 lbs. KY-31 tall fescue and 2.0 lbs. annual ryegrass/1000
of 3 inches.
Mulch around shubbery and trees with pine straw to depth
Temporary cover
-OR-
1.0 lbs. brown top millet/1000 sq. ft. May through August 25.
1.0 lbs. annual ryegrass/1000 sq. ft. August 25 through April.
Date
surface is uniform and free of large dirt clods.
Disk nutrients into soil to a depth of six inches until
1)
2)
3)
4)
5)
6)
7)
SEEDING SPECIFICATIONSSEEDING SPECIFICATIONS
CONSTRUCTION SEQUENCE
MAINTENANCE PLAN
fine gravel or sand may be needed to protect the filter cloth.
Where large stones are used or machine placement is difficult, a 4-inch layer of
If extensive damage is suspected, remove and replace the entire sheet.
of filter material with a minimum overlap of 12 inches around the damaged area.
If damage occurs remove the riprap and repair the sheet by adding another layer
next section as required. Take care not to damage the cloth when placing riprap.
ground and where necessary, bury the lower end of the cloth or overlap with the
the overlap. Bury the upstream end of the cloth a minimum of 12 inches below
Overlap the edges by at least 12 inches, and space anchor pins every 3 ft along
Synthetic filter fabric - Place the cloth filter directly on the prepared foundation.
layers with minimal mixing.
specified depth. Where more than one layer of filter material is used, spread the
foundation is prepared. For gravel, spread filter stone in a uniform layer to the
Sand and gravel filter blanket - Place the filter blanket immediately after the ground
inside dimensions and grade of the riprap meet design specifications.
sufficiently to allow placement of the riprap in a manner such that the finished
will be at the elevation of the surrounding area. Channels should be excavated
material. Cut the subgrade sufficiently deep that the finished grade of the riprap
depressions with riprap. Remove brush, trees, stumps and other objectional
to a density approximating that of the surrounding undisturbed material or overfill
lines and grades shown on the plans. Compact any fill required in the subgrade
Subgrade Preparation - Prepare the subgrade for riprap and filter to the required
CONSTRUCTION SPECIFICATIONS
flow. Control of weed and brush growth may be needed in some locations.
vigorous condition to protect the area from erosion and scour during out-of-bank
immediately. Maintain all vegetation adjacent to the channel in a healthy,
look for indications of piping, scour holes, or bank failures. Make repairs
where concentrated flow enters. Carefully check stability at road crossings and
promptly. Give special attention to the outlet and inlet sections and other points
Inspect channels at regular intervals as well as after major rains, and make repairs
MAINTENANCE
riprap should be apparent.
of the riprap should blend with the surrounding area. No overfall or protrusion of
stone sizes to produce a relatively smooth, uniform surface. The finished grade
stones. Hand placing may be necessary to achieve the proper distribution of
The finished slope should be free of pockets of small stone or clusters of large
the stones.
stone sizes. Take care not to dislodge the underlying base or filter when placing
riprap by dumping through chutes or other methods that cause segregation of
final placement. Place riprap to its full thickness in one operation. Do not place
be obtained by selective loading at the quarry and controlled dumping during
a minimum of voids. The desired disbribution of stones throughout the mass may
of the filter. Place riprap so that if forms a dense, well-graded mass of stone with
Stone Placement - Placement of riprap should follow immediately after placement
RIP RAP (6.15)
is an essential part of an effective erosion and sedimentation control plan.
maintenance of small eroded areas before they become significant gullies
washouts or breaks occur, repair them immediately. Prompt
remove all sediment from diversion and other water-disposal practices. If
sedimentation control practices, especially after heavy rainfalls. Promptly
Periodically check all graded areas and the supporting erosion and
MAINTENANCE
stabilization of these areas in the plan.
make sure they are adequately protected from erosion. Include final
12. Show topsoil stockpiles, borrow areas, and spoil areas on the plans, and
15 working days or longer.
measures on all graded areas when work is to be interrupted or delayed for
completed on each area in the grading plan. Apply temporary stabilization
11. Permanently stabilize all graded areas immediately after final grading is
with approved methods.
10. Handle seeps or springs encountered during construction in accordance
during all phases of development.
9. Keep diversions and other water conveyance measures free of sediment
slippage.
8. Do not place fill on a frozen foundation, due to possible subsidence and
materials into fill slopes.
7. Do not incorporate frozen material or soft or highly compressible
related problems.
the layers as required to reduce erosion, slippage, settlement, or other
6. Place all fill in layers not to exceed 9 inches in thickness, and compact
building debris, and other materials inappropriate for constructing stable fills.
5. Ensure that fill material is free of brush, rubbish, rocks, logs, stumps,
other objectionable material that would affect the planned stability of the fill.
4. Clear and grub areas to be filled to remove trees, vegetation, roots, or
placing topsoil.
3. Scarify areas to be topsoiled to a minimum depth of 2 inches before
it for use in finishing the grading of all critical areas.
2. Remove good topsoil from areas to be graded and filled, and preserve
construction schedule.
measures in accordance with the approved sedimentation control plan and
1. Construct and maintain all erosion and sedimentation control practices and
CONSTRUCTION SPECIFICATIONS
LAND GRADING (6.02)
TOPSOILING (6.04)
GRASS-LINED CHANNELS (6.30)
VEGETATIVE PLAN (NCDENR 6.11)
retain sediment.
Sediment barriers - Use sediment fences or other barriers where necessary to
All stockpile areas used shall be stabilized with silt fence and seeded.
topsoil is stockpiled in small piles located near areas where they will be used.
traffic routes. On large sites, respreading is easier and more economical when
Select stockpile location to avoid slopes and natural drainageways, avoiding
STOCKPILING
basins, diversions, and other controls into place before stripping.
generally varies along a gradient from hilltop to toe of the slope. Put sediment
soil cores at several locations within each area to be stripped. Topsoil depth
but depth varies depending on the site. Determine depth of stripping by taking
roadbuilding, or compaction by equipment. A 4 to 6-inch stripping depth is common,
Strip topsoil only from those areas that will be disturbed by excavation, filling,
STRIPPING
identified by their extremely light weight when dry.
Organic soils such as mucks and peats do not make good topsoil. They can be
if it meets the other criteria listed above.
desirable; however, material excavated from deeper layers may be worth storing
Generally, the upper part of the soil, which is richest in organic matter, is most
thickness affect the ease of excavation and spreading of topsoil.
Soil factors such as rock fragments, slope, depth to water table, and layer
The depth of material meeting the above qualifications should be at least 2 inches.
Sodium - sodium adsorption ratio should be less than 12.
Soluble salts - should be less than 500 ppm.
it is less than 6.0.
Acidity - pH should be greater than 3.6 before liming, and liming is required if
greater than 1.5% by weight.
Organic matter content - (sometimes referred to as "humic matter") should be
soils such as peat or muck as topsoil.
loam, clay loam, and loamy sand are fair. Do not use heavy clay and organic
Texture - loam, sandy loam, and silt loam are best; sandy clay loam, silty clay
handling. Quality topsoil has the following characteristics:
Determine whether the quality and quantity of available topsoil justifies selective
MATERIALS
CONSTRUCTION SPECIFICATIONS
to avoid excessive mixing of topsoil into the subsoil.
After topsoil application, follow procedure for seedbed preparation, taking care
between topsoil and subsoil.
after spreading topsoil. A disk may be used to promote bonding at the interface
On slopes and areas that will not be mowed, the surface may be left rough
high-maintenance turf is to be established.
germination. Light packing with a roller is recommended where
but avoid excessive compaction, as it increases runoff and inhibits seed
Compact the topsoil enough to ensure good contact with the underlying soil,
water pockets.
topsoiling or other operations to prevent the formation of depressions or
wet or frozen. Correct any irregularities in the surface that result from
Do not spread topsoil while it is frozen or muddy or when subgrade is
SPREADING TOPSOIL
the soil to a depth of at least 6 inches before spreading topsoil.
the topsoil and subsoil. If no amendments have been incorporated, loosen
by disking or scarifying to a depth of at least 4 inches, to ensure bonding of
Roughening - Immediately prior to spreading the topsoil. loosen the subgrade
Incorporate lime to a depth of at least 2 inches by disking.
recommended by soil tests or specified for the seeding mixture to be used.
soil is composed of heavy clays, incorporate agricultural limestone in amounts
Liming of subsoil - Where the pH of the existing subsoil is 6.0 or less, or the
approved plan and do not alter them by adding topsoil.
Grading - Maintain grades on the areas to be topsoiled according to the
such as diversions, berms, dikes, waterways, and sediment basins.
Before spreading topsoil, establish erosion and sedimentation control practices
SITE PREPARATION
growth.
must be stabilized with permanent vegetation to control erosion and weed
Permanent vegetation - If stockpiles will not be used within 12 months they
formation of the stockpile.
as possible, no more than 30 working days or 120 calendar days after the
Temporary seeding - Protect topsoil stockpiles by temporarily seeding as soon
withstand anticipated velocities during the establishment period.
Protect the channel with mulch or a temporary liner sufficient to
depend upon the severity of the conditions and selection of species.
4. The procedure used to establish grass in the channel will
surface water may enter the channel freely.
3. Remove and properly dispose of all excess soil so that
preparations and sod buildup.
the channel perimeter to allow for bulking during seedbed
dimensions shown on the plans plus a 0.2-ft overcut around
2. Excavate the channel and shape it to neat lines and
material from the foundation area and dispose of properly.
1. Remove all trees, brush, stumps, and other objectionable
CONSTRUCTION SPECIFICATIONS
erosion protection for the channel.
healthy, vigorous condition at all times, since it is the primary
to maintain the designed carrying capacity. Keep the grass in a
piping or scour holes. Remove all significant sediment accumulations
outlet and all road crossings for bank stability and evidence of
make repairs. It is particularly important to check the channel
channel; check it after every heavy rainfall event. Immediately
every rainfall. After grass is established, periodically check the
During the establishment period, check grass-lined channels after
MAINTENANCE
250 lbs./acre
250 lbs./acre
250 lbs./acre
250 lbs./acre
250 lbs./acre
250 lbs./acre
250 lbs./acre
at a rate of 450 gallons emulsion per acre of straw.
of all drainage swales, tack mulch with asphalt emulsion
surface equals or exceeds a 3:1 slope, and in the inverts
sunlight to seedlings. On areas where the ground
of ground surface should be visible to avoid blocking
sq. ft. (2 tons/acre). Spread uniformly. Approximately
Mulch seeded area with small grain straw at 90 lbs/1000
6. The City of Goldsboro contact is Bobby Croom, (919) 580-4278.
completion of construction or development.
all disturbed areas within 7 to 14 days or sooner following
requirements. Permanent ground cover is to be provided for
dated August 2011 for more information on ground stabilization
of any phase of grading. Refer to the latest NPDES Rules
or other areas within 7 to 14 days or sooner of completion
5. The Contractor shall provide ground cover on exposed slopes
cover.
vegetative plan to maintain a vigorous, dense vegetative
mulch all seeded areas according to specifications in the
4. The Contractor shall fertilize, reseed as necessary, and
to maintain a barrier.
fence. Silt fence will be repaired as necessary
fence when it becomes 0.5 feet deep at the
3. The Contractor shall remove sediment from behind silt
sediment pools no longer drains properly.
filled. Gravel will be cleaned or replaced when the
devices when storage capacity has been approximately 50%
2. The Contractor shall remove sediment from erosion control
inch of rainfall and once a week.
by the Contractor must be made and logged after every half
on site. The rain gauge must be kept onsite and inspections
general stormwater permit, a rain gauge must be installed
National Pollutant Discharge Elimination System (NPDES)
Contractor to maintain all practices as designed. Also per
week. Any needed repairs will be made immediately by the
runoff producing rainfall but in no case less than once every
control practices for stability and operation following every
1. The Contractor shall check all erosion and sediment
EC-9
the Mining Act.
through the Sedimentation Pollution Control Act as a one-use borrow site or through
they shall be considered separate land-disturbing activities and must be permitted either
activity and any related borrow or waste activity are not conducted by the same person,
or is a landfill regulated by the Division of Waste Management. If the land-disturbing
activity unless the borrow or waste activity is regulated under the Mining Act of 1971,
activity, the related borrow or waste activity shall constitute part of the land-disturbing
If the same person conducts the land-disturbing activity & any related borrow or waste
Office at 919-707-9200.
If you have questions, please contact the Land Quality Section at a DENR Regional
the Land Quality web site, http://portal.ncdenr.org/web/lr/erosion
The Combined Self-Monitoring form is available as a PDF and Word document from
easier to comply with self-inspection requirements.
Permit for Construction Activities, NCG 010000. The combined form should make it
Resources is responsible for administering both the SPCA and the NPDES Stormwater
NCG 010000. Beginning August 1, 2013, the Division of Energy, Mineral, and Land
Pollution Control Act and the NPDES Stormwater Permit for Construction Activities,
available. The new form was developed to satisfy the requirements of the Sedimentation
Inspection Reports and NPDES Self-Monitoring Reports, a combined form is now
To simplify documentation of Self-inspections took effect October 1, 2010.
control plan is being followed. Rules detailing the documentation of these
phase of the project to make sure that the approved erosion and sedimentation
persons responsible for land-disturbing activities inspect a project after each
The Sedimentation Pollution Control Act was amended in 2006 to require that
Notification of Land Resources Sediment and Erosion Control Self-Inspection Program:
maintain management control.
construction activities are needed, amend the sequence schedule in advance to
and until permanent vegetation on the project is established. When changes in
during the demolition or clearing and grubbing phases as well as throughout the life of
and sediment control measures must be installed, maintained and adjusted as needed
Follow the construction sequence throughout project development. Adequate erosion
MAINTENANCE
removed.
Contractor must receive permission by project inspector before any measures are
maintenance and vegetative plan.
removed, restored as existing, and permanently vegetated as described in the
and material area stockpile areas, and all other erosion control devices shall be
11. AFTER SITE IS STABILIZED, construction entrances, and construction staging
10. Site includes approximately 2.53 acres of permanent vegetation area.
9. Estimated time before final stabilization is 9 months.
after rainfall events. Needed repairs will be made immediately.
8. All erosion and sediment control practices will be inspected weekly and
devices maintained.
shall have temporary vegetative ground cover established and erosion control
ceases for more than the above mentioned length of time, all disturbed areas
areas and slopes shall be stabilized within 14 days. If work on the project
3:1, and high quality (HQW) zones should be stabilized within 7 days. All other
requirements. In summary, perimeter dikes, swales, ditches, slopes steeper than
Rules dated August 2011 for more information on ground stabilization
or sooner of completion of any phase of grading. Refer to the latest NPDES
specifications to maintain a vigorous, dense, vegetative cover within 7 to 14 days
7. All graded areas will be seeded, fertilized and mulched according to NCDOT
and mulch.
6. Finish grading of slopes, topsoil critical areas and permanently vegetate, seed
5. Complete final grading for trail.
as necessary, place silt fence around all temporary crossings and culverts as needed.
stabilize 2:1 slopes as indicated. Modify silt fence placement around trail and outlets
place reinforced silt fence as shown. Place additional erosion control matting and
4. In accordance with the erosion control plans, grade trail, install crosspipes, and
erosion control devices.
protection fence, construction entrance, temporary stream crossings, and all other
3. Prior to any land disturbing (including demolition) activities, install silt/tree
2. Flag the work limits for protection.
and invite NCDEMLR LQS contact number is (919) 707-9200.
1. Hold preconstruction conference at least one week prior to starting construction
CONSTRUCTION SPECIFICATIONS
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
-
d
t
l
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
NOT TO SCALE
DETAILS
EROSION CONTROL
POLY BARRICADE FABRIC (TYPICAL)
HIGH-TENSILE STRENGTH,
ORANGE, UV RESISTANT,
VARIABLE AS DIRECTED BY THE ENGINEER
FRONT VIEW
3
2
"
M
I
N
WI
D
T
H
POLY BARRICADE FABRIC (TYPICAL)
HIGH-TENSILE STRENGTH,
ORANGE, UV RESISTANT,
WARNING SIGN
4"
4"
4"
3
’-
0
"
2
’
-
0
"
SIDE VIEW
WARNING SIGN DETAIL
18"
40"
3"
STEEL POST
WOVEN WIRE FABRIC
GRADE
3"
3"
NOTES
DO NOT ENTER
TREE PROTECTION AREA
DO NOT ENTER
TREE PROTECTION AREA
WARNING SIGN
10’ O.C. MAXIMUM
EXTENDS TO TOP OF BOX
GALVANIZED HARDWARE WIRE
POSTS 2’-0" IN GROUND
STANDARDIZED METAL
ABOVE TOP OF BOX
TO A HEIGHT OF 12"-18" MIN.
#57 WASHED STONE PLACED
3’
2’
16"
2’
#57 STONE
2
1
METAL POST
2’
CONSTRUCTION SPECIFICATIONS
1. As synthetic fabric, use a previous sheet of nylon, polyester, or ethylene yarn - extra strength
(50 lb/1 inch minimum) - that contains ultraviolet ray inhibitors and stabilizers. Fabric should be
sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be
used for short-term applications. It must be replaced every 60 days.
2. Cut fabric from a continuous roll to eliminate joints.
3. For stakes, use 5-foot steel posts.
4. Space stakes evenly around the perimeter of the inlet a maximum of 4 ft apart, and securely
drive them into the ground, approximately 24 inches deep.
5. Place a 2 foot flap of wire mesh under the gravel for anchoring.
6. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stake.
7. The top of the frame and fabric must be well below the ground elevation downslope from
the drop inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary
dike on the down slope side of the structure to prevent bypass flow. Material from within the
sediment pool may be used for diking.
MAINTENANCE
Inspect the fabric barrier after each rain and make repairs as needed.
Remove sediment from the pool area as necessary to provide adequate storage volume for the
next rain. Take care not to damage or undercut the fabric during sediment removal.
8. #57 washed stone shall be paid for at the contract unit price per ton
"Sediment Control Stone."
CLOTH
" HARDWARE
STANDARD SILT FENCE OUTLET
SIDE VIEW
FRONT VIEW
HARDWARE CLOTH
WIRE FENCE
STEEL FENCE POST
GRADE
THE TRENCH
AND SILT FENCE FABRIC 6 INCHES INTO
BURY WIRE FENCE, HARDWARE CLOTH,
:NOTE
GRADE
18"
FABRIC
SILT FENCE
WIRE FENCEMAXIMUM 2 FEET APART
STEEL FENCE POST SET
# 57 WASHED STONE
FILTER OF 1 INCH DIAMETER PLAN VIEW
# 57 WASHED STONE
FILTER OF 1 INCH DIAMETER
STEEL FENCE POST
ON WIRE FENCE
SILT FENCE FABRIC
ON WIRE FENCE
HARDWARE CLOTH
HARDWARE CLOTH
HARDWARE CLOTH BY 12 INCHES
SILT FENCE FABRIC TO OVERLAP
:NOTE
FLOW DIRECTION
F
L
O
W
F
L
O
W
F
L
O
W
INCHES
12
OVERLAP
INCHES
12
OVERLAP
6"
AS A REPAIR OF SILT FENCE FAILURES.
ACRE AND THERE IS A LOW AREA. USE
DRAINAGE AREA DOES NOT EXCEED 1/4
USE SILT FENCE OUTLETS ONLY WHEN
:NOTE
LINE WIRES
MINIMUM 10 GAUGE
SIDE VIEW
FRONT VIEW
STANDARD TEMPORARY SILT FENCE
DIRECTED BY ENGINEER
ANCHOR SKIRT AS
OVER SKIRT
6" MINIMUM COVER
GRADE
FILL SLOPE
SILT FENCE FABRIC
WOVEN WIRE FABRIC
STEEL POST
3
2
"
M
IN
.
W
ID
T
H
AREAS OF CONCENTRATED FLOW.
DOES NOT EXCEED 1/4 ACRE AND NEVER IN
USE SILT FENCE ONLY WHEN DRAINAGE AREA
:NOTE
VARIABLE AS DIRECTED BY THE ENGINEER
WIRE FROM TOP
INSTALLED TO SECOND
SILT FENCE FABRIC
INTERMEDIATE WIRES
GAUGE 2
1MINIMUM 12
GRADE
8’-0" MAXIMUM
3
’
-
0
"
2
’
-
0
"
2
6
"
*
*
*
USE REINFORCED SILT FENCE OUTLET DETAIL
FOR REPAIR OF SILT FENCE FAILURES
TREE PROTECTION DETAIL
HARDWARE CLOTH AND GRAVEL INLET PROTECTION DETAIL (6.51)
EC-10
SIGNS SHALL BE INCIDENTAL TO THE FENCE.
BASED ON ACTUAL FIELD CONDITIONS.
ADDITIONAL SIGNS MAY BE REQUIRED BY THE CITY OR NCDENR,
MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT.
ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC.
SIGN PER PROTECTION AREA.
FOR TREE PROTECTION AREAS LESS THAN 200’ IN PERIMETER, PROVIDE NO LESS THAN ONE
PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50’ ON CENTER THEREAFTER.
SIGNS SHALL BE PLACED AT 50’ MAXIMUM INTERVALS.
LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED.
WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL.
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
-
d
t
l
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
NOT TO SCALE
DETAILS
EROSION CONTROL
NATURAL GROUND
NATURAL GROUND
FLOW
2’(MAX.)
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVEMENT
SHLD.
SLOPE
BACK
SLOPEDITCH
STAKE
2’ UPSLOPE
MATTING
STAKE
2’ DOWNSLOPE
STAKE
2’ UPSLOPE
MATTING
STAKE
2’ DOWNSLOPE
TOP VIEW
6’(MIN.)
18"(MIN.)
EXCELSIOR WATTLE
STAKE
UPSLOPE
STAKE
DOWNSLOPE
MATTING
MATTING
See Inset B
INSET B
STAPLES
VAR.
2’(MIN.)
2 IN.
See Inset A
INSET A
STAKES
WATTLE DETAIL
STANDARD SPECIFICATIONS.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
FORMED INTO A U SHAPE NOT LESS THAN 18" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT
CROSS SECTION.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
USE MINIMUM 18 IN. DIAMETER EXCELSIOR WATTLE.
NOTES:
EC-11
100
20
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
-
d
t
l
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
STORM DRAIN UNDER CONSTRUCTION
PLYWOOD INLET PROTECTION FOR
STORM DRAIN UNDER CONSTRUCTION
STONE FILTER INLET PROTECTION FOR
Upstream End of Storm Drain
3/4" Exterior Plywood
Across Pipe Inlet
Washed Stone Filter
Steel Fence Post Storm Drain
Upstream End of
Diameter
1/3 Pipe
Upstream End of Storm Drain
3/4" Exterior Plywood
Across Pipe Inlet
Washed Stone Filter
Steel Fence Post Storm Drain
Upstream End of
Diameter
1/3 Pipe
PLYWOOD INLET PROTECTION WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT
UNIT PRICE PER LINEAR FOOT OF PIPE CULVERT INSTALLATION.
STONE FILTER INLET PROTECTION WILL BE CONSIDERED INCIDENTAL TO THE CONTRACT
Trench
Bury Bottom of Plywood
Trench
Bury Bottom of Plywood
UNIT PRICE PER LINEAR FOOT OF PIPE CULVERT INSTALLATION.
Hardware Cloth
Overflow
Diameter
1/3 Pipe
Hardware Cloth
Overflow
Diameter
1/3 Pipe
DETAILS
EROSION CONTROL
NOT TO SCALE
EC-12
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME TIMEFRAME EXCEPTIONSSITE DESCRIPTION
NPDES GENERAL STORMWATER PERMIT
IF SLOPES ARE 10’ OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
7 DAYS FOR SLOPES GREATER THAN 50’ IN
LENGTH.
NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
NONE
NONEPERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES
SLOPES STEEPER THAN 3:1
SLOPES 3:1 OR FLATTER
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS
14 DAYS
7 DAYS
7 DAYS
7 DAYS
GUTTER
PIPE
GEOTEXTILE BAG
BLOCK (TYP)
RUBBER
2"X2"X3/4"
SACK
INSTALLED FILTER
PROFILE VIEW OF
PERMITTIVITY
FLOW RATE
APPARENT OPENING SIZE
UV RESISTANCE
TRAPEZOID TEAR
MULLEN BURST
PUNCTURE
GRAB TENSILE ELONGATION
GRAB TENSILE STRENGTH
PROPERTIES TEST METHOD UNITS
PERMITTIVITY
FLOW RATE
APPARENT OPENING SIZE
UV RESISTANCE
TRAPEZOID TEAR
MULLEN BURST
PUNCTURE
GRAB TENSILE ELONGATION
GRAB TENSILE STRENGTH
PROPERTIES TEST METHOD UNITS
LOW TO MODERATE FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
MODERATE TO HIGH FLOW GEOTEXTILE FABRIC SPECIFICATION TABLE
RESTRAINT
EXPANSION
ROPE
COLORED NYLON
1/4" BRIGHTLY
ELEVATION VIEW
RESTRAINT
NYLON ROPE EXPANSION
1/4" BRIGHTLY COLORED
(SEE DETAIL)
PROTECTION
FILTER SACK INLET
non-degradable materials.
with ultraviolet stabilizers or a seamless, high-density polyethylene
of seamless, high-density polyethylene photodegradable materials treated
leaf mulch under this specification. Utilize an outer netting that consists
netting material. Do not use straw, straw fiber, straw bales, pine needles or
fibers or hardwood mulch or a mix of these materials enclosed by a flexible
Composed of compacted geotextiles, curled excelsior wood, natural coconut
Produced by a Manufacturer experienced in sediment tube manufacturing.
Use inlet tubes that exhibit the following properties:
Materials
Inlet Tubes
ISOMETRIC VIEW
(IF NEEDED)
OR SILT FENCE
SEDIMENT TUBE
DEBRIS FROM ENTERING INLETS DURING CONSTRUCTION.
NOTE: USE INLET TUBES AS NEEDED TO PREVENT SILT AND
(OPTIONAL)
OVERFLOW HOLES
LOCATION.
COLLECTION
SEDIMENT
SACK AT A
TO EMPTY FILTER
REBAR FOR A HANDLE
1" REBAR. USE
LOOPS SIZED FOR
FOR HANDLES.
INLET USING REBAR
FILTER BAG FROM
1" REBAR. LIFT
LOOPS SIZED FOR
ASTM D-4491
ASTM D-4491
ASTM D-4751
ASTM D-4355
ASTM D-4533
ASTM D-3786
ASTM D-4833
ASTM D-4632
ASTM D-4632
0.55 SEC -1
40 GAL/MIN/SQ FT
40 US SIEVE
80 %
120 LBS
800 PSI
120 LBS
20 %
300 LBS
ASTM D-4491
ASTM D-4491
ASTM D-4751
ASTM D-4355
ASTM D-4533
ASTM D-3786
ASTM D-4833
ASTM D-4632
ASTM D-4632
1.5 SEC -1
200 GAL/MIN/SQ FT
20 US SIEVE
90 %
45 LBS
420 PSI
135 LBS
20 %
265 LBS
SURFACE.
OR UNDER SURROUNDING
SECURE LIFTING LOOPS TO INLET GRATE
INLET BOX.
MATCH THE INSIDE LENGTH OF THE GRATED
THE LENGTH, "L", OF THE FILTER SACK WILL 7.
BE BETWEEN 18 INCHES AND 36 INCHES.
THE DEPTH, "D", OF THE FILTER SACK WILL 6.
INLET BOX.
MATCH THE INSIDE WIDTH OF THE GRATED
THE WIDTH, "W", OF THE FILTER SACK WILL 5.
INSPECT PER REGULATORY REQUIREMENTS.4.
CONCERN.
PURCHASED WHEN OIL SPILLS ARE A
AN OIL ADSORBENT PAD OR PILLOW CAN BE 3.
SPECIFICATIONS TABLE.
EXCEEDS REQUIREMENTS IN THE
POLYPROPYLENE FABRIC THAT MEETS OR
GEOTEXTILE WILL BE A WOVEN 2.
SEEN.
EXPANSION RESTRAINT CAN NO LONGER BE
EMPTY FILTER SACK WHEN BRIGHTLY COLORED 1.
Inspector or Manufacturer’s Representative at the contractor’s expense.
Replace inlet tubes damaged during installation as directed by the
Inlet tubes may be temporarily moved during construction as needed.
Inspection and Maintenance:
underlying surface and the inlet tube.
Install inlet tubes lying flat on the ground, with no gaps between the
:Installation
NOT TO SCALE
INLET TUBES "SILT SOCK"FILTER SACK INLET PROTECTION
NOT TO SCALE
TUBE
SEDIMENT
WEIGHTED
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
P
r
o
j
\
P
l
a
n
S
h
e
e
t
s
\
E
r
o
s
i
o
n
C
o
n
t
r
o
l
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
e
c
-
d
t
l
.d
g
n
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
INCOMPLETE PLANS
DO NOT USE FOR R/W ACQUISITION
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS
011746024
3
/
3
/
2
0
15
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
EC-13
R
E
V
I
S
I
O
N
S
TYPE "ABOVE GRADE" WITH STRAW BALES
S
W
-
2
0
.
2
5
C
I
T
Y
O
F
R
A
L
E
I
G
H
P
U
B
L
I
C
W
O
R
K
S
D
E
P
A
R
T
M
E
N
T
NOTES
(TYP)
STRAW BALE10 mil PLASTIC LINING
B
PLAN
NOT TO SCALE
(OR EQUIVALENT)
SIGN DETAIL
CONCRETE WASHOUT
2"
8"
STEEL WIRE
1.12" DIA
DETAIL
STAPLE
10’ MINIMUM
VARIES
10 mil PLASTIC LINING
PLAN
NOT TO SCALE
10 mil PLASTIC LINING
WITH TWO STAKES
ENTIRE PERIMETER
FASTENED AROUND
WOOD FRAME SECURELY
WOOD FRAME
2X12 ROUGH
TWO-STACKED
(TYP)
STAKE
WITH WOOD PLANKS
TYPE "ABOVE GROUND"
SECTION B-B
NOT TO SCALE
B B
VARIES
10’ MINIMUM
AA
10 mil PLASTIC LINING
BERM
NOT TO SCALE
TYPE "BELOW GRADE"
D
R
A
W
N
B
Y
:
W
D
P
D
A
T
E
:
1
0
/
2
2
/
2
0
1
2
STABILIZED TO PREVENT EROSION.
WASHOUT FACILITIES SHALL BE BACKFILLED, REPAIRED, AND
CAUSED BY THE REMOVAL OF THE TEMPORARY CONCRETE
4. HOLES, DEPRESSIONS OR OTHER GROUND DISTURBANCE
OF THE WORK AND DISPOSED OF OR RECYCLED.
WASHOUT FACILITIES SHALL BE REMOVED FROM THE SITE
3. MATERIALS USED TO CONSTRUCT TEMPORARY CONCRETE
FACILITY.
WITHIN 30’ OF THE TEMPORARY CONCRETE WASHOUT
2. A CONCRETE WASHOUT SIGN SHALL BE INSTALLED
1. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD.
WASHOUT
CONCRETE
STRAW BALE
VARIES
10’ MINIMUM
BINDER WIRE
(OPTIONAL)
NATIVE MATERIAL
(2 PER BALE)
STAPLES
(2 PER BALE)
METAL STAKES
WOOD OR
SECTION B-B
NOT TO SCALE
10 mil PLASTIC LINING
B
PAINTED WHITE
48"X24"
PLYWOOD
6" HEIGHT
BLACK LETTERS
LAG SCREWS
36"
36"
3’
3 SIDES
FLAGGING ON
LATH AND
3.5"X3.5"X8’
WOOD POST
BERM
PLAN
SECTION A-A
NOT TO SCALE
SANDBAG
10 mil PLASTIC LINING
SANDBAG
W
A
S
H
O
U
T
C
O
N
C
R
E
T
E
DETAILS
EROSION CONTROL
012654005
EQUIPMENT CONTRACTOR USES
WIDTH OF CONSTRUCTION VEHICLE/
MUD MAT DETAIL
MUD MAT
E
Q
UI
P
M
E
N
T
CO
N
T
RA
CT
O
R
U
S
E
S
L
E
N
G
T
H
O
F
CO
N
S
T
RU
CTI
O
N
V
E
HI
CL
E/
ISOMETRIC VIEW
MANUFACTURE SPECIFICATION
MAT OVERLAP PER
2
5’
MI
N
CO
N
S
T
RU
CTI
O
N
E
N
T
RA
N
CE
2
5’
MI
N
CO
N
S
T
RU
CTI
O
N
E
N
T
RA
N
CE
(6" MIN)
RAILING
(6" MIN)
RAILING
(6" MIN DEPTH)
AGGREGATE
COARSE
2" TO 3"
ITEM.
INCIDENTAL TO THE MUD MAT PAY
APPROACHES TO MUD MAT SHALL BE
6. CONSTRUCTION ENTRANCE
MAT FOR APPROVAL.
5. CONTRACTOR MAY SUBMIT ALTERNATE MUD
DETERMINED BY THE ENGINEER.
MINIMIZE IMPACTS OR
4. NUMBER AND LOCATION OF MUD MATS TO
THE CONTRACTOR.
TIMELY MAINTENANCE MUST BE PROVIDED BY
FREQUENT CHECKS OF THE DEVICE AND
BOARDWALK CONSTRUCTION.
LIMIT IMPACTS FOR BRIDGE AND
UTILIZED IN WETLAND AREAS TO
3. MUD MAT(S) SHALL BE
MUD INTO WETLAND.
WILL PREVENT TRACKING OR DIRECT FLOW OF
2. MUST BE MAINTAINED IN A CONDITION WHICH
CONSTRUCTION VEHICLES.
PROVIDE FOR UTILIZATION BY ALL
1. MUD MAT(S) SHOULD BE LOCATED TO
NOTES:
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
10+90.00
120 120
125 125
130 130
11+00.00
120 120
125 125
130 130
11+50.00
120 120
125 125
130 130
12+00.00
120 120
125 125
130 130
12+50.00
120 120
125 125
130 130
13+00.00
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
13+50.00
120 120
125 125
130 130
14+00.00
120 120
125 125
130 130
14+50.00
120 120
125 125
130 130
15+00.00
115 115
120 120
125 125
130 130
15+50.00
115 115
120 120
125 125
130 130
15+64.00
X-1
-L1-
3:
1
12
3
.8
1
12
3
.8
4
0.020 3:
1
12
3
.6
6
12
3
.6
3
0.020 3:
1
12
3
.2
9
12
3
.2
9
0.020
3:1
12
3
.2
5
12
3
.13
0.020
12
3
.2
3
12
2
.9
7
0.020
3:
1
12
3
.0
5
12
2
.8
2
0.020
3:
1
12
2
.6
7
12
2
.6
6
0.020 3:
1
12
2
.4
0
12
2
.5
0
0.020
3:1
12
2
.3
4
12
2
.3
5
0.020
3:1
12
2
.0
1
12
2
.3
1
0.0203:1
3:
1
12
2
.0
3
12
3
.12
0.0203:1
3:
1 3:1
120.25
118
.9
5
0.0203:1
3:
1
12
3
.2
3
PROP 30" RCP W/ HW
JB
PROP
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
12
2
.7
7
12
2
.5
1
0.020
3:1
00 1010 2020 3030 4040 50506070
115 115
120 120
125 125
130 130
15+78.00
120 120
125 125
130 130
16+00.00
115 115
120 120
125 125
130 130
16+50.00
115 115
120 120
125 125
17+00.00
115 115
120 120
125 125
17+50.00
115 115
120 120
125 125
18+00.00
00 1010 2020 3030 4040 50506070
115 115
120 120
125 125
18+50.00
115 115
120 120
125 125
19+00.00
115 115
120 120
125 125
19+50.00
115 115
120 120
125 125
20+00.00
115 115
120 120
125 125
20+50.00
110 110
115 115
120 120
21+00.00
X-2
-L1-
12
2
.0
0
12
3
.0
8
0.0203:1
3:
1
12
2
.0
0
12
2
.0
2
0.020 3:
13:1
12
1.5
7
12
1.7
7
0.020
3:1
12
1.19
12
1.3
6
0.020
3:1
12
1.2
7
12
0
.9
3
0.020
3:
1
12
1.4
0
12
0
.5
1
0.0203:
1
12
1.0
5
12
0
.0
9
0.0203:
1
119
.9
0
119
.6
7
0.020
3:
1
119
.2
0
118
.8
9
0.020
3:
1
118
.5
3
117
.7
1
0.0203:
1
116
.6
2
116
.5
3
0.020
3:1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
110 110
115 115
120 120
21+34.00
105 105
110 110
115 115
120 120
21+50.00
105 105
110 110
115 115
120 120
21+64.00
105 105
110 110
115 115
120 120
21+89.00
105 105
110 110
115 115
120 120
22+00.00
00 1010 2020 3030 4040 50506070
110 110
115 115
120 120
22+19.00
110 110
115 115
120 120
22+50.00
110 110
115 115
120 120
23+00.00
110 110
115 115
120 120
23+50.00
110 110
115 115
120 120
24+00.00
110 110
115 115
24+50.00
105 105
110 110
115 115
25+00.00
X-3
-L1-
112
.9
9
115
.7
3
0.0203:1 3:
1
10
9
.9
1
115
.4
2
0.020
3:1 3:
1 12.5:1
113.03
3:1
PROP 36" RCP W/ HW
10
7
.2
5
115
.19
0.0203:1 3:
1 12.5:1
112.80
3:1JB
PROP
10
8
.14
114
.8
8
0.0203:1
3:
1 12.5:1
112.39
3:1
EX 36" RCP
JB
PROP
111.2
7
114
.7
6
0.0203:1
3:
1 12.5:1
112.21
3:1
113
.2
1
114
.5
6
0.0203:1
3:
1 12.5:1
111.38
3:1
114
.6
7
114
.2
3
0.020
3:
1
114
.5
6
113
.6
9
0.0203:
1
114
.3
4
113
.16
0.020
3:
1
113
.6
3
112
.6
2
0.020
3:
1
112
.3
2
111.3
8
0.020
3:
1
3:
1
110
.0
7
10
9
.3
8
0.020
3:
1
3:
1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
JOB NUMBER:
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND 0 105
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
105 105
110 110
115 115
25+50.00
100 100
105 105
110 110
26+00.00
100 100
105 105
110 110
26+50.00
95 95
100 100
105 105
110 110
27+00.00
95 95
100 100
105 105
110 110
27+50.00
95 95
100 100
105 105
110 110
28+00.00
00 1010 2020 3030 4040 50506070
95 95
100 100
105 105
110 110
28+50.00
95 95
100 100
105 105
110 110
28+94.00
95 95
100 100
105 105
110 110
29+00.00
95 95
100 100
105 105
110 110
29+04.00
90 90
95 95
100 100
105 105
110 110
29+50.00
X-4
-L1-
10
8
.2
2
10
7
.3
8
0.020
3:
1
10
5
.18
10
5
.6
3
0.008 3:
1
3:1
10
2
.7
0
10
4
.6
5
0.0203:1 3:
13:1
103.51
10
1.4
4
10
3
.9
2
0.0203:1 3:
1 3:1
102.82
10
0
.4
7
10
3
.18
0.0203:1 3:
1
3:1
102.08
10
0
.0
0
10
2
.4
5
0.0203:1 3:
1 3:1
101.33
9
9
.8
6
10
2
.3
0
0.018 3:
1 3:1
100.38
3:1
9
7
.7
0
10
3
.0
2
0.000
99.40
3:
1
3:1
9
7
.3
1
10
3
.0
7
0.000 3:1
3:
1
99.29
9
6
.8
6
10
3
.10
0.000
3:
1
99.22
3:1
9
6
.0
5
10
3
.2
4
0.000
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
95 95
100 100
105 105
110 110
29+74.00
95 95
100 100
105 105
110 110
30+00.00
95 95
100 100
105 105
110 110
30+26.98
95 95
100 100
105 105
110 110
30+50.00
95 95
100 100
105 105
110 110
31+00.00
00 1010 2020 3030 4040 50506070
100 100
105 105
110 110
115 115
31+50.00
105 105
110 110
115 115
32+00.00
105 105
110 110
115 115
120 120
32+50.00
105 105
110 110
115 115
120 120
33+00.00
110 110
115 115
120 120
33+50.00
110 110
115 115
120 120
34+00.00
X-5
-L1-
9
7
.3
2
10
3
.3
1
0.000
9
7
.2
4
10
3
.2
7
0.000
9
7
.0
6
10
3
.11
0.000
9
7
.8
4
10
3
.0
9
0.009
3:
13:1EX JB
10
1.2
6
10
4
.2
9
0.020 3:
13:1
10
6
.18
10
7
.2
6
0.020 3:
13:1
111.9
6
111.0
1
0.020 3:1
116
.0
0
114
.6
6
0.020 3:1
116
.0
3
115
.8
4
0.020 3:1
114
.9
4
114
.7
6
0.020 3:1
113
.5
6
113
.9
0
0.0203:1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
1.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
110 110
115 115
120 120
34+50.00
110 110
115 115
120 120
34+75.00
110 110
115 115
120 120
35+00.00
110 110
115 115
120 120
35+30.00
115 115
120 120
125 125
35+50.00
X-6
-L1-
113
.9
5
114
.3
7
0.020 3:13:
1
113.92
3:1
114
.3
6
115
.15
0.0203:1
114.42
3:13:
1
114
.9
1
116
.2
9
0.014 3:
1
114.93
3:1
117
.3
1
118
.14
0.002 3:
13:1
118
.16
118
.8
9
0.006 3:
1
3:1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
2
.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
115 115
120 120
40+00.00
115 115
120 120
125 125
40+50.00
115 115
120 120
125 125
40+70.00
115 115
120 120
125 125
130 130
41+00.00
120 120
125 125
130 130
41+50.00
120 120
125 125
130 130
42+00.00
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
42+50.00
120 120
125 125
130 130
43+00.00
120 120
125 125
130 130
43+50.00
120 120
125 125
130 130
44+00.00
120 120
125 125
130 130
44+50.00
120 120
125 125
130 130
45+00.00
X-7
-L2-
119
.0
0
119
.6
4
119
.4
1
0.016 3:1
12
1.0
0
12
0
.9
3
0.003
12
2
.3
1
12
2
.3
5
0.017 3:
1
3:1
12
3
.3
1
12
3
.2
4
0.0203:
1
12
4
.16
12
3
.7
5
0.020
3:
1
12
4
.9
6
12
3
.3
8
0.020
3:
1
12
4
.9
1
12
3
.0
1
0.020
3:
1
12
4
.17
12
2
.7
7
0.020
3:
1
12
3
.7
8
12
2
.6
2
0.020
3:
1
12
2
.6
6
0.020
3:
1
12
3
.3
6
12
2
.9
1
0.020
12
3
.2
1
3:
1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
2
.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
12
3
.0
0
12
2
.8
4
0.020
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
45+50.00
120 120
125 125
130 130
46+00.00
120 120
125 125
130 130
46+50.00
120 120
125 125
130 130
47+00.00
120 120
125 125
130 130
47+50.00
120 120
125 125
130 130
48+00.00
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
48+50.00
120 120
125 125
130 130
49+00.00
120 120
125 125
130 130
49+50.00
120 120
125 125
130 130
50+00.00
120 120
125 125
130 130
50+50.00
120 120
125 125
130 130
51+00.00
X-8
-L2-
12
2
.9
8
0.020
12
3
.0
6
12
3
.0
0
12
2
.9
4
0.0203:1
12
2
.9
9
12
3
.0
9
0.020
3:1
12
3
.0
0
12
3
.3
5
0.0203:1
3:
1
12
3
.0
0
12
4
.11
0.0203:1
3:
1
3:
1
121.60
12
2
.7
7
12
3
.8
7
0.0203:1
3:
1
3:
1
121.75
12
3
.0
0
12
3
.4
5
0.0203:1
3:
13:
1
121.90
12
2
.8
7
12
3
.0
3
0.0203:1
122.05
3:
1
12
2
.8
1
12
3
.0
3
0.0203:1
3:
1
122.20
3:
1
12
2
.8
0
12
3
.4
5
0.0203:1
3:
1
122.35
3:
1
12
2
.7
8
12
3
.8
8
0.0203:1
3:
1
122.50
3:
1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:JOB NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
2
.d
g
n
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050
0 105
Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
51+50.00
120 120
125 125
130 130
52+00.00
120 120
125 125
130 130
52+50.00
120 120
125 125
130 130
53+00.00
120 120
125 125
130 130
53+50.00
120 120
125 125
130 130
54+00.00
00 1010 2020 3030 4040 50506070
120 120
125 125
130 130
54+50.00
120 120
125 125
130 130
55+00.00
120 120
125 125
130 130
55+50.00
120 120
125 125
130 130
56+00.00
120 120
125 125
130 130
56+50.00
125 125
130 130
135 135
57+00.00
X-9
-L2-
12
2
.7
7
12
4
.2
1
0.0203:1
3:
1
121.70
3:
1
12
2
.9
4
12
3
.8
0
0.0203:1
3:
1
121.85
3:
1
12
3
.0
0
0.0203:1
3:
1
12
3
.3
1
122.00
3:
1
12
3
.0
0
0.020
12
3
.0
6
3:1
122.15
3:
1
12
3
.0
0
12
3
.15
0.0203:1
122.30
3:
1
12
3
.0
4
12
3
.3
5
0.0203:1
3:
1
122.45
3:
1
12
3
.4
1
12
3
.5
5
0.0203:1
12
3
.7
9
0.020
12
3
.8
0
3:1
12
4
.4
1
12
3
.4
3
3:1
0.000 3:
1
12
5
.3
3
12
5
.4
6
0.0203:1
12
6
.2
1
12
6
.5
6
0.0203:1
12
7
.16
12
7
.2
6
0.0203:1
3
/
3
/
2
0
15
PROJECT:
SHEET NUMBER:
REV. No.:REVISION:DATE:DRAWN BY:CHECKED BY:
011746024
K
:
\
R
A
L
_
R
o
a
d
w
a
y
\
0
117
4
6
0
2
4
-
N
e
w
H
o
p
e
M
u
l
t
i
U
s
e
P
a
t
h
\
R
o
a
d
w
a
y
\
X
S
C
\
N
e
w
H
o
p
e
R
d
_
r
d
y
_
x
p
l
_
L
2
.d
g
n
JOB NUMBER:
ROADWAY CROSS SECTIONS
MULTI-USE PATH AND 0 105
PE NO. F-0102
PREPARED IN THE OFFICE OF:
P.O. BOX 33068 - RALEIGH, NORTH CAROLINA 27636-3068
PHONE: (919) 677-2000 FAX: (919) 677-2050Copyright Kimley-Horn and Associates, Inc., 2015
shall be without liability to Kimley-Horn and Associates, Inc.
reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc.
intended only for the specific purpose and client for which it was prepared. Reuse of and improper
This document, together with the concepts and designs presented herein, as an instrument of service, is
(EB-5508)
NEW HOPE ROAD MULTI-USE PATH
00 1010 2020 3030 4040 50506070
125 125
130 130
135 135
57+50.00
125 125
130 130
135 135
58+00.00
125 125
58+25.00
X-10
-L2-
12
7
.7
2
12
7
.8
7
0.013
3:1
12
7
.8
9
12
7
.8
6
0.020
3:1
12
7
.7
8