HomeMy WebLinkAboutNCC230556_NOI Application_20230302Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 2/28/2023 2:55:16 PM (NCG01 NOI Submission)
Approve by Penny Markle 2/28/2023 4:04:28 PM (Review - NOI 129220 Marion-Whiteville 115kV Line, Replace
Switch 544 & 544-1 - EXPRESS)
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: March 3, 2023 5:00 PM.
The priority is: High 2/28/2023 2:55:25 PM
• The task was assigned to Penny Markle by round robin distribution 2/28/2023 2:55:25 PM
Submit by Tev.Holloman 3/2/2023 12:45:07 PM (Payment Verification for NCC230556)
0 Nuwan Wijesuriya
The task was assigned to DEMLR NCG01 Payment Team. The due date is: April 11, 2023 5:00 PM. The
priority is: High 2/28/2023 4:04:44 PM
• Tev.Holloman assigned the task to Tev.Holloman 3/2/2023 12:44:42 PM
R
�o
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting an NOI that was rejected before?
No
Yes
1a. Project Name*
Marion-Whiteville 115kV Line, Replace Switch 544 & 544-1 - EXPRESS
1b. Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c. Parcel ID Number(s) (PIN)
List all PINs associated with this project.
9198.00-68-1098.00, 9198.00-78-3517.000, 9198.00-86-2789.000, 0108.00-08-2863.000, 0108.00-19-5615.000,
0108.00-19-5462.000
2. County*
Columbus
3. Highway or Street Address*
Hinsons Crossroads
Street name only is acceptable if no address number assigned yet
4. City or Township*
Fair Bluff
5. State" NC
6. Zip Code* 28439
7. Latitude* Enter the latitude in decimal degrees
34.2680
8. Longitude* Enter the longitude in decimal degrees (MUST be negative)
-79.0062
U
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 05/15/2023
Estimated Construction Project Start Date
10. Date to End* 07/10/2023
Estimated Construction Project End Date
11. SIC (Primary)*
Other (9999)
Standard Industrial Classification for Development
12. Acres to be 10.80
disturbed* (including off -site borrow and waste areas)
13. Total site area 10.80
(acres) *
14. Post -construction 0.10
impervious area (Estimated)
(acres) *
Project Tracking ID NCC-COLUM-2023-Marion-WhiteviIle 115kV Line, Replace Switch
544 & 544-1 - EXPRESS
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a. Receiving Waterbody*
Gapway Swamp
Name of waterbody into which stormwater runoff will discharge
15b. Waterbody Index No.*
14-31
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
16a. Is this project subject to the NC Sediment Pollution Control Act? *
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA (American Rescue Plan Act) grant funds?
No
Yes
This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. Reviewer may update if status is
known.
B. Permittee Information
Part B.
Permittee Information - Legally Responsible Entity and Individual
......................................................................................................................................................................
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as
a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
1. Permittee* Legally Responsible Entity
Duke Energy Progress, LLC
If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name.
Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the
registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership (FRO) Form.
2. First Name* Nuwan
If Corporation, enter Registered Agent First Name
3. Last Name* Wijesuriya
If Corporation, enter Registered Agent Last Name
3b. Title Lead Transmission Permitting Manager
4. Permitee E-mail nuwan.wijesuriya@duke-energy.com
Address *
5. Permittee 9199316655
Telephone No.*
6. Permittee Mailing Street Address
Address* 410 South Wilmington Street
Address Line 2
City State / Province / Region
Raleigh North Carolina
Postal / Zip Code Country
27601 United States
Check box if the Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 410 South Wilmington Street
Address Line 2
City
State / Province / Region
Raleigh
NC
Postal / Zip Code
Country
27601-1849
US
8. Type of Ownership is only individual if an individual is named in B.1. above.
Ownership* Non -Government
C. Site Contact Information
Part C.
Proiect Site Contact Information
1. Primary Site Nuwan
Contact - First
Name*
2. Primary Site Wijesuriya
Contact - Last Name*
3. Title Lead Transmission Permitting Manager
4. Site Contact E-mail nuwan.wijesuriya@duke-energy.com
Address *
5. Site Contact 9195462090
Telephone No.*
6. Organization Name Duke Energy Progress, LLC
7. Site Contact Street Address
Mailing Address* 410 South Wilmington Street
Address Line 2
City
Raleigh
Postal / Zip Code
27601-1849
8. Consultant Name (Optional)
Wyatt Yelverton
First and Last name
9. Consultant E-mail wyatt.yelverton@hdrinc.com
This person will be copied on all correspondence.
10. Consultant 9193896681
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
nuwan.wijesuriya@duke-energy.com
Default is legally responsible person e-mail
12. Billing Telephone (For Annual Fee correspondence)
9199316655
Default is legally responsible person telephone
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 02/17/2023
Approved *
2. E&SC Plan Project COLUM-2023-008
Number/ID * Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. State DEQ Office* Wilmington (WiRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan COLUM-2023-008 Approval 2-17-2023.pdf 309.44KB
Approval letter or Must be PDF format
Grading Permit
6. Signed FRO Financial Responsibility/Ownership Form
2022-11-01_090082_signed FRO.pdf 1.29MB
Must be PDF format
7. Site Location Map Must be PDF format (limit 20 MB)
Vicinity Map.pdf 2.01 MB
Please do not upload entire set of E&SC plans.
B. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application. Include additional waterbodies if necessary.
9. NOI Certification Marion eNOI.pdf 1.08MB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project, for satisfying
the requirements of this permit, and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is, to the best of my knowledge and belief, true,
accurate, and complete based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person' (signing on behalf of Legally Responsible Person
named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Nuwan Wijesuriya
Title Lead Transmission Permitting Manager
Organization Legally Responsible Entity
Duke Energy Progress, LLC
Date * 02/28/2023
F. Tracking and COC Info
NOI Tracking No. 129220
NC Reference No. NCG01-2023-0556
Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed
from workflow if eNOI approved)
Certificate of NCC230556
Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SP (formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC230556-2023
Invoice Due Date 3/30/2023
Initial Fee $ 100.00
Invoice Status OPEN