HomeMy WebLinkAbout310298_Compliance Evaluation Inspection_20230228 Division of Water Resources
Facility Number 31 - 2-is'] O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection 0 Operation Review p Structure Evaluation O Technical Assistance
Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: 1 2),'.'6/23 1 Arrival Time: -1 ',1109M I Departure Time: : GG County: li v7 Region:Qi go
Farm Name: E3ro 4G/5- y i 5 Ny✓5'trX Owner Email:
Owner Name: jedalard lit/ Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: l wood 6rl7ey Integrator:
Certified Operator: pGV/ tJl5//r y Certification Number: 0/iq 3/
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder -;?600 ;L(000 I JNon-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
DischarEes and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes �o ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ['No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes [ o ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes [ o ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ffNo ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: ( - 2 R' Date of Inspection: /2
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ONo ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes [ o ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [ o ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes [allo ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes []-No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ONo ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks,or compliance alternatives that need [:] Yes Q No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes �o ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or l0 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 o ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes ErNo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes (a No ❑ NA [] NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes 0 No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes [allo ❑ NA ❑ NE
Required Records&Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes dNo ❑ NA ❑ NE
20, Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [D"No ❑ NA ❑NE
the appropriate box.
❑WUP ❑Checklists [—]Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes ZNo ❑ NA ❑NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes E!jNo ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [fNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facilit Number: 31 - 2,9 Date of Inspection: �Z ;z$ 2 3
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [E'No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes EVNo ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑-Ko ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No �A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [i] No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes Q'No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 0 No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Ycs No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 0 No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [2[No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes E2-No ❑ NA ❑ NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
6o- t sto�_ W lG scot, — du Fi�
51uc, r/ ,z/ Gr�jZ Ctnrivu
La!;bra J/Oh 5 5
Reviewer/Inspector Name: /u ' �� P�TriZ� Phone:
Reviewer/Inspector Signature: %! yam} Date:
Page 3 of 3 5/1212020