Loading...
HomeMy WebLinkAboutNCC230426_ESC Approval Submitted_20230228ROY COOPER Governor ELIZABETH S. BISER Secretary DOUGLAS R. ANSEL interlm Director NORTH CAROLINA Environmental Quality January 04, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Dare County ABC Board Attn: Mr. Ted Toler, General Manager PO Box 1879 Nags Head, North Carolina 27959 RE: Project Name: Dare ABC Retail - Buxton Project ID: Dare-2023-006 County: Dare Acres Approved: 1.1 City: Buxton Address: NC Hwy 12 River Basin: Pasquotank Date Received by LQS: December 6, 2022 Submitted By: Deel Engineering PLLC Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed atdeq,nc.gov/NCGO1. Please direct questions about the eN01 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: D--, E k- North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ,�11/[ Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 '°^m 252946.6481 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project, Sincerely, L ?At, Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc, Ted Toler, Dare County ABC Board (email) David A. Deel, PE; Deel Engineering, PLLC (email) WaRO Division of Water Resources (email) DE -.;_ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources _/'� v�1J1[ � Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 oa•�r� V 252.446.648E 1. The developer is responsible for the control of sediment on -site. 1f the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected after each storm event (NCGS 113A- 54.1(e)). Maintenance and/or clean out is necessary anytime the device is at 50% capacity. All sediment storage measures will remain on site and functional until all grading and final landscaping of the project is complete (15A NCAC 04B .0113). 2. The developer is responsible for obtaining all permits and approvals necessary for the development of this project prior to the commencement of this land disturbing activity. This could include our agency's Stormwater regulations and the Division of Water Resources' enforcement requirements within Section 401 of the Clean Water Act, the U.S. Army Corps of Engineers' jurisdiction of Section 404 of the Clean Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste Management's landfill regulations, the Environmental Protection Agency and/or The U.S. Army Corps of Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that may be required. This approval cannot supersede any other permit or approval. 3. Adequate and appropriate measures must be properly installed downstream, within the limits of disturbance, of any land disturbing activity to prevent sediment from leaving the limits of disturbance, entering existing drainage systems, impacting an on -site natural watercourse or adjoining property. (NCGS 113A-57) E Q �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 r�rrr caza�raa i "�1 � 252.946.6481 PROJECT INFORMATION SHEET APPROVAL DATE: lanuary 04.2023 RESPONSIBLE PARTY: Dare Countv ABC Board PROJECT NAME: Dare ABC Retail - Buxton COUNTY: Dare NO.: Dare-2023-006 OFF -SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON -SITE CONTACT: ON -SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE & RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@ncdenr.gov D��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources _ Washington Regional Office 1 943 Washington Square Mail I Washington, North Carolina 27889 252.946.6481 •CERTIFICATE OF P -.4AN APPROVAL The posting of this certificate certifies that aps erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality' in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54•(d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate roust be posted at: the primary entrance of the job site before construction begins and until establishment of perrnanenat gronndcover as required by Nortb Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). 100,M Aq)c 9%oo • V" r*X 4WY %OA- 4) Axe to* Ca4,ASk Project Frame and Location O% (04 120 Bate of Plan Approval Ccrtifieate ox Coverage Number I*iwm%r Regional Engineer