HomeMy WebLinkAboutNCC230537_ESC Approval Submitted_20230228ROY COOPER
Governor
ELIZABETH S. B1SER
Secretary
DOUGLAS R. ANSEL
Interim Director
Buncombe County
ATTN: Mr. Michael Mace
200 College Street, Suite 300
Asheville, NC 28801
NORTH CAROLINA
Environmental Quality
February 2, 2023
LETTER OF APPROVAL
RE: Project Name: Asheville High School Track Replacement
Acres Approved: 1.6
Project ID: BUNCO-2023-010
County: Buncombe
City: Asheville
Address: 419 McDowell Street
River Basin: French Broad
Stream Classification: C
Submitted By: Roper Civil Engineering
Date Initially Received by LQS: January 6, 2023
Date Revision Received by LQS: January 27, 2023
Plan Type: Institutional
Dear Mr. Michael Mace,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. This plan shall expire three (3) years following the
date of approval, if no land disturbing activity has been undertaken, as is required by Title
15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is processed, you will receive the COC via email. As the Financially Responsible
Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any Iand disturbing activity. The eNOI form may be accessed at
deq.nc.govJNCG01. Please direct questions about the eNOI form to the Stormwater Program
staff in the Raleigh central office. If the owner/operator of this project changes in the future,
the new responsible party must obtain a new COC.
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
MeaTM c.aacuw, �
Deovunan ui Envroiunmtet 9u�iry 828.296A500
Letter of Approval
Buncombe County
ATTN: Mr. Michael Mace
February 2, 2023
Page 2 of 3
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-S1 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Laura Christiansen
Engineer lI
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications Required for Approval
ec: Mr. Matthew Roper, PE (matt@roperce.com)
Mr. Ronnie Lunsford (ronald.lunsford@buncombecounty.org)
cc: Regional Office file
Letter of Approval
Buncombe County
ATTN: Mr. Michael Mace
February 2, 2023
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Asheville High School Track Replacement
Project ID: BUNCO-2023-010
County: Buncombe
1. Any changes to the Financial Responsibility/Ownership (FRO) form require the
form to be resigned and notarized to maintain the integrity of the document. Please
obtain a new signature and notarization for the revised FRO form and submit the
revised document to this office for review. {G.S.113A-54.1}