Loading...
HomeMy WebLinkAboutSW1221002_Plansheet CL313.P2 - Grading/Drainage Plan_20230223 LEGEND BIORETENTION 11 / °\ D o END WALL \ I \ CL905.P2 - \ °o\/ PROPERTY LINE \ 2137.00 (F) BUILDING LINE • Gresham Smyth o \ _ -2145- - EXISTING MAJOR CONTOUR GS-NC P.C. An Affiliate of Gresham Smith D6 BIORETENTION POND 1 /` °\ BERM ELEV= 2124.00 _ `'8 \ 2134 � / o\ - -2146- - - EXISTING MINOR CONTOUR PROVIDED WATER QUALITY VOLUME = 1,377 CIF RIM:2137.48 I I I REQUIRED WATER QUALITY VOLUME = 1,371 CIF � � oo EMERGENCY SPILLWAY ELEV- 2122.90 / / \ \ 2133 r REQUIRED SURFACE AREA = 1,371 SIF °o\ OUTLET STRUCTURE RIM ELEV= 2122.50 2145 MAJOR CONTOUR I I 2132 / _ PROVIDED SURFACE AREA = 1,377 SF - I I / / / 2131 _ �� o 0 2 ORIFICE ELEV= 2115.20 2146 MINOR CONTOUR 201 South College St. TW: 2137.50 / / / / BIORETENTION POND 04 °\ - - - - - - - - 10' RETAINING WALL Suite 1950 FG (N): 2137.00 N.4. N 2130 / \\ OUTLET STRUCTURE CL905.P2 o FG (S): 2130.00 I / ` Charlotte, NC 28244 \\ \ °° 2129 \D3 POND SURFACE ELEV 2115.20 \I STORM PIPE 704.944.7970 I I r \ \ � °J = 212a I / // RIM:2129.00�, I I j & \ \ \ STORMWATER CONTROL MEASURE / \\ HEADWALL ACCESS AND MAINTENANCE EASEMENT _ _ - _ - 72" OUTLET PIPE ELEV= 2095.35 4 \ I I i I / / / / / \ \ \ °\ ST STORM MANHOLE 6" PERFORATED PVC UNDERDRAIN I I / / / \ \ \ CATCH BASIN @ 1% MINIMUM SLOPE ° I / / / / / // �\ � \ \ � 01 10'WIDE BERM = 2130.00 � COMBINATION INLET / / / / / / / �G DRY DETENTION POND SECTION VIEW \ I I I� / // / \ ti - \\ - N.T.S. ® STORM CLEANOUT PERMANENT RIPRAP AT 08 \ \ ) A4 A5 � I1 I I /II 1g3II II g C I1II II II N°II I II I I I I I/ I i II I I I lI I' l I' I y♦♦ ♦ /♦ ♦ \J \\\ \\\\�\ \\\�\\\\\\ \ \\\ \ I NDWALL(TY\P.) CL905.P`2 \ \l\ � Q N�" r\ STRUCTURE LABEL RIM:2139.00 2139.00 Gresham SPOT ELEVATION2130.00 I 2129 2139.00 (F) Smith I C 1 .♦ FLUSH ELEVATIONSPILLWAYELEV2129.50 ♦ -- \ \ \� \ oIx o °212a MATCH EXISTING FINISH ° \I I .2139.00 M.E.F.G o �� GRADE ELEVATION\ \ 2127' E \ \ \\ � o � 198.80 -TOPOFCURB I p I D, I I I J I `♦♦ / X29.5o \\\ \ \✓/ ` \ \ 198.30 -BOTTOMOFCURB CURB ELEVATION 2126 IIi I II i II IIl II N°, II N III II :♦III/ LII i /I \\ \ \ 4 \\\ \\1-1 \\\\\\\U\\GE TW: 2139.50 -T OPOFFIN WISAHL L WALL ELEVAT ION rFG (N): 2139.0 GRADE FG(S): 2137.00\ ATWALL\ O\o °\D5 \ \ \o °��RIM:2139.17 D4 1-1 \ FLOW ARROW •Ce214 o\ evi -2 2128i50 D2 ° \ H.P. HIGH POINT GONAL All RPO R T�° "p<off L.P. LOW POINT 22 \ \ \\ i o � Asheville Regional p N � \ 2120 \\ \ \ \ \°® � STORMWATER CONTROL MEASURE I I NOTE: Airport \/ \ \ ACCESS AND MAINTENANCE EASEMENT 1 \ -�� 1. CONTRACTOR TO COORDINATE o° Terminal 1 I I 1 2�� \\ \\ \ \\i � � \ / � UNDERGROUND UTILITIES TO BE A MINIMUM OF I ° O" O" s \ \ \ °� / /� I 3 INCHES CLEAR BELOW THE BASE OF THE Modernization I I ° \ ♦ GRADE BEAMS WHEN PASSING UNDERNEATH. / 6" PERFORATED I I 1 I I I I I �° �/ CO, N \\ \\ \\ \ �' \ \ / 2. NO UTILITY LINES SHALL PENETRATE THE PVC UNDERDRAIN I I I I I \ \ \ \ / \ / 61 Terminal Drive Suite 1 IE - 2124.00 1 1 1 I I I I � ��a \ / \ � � � / FOOTING AT THE CENTRAL ENERGY PLANT Fletcher, North Carolina 28732 / I 1 1 1 ° -� n/ (� \ G , I I / EXCEPT FUEL LINES. 3. CONTRACTOR TO COORDINATE ALL 02/16/2022 UNDERDRAIN CLEANOUT (TYP.) l I I I / °\ UNDERGROUND UTILITY ROUTINGS. UTILITIES I I CO ; �" p 1 I SHALL BE KEPT A MINIMUM OF 12 INCHES \ I x 1 1 \ 1 1 II I I N N = Cl) / ���� p D / // I CLEAR FROM ALL FOUNDATIONS IN PLAN. GS Project#: 43483.02 TW: 2137.50 I I I I I 1 1 I 1 11 I h _ ov FG (N): 2137.00 I I I \ 1 1 1 1 I ° N N � 0) FG (S): 2130.00 ^ry ti �C/I N O �� / / Dp D �o �c POND EMER CY/ 07 ti^6 N \ SPILLWAY // CL904.P2 I \��UNIIIIIIINq��i / 4 I I I o O -� N N / 2116 p p • I .��`�� \�.CA/3p '''�% / X / S �, �- \ \ p / 20' WIDE EMERGENCY SPILLWAY ELEV= 2122.90 II = o53A4s Y P I I / END WALL 1 s 1 1 I 1 I I I D19 p p D D ` ` p D 2122.90 \ t 02/1�\ff23 / 2137.00 (F) 9�D:Hvo��?,. 2`117.20 � I I I I I I 1 1 1 1 1 I ' I 1 / \ p p U ° Dp p p ♦♦♦♦ // � / 10 D 1 1 \ p ♦♦ ♦ o / / NATHAN HUDGENS, PE r) / / I 1 I 1 I 1 1 1 I I I / \ DRY DETENTION POND 1 ° \ Dp D ♦ �° / / NC 053149 CCY) V') // // I / 1 I I I- 1 1 1 I - - - - - - - 100 YR WSE = 2123.00 \\ ♦ ♦♦ �o G� / / CVO - - - _- A - \ p a \10 REVISION I I / - - - - - _- I - I-� 1 I I I I =- _ - _ - _ - \ \\ \ \ I N \o / NO. DATE DESCRIPTION \ / 1 08/19/22 AGENCY COMMENTS EXISTING 72 RCP OUTLET PIPE D 1 II nNi m : \\ \� / 2 11/02/22 ASI 007 - _ - / 2�\\ RIM:2122.50 I N N 10'WIDE BERM = 2124 00 o�F ` 3 01/18/23 ASI 011 x N I / / / / / / / / / 27 27�8 2115.20 \ 4 02/17/23 AGENCY COMMENTS a) / / / / / / / CONTRACTOR TO VERIFY DEPTHS OF EXISTING 2j2o �9 STORM STRUCTURES AND PIPES TO REMAIN 2122 �� -\ Cl) ° - - - - `- 0 \( NI M \ 1 �, e. _ r'u • \\\ \moo co O `e. oc a \o 1* D18 '!`t \�F oc\ �� \ \ RIM:2135.38 vb&�; \ °' CONTRACTOR TO VERIFY DEPTHS OF EXISTING CL \ STORM STRUCTURES AND PIPES TO REMAIN. EXISTING STRUCTURE RIM TO BE RAISED FROM 2118.00 \\ J TO 2122.50 PER DRY DETENTION POND DESIGN. - \ \ EXISTING MANHOLE RIM TO BE LOWERED o \\ \ FROM 2118.94' TO 2116.20'. _ F s \ \ \ � - oc\ e�l�e _ DETENTION POND 1 03 I \i\ \\ Q \\ \\ ems! � OUTLET STRUCTURE CL902.P2 \\ ♦ \ \ N GRAPHIC SCALE DETAILED 0 co 1* KEYPLAN GRADING PLAN co - - - - - - - - - - - I �I Al ' A2 ' A3 �s CL313mP2 0 - - - - -i - - - - - i- - - - - Q OVERALL GRADING & DRAINAGE PLAN B1 B2 B3 1 SCALE: 1"=60' O CONSTRUCTION DOCUMENTS I