Loading...
HomeMy WebLinkAboutSW1221002_Supplement-EZ Form_20230223SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Proiect Area fac) )astal Wetland Area (ac) irface Water Area (ac) this project High or Low Density? )es this project use an off -site SCM? Greater Asheville Regional Airport Terminal Modernization 6.89 R COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 30 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 linfiltration System 12 Bioretention Cell 1 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 JGreen Roof 19 Level Spreader -Filter Strip (LS-FS) 20 Disconnected Impervious Surface (DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 IFilterra FORMS LOADED DESIGNER TIFICATION 27 Name and Title: Nathan Hudgens, PE 28 Organization: Gresham Smith 29 Street address: 222 2nd Ave S, STE 1400 30 City, State, Zip: Nashville, TN 37201 31 Phone number(s): 615-770-8155 32 Email: nathan.hudgens@greshamsith.com Certification Statement: certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Seal Signa urref Designer 02/20/2023 Date DRAINAGE AREAS 1 Ils this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Bioretention Pond 5 Total drainage area (sq ft) 300154 169222 6 Onsite drainage area (sq ft) 300154 169222 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project (sq ft) 227221 sf 141167 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) N/A N/A 10 New BUA not on subdivided lots (subject to permitting) (sf) 227221 sf 141167 sf 11 Offsite BUA (sq ft) N/A N/A 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft) 22073 sf 15502 sf Sidewalk (sq ft) 26625 sf 15899 sf Roof (sq ft) 69790 sf 52088 sf Roadway (sq ft) 66700 sf 15645 sf Future (sq ft) N/A N/A Other, please specify in the comment box below (sq ft) 42033 sf 42033 sf 13 New infiltrating permeable pavement on subdivided lots (sq ft) N/A N/A 14 New infiltrating permeable pavement not on Isubdivided lots (sq ft) N/A N/A 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 205465 sf 18 Percent BUA 76% 19 Design storm (inches) 2.2 in 20 1 Design volume of SCM (cu ft) 1204 cf 21 ICalculation method or design volume Volume Mate ing ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about the drainage area(s): 42,033 sf of impervious area added on the airside of the airport is routed to the bioretention pond and included in the site total area to account for physical limitations of routing all impervious area at the north side of the terminal to a primary SCM. BIORETENTION CELL 1 jDrainage area number 1 1 (1-5 and 1-6) 2 IMinimum required treatment volume cu ft c GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designedy an NG licensedpro essiona . es BIORETENTION CELL MDC FROM 02H .1052 18 SHWT elevation ms 2102.30 19 Bottom of the bioretention cell (fmsl) 2123.75 20 Ponding depth of the design storm (inches) 12 in 21 Surface area of the bioretention cell (square feet) 1377 sf 22 Design volume of SCM (cu ft) 1377 cf 23 Is the bioretention cell used for peak attenuation? No 24 Depth of peak attenuation over planting surface (in) 12 in 25 Height of peak attenuation outlet above the planting surface (in) 12 in 26 Infiltration rate of the in situ soil (inch/hour) 1 in/hr 27 Diameter of the underdrain pipes (if applicable) 6 in 28 Does the design include Internal Water Storage (IWS)? Yes 29 if so, elevation of the top of the IWS (fmsl) 2126.5 30 Elevation of the planting surface (fmsl) 2128 31 other)? Trees/Shrubs 32 Media depth (inches) 36 in 33 Percentage of medium to coarse washed sand by volume 80% 34 Percentage of fines (silt and clay) by volume 10% 35 Percentage of organic matter by volume 10% 36 Type of organic material pine bark fines 37 Phosphorus Index (P-Index) of media (unitless) 30 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch, if applicable (inches) 3 in 41 Type of mulch, if applicable hardwood 42 IHow many clean out pipes are being installed? 1 43 11 ype OT pretreatment tha will be used: grave ADDITIONAL 44 INFORMATION Please use this space to provide any additional information about the bioretention cell(s): Bioretention 3 9:46 AM 2/20/2023