HomeMy WebLinkAboutSW6140302_Supplement_20140424N17nr�rrr Permit No. it w'e _r4. (ro be provided by D WD) �\ 11 0Q=�2�(7V�J�452 dji'•Pjo2pF WA7cROC NCDENR 0..0.... STORMWATER MANAGEMENT PEQT'APPr QJION ORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This tom must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted skmg with all ofthe required information. I!. PROJECT INFORMATION Project name West Hampton Phase II Contact person Scott Brown Phone number 910-426-6777 ext. 102 _ Date 2J3I2014 - Drainage area number 1 III DESIGNIINFORMATION'. Site Characteristics Drainage area 1,157,130 ii Impervious area, post -development 356,178 ft2 %impervious 30.78 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 31,768 fts Volume provided 51,950 ftr OK, volume provided is equal to or in excess of volume required. Storage Volume: SAWaters 1.5'runoff volume fts -- - ---- - - Pre -development 1-yr, 24-hr runoff it Post -development 1-yr, 24-hr runoff ft3 Minimum volume required it I I OCT 16 2014 � Volume provided fts Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in _ ' _GE _ 1 Rational C, pre -development 0.30 (unidess) - Rational C, post -development 0.52 (unitess) /-� Z _U Rainfall intensity: l-yr, 24-hr storm Pre -development 1-yr,224hr peak bow 0.13 inthr .ftslsec OK U Post -development 1-yr, 224hr peak flow 0 .3939 ft'Isec Pre/Post 1-yr, 24-hr peak flow control -0.65 ftslsec (] Elevations Temporary pool elevation - 101.20 fmsl Permanent pool elevation 99.10 fmsl SHWT elevation (approx. at the pen. pool elevation) 99.57 fmsl Top of 10ft vegetated shelf elevation 99.60 fmsl Bottom of 10ft vegetated shelf elevation 98.60 fmsl Data not needed for calculation option #1, but OK if provided. Sediment deanout, top elevation (bottom of pond) 94.10 fmsl Sediment Geanout, bottom elevation 93.10 fmsl Data not needed for calculation option #1, but OK if provided. Sediment storage provided 1.00 it Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 101.2 fmsl OK Form SW401-Wet Detention Basir,Rev.9-4/18/12 Parts I. S II. Design Summary, Page 1 of 2 Permit (fo be povided by DM) II!, DESIGMINFORMATION Surface Areas Area, temporary pool 25,593 ftr Area REQUIRED, permanent pod 20,018 It SAIDA ratio 1.73 (unithm) Area PROVIDED, permanent pool, A�,,,y d 20,065 ft` OK Area, bottom of 1 OR vegetated shelf, A a, �,� 16,839 ft` Area, sediment deanout, top elevation (bottom of pond), A,.,e 8,936 fe Volumes Volume, temporary pool 51,950 fta OK Volume, permanent pool, Vpa _,a,, 79,625 ft' Volume, forebay, (sum of forebays if more than one fombay) 14,354 ft" Forebay % of permanent pool volume 18.0% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 1.73 (unifiess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pod, Vp _,,y 79,625 ft' Area provided, permanent pool, A _,d 20,065 ft Average depth calculated 3.00 If OK Average depth used in SAIDA, d., (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pod, Ap,. 20,065 ft/ Area, bottom of tOft vegetated shelf, Ae mer 16,839 ft' Area, sediment deanout, top elevation (bottom of pond), Abya.4 8,936 ft' 'Depth' (distance btw bottom of 1 Oft shelf and top of sediment) 4.50 ft Average depth calculated ft Average depth used in SAIDA, d,V, (Round to down to nearest 0.511) It Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 3.25 in Area of orifice (ff-non-circular) in' Coefficient of discharge (Cc) 0.60 (unit ess) Driving head (Hj 0.00 it Drawdown through weir! N (Y or N) Weirtype (unifless) Coefficient of discharge (C„) (unittess) Length of weir (L) it Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 1.04 ftalsec Post -development 1-yr, 24-hr peak flow 0.39 ft'/sec Stooge volume discharge rate (through discharge orifice or weir) 0.23 fl3lsac Storage volume drawdown fire 2.60 days OK, draws down in 25 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 it OK Length of towpath to width ratio 3 :1 OK Length to width ratio 3.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.2 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Captives all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP OUT Fonn SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design summary, Page 2 of 2 Permit No. (to be Provided by DWQ) III!, REQUIRED'ITEMS CHECKLIST' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. C 3.0 4 > 1. Plans (1"- 50' or larger) of the entire site showing: 3•q Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. S R C 3�- 3.9 2. Partial plan (1" = 30' or larger) and details for the wet detention basin shoving: (LS't�-S 17 - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. 513 ^^ l` S. 14 3. Section view of the wet detention basin (1" = 20' or larger) showing: S / 7 - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. S13—J•$� 3.9 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 513 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 5 r3 3. D 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 5 t3 0AU S 7. The supporting calculations. Si3 f U05 &, A copy of the signed and notarized operation and maintenance (O&M) agreement. S IS MC CS g A copy of the deed restrictions (if required). SL7 Q Q� PS 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/19/12 Part III. Required Items Checklist, Page 1 of 1 Permit No. /to ee provided by Dw0) SEAL 027452 0 NCDENR b / I `01 STORM WATER MANAGEMENT PERMIT APPLICATION FORM i' o 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Dale Drainage area number Scatt Brown 910426-6777 ext. 102 II. DESIGN INFORMATION Site Characteristics Drainage area 441,212 if Impervious area, post -development 134,087 f? %impervious 30.39 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5'runoff volume Pre -development 1-yr, 24-hp runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre.IPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm, pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the lop of the additional volume o2�F 10ATEg0G y T O T 11,732 ft3 12,368 ft3 OK, volume provided is equal to or in excess of volume required. ft3 it, ft3- ft3 , It Y (Y or N) 3.0 in 0.30 (unidess) 0.50 (unidess) 0.13 inmr OK 0.39 ft3lsec 0.09 ft3/sec -0.30 ft3/sac 112.71 fmsl 111.50 fmsl 111.94 lnisl 112.00 first 111.00 fmsl 106.50 fmsl 105.50 Irnsl 1.00 It (Y or N) 112.7 fmsl OCT 16 ?C.•: Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. OK Forth SW401-Wet Detention Basin-Rev.g-4/18A2 Pans 1. S 11. Design Summary, Page 1 of 2 -j," .; Permit (to be Provided 0y DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 11,855 ft3 Area REQUIRED, permanent pool 8,383 ft SAIDA ratio 1.90 (unitless) Area PROVIDED, permanent pool, A� 8,491 ft OK _pw Area, bottom of 1 Oft vegetated shelf, A, uon 6,619 ft Area, sediment cleanout, top elevation (bottom of pond), A. �a 2,359 ft Volumes Volume, temporary pool 12,368 ft3 OK Volume, permanent pool, Va,,,,. 25,011 ft' Volume, forebay (sum of forebays if more than one forebay) 4,520 ft' forebay %of permanent pool volume 18.1% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) MountairVPiedmont SAIDA Table Used? N (Y or N) SAIDA ratio 1.90 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vim,,, . 25,011 ft3 Area provided, permanent pool, A._. 8,491 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, d., (Round to nearest 0.511) 3.0 it OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ate,,,, 8,491 ft' Area, bottom of 10ft vegetated shelf, A,ua, 6,619 fh Area, sediment cleanout, top elevation (bottom of pond), Ay,. 2,359 e 'Depth' (distance blw bottom of 1Oft shelf and top of sediment) 4.50 it Average depth calculated it Average depth used in SAIDA, J., (Round to down to nearest 05ft) It Drawdown Calculations Dmwdown through orifice? Y (Y or N) Diameter of orifice (d circular) 1.75 in Area of orifice (if-noncircular) in Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.40 ft Dmwdown thmugh weir/ N (Y or N) Weir type (unitless) Coefficient of discharge (C„) (uni8ess) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 0.39 ft3/sec Post -development 1-yr, 24-hr peak flow 0.09 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.05 ft3ISec Storage volume drawdown time 2.80 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & onfce? Y (Y or N) OK Freeboard provided 2.3 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PUMP OUT Forth SW401-Wet Detention Basin-Rev.94/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III:, REQUIRED, ITEMS -CHECKLIST' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. s� (-3• D �0 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROM, Overflow device, and Boundaries of drainage easement. S3 C 7,8 - 39 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. S" /6 3. Section view of the wet detention basin (1" = 20' or larger) showing: Z 7 - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 58 0-3.8-7.9 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. S8 SAC e5 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. S 3 (AL(s 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. S B "11e5 7. The supporting calculations. 5/3 (A/CS 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. 53 U/es 9. A copy of the deed restrictions (if required). Sf3 �4LCS 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.94/18/12 Pan III. Required Items Checklist, Page 1 of 1 Permit No. • - (to be provided by DWQ) o201C WA TF9OG NCDENR o�< STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION'. Project name West Hampton Phase II Contact person Scott Broom Phone number 910-426-6777 ext. 102 Date 2/3/2014 Drainage area number 1 II!. DESIGN; INFORMATIONI - - - - Site Characteristics Drainage area 1,157,130 ft° Impervious area, post -development 356,178 ft' %impervious 30.78 % Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelposl control of the tyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWr elevation (approx. at the perm. pool elevation) Top of 1011 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp, pool? Elevation of the top of the additional volume 1.0 in 31,768 ft3 52,135 ft3 OK, volume provided is equal to or in excess of volume required. It Y , (Y or N) 3.0 in 0.30 (unrtless) 0.52 (uniUess) 0.13 m/hr OK 1.04 ft3/sec 0.39 ft3/sec -0.65 ft'/sec OCT 1 6 C 101.18 fmsl 99.10 fmsl 99.57 fmsl 99.60 fmsl 98.60 Imsl Data not needed for calculation option #1, but OK if provided. 94.10 fmsl 93.10 trust Data not needed for calculation option 411, but OK 8 provided. 1.00 it Y (Y or N) 101.2 hnsl OK Feral SW401-Wet Detention Basin-Rev.9-4118112 Parts I. & It. Design Summary, Pape 1 of 2 Permit No. (b be pmmW by DWD) Il..DESIGN ..INFORMATIONL.... Surface Areas Area, temporary pool 27,055 ft' Area REQUIRED, permanent pool 17,820 ftz SAIDA ratio 1.54 (unitless) Area PROVIDED, permanent pool, Ap,,,, cad 21,032 ft` OK Area, bottom of 1 Oft vegetated shelf, A,,N. 18,195 ft` Area, sediment cleanout, top elevation (bottom of pond), Aw,y 9,477 ft` Volumes Volume, temporary pool 52,135 ft' OK Volume, permanent pool, Vy,,,,ym 68,311 ft' Volume, forebay (sum of forebays ff more than one forebay) 14,445 ft' Forebay %of permanent pool volume 21.1% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA redo 1.54 (unidess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vp,, ,, 68,311 ft' Area provided, permanent pool, Ap,.,r," 21,032 ft` Average depth calculated 4.40 it OK Average depth used in SAIDA, d„, (Round to nearest 0.5ft) 4.5 It OK Calculation option 2 used? (See Figure 10-21h) N (Y or N) Area provided, permanent pool, Ao _p, 21,032 ft` Area, bottom of 1Oft vegetated shelf, A, -a 18,195 ft Area, sediment cleanout, top elevation (bottom of pond), Ay_,, 9,477 ft 'Depth" (distance b/w bottom of 10ft shelf and lop of sediment) 4.50 ft Average depth calculated ft Average depth used in SAIDA, it.., (Round to down to nearest 0.5ft) It Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of office (if-non-arcular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development i-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow 8 orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 3.25 in in' 0.60 (unless) 0.00 ft N (Y or N) (unless) (unitless) ft ft 1.04 ft'/sec 0.39 ft3/sec 0.23 ft'/sec 2.60 days 3 :1 10 :1 10.0 If 3a 3.0 :1 Y (Y or N) 1.4 ft N (Y or N) Y (Y or N) Y (Y or N) PUMP OUT OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK Of Form SW401-Wet Detention Basio-Rev.9-M78112 Paris I, a II. Design Summary, Page 2 of 2 j, Permit No. . (b be provided by DWD) o2pf W AT -; S NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad 111) must be printed, filled out and submitted along with ell of the required information. I. PROJECT INFORMATIONi Project name West Hampton Phase II Contact person Scoft Bro m Phone number 910-426-6777 ext. 102 Date 2/3/2014 Drainage area number 1 11 DESIGN INFORMATION Site Characteristics Drainage area 441,212 ft' Impervious area, post -development 134,087 g2 %impervious 30.39 % Design rainfall depth 1.0 in Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' mnog volume Pre -development l-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SH WT elevation (approx. at the perm. pool elevation) Top of 1011 vegetated shelf elevation Bottom of 1011 vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment deanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 11,732 ft3 12,368 it' OK, volume provided is equal to or in excess of volume required, ft3 it ft3 ft3 ft3 OCT 16 Y (Y or N) 3.0 in 0.30 (unitless) 0.50 (unifless) 0.13 in/hr OK 0.39 ft3/sec 0.09 ft3/sec -0.30 ff3kcr. 112.71 hnsl 111.50 first 111.94 mist 112.00 first 111.00 fmsl Data not needed for calculation option Ill, but OK if provided. 106.50 fmsl 105.50 fmsl Data not needed for calculation option 1t1, but OK if provided. 1.00 it Y (Y or N) 112.7 bnsl OK Form SW401-Wet Detention Basin-Rev.9-4/1e/12 Pans I. 311. Design Summary, Page 1 of 2 Permit No. fro be provided by DWD) Ib, DESIGN!JNFORMATIONI Surface Areas Area, temporary pool Area REQUIRED, permanent pod SAIDA ratio Area PROVIDED, permanent pool, Ap,, w Area, bottom of 10ft vegetated shelf, A..,,,, Area, sediment deanout, top elevation (bottom of pond), A,., Volumes 11,855 ft 8,383 ft 1.90 (unitless) 8,491 ft OK 6,619 ft 2,359 ft Volume, temporary pod 12,368 ft3 Volume, permanent pod, Vp,,,, cm 25,011 fts Volume, fombay (sum of forebays 8 more than one tomboy) 4,520 ft3 Forebay % of permanent pool volume 18.1 % % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountairvPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-21h) Volume, permanent pool, V._P, Area provided, permanent pool, Ap,,,, w Average depth calculated Average depth used in SAIDA, dn., (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap,,,,y Area, bottom of 1Oft vegetated shelf, A,,ran 90 % Y (Y or N) N (Y or N) 1.90 (unidess) OK OK Y (Y or N) 25,011 ft3 B,491 f? 3.00 If OK 3.Oft OK N (Y or N) 8,491 fe 6,619 ft Area, sediment deari top elevation (bottom of pond), A,. 2,359 fe 'Depth' (distance btw bottom of 1 Oft shelf and top of sediment) 4.50 ft Average depth calculated It Average depth used in SAIDA, d,., (Round to down to nearest 0.5ft) It Drawdown Calculations Drawdown through orfice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Ha) Drawdown through weir? Weirtype Coefficient of discharge (C,) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of towpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated fifer provided? Recorded drainage easement provided? Capures all runoff at ultimate buildout? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.75 in in7 0.60 (unidess) 0.40 It N (Y or N) (unidess) limitless) It It 0.39 ft3/sec 0.09 ft3/sec 0.05 fts/sec 2.80 days 3 :1 10 :1 10.0 It 3a 2.0 a Y (Y or N) 2.3 It N (Y or N) Y (Y or N) Y (Y or N) PUMP OUT OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK OK Form SW401-Wet Detention Basir-Ray.9-4/1B/f2 Pans 1. & It. Design Summary, Page 2 of 2 I 's' Permit (to be provided by NCDENR SEAC f 027452 - %C "'-AfG,INEE 0, 'I� I o2�F WA7EAo *Q ,f� 0 STORMWA EC CERTIFICATION APPLICATION f'ORM' ' �M WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Pad 111) most be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name West Hampton Phase II Contact person Scott Brown Phone number 910-426-6777 ext. 102 Date 2/3/2014 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics - - -- Drainagearea 1,157,130 e - Impervious area, post development 356,178 112 - r %impervious 30.78 % Design rainfall depth 1.0 in - OCT 16 Storage Volume: Non -SA Waters Minimum volume required 31,768 ft3 Volume provided 52,135 Its Of, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5' mnoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hrstorm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment cleanoul, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume ft3 ft3 Y (Y or N) 3.0 in 0.30 (unitless) 0.52 (unitless) 0.13 inRu OK 1.04 ft3lsec 0.39 ft3lsec -0.65 ft3lsec 101.18 fmsl 99.10 fmsl 99.57 fmsl 99.60 fmsl 98.60 fmsl 94.10 tryst 93.10 fmsl 1.00 It APR 2 1 2014 Data not needed for calculation option #1, but OK if provided. Data not needed for calculation option #1, but OK if provided. Y (Y or N) 101.2 fmsl OK Forth SW401-Wet Detention Basin -Rev 9-4118/12 Parts I. S 11. Design Summary, Page 1 of 2 Permit No. (to be provided by DWO) II. DESIGN INFORMATION Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, An, . Area, bottom of 1 Oft vegetated shelf, A. vie, Area, sediment cleanout, top elevation (bottom of pond), A.y re„ Volumes 27,055 it' 17,820 fl 1.54 (unitless) 21,032 ft? OK 18,195 ftz 9,477 It' Volume, temporary pool 52,135 ft' Volume, permanent pool, Vo,,,, r, 68,311 ft3 Volume, forebay (sum of forebays if more than one forebay) 14,445 ft3 Forebay %of permanent pool volume 21.1% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? MountairVPiedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vim,,, , Area provided, permanent pool, A._,, Average depth calculated Average depth used in SAIDA, da,., (Round to nearest 0.511 Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A.-. Area, bottom of 1 Oft vegetated shelf, Aw g� 90 % Y (Y or N) N (Y or N) 1.54 (unitless) Y (Y or N) 68,311 ft3 21,032 Ile 4.40 it 4.5 it N (Y or N) 21,032 ft 18,195 ft Area, sediment deanout, top elevation (bottom of pond), A,., 9,477 11 'Depth' (distance btw bottom of 1Oft shelf and top of sediment) 4.50 it Average depth calculated it Average depth used in SAIDA, d., (Round to down to nearest 0.511) ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cu) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head(H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of Impart to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 3.25 in in 0.60 (unitless) 0.00 It N (Y or N) (unitless) (unitless) it ft 1.04 ft3/sec 0.39 ft3/sec 0.23 ft3/sec 2.60 days 3 :1 10 :1 10.0 it 3 :1 3.0 :1 Y (Y or N) 1.4 It N (Y or N) Y (Y or N) Y (Y or N) PUMP OUT OK OK OK OK OK, draws down in 2-5 days. OK OK OK OK OK OK OK OK OK OK Form SW401-Wel Detention Basin -Rev 9-4/ia/12 Parts I. & ll. Design Summary, Page 2 of 2