HomeMy WebLinkAboutNCC230515_Site Plan or Location Map_20230227TRENCH SECTION LENGTHS:
4" MDPE = 2,635f LF
6" MDPE = 2,730t LF
TOTAL LENGTH OF TRENCHING = 5,365f FT
BORE SECTION LENGTHS:
4" MDPE = 2,685f LF
(INCLUDES 400t LF OF 8-IN STEEL CASING PIPE)
6" MDPE = 4,250f LF
TOTAL LENGTH OF BORES = 6,935f FT
TOTAL PROJECT LENGTH = 12,300t FT
t TOTAL AREA OF LAND DISTURBANCE = 5.71 AC.
CONSTRUCTION PLANS
FOR LINE 53 REPLACEMENT
TARBORO, EDGECOMBE COUNTY, NC
LOCATION MAP
N
NTS
ISSUE FOR CONSTRUCTION
DATE JANUARY 26, 2023
SHEET INDEX
1 COVER SHEET
2 STANDARD NOTES
3 PROPOSED GAS LINE STA. 10+00 TO STA. 20+00
4 PROPOSED GAS LINE STA. 20+00 TO STA. 30+00
5 PROPOSED GAS LINE STA. 30+00 TO STA. 40+00
6 PROPOSED GAS LINE STA. 40+00 TO STA. 50+00
7 PROPOSED GAS LINE STA. 50+00 TO STA. 60+00
8 PROPOSED GAS LINE STA. 60+00 TO STA. 70+00
9 PROPOSED GAS LINE STA. 70+00 TO STA. 80+00
10 PROPOSED GAS LINE STA. 80+00 TO STA. 90+00
11 PROPOSED GAS LINE STA. 90+00 TO STA. 100+00
12 PROPOSED GAS LINE STA. 100+00 TO STA. 110+00
13 PROPOSED GAS LINE STA. 110+00 TO STA. 120+00
14 PROPOSED GAS LINE STA. 120+00 TO STA. 127+50t
15 CSX CROSSING #1
16 CSX CROSSING #2
17 STANDARD DETAILS
18 STANDARD DETAILS
19 EROSION CONTROL NOTES
20 EROSION CONTROL DETAILS
CIVIL ENGINEER: MICHAEL A. YOUNG, PE
ALPHA & OMEGA GROUP
4601 LAKE BOONE TRAIL, SUITE 3C
RALEIGH, INC 27607
919-981-0310
MAYOUNG@AOGROUP.COM
PING CONTACT: JOSHUA LANAVILLE
919-705-5061
JOSHUA.LANAVILLE®DUKE—ENERGY.COM
41,
Know what's below.
Call before you dig.
'4"111
lk �
�� SEAL
022982
M i c�4��lSMn�IX�l9iied by
A. Young 09:22:07:22:0123.01.-06'00'
'
•. DUKE
ENERGY,
�)iedrnont
x natural Gas
H
Z
a
W
W
z
W
o
W
�
�
Q
U
J
_
0-
d
W
0
�
�
z
M
Z
o
<
o
u7
m
as
W
L
�
a
Z_O~
ry
w
0
U
Project No.:
2021.082
Issued For:
CONSTRUCTION
Issued Date:
1/26/2023
Drawn By: CTS
Checked By: MAY
Sheet No.:
1