Loading...
HomeMy WebLinkAboutNCC230515_Site Plan or Location Map_20230227TRENCH SECTION LENGTHS: 4" MDPE = 2,635f LF 6" MDPE = 2,730t LF TOTAL LENGTH OF TRENCHING = 5,365f FT BORE SECTION LENGTHS: 4" MDPE = 2,685f LF (INCLUDES 400t LF OF 8-IN STEEL CASING PIPE) 6" MDPE = 4,250f LF TOTAL LENGTH OF BORES = 6,935f FT TOTAL PROJECT LENGTH = 12,300t FT t TOTAL AREA OF LAND DISTURBANCE = 5.71 AC. CONSTRUCTION PLANS FOR LINE 53 REPLACEMENT TARBORO, EDGECOMBE COUNTY, NC LOCATION MAP N NTS ISSUE FOR CONSTRUCTION DATE JANUARY 26, 2023 SHEET INDEX 1 COVER SHEET 2 STANDARD NOTES 3 PROPOSED GAS LINE STA. 10+00 TO STA. 20+00 4 PROPOSED GAS LINE STA. 20+00 TO STA. 30+00 5 PROPOSED GAS LINE STA. 30+00 TO STA. 40+00 6 PROPOSED GAS LINE STA. 40+00 TO STA. 50+00 7 PROPOSED GAS LINE STA. 50+00 TO STA. 60+00 8 PROPOSED GAS LINE STA. 60+00 TO STA. 70+00 9 PROPOSED GAS LINE STA. 70+00 TO STA. 80+00 10 PROPOSED GAS LINE STA. 80+00 TO STA. 90+00 11 PROPOSED GAS LINE STA. 90+00 TO STA. 100+00 12 PROPOSED GAS LINE STA. 100+00 TO STA. 110+00 13 PROPOSED GAS LINE STA. 110+00 TO STA. 120+00 14 PROPOSED GAS LINE STA. 120+00 TO STA. 127+50t 15 CSX CROSSING #1 16 CSX CROSSING #2 17 STANDARD DETAILS 18 STANDARD DETAILS 19 EROSION CONTROL NOTES 20 EROSION CONTROL DETAILS CIVIL ENGINEER: MICHAEL A. YOUNG, PE ALPHA & OMEGA GROUP 4601 LAKE BOONE TRAIL, SUITE 3C RALEIGH, INC 27607 919-981-0310 MAYOUNG@AOGROUP.COM PING CONTACT: JOSHUA LANAVILLE 919-705-5061 JOSHUA.LANAVILLE®DUKE—ENERGY.COM 41, Know what's below. Call before you dig. '4"111 lk � �� SEAL 022982 M i c�4��lSMn�IX�l9iied by A. Young 09:22:07:22:0123.01.-06'00' ' •. DUKE ENERGY, �)iedrnont x natural Gas H Z a W W z W o W � � Q U J _ 0- d W 0 � � z M Z o < o u7 m as W L � a Z_O~ ry w 0 U Project No.: 2021.082 Issued For: CONSTRUCTION Issued Date: 1/26/2023 Drawn By: CTS Checked By: MAY Sheet No.: 1