Loading...
HomeMy WebLinkAbout20130173 Ver 1_Approval Letter_20130904. � ��. 5��� ��- , NCDENR : North Carolina Department of Environment and Natural Resources � Division of Water Quality 'Y� �� � � � Z013 '- � Pat McCrory Charles Wakild, P. E. John E Governor Director DWQ Project No: 20130173 County: Jones Applicant: NCDOT-- Project Name: Bridge #20 over Island Creek 401 Water Quality Certification Issued Date: March 27, 2013 Certificate of Completion -�,,, � � ��°R�.,�f� , Skvarla,'111 Secretary Upon completion of all work approved within the 401 Water quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the Webscape Unit, NC DWQ, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certi�cation I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials: Signature: Agent's Certifcation Date: I, , hereby state that, to the best of my abilities, due care and diligence was.used in the observation of the construction such that the construction was observed to be built within s,ubstantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and s�pecifications, and other supporting materials. Signature: Date: If this project was designed by a Certi�ed Professional I, �ran� �_A,{[►.,nYl Q , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having een authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that,. to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. � Signature: `�?������ Wetlands, Buffers, Stormwater— Compliance and Permitting (Webscape) Unit 1650 Mail Service Center, Raleigh, NoAh Carolina 27699-1650 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 919�07-63001 FAX: 919-807-64941 Customer Service:1-877�23-6748 Intemet: www.ncwaterquality.org Date: g- 2 3- 1?� NorthCarolina �aturall�