HomeMy WebLinkAboutNCC230470_NOI Application_20230223Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 2/16/2023 10:47:27 AM (NCG01 NOI Submission)
Approve by Brooklyn. Broussard 2/16/2023 10:53:52 AM (Review - NOI 127548 HL-0028 US 401 at Mill Creek)
• The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: February 21, 2023 5:00
PM 2/16/2023 10:48:09 AM
• The task was assigned to Brooklyn. Broussard by round robin distribution 2/16/2023 10:48:09 AM
Submit by Tev.Holloman 2/23/2023 9:10:17 AM (Payment Verification for NCC230470)
• Bryan Vickery
The task was assigned to DEMLR NCG01 Payment Team. The due date is: March 30, 2023 5:00 PM
2/16/2023 10:54:13 AM
• Tev.Holloman assigned the task to Tev.Holloman 2/23/2023 9:08:16 AM
R
�o
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting an NOI that was rejected before?
No
Yes
Previous Rejected NOI No.
127389
Prior Reviewer Name
Brooklyn Broussard
1a. Project Name*
HL-0028 US 401 at Mill Creek
1b. Specific Lot Numbers
This field may be used to list specifc lot numbers.
N/A
1c. Parcel ID Number(s) (PIN)
List all PINS associated with this project.
N/A
2. County*
Wake
3. Highway or Street Address*
US-401 and Mill Creek Drive
Street name only is acceptable if no address number assigned yet
4. City or Township*
Fuquay-Varina
5. State* NC
6. Zip Code* 27526
7. Latitude* Enter the latitude in decimal degrees
35.6010
8. Longitude* Enter the longitude in decimal degrees (MUST be negative)
-78.7540
U
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
04/17/2023
Estimated Construction Project Start Date
10. Date to End*
12/17/2023
Estimated Construction Project End Date
11. SIC (Primary)*
Other (9999)
Standard Industrial Classification for Development
12. Acres to be 1.57
disturbed* (including off -site borrow and waste areas)
13. Total site area 3.39
(acres) *
14. Post -construction 0.77
impervious area (Estimated)
(acres) *
Project Tracking ID NCC-WAKE-2023-HL-0028 US 401 at Mill Creek
Assigned automatically (not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a. Receiving Waterbody*
Terrible Creek
Name of waterbody into which stormwater runoff will discharge
15b. Waterbody Index No.*
27-43-15-8-(1)
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
16a. Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA (American Rescue Plan Act) grant funds?
No
Yes
This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date. Reviewer may update if status is
known.
B. Permittee Information
Part B.
Permittee Information - Legally Responsible Entity and Individual
......................................................................................................................................................................
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as
a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
1. Permittee* Legally Responsible Entity
Town of Fuquay-Varina
If permittee is an individual, enter first and last name in this field. Otherwise, enter organization/business name.
Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the
registration here. Permittee must be the same entity that is responsible for the land -disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership (FRO) Form.
2. First Name* Matthew
If Corporation, enter Registered Agent First Name
3. Last Name* Poling
If Corporation, enter Registered Agent Last Name
3b. Title Engineering Director
4. Permitee E-mail mpoling@fuquay-varina.org
Address *
5. Permittee 919-753-1035
Telephone No.*
6. Permittee Mailing Street Address
Address* 134 North Main Street
Address Line 2
City
State / Province / Region
Fuquay-Varina
NC
Postal / Zip Code
Country
27526-1934
us
Check box if the Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address * 134 North Main Street
Address Line 2
City
State / Province / Region
Fuquay-Varina
NC
Postal / Zip Code
Country
27526-1934
us
8. Type of Ownership is only individual if an individual is named in B.1. above.
Ownership* Government - Municipal
C. Site Contact Information
Part C.
Proiect Site Contact Information
1. Primary Site Matthew
Contact - First
Name*
2. Primary Site Poling
Contact - Last Name*
3. Title Engineering Director
4. Site Contact E-mail mpoling@fuquay-varina.org
Address *
5. Site Contact 919-753-1035
Telephone No.*
6. Organization Name Town of Fuquay Varina
7. Site Contact Street Address
Mailing Address* 134 North Main Street
Address Line 2
City
Fuquay-Varina
Postal / Zip Code
27526-1934
8. Consultant Name (Optional)
Bryan Vickery
First and Last name
9. Consultant E-mail bryan.vickery@kimley-horn.com
This person will be copied on all correspondence.
10. Consultant 919-653-2905
Telephone No.
11. Billing E-mail (For Annual Fee correspondence)
mpoling@fuquay-varina.org
Default is legally responsible person e-mail
12. Billing Telephone (For Annual Fee correspondence)
919-753-1035
Default is legally responsible person telephone
State / Province / Region
NC
Country
us
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 12/08/2022
Approved *
2. E&SC Plan Project WAKE-2023-032
Number/ID * Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4. State DEQ Office* Raleigh (RRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can
include the beginning point and end point coordinates in the "Notes" box below).
5. E&SC Plan E&SC Plan Approval Letter.pdf 259.62KB
Approval letter or Must be PDF format
Grading Permit
6. Signed FRO Financial Responsibility/Ownership Form
Signed FRO.pdf 800.65KB
Must be PDF format
7. Site Location Map Must be PDF format (limit 20 MB)
Site Location Map.pdf 396.26KB
Please do not upload entire set of E&SC plans.
B. Notes (Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application. Include additional waterbodies if necessary.
9. NOI Certification NOI Certification Form.pdf 865.82KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613 (1) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project, for satisfying
the requirements of this permit, and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is, to the best of my knowledge and belief, true,
accurate, and complete based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person' (signing on behalf of Legally Responsible Person
named in Part B)
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Matthew B. Poling, PE
Title Engineering Director
Organization Legally Responsible Entity
Town of Fuquay-Varina
Date * 02/16/2023
F. Tracking and COC Info
NOI Tracking No. 127548
NC Reference No. NCG01-2023-0470
Indicates NCG01 or NCG25. Uses NOI number until approved, then uses NUMBER incremented by SP (passed
from workflow if eNOI approved)
Certificate of NCC230470
Coverage (COC) No.* Uses NOI number until approved, then uses NUMBER incremented by SP (formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC230470-2023
Invoice Due Date 3/18/2023
Initial Fee $ 100.00
Invoice Status OPEN