Loading...
HomeMy WebLinkAbout20150250 Ver 1_401 Application_20150315-pou 11 - 0- _ 8 TERR TRANSPO aTtON PERM ►TYING UNfr i O�O� W ATF9OG E 20150250 Office Use Only Corps action ID no DWQ project no Form Version 1 4 January 2009 Page 1 of 10 PCN Form — Version 1 4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1 Processing la Type(s) of approval sought from the Corps 1Z Section 404 Permit El Section 10 Permit lb Specify Nationwide Permit (NWP) number 14 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the project located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ® No 1h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2 Project Information 2a Name of project Ardrey Kell Extension 2b County Mecklenburg 2c Nearest municipality / town Charlotte 2d Subdivision name 2e NCDOT only, T I P or state project no 3 Owner Information 3a Name(s) on Recorded Deed Marsh Mortgage Co 3b Deed Book and Page No 04404 -349, and 01849 -163 3c Responsible Party (for LLC if applicable) George Warren 3d Street address P O Box 3529 3e City, state, zip Charlotte, NC 28235 3f Telephone no 704- 602 -2086 3g Fax no 3h Email address Page 1 of 10 PCN Form — Version 1 4 January 2009 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other, specify 4b Name 4c Business name (if applicable) 4d Street address 4e City, state, zip 4f Telephone no 4g Fax no 4h Email address S. Agent/Consultant Information (if applicable) 5a Name Tamp Bandy 5b Business name (if applicable) Wetland and Natural Resource Consultants 5c Street address 4108 LB Propst Drive 5d City, state, zip Conover, NC 28613 5e Telephone no 828- 302 -3437 5f Fax no 5g Email address tamp @wetland - consultants com Page 2 of 10 PCN Form — Version 1 4 January 2009 B. Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) Parcel ID 23112797 & 23123101 lb Site coordinates (in decimal degrees) Latitude 035 058884 Longitude - 080 754866 1c Property size (right of way) 12 acres 2. Surface Waters 2a Name of nearest body of water to proposed project Six Mile Creek 2b Water Quality Classification of nearest receiving water C 2c River basin Catawba 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application The project area bounds are entirely forested with a duke power utility right of way and two sanitary sewer right of ways 3b List the total estimated acreage of all existing wetlands on the property no wetlands within Ardrey Kell Road Ext ROW 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property —300 If within Ardrey Kell Road Ext project area 3d Explain the purpose of the proposed project linear transportation project to extend an existing road further to connect a growing area to a mayor highway (NC -16 - Providence Road) Two separate NWP 14's are being requested, one fore each crossing 3e Describe the overall project in detail, including the type of equipment to be used Heavy earth moving equipment will be used to install two temporary crossings, then grade, shape and finish the proposed roadway Site 1 will include one 54" culvert impacting 98 2 linear feet, and Site 2 will include one 96" culvert impacting 105 linear feet 4. Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? ® preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) Agency /Consultant Company WNR Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation JD is attached SAW- 2014 -01305 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑ No ® Unknown 5b If yes, explain in detail according to "help file" instructions 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a Wetland impact number Permanent (P) or Temporary T 2b Type of impact 2c Type of wetland (if known) 2d Forested 2e Type of jurisdiction Corps (404, 10) or DWQ (401, other) 2f Area of impact (acres) W1 - Choose one Choose one Yes /No - W2 - Choose one Choose one Yes /No - W3 - Choose one Choose one Yes /No - W4 - Choose one Choose one Yes /No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /No - 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a Stream impact number - Permanent (P) or Temporary (T) 3b Type of impact 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e Type of jurisdiction (Corps - 404, 10 DWQ — non -404, other) 3f Average stream width (feet) 3g Impact length (linear feet) S1 T Other (Type In) Site 1 PER Corps 6 12 S2 P Culvert Site 1 PER Corps 6 982 S3 T Other (Type In) Site 2 PER Corps 10 12 S4 P Culvert Site 2 PER Corps 10 105 S5 - Choose one - - S6 - Choose one - - 3h Total stream and tributary impacts 203 2 If 31 Comments Page 4 of 10 PCN Form — Version 1 4 January 2009 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, then complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer impact number — Permanent (P) or Temporary (T) 6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet 61 - Yes /No B2 - Yes /No B3 - Yes /No B4 - Yes /No B5 - Yes /No B6 - Yes /No 6h Total buffer impacts 61 Comments Page 5 of 10 PCN Form — Version 1 4 January 2009 D Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Stream crossings were aligned as perpendicular as possible to the streams to minimize impacts, and located downstream of a confluence to avoid another crossing 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Retaining walls are to be constructed along both sides of the proposed road to mimize impact lengths Culvert will be installed according to agency specifications and to allow for aquatic life passage Erosion control measuses will betaken to stabilize all disturbed areas 2 Compensatory Mitigation for Impacts to Waters of the U S. or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank E:1 Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4 Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan Page 6 of 10 PCN Form — Version 1 4 January 2009 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 7 of 10 PCN Form — Version 1 4 January 2009 E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1 b If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? >24% % 2b Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c If this project DOES NOT require a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan Engineer to provide SW plan for review through CDOT application process 2e Who will be responsible for the review of the Stormwater Management Plan? Charlotte - Mecklenburg Stormwater 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Charlotte - Mecklenburg 3b Which of the following locally - implemented stormwater management programs apply (check all that apply) ❑ Phase II ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 4 DWQ Stormwater Program Review 4a Which of the following state - implemented stormwater management programs apply (check all that apply) ❑ Coastal counties ❑ HQW ❑ ORW ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1 4 January 2009 F Supplementary Information 1 Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ® No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter ) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 9 of 10 PCN Form — Version 1 4 January 2009 5 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? 5c If yes, indicate the USFWS Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NCDENR Natural Heritage Program Map Viewer and GIS Layer 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitats ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? NCHPO GIS Service 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ❑ Yes ® No 8b If yes, explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determinations FEMA floodmaps GIS layer Tamp Bandy 1� 2/25/2015 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided Page 10 of 10 PCN Form — Version 1 4 January 2009 Corps Submittal Cover Sheet Please provide the following info 2 G i 5 0 2 5 0 1 Project Name Ardrey Kell Extension Project 2 Name of Property Owner /Applicant Marsh Realty Company 3 Name of Consultant /Agent Wetland and Natural Resource Consultants *Agent authorization needs to be attached 4 Related/Previous Action ID number(s) unknown 5 Site Address 3600 Tilley Morris Rd Charlotte, NC 6 Subdivision Name 7 City Charlotte 8 County Mecklenburg 9 Lat 3505532 Long -80 75822 (Decimal Degrees Please ) 10 Quadrangle Name Weddington 11 Waterway Sixmile Creek 12 Watershed Catawba River Basin (HUC 030501030203) 13 Requested Action. D X Nationwide Permit # 14 0 6 2015 General Permit # — DENR • bVATER RESOURCES Jurisdictional Determination Request TRANSPORTATION PERMITTING UNIT Pre- Application Request The following information will be completed by Corps office WE Prepare File Folder Assign number in ORM Authorzation Section 10 Project Descrptioi-/ Nature of Activity/ Project Purpose Site /Waters Name Keywords Section 404 Begin Date r � ^� v. a Wetland and Natural Resource Consultants, Inc February 23, 2015 USACE, Asheville Regulatory Field Office Attn: Mr. William Elliot 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 Re Ardrey Kell Road Extension Marsh Realty Company, Waverly Estates Charlotte, Mecklenburg County, North Carolina Mr. Elliot. This package is being submitted on behalf of Marsh Realty Company. With this submittal, we are seeking two separate Nationwide 14 Permits for two separate road crossings. The proposed project is an extension of Ardrey Kell Road, connecting from Hwy 16 to Tilley Morris Road. This segment of road is depicted on the local thoroughfare plan. While the project involves extension of an existing named public road, the proposed project construction is to be completely privately funded The two impact sites are referred to in this package as Site-1 (the western most crossing), and Site -2 (the eastern crossing) WNR completed a field delineation of the full tract that includes this project area in January of 2014 A JD request was submitted in June 2014, but has not yet been approved Included in this package are detail drawings and impact maps of the proposed project area. Please contact me if you have any questions, comments, or if you would like to conduct a site visit Respectfully submitted, Tamp Bandy mobile. 828 -302 -3437 email: tamp@a wetland- consultants.com Conover Office 4108 LB Propst Drive Conover, NC 28613 Phone 828 - 302 -3437 Department of the Army Wilmington District, Corps of Engineers PO Box 1890 Wilmington, North Carolina, 28402 -1890 -and- NC Division of Water Quality, WBSCPE Unit 512 North Salisbury Street Raleigh, North Carolina, 27604 Re Agent Authorization The undersigned, registered property owners of the noted property, do hereby authorize Wetland and Natural Resource Consultants to act on my behalf and take all actions necessary for the processing of this jurisdictional verification, permit or certification request and any and all standard and special conditions attached I /we reserve the right to accept or appeal all final, proffered actions, jurisdictional determinations, permits or certifications and any and all standard and special conditions attached Property Owner / Applicant M(�'�,5W ,,-� Ca0IP$N'I Contact Name CISC';' � C-tpt Street Address / PO Box I //2 ) ifAf2miFZ C0A" &40H& vac -yD.. STV YS-0 City, State, Zip Code c- WN440 =1 nil C ,? 9 ;1 Z 6, Phone /Fax Number (7vq) req-S30� / %�,) Sy3-6630 Protect Name Property Street Address (street address, city, State and pCo my and Tax PIN) Owner / Applicant Signature WJ"' 4 dmr. V. ?fV4I tnr' Date Hickory Office 1646 Machine Shop Road Hickory NC 28602 r, t 4 VIM. ARDREY DELL ROAD EXT'ENSI ®N ARDREY DELL ROAD - SR 3632 CHARLOT'T'E, NC 28217 PARCEL ID # 23112797 & 23123101 LIST OF DRAWINGS ROADWAY R10 COVER SHEET R11 GENERAL NOTES R2 0 TYPICAL SECTIONS R30 DRAINAGE SUMMARY R4 0 R4 6 PLAN SHEETS R5 0-R5 PROF LE SHEETS RB O R6 5 EROSION CONTROL R7 0 R7 3 TRAFFIC CONTROL PAVEMENT MARKINGS d SIGNING RS 0 RB 19 CROSS SECTIONS lim SITE LOCATION MAP 1 i �lU� d I SITE igey MO^sFtl LOCATION MAP SCALE 1 .1000 1 CONTACTS OWNER GEORGE WARREN MASH MORTGAGE CO P O BOX 75328 CHARLOTTE NC 28235 TELE (7(4) 602 2086 E MAIL GWARRENCMARSHASSOCIATES COM CIVIL ENGINEER TIICMAS W LAMBERT PE AMERICAN ENGINEERING ASSOCIATES SOUTHEAST PA 8008 CORPORATE CENTER DR SUITE 110 CHARLOTTE NC 28226 TCLE (704)375-2438 E-MAIL 11— bCMU.— — oe com ZONING R 3 (CD) SEE RE ZONING PETITION 97 27(c) INCLUDING AMENDMENTS THE PROPOSED PROJECT IS WITHIN THE LIMITS OF THE CITY OF CHARLOTTE (ANNEXATION APPLICATION PEDING) 811PUTAMN fOR RGIBE N � Y'1 � b c'1 P, _ co co y g •N Ulp�••• �Od5,011- PQtMiT gPPLCd71bN uaoRC4non toc JCB XUUBBt tIBp1,B, LBBECU(b BY � M uxLB I m B.rt me /Is ,wt a. nw z bD a Q L U v,A W ® �E� EXHIBITS COVER SHEET v¢u ENV1.0 SUMMARY STREAM IMPACTS PERM. ROADWAY BANK 3TABILIZ. TEMP. UTILITY SITE 1 98.2 LF 23.4 LF 12.0 LF SITE 2 105.0 LF 30.0 LF 12.0 LF 11M010pN w111NE N M1 rA v, HW 14 &TEi- � uomalnmw��rinrer � I' � d awr w i _�. .: --, .... :.:..., s::_a,.. ••s+r u.u•.u..euv++.+.. '�Y+t -* w •.ivx..•.0 ... w,, i..,.�.y...... y .... .. ...�.. ... _. 0' -L- ARDREY KELL RD. �xw.•.r .."�'i wwe .. . I p w� e1r 1 FUTURE CASTELFORD RESIDENTIAL SUBDIVISION �', +� ( •.•,L 1wea.nrl 1 L I' mp f Is �rc W� srtE alal+ — 0 07 w DETAIL E RIP RAP AT EMBANKMENT INa'ie IP.nin; I1N.h 101ni T:1 G"°° PROP. MODULAR BLOCK GEOTENIILE RETAINING WALL TEMP. SW IMPACTS Tryi MM Ll.. 6 TONS, CL B ue.eop e.o.ell.- IB a PROP. HANDRAIL PROP. RIP RAP AT EMBANKMENT SEE DETAIL E LAT.'V' DITCH � SEE DETAIL D snuu+ .aa +w N y � N r•t - U \ x i HW � n b O - TT- 6' SIDEWALK Y. tt 8' PLANTING STRIP T o cy >' b U CB 5' BIKE LANE \ - —� -L- ARDREY KELL RD. n ; – 2' -6" C &G - - - Do 76f00 ° 0i EC R� F64 ©N2 PV' T WPPUCAD N nnn PERM. SW IMPACTS —� N o uoonu ron Loc _ CB 5' BIKE LANE 2' -6" C &G Ois /5 'RCP - ->• is O 8' PLANTING STRIP MH — 6' SIDEWALK CECxEO B•: M HW t4 HW \�7ROP. P \ wrE: iae /is < PROP. HANDRAIL WATER MAIN S V m ' Site 1 Impact Details: PROP.MODULAR BLOCK SS w v " M w 6 E Temporary Impact: RETAINING WALL PROP, RIP RAP AT EMBANKMENT •/ Q f 12 Linear Feet SEE DETAIL E Permanent impact: P ASSESSED JURISDICTIONAL / PERENNIAL RPW "S ExtiIBIT SITE t 98.2 Linear Feet (0.014 Acres) GAWK 5C� m o m m xEENV1.2 1 PROP. MODULAR BLOCK RETAINING WALL .<< 1 TEMP. Sly IMPACTS PROP. HANDRAIL PROP. RIP RAP LAT. 'V' DITCH AT EMBANKMENT SEE DETAIL D' SEE DETAIL E ,7 PROP.HANDRoi it PROP. WATRR MAIN P40P.iWOOLAR BLOCK': R&AfNI,NG,WAL4 PROP. RIP RAP AT EMBANKMENT SEE DETAIL E ASSESSED JURISDICTIONAL --� / PERENNIAL RPW'S �y awwnc rAE v 0 q 27 STREAMBANK STABLIZATION LAT.VDITCH PROP MODULAR BLOCK SEE DETAIL G., SEE DETAIL D RETAINING WALL LAT.VDITCH SEE DETAIL H PROP. HANDRAIL PROI 27 A' 6' SIDEWALK '�\ 8' PLANTING STRIP ao ARDREy KE -LL ROAD ACTS — . & 8' PLANTING STRIP 1<E LAN l5" RCP zt CB 6' SIDEWALK 15' MH 15' RCP PROP. WATER MAIN Hw PROP. HANDRAIL Hw E9 PROP. MODULAR BLOCK RETAINING WALL Site 2 Impact Details: STREAMBANK STABLIZATION Temporary Impact: SEE DETAIL G 12 Linear Feet ASSESSED JURISDICTIONAL PERENNIAL RPW'S Permanent impact: 105 Linear Feet (0.036 Acres) A- SNAPHIC Sr" * rim—M—W-0-4091. [*am on IL we Loruo EXHIBIT WE 2 ENV1.4 rye ? STREAMBANK STABL/ZATION LAT. 'V' DITCH PROP. MODULAR BLOCK SEE DETAIL � SEE DETAIL D RETAINING WALL CS LAT. V DITCH r _ SEE DETAIL H $ PROP. HANDRNL"'"" 27 HW F 6' SIDEWALK v H 8' PLANTINGS FP � ,�! \ •� y rul v CB 5 E LAN E a -� ``` sF oq Y 'L AIRDR CB x _ ELL_ ROAD a 6. _ _ in �6 5' E LANE I5" RCP 40 8' PLANTING TRIP i✓ _ s V :SIDEWALK /5•RCP _ t_ o in a 999 i� N s l5` RCP ' / /5• /+'CP Ce PROP WATER ,MAIN HW �e \ m •••a u••. PROP. HANDRAIL HW R 29 .aYn 11 bog PROP. MODULAR BLOCK a RETAINING WALL W C i STREAMBANK STABLIZATION 9 SEE DETAIL G �1 ASSESSED JURISDICTIONAL —1 ..... - ..... E>uNBR y PERENNIAL RPWS F " 311E Z awwn savr ,h d w M 0 CHESTNUT HILL DRIVE 7' ENb'AEY 85 �1` �. . 1 -L- f RDREY KELL jRD. t T910.9117 FEACE ( _ CASTLEFORq AVF, ASSESSF.P' JURISDICTIONAL — mrpwa �r^WT'V# WMANCE 1 r PERENNf4L RPW'S /IAA6�Ip s - le F4TURE CASTELFO�D RESIDENTIALrY SUBDIVISION1 o� Av r I I, I; gy m_ ID .- m —'u N fA M V •� 0.' u d � P. x s y sz 4& tm p MIIYpN Cltlp4l °EWm N R WM !M1 M 1Nt9.YMY Z m= Q L ■ v„ ■ �d Lu EROSION CONTROL PLAN PHASE i ENV2.1 1 LIMITS OF ROADWAY PROJECT rEBrP.RCCx txr cwecx.rrPE a �sraxaw3o2 mP.i --RXK MPE XdT SEarExr rnw.nPE e STaBD.16 W2 ("J F ... . .•' EtA ARUREY ...: OVEMENTS _ .... ..� SEE ION PLANS BBBBBBr^tr. ��, RIXM' Ix1ET SEDIMENT ►Ms1YPt 0 -L- ARDREY KELL CASTLEFOR AVE ASSESSED JURISDICTIONAL ' Y PERENNIAL RPW5 FUTURE CASTELFORD RESIDENTIALUW SUBDIVISION W x H �o 0 6 n � e C'' •e a'o J7 i z° tc T N V V i y V Q �N at rt x �r C ` +MM MOOxItlOgB LOG JOB xUBBP: GIgIA� cJrcaun Be n1 awii n: oA svac: rx asrz: vans uBSOBhw Z mi a 2 w' aW EROSwN coNrROL PLAN PHASE 2 ENV2.2 � 4F� iIM, IL I M`�411, M A. M ENG PROPOSED CLASSIFICATION D" fkKea Rd EA-- Ral%-..t Jog nt .P Phillips Rd Ci-.fi.=. Change MAJOR THOROUGHFARE Moore RdUntynDrOwsificationCharge i 16, 11 1,41 Harmony Church Rd Classificatio. Change J 18,2 Stevens RM Rd Classiftation Change January 18, 20 Pleasant Plaits Rd Classification Change January 18, 2 Trade St Classification Change- --j-sary — 1-8.26 WeddingtonRcCONWsificalton-Owie J--y 18.2006 Trade SlCla�Chan� 18, 2006 Wira� i .ir-tie. Change - _Jmxoy January 1 8. 2006 E Unh- St Classification Charge -.IaruWl 8. 2006 Metthe��Mnt KH Rd Classification Change jj�j��, 2 Ch-Vwt Ln Rearignmer! July lg, 2006 Recta River Rd/Shcpio� W.sj4jjWlgnmga;j—N-.lbar 15. Asbury Chapel Rd ReaNgnrneni�- November 15.2006 P�perdy Church Rd Reakgwent Mach 21. 2007 husks Rd Reafignment July 18, 2007 Sugar Creak Rd Connector Realignment September 19. 2 7 NE ��tj-.WR-d - - --a Jam-YI6,2608 -Fm-sperity Church Rd Est Riwjment November 19. 2 ChwchWft Rabg--rt- March 18, 2009 NC 73fkh�—Rd Rea-k-�—fg November pre�ur �RdF�ReaRgnment Ma"21,2012 Rd Realignment - — I..h 21. 2012 iIM, IL I M`�411, M A. M ENG PROPOSED CLASSIFICATION CLASS II MAJOR THOROUGHFARE ------- — MfNORTHOROUGIfFARE TN-MRCHANGF GRADE SEPARATFOX 0 RAILROAD 7� �l 1 N.rh T nSVat t THOROCGHFARES MUDE ROUTE I :LA.IS Fl MAJ0R'nH)R0ITGFtFARF-% A-1 a-