HomeMy WebLinkAboutNCC220658_NOT Closeout Documents_20230209SEDIMENTATION INSPECTION REPORT
New Hanover County
Engineering Department
230 Government Center Drive • Suite 160
Wilmington, North Carolina 28403
TELEPHONE (910)-798-7139
Beth E. Wetherill, C.P.E.S.C.
Soil Erosion Specialist
Email: bwetherill@nhcgov.com
Project Name & Location: Harris Teeter Fuel Center at Crossroads @
Grading Permit #: 46-17
Independence- 3836 Carolina Beach Road
Revision 3
Financially Responsible Party & Address: Harris Teeter Properties, LLC- 701 Crestdale Road, Matthews, NC
28105
Pictures: ❑ Yes ❑X No
Weather & Soil Conditions: Partly Cloudy, Dry conditions, 57F
Inspection Type: ElElElDate
Initial Periodic ® Final Complaint
Date or
Report Sent:
2 22
Contact Made With: N/A
Inspection report to be sent/given, including financially responsible party: Jacob Phares-
iphares@harristeeter.com , Peter Buskirk- pete.buskirk@gmail.com
Has this project been issued a NOV? ❑ Yes ❑X No
Potential NPDES violation? ❑ Yes ❑X No
Degree: Choose an item.
NPDES Type:
Is there offsite sediment? ❑ Yes ❑X No
Degree: Choose an item.
Location:
Part 1: Please take immediate corrective action for the following items within 7-10 days of this inspection for
the site to be in compliance with the Erosion and Sedimentation Control Ordinance:
❑X N/A
Part 2: Please take corrective action for the following items prior to next periodic inspection for the site to be
in compliance with the Erosion and Sedimentation Control Ordinance:
❑X N/A
Part 3: Additional Comments: Permanent ground cover sufficient to restrain erosion has been established. No
additional self -monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. The New Hanover County Land Disturbance Permit is now closed.
Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01)
must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at:
https:Hedocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded
as part of completing the NOT process.
Report by: Beth Furr
Date of Inspection: 12/16/2022
Others Present:
Bfurr@nhcgov.com
Pictures: N/A
Contact this office with any questions and/or comments about this report and/or project.